{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,21]],"date-time":"2026-04-21T21:55:36Z","timestamp":1776808536702,"version":"3.51.2"},"reference-count":52,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2020,6,15]],"date-time":"2020-06-15T00:00:00Z","timestamp":1592179200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,6,15]],"date-time":"2020-06-15T00:00:00Z","timestamp":1592179200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2021,2]]},"DOI":"10.1007\/s13198-020-01006-6","type":"journal-article","created":{"date-parts":[[2020,6,15]],"date-time":"2020-06-15T14:03:35Z","timestamp":1592229815000},"page":"44-52","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["Sustainable inventory policy for an imperfect production system with energy usage and volume agility"],"prefix":"10.1007","volume":"12","author":[{"given":"K. M.","family":"Kamna","sequence":"first","affiliation":[]},{"given":"Prerna","family":"Gautam","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6179-8376","authenticated-orcid":false,"given":"Chandra K.","family":"Jaggi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,6,15]]},"reference":[{"issue":"8","key":"1006_CR1","doi-asserted-by":"crossref","first-page":"1093","DOI":"10.1287\/mnsc.42.8.1093","volume":"42","author":"PL Abad","year":"1996","unstructured":"Abad PL (1996) Optimal pricing and lot-sizing under conditions of perishability and partial backordering. Manag Sci 42(8):1093\u20131104","journal-title":"Manag Sci"},{"issue":"1","key":"1006_CR2","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1016\/S0305-0548(99)00086-6","volume":"28","author":"PL Abad","year":"2001","unstructured":"Abad PL (2001) Optimal price and order size for a reseller under partial backordering. Comput Oper Res 28(1):53\u201365","journal-title":"Comput Oper Res"},{"issue":"2","key":"1006_CR3","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/S0925-5273(02)00142-1","volume":"83","author":"PL Abad","year":"2003","unstructured":"Abad PL, Jaggi CK (2003) A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive. Int J Prod Econ 83(2):115\u2013122","journal-title":"Int J Prod Econ"},{"key":"1006_CR4","doi-asserted-by":"crossref","first-page":"106208","DOI":"10.1016\/j.cie.2019.106208","volume":"139","author":"AK Agrawal","year":"2020","unstructured":"Agrawal AK, Yadav S (2020) Price and profit structuring for single manufacturer multi-buyer integrated inventory supply chain under price-sensitive demand condition. Comput Ind Eng 139:106208","journal-title":"Comput Ind Eng"},{"key":"1006_CR5","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.ijpe.2018.11.008","volume":"208","author":"Q Bai","year":"2019","unstructured":"Bai Q, Jin M, Xu X (2019) Effects of carbon-emission reduction on supply chain coordination with vendor-managed deteriorating product inventory. Int J Prod Econ 208:83\u201399","journal-title":"Int J Prod Econ"},{"key":"1006_CR6","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1016\/j.cie.2016.08.021","volume":"101","author":"K Biel","year":"2016","unstructured":"Biel K, Glock CH (2016) Systematic literature review of decision support models for energy-efficient production planning. Comput Ind Eng 101:243\u2013259","journal-title":"Comput Ind Eng"},{"issue":"6\u20137","key":"1006_CR7","doi-asserted-by":"crossref","first-page":"667","DOI":"10.1016\/j.jclepro.2010.11.011","volume":"19","author":"K Bunse","year":"2011","unstructured":"Bunse K, Vodicka M, Sch\u00f6nsleben P, Br\u00fclhart M, Ernst FO (2011) Integrating energy efficiency performance in production management\u2014gap analysis between industrial needs and scientific literature. J Clean Prod 19(6\u20137):667\u2013679","journal-title":"J Clean Prod"},{"issue":"1","key":"1006_CR8","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.ejor.2004.05.003","volume":"168","author":"HJ Chang","year":"2006","unstructured":"Chang HJ, Teng JT, Ouyang LY, Dye CY (2006) Retailer\u2019s optimal pricing and lot-sizing policies for deteriorating items with partial backlogging. Eur J Oper Res 168(1):51\u201364","journal-title":"Eur J Oper Res"},{"issue":"1\u20132","key":"1006_CR9","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1007\/s10479-014-1547-0","volume":"241","author":"X Chao","year":"2016","unstructured":"Chao X, Gong X, Zheng S (2016) Optimal pricing and inventory policies with reliable and random-yield suppliers: characterization and comparison. Ann Oper Res 241(1\u20132):35\u201351","journal-title":"Ann Oper Res"},{"issue":"1","key":"1006_CR10","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1016\/j.ejor.2009.07.002","volume":"203","author":"H Chen","year":"2010","unstructured":"Chen H, Chen YF, Chiu CH, Choi TM, Sethi S (2010) Coordination mechanism for the supply chain with leadtime consideration and price-dependent demand. Eur J Oper Res 203(1):70\u201380","journal-title":"Eur J Oper Res"},{"key":"1006_CR11","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1016\/j.tre.2018.12.014","volume":"122","author":"Y Daryanto","year":"2019","unstructured":"Daryanto Y, Wee HM, Astanti RD (2019) Three-echelon supply chain model considering carbon emissions and item deterioration. Transp Res Part E Logist Transp Rev 122:368\u2013383","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"2","key":"1006_CR12","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1504\/IJOR.2015.067342","volume":"22","author":"H Dem","year":"2015","unstructured":"Dem H, Singh SR (2015) Joint replenishment modelling of a multi-item system with greening policy and volume flexibility. Int J Oper Res 22(2):148\u2013166","journal-title":"Int J Oper Res"},{"issue":"1","key":"1006_CR13","first-page":"127","volume":"5","author":"H Dem","year":"2014","unstructured":"Dem H, Singh S, Kumar J (2014) An EPQ model with trapezoidal demand under volume flexibility. Int J Ind Eng Comput 5(1):127\u2013138","journal-title":"Int J Ind Eng Comput"},{"issue":"6","key":"1006_CR14","doi-asserted-by":"crossref","first-page":"1006","DOI":"10.1111\/poms.12523","volume":"25","author":"DF Drake","year":"2016","unstructured":"Drake DF, Kleindorfer PR, Van Wassenhove LN (2016) Technology choice and capacity portfolios under emissions regulation. Prod Oper Manag 25(6):1006\u20131025","journal-title":"Prod Oper Manag"},{"issue":"2","key":"1006_CR15","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1016\/j.omega.2005.05.002","volume":"35","author":"CY Dye","year":"2007","unstructured":"Dye CY (2007) Joint pricing and ordering policy for a deteriorating inventory with partial backlogging. Omega 35(2):184\u2013189","journal-title":"Omega"},{"issue":"3","key":"1006_CR16","doi-asserted-by":"crossref","first-page":"271","DOI":"10.5267\/j.uscm.2017.11.003","volume":"6","author":"P Gautam","year":"2018","unstructured":"Gautam P, Khanna A (2018) An imperfect production inventory model with setup cost reduction and carbon emission for an integrated supply chain. Uncertain Supply Chain Manag 6(3):271\u2013286","journal-title":"Uncertain Supply Chain Manag"},{"key":"1006_CR17","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.jclepro.2019.06.005","volume":"233","author":"P Gautam","year":"2019","unstructured":"Gautam P, Kishore A, Khanna A, Jaggi CK (2019) Strategic defect management for a sustainable green supply chain. J Clean Prod 233:226\u2013241","journal-title":"J Clean Prod"},{"key":"1006_CR18","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1016\/j.ejor.2006.09.062","volume":"183","author":"BC Giri","year":"2007","unstructured":"Giri BC, Dohi T (2007) Inspection scheduling for imperfect production processes under free repair warranty contract. Eur J Oper Res 183:238\u2013252","journal-title":"Eur J Oper Res"},{"key":"1006_CR19","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(93)90085-2","volume":"69","author":"SK Goyal","year":"1993","unstructured":"Goyal SK, Gunasekaran A, Martikainen T, Yli-Olli P (1993) Integrating production and quality control policies: a survey. Eur J Oper Res 69:1\u201313","journal-title":"Eur J Oper Res"},{"key":"1006_CR20","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1016\/0377-2217(94)00276-2","volume":"89","author":"H Gurnani","year":"1996","unstructured":"Gurnani H, Drezner Z, Akella R (1996) Capacity planning under different inspection strategies. Eur J Oper Res 89:302\u2013312","journal-title":"Eur J Oper Res"},{"key":"1006_CR21","unstructured":"Gutowski T, Dahmus J, Thiriez A (2006) Electrical energy requirements for manufacturing processes. In: 13th CIRP international conference on life cycle engineering, vol 31(1). CIRP International Leuven, Belgium, pp 623\u2013638"},{"key":"1006_CR22","doi-asserted-by":"crossref","first-page":"106207","DOI":"10.1016\/j.cie.2019.106207","volume":"139","author":"YS Huang","year":"2020","unstructured":"Huang YS, Fang CC, Lin YA (2020) Inventory management in supply chains with consideration of logistics, green investment and different carbon emissions policies. Comput Ind Eng 139:106207","journal-title":"Comput Ind Eng"},{"issue":"2","key":"1006_CR24","first-page":"110","volume":"2","author":"A Khanna","year":"2017","unstructured":"Khanna A, Gautam P, Jaggi CK (2017) Inventory modeling for deteriorating imperfect quality items with selling price dependent demand and shortage backordering under credit financing. Int J Math Eng Manag Sci 2(2):110\u2013124","journal-title":"Int J Math Eng Manag Sci"},{"key":"1006_CR25","first-page":"4","volume":"13","author":"UK Khedlekar","year":"2018","unstructured":"Khedlekar UK, Tiwari RK (2018) Imperfect production model for sensitive demand with shortage. Reliab Theory Appl 13:4\u201351","journal-title":"Reliab Theory Appl"},{"issue":"5","key":"1006_CR26","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1016\/0305-0548(94)00032-4","volume":"22","author":"M Khouja","year":"1995","unstructured":"Khouja M (1995) The economic production lot size model under volume flexibility. Comput Oper Res 22(5):515\u2013523","journal-title":"Comput Oper Res"},{"issue":"1","key":"1006_CR27","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/S0925-5273(96)00064-3","volume":"48","author":"M Khouja","year":"1997","unstructured":"Khouja M (1997) The scheduling of economic lot sizes on volume flexible production systems. Int J Prod Econ 48(1):73\u201386","journal-title":"Int J Prod Econ"},{"issue":"12","key":"1006_CR28","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1057\/jors.1994.217","volume":"45","author":"M Khouja","year":"1994","unstructured":"Khouja M, Mehrez A (1994) Economic production lot size model with variable production rate and imperfect quality. J Oper Res Soc 45(12):1405\u20131417","journal-title":"J Oper Res Soc"},{"issue":"1","key":"1006_CR29","doi-asserted-by":"crossref","first-page":"101594","DOI":"10.1016\/j.jsis.2020.101594","volume":"29","author":"NCA Lee","year":"2020","unstructured":"Lee NCA, Wang ET, Grover V (2020) IOS drivers of manufacturer-supplier flexibility and manufacturer agility. J Strateg Inf Syst 29(1):101594","journal-title":"J Strateg Inf Syst"},{"key":"1006_CR30","doi-asserted-by":"crossref","first-page":"724","DOI":"10.1016\/j.mcm.2010.04.024","volume":"52","author":"WN Ma","year":"2010","unstructured":"Ma WN, Gong DC, Lin GC (2010) An optimal common production cycle time for imperfect production processes with scrap. Math Comput Model 52:724\u2013737","journal-title":"Math Comput Model"},{"issue":"4","key":"1006_CR31","doi-asserted-by":"crossref","first-page":"858","DOI":"10.3390\/en11040858","volume":"11","author":"B Marchi","year":"2018","unstructured":"Marchi B, Zanoni S, Ferretti I, Zavanella L (2018) Stimulating investments in energy efficiency through supply chain integration. Energies 11(4):858","journal-title":"Energies"},{"key":"1006_CR32","doi-asserted-by":"crossref","first-page":"502","DOI":"10.1016\/j.cie.2019.02.009","volume":"129","author":"B Marchi","year":"2019","unstructured":"Marchi B, Zanoni S, Jaber MY (2019a) Economic production quantity model with learning in production, quality, reliability and energy efficiency. Comput Ind Eng 129:502\u2013511","journal-title":"Comput Ind Eng"},{"key":"1006_CR33","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1016\/j.ijpe.2019.01.017","volume":"211","author":"B Marchi","year":"2019","unstructured":"Marchi B, Zanoni S, Zavanella LE, Jaber MY (2019b) Supply chain models with greenhouse gases emissions, energy usage, imperfect process under different coordination decisions. Int J Prod Econ 211:145\u2013153","journal-title":"Int J Prod Econ"},{"issue":"9\u201310","key":"1006_CR34","doi-asserted-by":"crossref","first-page":"2029","DOI":"10.1016\/j.mcm.2008.10.012","volume":"49","author":"J Mo","year":"2009","unstructured":"Mo J, Mi F, Zhou F, Pan H (2009) A note on an EOQ model with stock and price sensitive demand. Math Comput Model 49(9\u201310):2029\u20132036","journal-title":"Math Comput Model"},{"key":"1006_CR35","doi-asserted-by":"crossref","first-page":"3242","DOI":"10.1016\/j.apm.2015.09.095","volume":"40","author":"L Moussawi-Haidar","year":"2016","unstructured":"Moussawi-Haidar L, Salameh M, Nasr W (2016) Production lot sizing with quality screening and rework. Appl Math Model 40:3242\u20133256","journal-title":"Appl Math Model"},{"key":"1006_CR36","doi-asserted-by":"publisher","DOI":"10.1016\/j.asej.2020.03.004","author":"AH Nobil","year":"2020","unstructured":"Nobil AH, Sedigh AHA, C\u00e1rdenas-Barr\u00f3n LE (2020) Reorder point for the EOQ inventory model with imperfect quality items. Ain Shams Eng J. https:\/\/doi.org\/10.1016\/j.asej.2020.03.004","journal-title":"Ain Shams Eng J"},{"issue":"2","key":"1006_CR37","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/S0925-5273(98)00240-0","volume":"65","author":"H Polatoglu","year":"2000","unstructured":"Polatoglu H, Sahin I (2000) Optimal procurement policies underprice-dependent demand. Int J Prod Econ 65(2):141\u2013171","journal-title":"Int J Prod Econ"},{"issue":"4","key":"1006_CR38","first-page":"309","volume":"76","author":"S Sana","year":"2006","unstructured":"Sana S, Chaudhuri KS (2006) On a volume flexible stock-dependent inventory model. Proc-Natl Acad Sci India Sect A 76(4):309","journal-title":"Proc-Natl Acad Sci India Sect A"},{"issue":"1","key":"1006_CR39","first-page":"57","volume":"6","author":"S Sana","year":"2004","unstructured":"Sana S, Chaudhuri KS, Mahavidyalaya B (2004) On a volume flexible production policy for a deteriorating item with time-dependent demand and shortages. Adv Model Optim 6(1):57\u201374","journal-title":"Adv Model Optim"},{"issue":"1","key":"1006_CR40","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1504\/IJOR.2007.011444","volume":"2","author":"SS Sana","year":"2007","unstructured":"Sana SS, Goyal SK, Chaudhuri K (2007) On a volume flexible inventory model for items with an imperfect production system. Int J Oper Res 2(1):64\u201380","journal-title":"Int J Oper Res"},{"key":"1006_CR41","doi-asserted-by":"crossref","unstructured":"Sangal I, Gupta V (2016) Vendor-supplier cooperative inventory model with two warehouse and variable demand rate under the environment of volume agility. In: Proceedings of fifth international conference on soft computing for problem solving. Springer, Singapore, pp 109\u2013123","DOI":"10.1007\/978-981-10-0451-3_12"},{"key":"1006_CR42","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.tre.2016.03.018","volume":"91","author":"B Sarkar","year":"2016","unstructured":"Sarkar B, Ganguly B, Sarkar M, Pareek S (2016) Effect of variable transportation and carbon emission in a three-echelon supply chain model. Transp Res Part E Logist Transp Rev 91:112\u2013128","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"4","key":"1006_CR43","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/BF00186471","volume":"2","author":"AK Sethi","year":"1990","unstructured":"Sethi AK, Sethi SP (1990) Flexibility in manufacturing: a survey. Int J Flex Manuf Syst 2(4):289\u2013328","journal-title":"Int J Flex Manuf Syst"},{"issue":"1","key":"1006_CR44","doi-asserted-by":"crossref","first-page":"1012989","DOI":"10.1080\/23311916.2015.1012989","volume":"2","author":"NH Shah","year":"2015","unstructured":"Shah NH (2015) Manufacturer-retailer inventory model for deteriorating items with price-sensitive credit-linked demand under two-level trade credit financing and profit-sharing contract. Cogent Eng 2(1):1012989","journal-title":"Cogent Eng"},{"issue":"2","key":"1006_CR45","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1080\/02331934.2011.590485","volume":"61","author":"J Shi","year":"2012","unstructured":"Shi J, Zhang G, Lai KK (2012a) Optimal ordering and pricing policy with supplier quantity discounts and price-dependent stochastic demand. Optimization 61(2):151\u2013162","journal-title":"Optimization"},{"key":"1006_CR46","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.egypro.2012.01.022","volume":"16","author":"Y Shi","year":"2012","unstructured":"Shi Y, Chen L, Liu Z, Yan J, Hu J (2012b) Analysis on the carbon emission reduction potential in the cement industry in terms of technology diffusion and structural adjustment: a case study of Chongqing. Energy Procedia 16:121\u2013130","journal-title":"Energy Procedia"},{"issue":"1","key":"1006_CR47","first-page":"61","volume":"7","author":"SR Singh","year":"2010","unstructured":"Singh SR (2010) Supply chain models with imperfect production process and volume flexibility under inflation. IUP J Supply Chain Manag 7(1):61\u201376","journal-title":"IUP J Supply Chain Manag"},{"issue":"23","key":"1006_CR48","first-page":"1","volume":"72","author":"SR Singh","year":"2013","unstructured":"Singh SR, Gupta V, Bansal P (2013) EOQ model with volume agility, variable demand rate, Weibull deterioration rate and inflation. Int J Comput Appl 72(23):1\u20136","journal-title":"Int J Comput Appl"},{"issue":"4","key":"1006_CR49","doi-asserted-by":"crossref","first-page":"945","DOI":"10.1016\/j.cie.2010.09.005","volume":"59","author":"S Sinha","year":"2010","unstructured":"Sinha S, Sarmah SP (2010) Single-vendor multi-buyer discount pricing model under stochastic demand environment. Comput Ind Eng 59(4):945\u2013953","journal-title":"Comput Ind Eng"},{"key":"1006_CR50","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/0377-2217(91)90334-R","volume":"52","author":"CS Tang","year":"1991","unstructured":"Tang CS (1991) Designing an optimal production system with inspection. Eur J Oper Res 52:45\u201354","journal-title":"Eur J Oper Res"},{"issue":"11","key":"1006_CR51","doi-asserted-by":"crossref","first-page":"3562","DOI":"10.1016\/j.cor.2007.01.024","volume":"35","author":"YC Tsao","year":"2008","unstructured":"Tsao YC, Sheen GJ (2008) Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments. Comput Oper Res 35(11):3562\u20133580","journal-title":"Comput Oper Res"},{"issue":"7","key":"1006_CR52","doi-asserted-by":"crossref","first-page":"870","DOI":"10.1057\/palgrave.jors.2601905","volume":"56","author":"PS You","year":"2005","unstructured":"You PS (2005) Inventory policy for products with price and time-dependent demands. J Oper Res Soc 56(7):870\u2013873","journal-title":"J Oper Res Soc"},{"issue":"4","key":"1006_CR53","doi-asserted-by":"crossref","first-page":"490","DOI":"10.1016\/j.camwa.2007.01.026","volume":"54","author":"PS You","year":"2007","unstructured":"You PS, Chen TC (2007) Dynamic pricing of seasonal goods with spot and forward purchase demands. Comput Math Appl 54(4):490\u2013498","journal-title":"Comput Math Appl"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-020-01006-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-020-01006-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-020-01006-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,6,14]],"date-time":"2021-06-14T23:45:02Z","timestamp":1623714302000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-020-01006-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6,15]]},"references-count":52,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2021,2]]}},"alternative-id":["1006"],"URL":"https:\/\/doi.org\/10.1007\/s13198-020-01006-6","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,6,15]]},"assertion":[{"value":"20 April 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"5 June 2020","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 June 2020","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}