{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,12]],"date-time":"2026-03-12T15:37:01Z","timestamp":1773329821206,"version":"3.50.1"},"reference-count":56,"publisher":"Springer Science and Business Media LLC","issue":"S2","license":[{"start":{"date-parts":[[2020,6,26]],"date-time":"2020-06-26T00:00:00Z","timestamp":1593129600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,6,26]],"date-time":"2020-06-26T00:00:00Z","timestamp":1593129600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2020,7]]},"DOI":"10.1007\/s13198-020-01012-8","type":"journal-article","created":{"date-parts":[[2020,6,26]],"date-time":"2020-06-26T04:37:15Z","timestamp":1593146235000},"page":"239-246","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Three reliability models of a building cable manufacturing plant: a comparative analysis"],"prefix":"10.1007","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8845-8742","authenticated-orcid":false,"given":"S. Z.","family":"Taj","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. M.","family":"Rizwan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B. M.","family":"Alkali","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"D. K.","family":"Harrison","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"G.","family":"Taneja","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,6,26]]},"reference":[{"issue":"20","key":"1012_CR1","first-page":"9697","volume":"12","author":"N Adlakha","year":"2017","unstructured":"Adlakha N, Taneja G, Shilpi B (2017) Reliability and cost-benefit analysis of a two-unit cold standby system used for communication through satellite with assembling and activation time. Int J Appl Eng Res 12(20):9697\u20139702","journal-title":"Int J Appl Eng Res"},{"issue":"2","key":"1012_CR2","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1007\/s13198-016-0445-z","volume":"8","author":"R Bhardwaj","year":"2017","unstructured":"Bhardwaj R, Kaur K, Malik S (2017) Reliability indices of a redundant system with standby failure and arbitrary distribution for repair and replacement times. Int J Syst Assur Eng Manag 8(2):423\u2013431","journal-title":"Int J Syst Assur Eng Manag"},{"key":"1012_CR3","volume-title":"Markov processes for stochastic modelling","author":"O Ibe","year":"2008","unstructured":"Ibe O (2008) Markov processes for stochastic modelling. Academic Press, London"},{"issue":"1","key":"1012_CR4","doi-asserted-by":"crossref","first-page":"77","DOI":"10.15415\/mjis.2013.21006","volume":"2","author":"R Malhotra","year":"2013","unstructured":"Malhotra R, Taneja G (2013) Reliability and availability analysis of a single unit system with varying demand. Math J Interdiscip Sci 2(1):77\u201388","journal-title":"Math J Interdiscip Sci"},{"key":"1012_CR5","doi-asserted-by":"publisher","DOI":"10.1155\/2014\/896379","author":"R Malhotra","year":"2014","unstructured":"Malhotra R, Taneja G (2014) Stochastic analysis of a two-unit cold standby system wherein both units may become operative depending upon the demand. J Qual Reliab Eng. https:\/\/doi.org\/10.1155\/2014\/896379","journal-title":"J Qual Reliab Eng"},{"issue":"10","key":"1012_CR6","first-page":"179","volume":"9","author":"R Malhotra","year":"2015","unstructured":"Malhotra R, Taneja G (2015a) Comparative analysis of two stochastic models subjected to inspection and scheduled maintenance. Int J Softw Eng Its Appl 9(10):179\u2013188","journal-title":"Int J Softw Eng Its Appl"},{"key":"1012_CR7","doi-asserted-by":"publisher","DOI":"10.1186\/s40064-015-1484-7","author":"R Malhotra","year":"2015","unstructured":"Malhotra R, Taneja G (2015b) Comparative study between a single unit system and a two-unit cold standby system with varying demand. SpringerPlus. https:\/\/doi.org\/10.1186\/s40064-015-1484-7","journal-title":"SpringerPlus"},{"key":"1012_CR8","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP (2009a) MTSF and availability of a two unit CC plant. In: International conference on modelling, simulation, and applied optimization, Sharjah, UAE"},{"issue":"1","key":"1012_CR9","first-page":"25","volume":"5","author":"AG Mathew","year":"2009","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2009b) Profit evaluation of a single unit CC plant with scheduled maintenance. Caled J Eng 5(1):25\u201333","journal-title":"Caled J Eng"},{"key":"1012_CR10","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2009c) Optimization of a single unit CC plant with scheduled maintenance policy. In: International conference on recent advances in material processing technology, India"},{"key":"1012_CR11","doi-asserted-by":"crossref","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2010a) Comparative analysis between profits of the two models of a CC plant. In: International conference on modelling, optimization and computing, India","DOI":"10.1063\/1.3516306"},{"issue":"3","key":"1012_CR12","first-page":"197","volume":"5","author":"AG Mathew","year":"2010","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2010b) Reliability modelling and analysis of a two unit parallel CC plant with different installed capacities. J Manuf Eng 5(3):197\u2013204","journal-title":"J Manuf Eng"},{"issue":"7","key":"1012_CR13","doi-asserted-by":"crossref","first-page":"1488","DOI":"10.1016\/j.jfranklin.2010.04.016","volume":"348","author":"AG Mathew","year":"2011","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP (2011a) Reliability modelling and analysis of a two unit continuous casting plant. J Frankl Inst 348(7):1488\u20131505","journal-title":"J Frankl Inst"},{"issue":"2","key":"1012_CR14","first-page":"179","volume":"7","author":"AG Mathew","year":"2011","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2011b) Reliability analysis of identical two-unit parallel CC plant system operative with full installed capacity. Int J Perform Eng 7(2):179\u2013185","journal-title":"Int J Perform Eng"},{"issue":"3","key":"1012_CR15","doi-asserted-by":"crossref","first-page":"542","DOI":"10.1007\/s13198-016-0553-9","volume":"8","author":"S Mortazavi","year":"2017","unstructured":"Mortazavi S, Karbasian M, Goli S (2017) Evaluating MTTF of 2-out-of-3 redundant systems with common cause failure and load share based on alpha factor and capacity flow models. Int J Syst Assur Eng Manag 8(3):542\u2013552","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"1012_CR16","first-page":"499","volume":"15","author":"A Naithani","year":"2013","unstructured":"Naithani A, Parashar B, Bhatia P, Taneja G (2013) Cost benefit analysis of a 2-out-of-3 induced draft fans system with priority for operation to cold standby over working at reduced capacity. Adv Model Optim 15(2):499\u2013509","journal-title":"Adv Model Optim"},{"issue":"S2","key":"1012_CR17","doi-asserted-by":"crossref","first-page":"1383","DOI":"10.1007\/s13198-017-0608-6","volume":"8","author":"A Naithani","year":"2017","unstructured":"Naithani A, Parashar B, Bhatia P, Taneja G (2017) Probabilistic analysis of a 3-unit induced draft fan system with one warm standby with priority to repair of the unit in working state. Int J Syst Assur Eng Manag 8(S2):1383\u20131391","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"1012_CR18","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1007\/s13198-015-0362-6","volume":"7","author":"R Niwas","year":"2016","unstructured":"Niwas R, Kadyan M, Kumar J (2016) MTSF (mean time to system failure) and profit analysis of a single-unit system with inspection for feasibility of repair beyond warranty. Int J Syst Assur Eng Manag 7(1):198\u2013204","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"1012_CR19","first-page":"1","volume":"4","author":"N Padmavathi","year":"2012","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2012) Reliability analysis of an evaporator of a desalination plant with online repair and emergency shutdowns. Aryabhatta J Math Inf 4(1):1\u201312","journal-title":"Aryabhatta J Math Inf"},{"key":"1012_CR20","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2013a) Comparative analysis of the two models of an evaporator of a desalination plant. In: International conference on information and mathematical science, India"},{"issue":"1","key":"1012_CR21","first-page":"1","volume":"4","author":"N Padmavathi","year":"2013","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2013b) Probabilistic analysis of an evaporator of a desalination plant with priority for repair over maintenance. Int J Sci Stat Comput 4(1):1\u20138","journal-title":"Int J Sci Stat Comput"},{"issue":"1","key":"1012_CR22","first-page":"15","volume":"5","author":"N Padmavathi","year":"2014","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2014a) Probabilistic analysis of a desalination plant with major and minor failures and shutdown during winter season. Int J Sci Stat Comput 5(1):15\u201323","journal-title":"Int J Sci Stat Comput"},{"issue":"1","key":"1012_CR23","first-page":"219","volume":"6","author":"N Padmavathi","year":"2014","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2014b) Probabilistic analysis of a seven unit desalination plant with minor\/major failures and priority given to repair over maintenance. Aryabhatta J Math Inf 6(1):219\u2013230","journal-title":"Aryabhatta J Math Inf"},{"issue":"12","key":"1012_CR24","first-page":"1","volume":"1","author":"N Padmavathi","year":"2015","unstructured":"Padmavathi N, Rizwan SM, Senguttuvan A (2015) Comparative analysis between the reliability models portraying two operating conditions of a desalination plant. Int J Core Eng Manag 1(12):1\u201310","journal-title":"Int J Core Eng Manag"},{"issue":"3","key":"1012_CR25","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1109\/TR.2007.903151","volume":"56","author":"B Parashar","year":"2007","unstructured":"Parashar B, Taneja G (2007) Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities. IEEE Trans Reliab 56(3):534\u2013539","journal-title":"IEEE Trans Reliab"},{"issue":"2","key":"1012_CR26","first-page":"1","volume":"3","author":"SM Rizwan","year":"2007","unstructured":"Rizwan SM (2007) Reliability analysis of a two unit system with two repairmen. Caled J Eng 3(2):1\u20135","journal-title":"Caled J Eng"},{"issue":"1","key":"1012_CR27","first-page":"133","volume":"2","author":"SM Rizwan","year":"2015","unstructured":"Rizwan SM, Mathew AG (2015) Performance analysis of port cranes. Int J Core Eng Manag 2(1):133\u2013140","journal-title":"Int J Core Eng Manag"},{"issue":"1\/2","key":"1012_CR28","first-page":"7","volume":"52","author":"SM Rizwan","year":"2000","unstructured":"Rizwan SM, Taneja G (2000) Profit analysis of a system with perfect repair at partial failure or complete failure. Pure Appl Math Sci 52(1\/2):7\u201314","journal-title":"Pure Appl Math Sci"},{"issue":"2","key":"1012_CR29","first-page":"21","volume":"3","author":"SM Rizwan","year":"2014","unstructured":"Rizwan SM, Thanikal JV (2014) Reliability analysis of a waste water treatment plant with inspection. i-Manager\u2019s\u00a0J Math 3(2):21\u201326","journal-title":"i-Manager\u2019s\u00a0J Math"},{"issue":"1\u20133","key":"1012_CR30","first-page":"27","volume":"5","author":"SM Rizwan","year":"2000","unstructured":"Rizwan SM, Taneja G, Tuteja RK (2000) Comparative study between the profits of two models for a two unit system with rest period of repairman. J Decis Math Sci 5(1\u20133):27\u201344","journal-title":"J Decis Math Sci"},{"issue":"2","key":"1012_CR31","first-page":"81","volume":"10","author":"SM Rizwan","year":"2005","unstructured":"Rizwan SM, Chauhan H, Taneja G (2005a) Stochastic analysis of systems with accident and inspection. Emir J Eng Res 10(2):81\u201387","journal-title":"Emir J Eng Res"},{"key":"1012_CR32","unstructured":"Rizwan SM, Khurana V, Taneja G (2005b) Reliability modelling of a hot standby PLC system. In: International conference on communication, computer and power, Sultanate of Oman"},{"issue":"4","key":"1012_CR33","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1080\/02286203.2007.11442438","volume":"27","author":"SM Rizwan","year":"2007","unstructured":"Rizwan SM, Khurana V, Taneja G (2007) Modelling and optimization of a single-unit PLC system. Int J Model Simul 27(4):361\u2013368","journal-title":"Int J Model Simul"},{"issue":"3","key":"1012_CR34","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1080\/02286203.2010.11442586","volume":"30","author":"SM Rizwan","year":"2010","unstructured":"Rizwan SM, Khurana V, Taneja G (2010) Reliability analysis of a hot standby industrial system. Int J Model Simul 30(3):315\u2013322","journal-title":"Int J Model Simul"},{"issue":"5","key":"1012_CR35","first-page":"523","volume":"9","author":"SM Rizwan","year":"2013","unstructured":"Rizwan SM, Padmavathi N, Pal A, Taneja G (2013) Reliability analysis of a seven unit desalination plant with shutdown during winter season and repair\/maintenance on FCFS basis. Int J Perform Eng 9(5):523\u2013528","journal-title":"Int J Perform Eng"},{"issue":"3","key":"1012_CR36","first-page":"3","volume":"17","author":"SM Rizwan","year":"2014","unstructured":"Rizwan SM, Thanikal JV, Torrijos M (2014) A general model for reliability analysis of a domestic waste water treatment plant. Int J Cond Monit Diagn Eng Manag 17(3):3\u20136","journal-title":"Int J Cond Monit Diagn Eng Manag"},{"issue":"1","key":"1012_CR37","first-page":"195","volume":"7","author":"SM Rizwan","year":"2015","unstructured":"Rizwan SM, Padmavathi N, Taneja G (2015a) Performance analysis of a desalination plant as a single unit with mandatory shutdown during winter. Aryabhatta J Math Inf 7(1):195\u2013202","journal-title":"Aryabhatta J Math Inf"},{"issue":"24","key":"1012_CR38","first-page":"44075","volume":"10","author":"SM Rizwan","year":"2015","unstructured":"Rizwan SM, Thanikal JV, Padmavathi N, Yazidi H (2015b) Reliability and availability analysis of an anaerobic batch reactor treating fruit and vegetable waste. Int J Appl Eng Res 10(24):44075\u201344079","journal-title":"Int J Appl Eng Res"},{"issue":"1188","key":"1012_CR39","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1098\/rspa.1955.0198","volume":"232","author":"WL Smith","year":"1955","unstructured":"Smith WL (1955) Regenerative stochastic processes. Proc R Soc Lond A 232(1188):6\u201331","journal-title":"Proc R Soc Lond A"},{"key":"1012_CR40","doi-asserted-by":"crossref","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2017a) Reliability modelling and analysis of a single machine subsystem of a cable plant. In: 7th International conference on modelling, simulation, and applied optimization, Sharjah, UAE","DOI":"10.1109\/ICMSAO.2017.7934917"},{"issue":"8","key":"1012_CR41","first-page":"1752","volume":"1","author":"SZ Taj","year":"2017","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2017b) Reliability analysis of a single machine subsystem of a cable plant with six maintenance categories. Int J Appl Eng Res 1(8):1752\u20131757","journal-title":"Int J Appl Eng Res"},{"issue":"3","key":"1012_CR42","doi-asserted-by":"crossref","first-page":"12","DOI":"10.26634\/jmat.6.3.13649","volume":"6","author":"SZ Taj","year":"2017","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2017c) Probabilistic modelling and analysis of a cable plant subsystem with priority to repair over preventive maintenance. i-Manager\u2019s J Math 6(3):12\u201321","journal-title":"i-Manager\u2019s J Math"},{"issue":"3.4","key":"1012_CR43","doi-asserted-by":"crossref","first-page":"243","DOI":"10.14419\/ijet.v7i3.4.16782","volume":"7","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2018a) Performance analysis of a rod breakdown system. Int J Eng Technol 7(3.4):243\u2013248","journal-title":"Int J Eng Technol"},{"issue":"6","key":"1012_CR44","first-page":"413","volume":"52","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2018b) Reliability analysis of a 3-unit subsystem of a cable plant. Adv Appl Stat 52(6):413\u2013429","journal-title":"Adv Appl Stat"},{"issue":"8","key":"1012_CR45","first-page":"814","volume":"9","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2018c) Performance and cost benefit analysis of a cable plant with storage of surplus produce. Int J Mech Eng Technol 9(8):814\u2013826","journal-title":"Int J Mech Eng Technol"},{"issue":"11","key":"1012_CR46","first-page":"370","volume":"9","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2018d) Profit analysis of a cable manufacturing plant portraying the winter operating strategy. Int J Mech Eng Technol 9(11):370\u2013381","journal-title":"Int J Mech Eng Technol"},{"issue":"3","key":"1012_CR47","doi-asserted-by":"crossref","first-page":"155","DOI":"10.3844\/jmssp.2013.155.160","volume":"9","author":"G Taneja","year":"2013","unstructured":"Taneja G, Malhotra R (2013) Cost-benefit analysis of a single unit system with scheduled maintenance and variation in demand. J Math Stat 9(3):155\u2013160","journal-title":"J Math Stat"},{"issue":"1\/2","key":"1012_CR48","first-page":"131","volume":"35","author":"G Taneja","year":"1992","unstructured":"Taneja G, Rizwan SM, Kumar R (1992) Profit analysis of a system with perfect repair at partial failure and priority for repair to complete failed unit. Pure Appl Math Sci 35(1\/2):131\u2013141","journal-title":"Pure Appl Math Sci"},{"issue":"2","key":"1012_CR49","first-page":"305","volume":"8","author":"G Taneja","year":"2016","unstructured":"Taneja G, Malhotra R, Chitkara AK (2016) Comparative profit analysis of two reliability models with varying demand. Aryabhatta J Math Inf 8(2):305\u2013314","journal-title":"Aryabhatta J Math Inf"},{"issue":"10","key":"1012_CR50","first-page":"1353","volume":"32","author":"RK Tuteja","year":"1992","unstructured":"Tuteja RK, Taneja G (1992) Cost-benefit analysis of a two server, two unit, warm standby system with different types of failure. MicroelectronReliab 32(10):1353\u20131359","journal-title":"MicroelectronReliab"},{"key":"1012_CR51","unstructured":"Tuteja RK, Rizwan SM, Taneja G (1999) A two server system with regular repairman who is not always available. In: National symposium on management science and statistics\u2014applications to trade and industry, India"},{"issue":"1\u20134","key":"1012_CR52","first-page":"1","volume":"21","author":"RK Tuteja","year":"2000","unstructured":"Tuteja RK, Rizwan SM, Taneja G (2000) Profit evaluation of a two unit cold standby system with tiredness and two types of repairman. J Indian Soc Stat Oper Res 21(1\u20134):1\u201310","journal-title":"J Indian Soc Stat Oper Res"},{"issue":"16","key":"1012_CR53","first-page":"5616","volume":"12","author":"Yaqoob Al Rahbi","year":"2017","unstructured":"Yaqoob Al Rahbi, Rizwan SM, Alkali BM, Cowell Andrew, Taneja G (2017a) Reliability analysis of rodding anode plant in aluminium industry. Int J Appl Eng Res 12(16):5616\u20135623","journal-title":"Int J Appl Eng Res"},{"key":"1012_CR54","doi-asserted-by":"crossref","unstructured":"Yaqoob Al Rahbi, Rizwan SM, Alkali BM, Andrew Cowell, Taneja G (2017b) Reliability analysis of a subsystem in aluminium plant. In: 6th International conference on reliability, infocom technologies and optimization, India","DOI":"10.1109\/ICRITO.2017.8342424"},{"issue":"4","key":"1012_CR55","first-page":"695","volume":"9","author":"Yaqoob Al Rahbi","year":"2018","unstructured":"Yaqoob Al Rahbi, Rizwan SM, Alkali BM, Cowell Andrew, Taneja G (2018a) Maintenance analysis of a butt thimble removal station in aluminium plant. Int J Mech Eng Technol 9(4):695\u2013703","journal-title":"Int J Mech Eng Technol"},{"issue":"5","key":"1012_CR56","first-page":"569","volume":"53","author":"Yaqoob Al Rahbi","year":"2018","unstructured":"Yaqoob Al Rahbi, Rizwan SM, Alkali BM, Cowell Andrew, Taneja G (2018b) Reliability analysis of rodding anode plant in an aluminum industry with multiple repairmen. Adv Appl Stat 53(5):569\u2013597","journal-title":"Adv Appl Stat"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-020-01012-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-020-01012-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-020-01012-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,6,26]],"date-time":"2021-06-26T00:09:36Z","timestamp":1624666176000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-020-01012-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6,26]]},"references-count":56,"journal-issue":{"issue":"S2","published-print":{"date-parts":[[2020,7]]}},"alternative-id":["1012"],"URL":"https:\/\/doi.org\/10.1007\/s13198-020-01012-8","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,6,26]]},"assertion":[{"value":"5 August 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 March 2020","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"26 June 2020","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}