{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T17:46:28Z","timestamp":1740159988136,"version":"3.37.3"},"reference-count":13,"publisher":"Springer Science and Business Media LLC","license":[{"start":{"date-parts":[[2021,4,22]],"date-time":"2021-04-22T00:00:00Z","timestamp":1619049600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,4,22]],"date-time":"2021-04-22T00:00:00Z","timestamp":1619049600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51808424 and 51478384"],"award-info":[{"award-number":["51808424 and 51478384"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"DOI":"10.1007\/s13198-021-01106-x","type":"journal-article","created":{"date-parts":[[2021,4,22]],"date-time":"2021-04-22T15:04:54Z","timestamp":1619103894000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["WBS-free scheduling method based on database relational model"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7442-4944","authenticated-orcid":false,"given":"Xiaokang","family":"Han","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,4,22]]},"reference":[{"issue":"2","key":"1106_CR1","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1007\/s10951-009-0143-7","volume":"14","author":"B Ashtiani","year":"2011","unstructured":"Ashtiani B, Aryanezhad L (2011) New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing. J Sched 14(2):157\u2013171. https:\/\/doi.org\/10.1007\/s10951-009-0143-7","journal-title":"J Sched"},{"issue":"5","key":"1106_CR2","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1007\/s10951-015-0416-2","volume":"18","author":"MA Bajestani","year":"2015","unstructured":"Bajestani MA, Beck JC (2015) A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines. J Sched 18(5):471\u2013486. https:\/\/doi.org\/10.1007\/s10951-015-0416-2","journal-title":"J Sched"},{"issue":"2","key":"1106_CR3","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1007\/s10951-010-0215-8","volume":"15","author":"Y Cai","year":"2012","unstructured":"Cai Y, Kutanoglu E, Qin HJ (2012) Single-machine scheduling with advanced process control constraints. J Sched 15(2):165\u2013179. https:\/\/doi.org\/10.1007\/s10951-010-0215-8","journal-title":"J Sched"},{"issue":"1","key":"1106_CR4","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1061\/(ASCE)0733-9364(2006)132:1(67)","volume":"132","author":"DK Chua","year":"2006","unstructured":"Chua DK, Godinot M (2006) Use of a wbs matrix to improve interface management in projects. J Const Eng Manag 132(1):67\u201379. https:\/\/doi.org\/10.1061\/(ASCE)0733-9364(2006)132:1(67)","journal-title":"J Const Eng Manag"},{"key":"1106_CR5","volume-title":"Theory of scheduling","author":"RW Conway","year":"1967","unstructured":"Conway RW, Maxwell WL, Miller A (1967) Theory of scheduling. Addison-Wesley Publishing Co., London"},{"key":"1106_CR6","volume-title":"Critical chain","author":"EM Goldratt","year":"1997","unstructured":"Goldratt EM (1997a) Critical chain. The North River Press, Great Barrington"},{"key":"1106_CR7","volume-title":"It\u2019s not luck","author":"EM Goldratt","year":"1997","unstructured":"Goldratt EM (1997b) It\u2019s not luck. The North River Press, Great Barrington"},{"key":"1106_CR10","unstructured":"O'Neil PE (1994) Database : principles programming performance. DBLP."},{"key":"1106_CR11","volume-title":"A guide to the project management body of knowledge (PMBOK\u00ae Guide)","author":"PMI","year":"2017","unstructured":"PMI (2017) A guide to the project management body of knowledge (PMBOK\u00ae Guide), 6th edn. Project Management Institute Inc., Pennsylvania","edition":"6"},{"key":"1106_CR12","volume-title":"Oracle primavera\u00ae P6 project management reference manual","author":"O Primavera","year":"2009","unstructured":"Primavera O (2009) Oracle primavera\u00ae P6 project management reference manual. Oracle, Redwood City"},{"key":"1106_CR13","doi-asserted-by":"publisher","first-page":"93","DOI":"10.2307\/2628369","volume":"16","author":"A Pritsker","year":"1969","unstructured":"Pritsker A, Wolfe WPM (1969) Multiproject scheduling with limited resources: a zero-one programming approach. Manag Sci 16:93\u2013108. https:\/\/doi.org\/10.2307\/2628369","journal-title":"Manag Sci"},{"key":"1106_CR14","unstructured":"Qian X, Yu J, Dai R (1993) A new discipline of science-the study of open complex giant system and its methodology. Chin J Syst Eng Elect 4(2): 2\u201312. https:\/\/www.cnki.net\/kcms\/doi\/CNKI:SUN:XTGJ.0.1993-02-000"},{"issue":"3","key":"1106_CR16","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1007\/s10951-016-0505-x","volume":"21","author":"S Rostami","year":"2017","unstructured":"Rostami S, Creemers S, Leus R (2017) New strategies for stochastic resource-constrained project scheduling. J Sched 21(3):349\u2013365. https:\/\/doi.org\/10.1007\/s10951-016-0505-x","journal-title":"J Sched"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-021-01106-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-021-01106-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-021-01106-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,6,2]],"date-time":"2021-06-02T14:59:52Z","timestamp":1622645992000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-021-01106-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,4,22]]},"references-count":13,"alternative-id":["1106"],"URL":"https:\/\/doi.org\/10.1007\/s13198-021-01106-x","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"type":"print","value":"0975-6809"},{"type":"electronic","value":"0976-4348"}],"subject":[],"published":{"date-parts":[[2021,4,22]]},"assertion":[{"value":"15 February 2021","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 February 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"9 April 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 April 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declaration"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"Any submission that has data collected from human subjects requires ethics approval.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethics approval"}}]}}