{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,7]],"date-time":"2026-05-07T15:48:22Z","timestamp":1778168902893,"version":"3.51.4"},"reference-count":153,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2021,9,22]],"date-time":"2021-09-22T00:00:00Z","timestamp":1632268800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2021,9,22]],"date-time":"2021-09-22T00:00:00Z","timestamp":1632268800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2022,4]]},"DOI":"10.1007\/s13198-021-01375-6","type":"journal-article","created":{"date-parts":[[2021,9,22]],"date-time":"2021-09-22T10:03:00Z","timestamp":1632304980000},"page":"978-997","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":23,"title":["Lean production performance indicators for medium and small manufacturing enterprises: modelling through analytical hierarchy process"],"prefix":"10.1007","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8034-9824","authenticated-orcid":false,"given":"Jagdish","family":"Bhadu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0540-4771","authenticated-orcid":false,"given":"Pramod","family":"Kumar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3710-5538","authenticated-orcid":false,"given":"Jaiprakash","family":"Bhamu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6726-310X","authenticated-orcid":false,"given":"Dharmendra","family":"Singh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,9,22]]},"reference":[{"issue":"4","key":"1375_CR1","first-page":"53","volume":"2","author":"AM Abdi","year":"2013","unstructured":"Abdi AM, Sheikh Ali AY (2013) Innovation and business performance in telecommunication industry in sub-saharan African context: case of Somalia. Asian J Manag Sci Educ 2(4):53\u201367","journal-title":"Asian J Manag Sci Educ"},{"key":"1375_CR2","doi-asserted-by":"publisher","first-page":"660","DOI":"10.1016\/j.jclepro.2019.06.279","volume":"234","author":"F Abu","year":"2019","unstructured":"Abu F, Gholami H, Mat Saman MZ, Zakuan N, Streimikiene D (2019) The implementation of lean manufacturing in the furniture industry: a review and analysis on the motives, barriers, challenges, and the applications. J Clean Prod 234:660\u2013680","journal-title":"J Clean Prod"},{"issue":"4","key":"1375_CR3","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/su13041978","volume":"13","author":"F Abu","year":"2021","unstructured":"Abu F, Gholami H, Saman MZM, Zakuan N, Streimikiene D, Kyriakopoulos GL (2021) An SEM approach for the barrier analysis in lean implementation in manufacturing industries. Sustainability 13(4):1\u201318","journal-title":"Sustainability"},{"issue":"12","key":"1375_CR4","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/j.ifacol.2016.07.550","volume":"49","author":"I Alhuraish","year":"2016","unstructured":"Alhuraish I, Robledo C, Kobi A (2016) Assessment of lean manufacturing and Six Sigma operation with decision making based on the analytic hierarchy process. IFAC Pap OnLine 49(12):59\u201364","journal-title":"IFAC Pap OnLine"},{"issue":"1","key":"1375_CR5","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/23311916.2016.1207296","volume":"3","author":"SA Ali Naqvi","year":"2016","unstructured":"Ali Naqvi SA, Fahad M, Atir M, Zubair M, Shehzad MM (2016) Productivity improvement of a manufacturing facility using systematic layout planning. Cogent Eng 3(1):1\u201313","journal-title":"Cogent Eng"},{"issue":"5","key":"1375_CR6","doi-asserted-by":"publisher","first-page":"865","DOI":"10.1080\/00207540310001631566","volume":"42","author":"JM Allwood","year":"2004","unstructured":"Allwood JM, Lee WL (2004) The impact of job rotation on problem solving skills. Int J Prod Res 42(5):865\u2013881","journal-title":"Int J Prod Res"},{"issue":"4","key":"1375_CR7","first-page":"330","volume":"12","author":"NB Amos","year":"2020","unstructured":"Amos NB, Ariguzo VA, Egwakhe AJ, Abiodun AJ (2020) Lean manufacturing and production efficiency of the food and beverages sector in Nigeria. Int J Adv Oper Manag 12(4):330\u2013350","journal-title":"Int J Adv Oper Manag"},{"key":"1375_CR8","doi-asserted-by":"crossref","unstructured":"Amrina E, Yusof SM (2011) Key performance indicators for sustainable manufacturing evaluation in automotive companies. In: Proceedings of the 2011 IEEE IEEM, pp 1093\u20131097","DOI":"10.1109\/IEEM.2011.6118084"},{"issue":"11","key":"1375_CR9","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ifacol.2018.08.227","volume":"51","author":"G Ante","year":"2018","unstructured":"Ante G, Facchini F, Mossa G, Digiesi S (2018) Developing a key performance indicators tree for lean and smart production systems. IFAC Pap OnLine 51(11):13\u201318","journal-title":"IFAC Pap OnLine"},{"issue":"9","key":"1375_CR10","first-page":"1585","volume":"12","author":"A Anvari","year":"2011","unstructured":"Anvari A, Ismail Y, Hojjati SM (2011) A study on total quality management and lean manufacturing: through lean thinking approach. World Appl Sci J 12(9):1585\u20131596","journal-title":"World Appl Sci J"},{"key":"1375_CR11","doi-asserted-by":"crossref","unstructured":"Arevalo-Barrera BC, Parreno-Marcos FE, Quiroz-Flores JC, Alvarez-Merino JC (2019) Waste reduction using lean manufacturing tools: a case in the manufacturing of bricks. In: IEEE international conference on industrial engineering and engineering management, pp 1285\u20131289","DOI":"10.1109\/IEEM44572.2019.8978508"},{"issue":"4","key":"1375_CR12","first-page":"1073","volume":"25","author":"NNR Azyan","year":"2017","unstructured":"Azyan NNR, Norkhairunnisa M, Tay CH, Hanim MAA (2017) Techniques on dispersion of nano particles in polymer matrices: a review. Pertanika J Sci Technol 25(4):1073\u20131084","journal-title":"Pertanika J Sci Technol"},{"issue":"3","key":"1375_CR13","doi-asserted-by":"publisher","first-page":"291","DOI":"10.1080\/095372800232252","volume":"11","author":"L Bamber","year":"2010","unstructured":"Bamber L, Dale BG (2010) Lean production: a study of application in a traditional manufacturing environment. Prod Plan Control 11(3):291\u2013298","journal-title":"Prod Plan Control"},{"issue":"5","key":"1375_CR14","doi-asserted-by":"publisher","first-page":"702","DOI":"10.1108\/IJOPM-07-2013-0329","volume":"35","author":"D Bamford","year":"2015","unstructured":"Bamford D, Forrester P, Dehe B, Leese RG (2015) Partial and iterative lean implementation: two case studies. Int J Oper Prod Manag 35(5):702\u2013727","journal-title":"Int J Oper Prod Manag"},{"issue":"3","key":"1375_CR15","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1108\/01443579510080535","volume":"15","author":"S Banerjee","year":"1995","unstructured":"Banerjee S, Sriram V (1995) The impact of electronic data interchange on purchasing: an empirical investigation. Int J Oper Prod Manag 15(3):29\u201338","journal-title":"Int J Oper Prod Manag"},{"issue":"3","key":"1375_CR16","first-page":"244","volume":"4","author":"R Banomyong","year":"2011","unstructured":"Banomyong R, Supatn N (2011) Supply chain assessment tool development in Thailand: an SME perspective\u2019. Int J Procure Manag 4(3):244\u2013258","journal-title":"Int J Procure Manag"},{"issue":"4","key":"1375_CR17","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/j.jengtecman.2008.10.003","volume":"25","author":"ME Bayou","year":"2008","unstructured":"Bayou ME, Korvin AD (2008) Measuring the leanness of manufacturing systems: a case study of Ford motor company and general motors. J Eng Technol Manag 25(4):287\u2013304","journal-title":"J Eng Technol Manag"},{"key":"1375_CR18","doi-asserted-by":"publisher","first-page":"388","DOI":"10.1016\/j.procs.2010.12.065","volume":"3","author":"F Behrouzi","year":"2011","unstructured":"Behrouzi F, Wong KY (2011) Lean performance evaluation of manufacturing systems: a dynamic and innovative approach. Proc Comput Sci 3:388\u2013395","journal-title":"Proc Comput Sci"},{"key":"1375_CR19","first-page":"361","volume-title":"Closing the gap between practice and research in industrial engineering. Lecture notes in management and industrial engineering","author":"A Belhadi","year":"2018","unstructured":"Belhadi A, Touriki FE, El fezazi S (2018) Development of a lean assessment tool for small and medium sized-enterprises. In: Viles E, Ormazabal M, Lleo A (eds) Closing the gap between practice and research in industrial engineering. Lecture notes in management and industrial engineering. Springer, Cham, pp 361\u2013369"},{"key":"1375_CR20","doi-asserted-by":"publisher","DOI":"10.1093\/acprof:oso\/9780199357215.001.0001","volume-title":"The handbook of behavioral operations management: social and psychological dynamics in production and service settings","author":"E Bendoly","year":"2015","unstructured":"Bendoly E, Van Wezel W, Bachrach DG (2015) The handbook of behavioral operations management: social and psychological dynamics in production and service settings. Oxford University Press, New York"},{"key":"1375_CR22","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-10-2020-0540","author":"J Bhadu","year":"2021","unstructured":"Bhadu J, Singh D, Bhamu JP (2021) Analysis of lean implementation barriers in Indian ceramic industries: modeling through interpretive ranking process. Int J Product Perform Manag. https:\/\/doi.org\/10.1108\/IJPPM-10-2020-0540","journal-title":"Int J Product Perform Manag"},{"key":"1375_CR23","doi-asserted-by":"publisher","DOI":"10.1504\/IJPQM.2020.10035980","author":"J Bhadu","year":"2020","unstructured":"Bhadu J, Bhamu JP, Singh D, Sangwan KS (2020) An ISM approach for lean implementation barriers in labor intensive Indian ceramic SMEs. Int J Product Qual Manag. https:\/\/doi.org\/10.1504\/IJPQM.2020.10035980","journal-title":"Int J Product Qual Manag"},{"issue":"7","key":"1375_CR21","doi-asserted-by":"publisher","first-page":"876","DOI":"10.1108\/IJOPM-08-2012-0315","volume":"34","author":"J Bhamu","year":"2014","unstructured":"Bhamu J, Sangwan KS (2014) Lean manufacturing: literature review and research issues. Int J Oper Prod Manag 34(7):876\u2013940","journal-title":"Int J Oper Prod Manag"},{"issue":"5","key":"1375_CR24","doi-asserted-by":"publisher","first-page":"670","DOI":"10.1108\/17410380810877311","volume":"19","author":"S Bhasin","year":"2008","unstructured":"Bhasin S (2008) Lean and performance measurement. J Manuf Technol Manag 19(5):670\u2013684","journal-title":"J Manuf Technol Manag"},{"key":"1375_CR25","volume-title":"The new lean toolbox: towards fast flexible flow","author":"J Bicheno","year":"2004","unstructured":"Bicheno J (2004) The new lean toolbox: towards fast flexible flow, 3rd edn. PICSIE Books, Buckingham","edition":"3"},{"key":"1375_CR26","doi-asserted-by":"publisher","first-page":"603","DOI":"10.1007\/s40092-019-0313-y","volume":"15","author":"SS Bidhendi","year":"2019","unstructured":"Bidhendi SS, Goh S, Wandel A (2019) Development of a weighted leanness measurement method in modular construction companies. J Ind Eng Int 15:603\u2013625","journal-title":"J Ind Eng Int"},{"issue":"8","key":"1375_CR27","doi-asserted-by":"publisher","first-page":"923","DOI":"10.1108\/01437721111181679","volume":"32","author":"T Bonavia","year":"2015","unstructured":"Bonavia T, Marin-Garcia JA (2015) Integrating human resource management into lean production and their impact on organizational performance. Int J Manpow 32(8):923\u2013938","journal-title":"Int J Manpow"},{"key":"1375_CR28","volume-title":"Handbook of corporate performance management","author":"MC Bourne","year":"2011","unstructured":"Bourne MC, Bourne P (2011) Handbook of corporate performance management. Wiley, Chichester"},{"issue":"2","key":"1375_CR29","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1080\/10429247.2006.11431689","volume":"18","author":"BC Brown","year":"2006","unstructured":"Brown BC, Collins TR, McCombs EL (2006) Transformation from batch to lean manufacturing: the performance issues. Eng Manag J 18(2):3\u201314","journal-title":"Eng Manag J"},{"key":"1375_CR30","doi-asserted-by":"crossref","unstructured":"Buchmeister B, Palcic I (2016) Indicator for project optimization with the cost-time investment criterion. In: Proceedings of the 26th DAAAM international symposium, pp 12\u201317","DOI":"10.2507\/26th.daaam.proceedings.002"},{"key":"1375_CR31","doi-asserted-by":"crossref","unstructured":"Buchmeister B, Friscic D, Palcic I (2008) Bullwhip effect study in a constrained supply chain. In: 24th DAAAM international symposium on intelligent manufacturing and automation, vol 69, pp 63\u201371","DOI":"10.1016\/j.proeng.2014.02.204"},{"issue":"12","key":"1375_CR32","doi-asserted-by":"publisher","first-page":"1488","DOI":"10.1108\/01443570010355750","volume":"20","author":"D Bulent","year":"2000","unstructured":"Bulent D, Tugwell P, Greatbanks R (2000) Overall equipment effectiveness as a measure of operational improvement\u2014a practical analysis. Int J Oper Prod Manag 20(12):1488\u20131502","journal-title":"Int J Oper Prod Manag"},{"issue":"1","key":"1375_CR33","first-page":"114","volume":"21","author":"T Chanegrih","year":"2016","unstructured":"Chanegrih T, Creusier J (2016) The effect of internal and external lean practices on performance: a firm-centered approach. Manag Int 21(1):114\u2013125","journal-title":"Manag Int"},{"issue":"1","key":"1375_CR34","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1002\/bse.1907","volume":"26","author":"A Chiarini","year":"2015","unstructured":"Chiarini A (2015) Environmental policies for evaluating suppliers performance based on GRI indicators. Bus Strateg Environ 26(1):98\u2013111","journal-title":"Bus Strateg Environ"},{"issue":"5","key":"1375_CR35","doi-asserted-by":"publisher","first-page":"1386","DOI":"10.1080\/00207543.2020.1821119","volume":"59","author":"MP Ciano","year":"2021","unstructured":"Ciano MP, Dallasega P, Orzes G, Rossi T (2021) One-to-one relationships between Industry 4.0 technologies and lean production techniques: a multiple case study. Int J Prod Res 59(5):1386\u20131410","journal-title":"Int J Prod Res"},{"issue":"3","key":"1375_CR36","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1007\/s11213-017-9424-9","volume":"31","author":"DC Collatto","year":"2018","unstructured":"Collatto DC, Dresch A, Lacerda DP, Bentz IG (2018) Is action design research indeed necessary? Analysis and synergies between action research and design science research. Syst Pract Action Res 31(3):239\u2013267","journal-title":"Syst Pract Action Res"},{"issue":"10","key":"1375_CR37","first-page":"15","volume":"80","author":"R Cooper","year":"1999","unstructured":"Cooper R, Slagmulder R (1999) Supply chain management for lean enterprises: inter organizational cost management. Strateg Finance 80(10):15\u201322","journal-title":"Strateg Finance"},{"issue":"2","key":"1375_CR38","doi-asserted-by":"publisher","first-page":"104","DOI":"10.1080\/09537287.2020.1713413","volume":"32","author":"AF Da Silva","year":"2021","unstructured":"Da Silva AF, Marins FAS, Dias EX, Ushizima CA (2021) Improving manufacturing cycle efficiency through new multiple criteria data envelopment analysis models: an application in green and lean manufacturing processes. Prod Plan Control 32(2):104\u2013120","journal-title":"Prod Plan Control"},{"issue":"1","key":"1375_CR39","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1016\/j.ijpe.2009.10.031","volume":"133","author":"K Demeter","year":"2010","unstructured":"Demeter K, Matyusz Z (2010) The impact of lean practices on inventory turnover. Int J Prod Econ 133(1):154\u2013163","journal-title":"Int J Prod Econ"},{"key":"1375_CR40","volume-title":"The lean enterprise: designing and managing strategic processes for customer winning performance","author":"D Dimancescu","year":"1997","unstructured":"Dimancescu D, Hines P, Rich N (1997) The lean enterprise: designing and managing strategic processes for customer winning performance. AMACOM, New York"},{"issue":"2","key":"1375_CR41","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1016\/j.tifs.2013.03.002","volume":"31","author":"M Dora","year":"2013","unstructured":"Dora M, Kumar M, Van Goudbergen D, Molnar A, Gellynck X (2013) Operational performance and critical success factors of lean manufacturing in European food processing SMEs. Trends Food Sci Technol 31(2):156\u2013164","journal-title":"Trends Food Sci Technol"},{"key":"1375_CR42","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1007\/s40092-014-0080-8","volume":"10","author":"SR Dulange","year":"2014","unstructured":"Dulange SR, Pundir AK, Ganapathy L (2014) Prioritization of factors impacting on performance of power looms using AHP. J Ind Eng Int 10:217\u2013227","journal-title":"J Ind Eng Int"},{"issue":"4","key":"1375_CR43","first-page":"24","volume":"9","author":"R Elboq","year":"2020","unstructured":"Elboq R, Hlyal M, El Alami J (2020) Lean manufacturing and Six Sigma critical success factors: a case study of the Moroccan aeronautic industry. Int J Supply Chain Manag 9(4):24\u201335","journal-title":"Int J Supply Chain Manag"},{"issue":"3","key":"1375_CR44","doi-asserted-by":"publisher","first-page":"20","DOI":"10.1108\/00438029510146944","volume":"44","author":"R Forrester","year":"1995","unstructured":"Forrester R (1995) Implications of lean manufacturing for human resource strategy. Work Study 44(3):20\u201324","journal-title":"Work Study"},{"issue":"3\/4","key":"1375_CR45","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1108\/01409170110782793","volume":"24","author":"A Gautreau","year":"2001","unstructured":"Gautreau A, Kleiner B (2001) Recent trends in performance measurement systems: the balanced scorecard approach. Manag Res News 24(3\/4):153\u2013156","journal-title":"Manag Res News"},{"issue":"3","key":"1375_CR46","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1016\/S0925-5273(96)00093-X","volume":"48","author":"AM Ghalayini","year":"1997","unstructured":"Ghalayini AM, Noble JS, Crowe TJ (1997) An integrated dynamic performance measurement system for improving manufacturing competitiveness. Int J Prod Econ 48(3):207\u2013225","journal-title":"Int J Prod Econ"},{"issue":"21","key":"1375_CR47","doi-asserted-by":"publisher","first-page":"6434","DOI":"10.1080\/00207543.2014.940430","volume":"52","author":"PJ Gollan","year":"2014","unstructured":"Gollan PJ, Kalfa S, Agarwal R, Green R, Randhawa K (2014) Lean manufacturing as a high-performance work system: the case of Cochlear. Int J Prod Res 52(21):6434\u20136447","journal-title":"Int J Prod Res"},{"issue":"2","key":"1375_CR48","doi-asserted-by":"publisher","first-page":"136","DOI":"10.1080\/0740817X.2011.593609","volume":"44","author":"S Gopinath","year":"2012","unstructured":"Gopinath S, Theodor IF (2012) A waste relationship model and center point tracking metric for lean manufacturing systems. IIE Trans 44(2):136\u2013154","journal-title":"IIE Trans"},{"issue":"1","key":"1375_CR49","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1007\/s13762-013-0409-7","volume":"12","author":"K Govindan","year":"2015","unstructured":"Govindan K, Azevedo SG, Carvalho H, Cruz-Machado V (2015) Lean green and resilient practices influence on supply chain performance: interpretive structural modeling approach. Int J Environ Sci Technol 12(1):15\u201334","journal-title":"Int J Environ Sci Technol"},{"issue":"6\/8","key":"1375_CR50","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1080\/09537287.2017.1309716","volume":"28","author":"K Govindan","year":"2017","unstructured":"Govindan K, Mangla SK, Luthra S (2017) Prioritising indicators in improving supply chain performance using fuzzy AHP: insights from the case example of four Indian manufacturing companies. Prod Plan Control 28(6\/8):552\u2013573","journal-title":"Prod Plan Control"},{"key":"1375_CR51","doi-asserted-by":"publisher","first-page":"1225","DOI":"10.1016\/j.proeng.2014.03.113","volume":"69","author":"D Gracanin","year":"2014","unstructured":"Gracanin D, Buchmeister B, Lalic B (2014) Using cost-time profile for value stream. Optim Proc Eng 69:1225\u20131231","journal-title":"Optim Proc Eng"},{"issue":"3","key":"1375_CR52","doi-asserted-by":"publisher","first-page":"316","DOI":"10.1108\/01443570010308077","volume":"20","author":"A Gunasekaran","year":"2000","unstructured":"Gunasekaran A, Forker L, Kobu B (2000) Improving operations performance in a small company: a case study. Int J Oper Prod Manag 20(3):316\u2013336","journal-title":"Int J Oper Prod Manag"},{"issue":"5","key":"1375_CR53","doi-asserted-by":"publisher","first-page":"957","DOI":"10.1108\/IJLSS-12-2017-0150","volume":"11","author":"S Hartini","year":"2020","unstructured":"Hartini S, Ciptomulyono U, Anityasari M, Sriyanto M (2020) Manufacturing sustainability assessment using a lean manufacturing tool: a case study in the Indonesian wooden furniture industry. Int J Lean Six Sigma 11(5):957\u2013985","journal-title":"Int J Lean Six Sigma"},{"issue":"2","key":"1375_CR54","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1108\/JMTM-04-2019-0140","volume":"31","author":"JC Hernandez-Matias","year":"2019","unstructured":"Hernandez-Matias JC, Ocampo JR, Hidalgo A, Vizan A (2019) Lean manufacturing and operational performance: interrelationships between human-related lean practices. J Manuf Technol Manag 31(2):217\u2013235","journal-title":"J Manuf Technol Manag"},{"key":"1375_CR55","volume-title":"Lean manufacturing implementation: a complete execution manual for any size manufacturer","author":"DP Hobbs","year":"2003","unstructured":"Hobbs DP (2003) Lean manufacturing implementation: a complete execution manual for any size manufacturer. J. Ross Publishing, Plantation"},{"key":"1375_CR56","first-page":"1862","volume":"28","author":"SMH Hojjati","year":"2013","unstructured":"Hojjati SMH, Anvary A (2013) An integrated SAW TOPSIS method for ranking the major lean practices based on four attributes. World Appl Sci J 28:1862\u20131871","journal-title":"World Appl Sci J"},{"issue":"11","key":"1375_CR57","doi-asserted-by":"publisher","first-page":"6780","DOI":"10.1016\/j.ijhydene.2011.02.119","volume":"36","author":"Y Hou","year":"2011","unstructured":"Hou Y, Wang B, Ouyang G, Shen H, He Y (2011) An analytic hierarchy process to evaluate PEM fuel cell engine performance. Int J Hydrog Energy 36(11):6780\u20136787","journal-title":"Int J Hydrog Energy"},{"key":"1375_CR155","unstructured":"http:\/\/www.iea.org\/statistics. Accessed 09 May 2019"},{"key":"1375_CR156","unstructured":"http:\/\/www.msme.gov.in. Annual report (2018\u20132019) Govt. of India Ministry of MSMEs (GOIMMSME, 2018), New Delhi, cited on 20th August 2020"},{"key":"1375_CR157","unstructured":"https:\/\/www.grantthornton.in\/en\/insights\/articles\/indias-readiness-for-industry-4.0--a-focus-on-automotive-sector\/. Cited on 25th August 2020"},{"issue":"7","key":"1375_CR58","doi-asserted-by":"publisher","first-page":"980","DOI":"10.1108\/JMTM-02-2014-0013","volume":"26","author":"Q Hu","year":"2015","unstructured":"Hu Q, Mason R, Williams SJ, Found P (2015) Lean implementation within SMEs: a literature review. J Manuf Technol Manag 26(7):980\u20131012","journal-title":"J Manuf Technol Manag"},{"issue":"8","key":"1375_CR59","doi-asserted-by":"publisher","first-page":"804","DOI":"10.1080\/09537280110061557","volume":"12","author":"M Hudson","year":"2001","unstructured":"Hudson M, Lean J, Smart PA (2001) Improving control through effective performance measurement in SMEs. Prod Plan Control 12(8):804\u2013813","journal-title":"Prod Plan Control"},{"key":"1375_CR60","unstructured":"Huther M (2016) Digitalisation: an engine for structural change\u2014a challenge for economic policy. IW policy paper, no. 15\/2016E. Institut der deutschen Wirtschaft (IW), Koln"},{"issue":"4","key":"1375_CR61","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/su11041112","volume":"11","author":"M Iranmanesh","year":"2019","unstructured":"Iranmanesh M, Zailani S, Hyun SS, Ali HM, Kim K (2019) Impact of lean manufacturing practices on firm\u2019s sustainable performance: lean culture as a moderator. Sustainability 11(4):1\u201320","journal-title":"Sustainability"},{"issue":"4","key":"1375_CR62","first-page":"201","volume":"22","author":"A Ishizaka","year":"2009","unstructured":"Ishizaka A, Labib A (2009) Analytic hierarchy process and expert choice; benefits and limitations, or insight. Oper Res 22(4):201\u2013220","journal-title":"Oper Res"},{"issue":"2","key":"1375_CR63","doi-asserted-by":"publisher","first-page":"122","DOI":"10.1108\/IJLSS-12-2012-0014","volume":"5","author":"JR Jadhav","year":"2014","unstructured":"Jadhav JR, Mantha SS, Rane SB (2014) Exploring barriers in lean implementation. Int J Lean Six Sigma 5(2):122\u2013148","journal-title":"Int J Lean Six Sigma"},{"key":"1375_CR64","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-0365-1","volume-title":"Strategic decision making in modern manufacturing USA","author":"HS Jagdev","year":"2004","unstructured":"Jagdev HS, Brennan A, Browne J (2004) Strategic decision making in modern manufacturing USA. Kluwer Academic Publishers, Dordrecht"},{"key":"1375_CR66","doi-asserted-by":"crossref","unstructured":"Kaganski S, Majak J, Karjust K, Toompalu S (2017) Implementation of key performance indicators selection model as part of the enterprise analysis model. In: The 50th CIRP conference on manufacturing systems, vol 63, pp 283\u2013288","DOI":"10.1016\/j.procir.2017.03.143"},{"issue":"4","key":"1375_CR67","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1111\/1540-5885.1340283","volume":"13","author":"C Karlsson","year":"1996","unstructured":"Karlsson C, Ahlstrom P (1996) The difficult path to lean product development. J Prod Innov 13(4):283\u2013295","journal-title":"J Prod Innov"},{"key":"1375_CR68","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1177\/1069031X9700500405","volume":"5","author":"CS Katsikeas","year":"1997","unstructured":"Katsikeas CS, Deng SL, Wortzel LH (1997) Perceived export success factors of small and medium-sized Canadian firms. J Int Mark 5:53\u201372","journal-title":"J Int Mark"},{"issue":"2","key":"1375_CR69","first-page":"176","volume":"15","author":"M Khadem","year":"2008","unstructured":"Khadem M (2008) Efficacy of lean metrics in evaluating the performance of manufacturing systems. Int J Ind Eng Theory Appl Pract 15(2):176\u2013184","journal-title":"Int J Ind Eng Theory Appl Pract"},{"key":"1375_CR70","volume-title":"Basic financial management: financial statement analysis New Delhi","author":"MY Khan","year":"2006","unstructured":"Khan MY, Jain PK (2006) Basic financial management: financial statement analysis New Delhi. Tata McGraw-Hill Publishing Company Limited, New York"},{"issue":"4","key":"1375_CR71","first-page":"903","volume":"11","author":"S Khokhlov","year":"2017","unstructured":"Khokhlov S, Safina E (2017) Paradox of alternative energy consumption: lean or profligacy? Int J Qual Res 11(4):903\u2013917","journal-title":"Int J Qual Res"},{"issue":"2","key":"1375_CR74","first-page":"59","volume":"73","author":"J Kotter","year":"1995","unstructured":"Kotter J (1995) Leading change: why transformation efforts fail. Harv Bus Rev 73(2):59\u201367","journal-title":"Harv Bus Rev"},{"key":"1375_CR75","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1016\/j.eswa.2018.06.060","volume":"114","author":"J Krejci","year":"2018","unstructured":"Krejci J, Stoklasa J (2018) Aggregation in the analytic hierarchy process: why weighted geometric mean should be used instead of weighted arithmetic mean. Expert Syst Appl 114:97\u2013106","journal-title":"Expert Syst Appl"},{"issue":"2","key":"1375_CR77","first-page":"180","volume":"34","author":"N Kumar","year":"2019","unstructured":"Kumar N, Mathiyazhagan K (2019) Manufacturing excellence in the Indian automobile industry through sustainable lean manufacturing: a case study. Int J Serv Oper Manag 34(2):180\u2013196","journal-title":"Int J Serv Oper Manag"},{"issue":"3","key":"1375_CR78","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1504\/IJBEX.2020.106383","volume":"20","author":"N Kumar","year":"2020","unstructured":"Kumar N, Mathiyazhagan K (2020) Sustainability in lean manufacturing: a systematic literature review. Int J Bus Excell 20(3):295\u2013321","journal-title":"Int J Bus Excell"},{"issue":"4","key":"1375_CR76","doi-asserted-by":"publisher","first-page":"407","DOI":"10.1080\/09537280500483350","volume":"17","author":"M Kumar","year":"2006","unstructured":"Kumar M, Antony J, Singh RK, Tiwari MK, Perry D (2006) Implementing the Lean Sigma framework in an Indian SME: a case study. Prod Plan Control 17(4):407\u2013423","journal-title":"Prod Plan Control"},{"key":"1375_CR79","doi-asserted-by":"publisher","DOI":"10.5772\/intechopen.85815","volume-title":"Lean Six Sigma-behind the mask","author":"K Lamine","year":"2019","unstructured":"Lamine K (2019) Lean Six Sigma and performance metrics. In: Lamine K (ed) Lean Six Sigma-behind the mask. Intech Open, London. https:\/\/doi.org\/10.5772\/intechopen.85815"},{"key":"1375_CR80","volume-title":"The Toyota Way Field book: a practical guide for implementing Toyotas 4Ps","author":"JK Liker","year":"2006","unstructured":"Liker JK, Meier D (2006) The Toyota Way Field book: a practical guide for implementing Toyotas 4Ps. McGraw-Hill Companies Inc, New York"},{"issue":"1","key":"1375_CR81","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1002\/hfm.20723","volume":"28","author":"M Liu","year":"2017","unstructured":"Liu M, Huang Y, Zhang D (2017) Gamification\u2019s impact on manufacturing: enhancing job motivation satisfaction and operational performance with smart phone-based gamified job design. Hum Factors Ergon Manuf Serv Ind 28(1):38\u201351","journal-title":"Hum Factors Ergon Manuf Serv Ind"},{"issue":"1","key":"1375_CR82","doi-asserted-by":"publisher","first-page":"30","DOI":"10.1016\/j.ijpe.2010.12.022","volume":"131","author":"D Losonci","year":"2011","unstructured":"Losonci D, Demeter K, Jenei I (2011) Factors influencing employee perceptions in lean transformations. Int J Prod Econ 131(1):30\u201343","journal-title":"Int J Prod Econ"},{"key":"1375_CR83","doi-asserted-by":"publisher","first-page":"509","DOI":"10.1016\/j.jclepro.2017.02.099","volume":"151","author":"SK Mangla","year":"2017","unstructured":"Mangla SK, Govindan K, Luthra S (2017) Prioritizing the barriers to achieve sustainable consumption and production trends in supply chains using fuzzy analytical hierarchy process. J Clean Prod 151:509\u2013525","journal-title":"J Clean Prod"},{"issue":"5\/6","key":"1375_CR84","first-page":"47","volume":"17","author":"PJ Martinez-Jurado","year":"2013","unstructured":"Martinez-Jurado PJ, Moyano-Fuentes J, Jerez-Gomez P (2013) Human resource management in lean production adoption and implementation processes: success factors in the aeronautics industry BRQ. Bus Res Q 17(5\/6):47\u201368","journal-title":"Bus Res Q"},{"issue":"3","key":"1375_CR85","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1002\/jcaf.20293","volume":"18","author":"BH Maskell","year":"2007","unstructured":"Maskell BH, Kennedy FA (2007) Why do we need lean accounting and how does it work? J Corp Account Finance 18(3):59\u201373","journal-title":"J Corp Account Finance"},{"issue":"1","key":"1375_CR86","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/S0272-6963(00)00030-9","volume":"19","author":"KE McKone","year":"2001","unstructured":"McKone KE, Schroeder RG, Cua KO (2001) The impact of total productive maintenance on manufacturing performance. J Oper Manag 19(1):39\u201358","journal-title":"J Oper Manag"},{"key":"1375_CR87","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1007\/978-3-030-57548-9_35","volume":"201","author":"A Mesones-Guillen","year":"2021","unstructured":"Mesones-Guillen A, Palacios-Jesus L, Carvallo-Munar E, Salas-Castro R, Cardenas-Rengifo L (2021) Lean manufacturing model adapted for waste reduction in peruvian condiment production agri-businesses. Smart Innov Syst Technol 201:381\u2013389","journal-title":"Smart Innov Syst Technol"},{"issue":"13","key":"1375_CR88","first-page":"1","volume":"52","author":"S Modgil","year":"2019","unstructured":"Modgil S, Sonwaney V (2019) Planning the application of blockchain technology in identification of counterfeit products: sectorial prioritization. IFAC OnLine 52(13):1\u20135","journal-title":"IFAC OnLine"},{"key":"1375_CR89","doi-asserted-by":"publisher","first-page":"233","DOI":"10.1016\/j.jbusres.2018.09.002","volume":"106","author":"AK Moldner","year":"2020","unstructured":"Moldner AK, Garza-Reyes JA, Kumar V (2020) Exploring lean manufacturing practices\u2019 influence on process innovation performance. J Bus Res 106:233\u2013249","journal-title":"J Bus Res"},{"issue":"1","key":"1375_CR90","first-page":"32","volume":"17","author":"H Moradlou","year":"2017","unstructured":"Moradlou H, Parera T (2017) Identification of the barriers in implementation of lean principles in Iranian SMEs: case study approach. Glob J Manag Bus 17(1):32\u201341","journal-title":"Glob J Manag Bus"},{"issue":"5","key":"1375_CR91","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1108\/02635570310477398","volume":"103","author":"J Motwani","year":"2003","unstructured":"Motwani J (2003) A business process change framework for examining lean manufacturing: a case study. Ind Manag Data Syst 103(5):339\u2013346","journal-title":"Ind Manag Data Syst"},{"key":"1375_CR92","first-page":"1","volume-title":"Design and management of lean production systems","author":"D Mourtzis","year":"2014","unstructured":"Mourtzis D, Doukas M (2014) The evolution of manufacturing systems: from craftsmanship to the era of customization. In: Modrak V, Semanco P (eds) Design and management of lean production systems. IGI Global, Hershey, pp 1\u201329"},{"issue":"5","key":"1375_CR93","doi-asserted-by":"publisher","first-page":"440","DOI":"10.1016\/j.jom.2005.11.011","volume":"24","author":"R Narasimhan","year":"2006","unstructured":"Narasimhan R, Swink M, Kim SW (2006) Disentangling leanness and agility: an empirical investigation. J Oper Manag 24(5):440\u2013457","journal-title":"J Oper Manag"},{"key":"1375_CR94","doi-asserted-by":"crossref","unstructured":"Oliver N, Delbridge R, Lowe J (1996) Lean production practices: international comparisons in the auto components industry. Br J Manag 7 (SPEC ISS)","DOI":"10.1111\/j.1467-8551.1996.tb00146.x"},{"issue":"3","key":"1375_CR95","doi-asserted-by":"publisher","first-page":"543","DOI":"10.1108\/JMTM-12-2018-0446","volume":"32","author":"M Pagliosa","year":"2019","unstructured":"Pagliosa M, Tortorella G, Ferreira JCE (2019) Industry 4.0 and lean manufacturing: a systematic literature review and future research directions. J Manuf Technol Manag 32(3):543\u2013569","journal-title":"J Manuf Technol Manag"},{"issue":"5","key":"1375_CR96","doi-asserted-by":"publisher","first-page":"725","DOI":"10.1108\/JMTM-08-2013-0112","volume":"26","author":"F Pakdil","year":"2015","unstructured":"Pakdil F, Leonard KM (2015) The effect of organizational culture on implementing and sustaining lean processes. J Manuf Technol Manag 26(5):725\u2013743","journal-title":"J Manuf Technol Manag"},{"issue":"1","key":"1375_CR97","first-page":"56","volume":"1","author":"SLD Pandey","year":"2010","unstructured":"Pandey SLD, Pandey SK (2010) An analysis of financial position and various elements of asset and liability management (ALM) in Indian banking industry. Manag Converg 1(1):56\u201366","journal-title":"Manag Converg"},{"issue":"10\u201311","key":"1375_CR98","doi-asserted-by":"publisher","first-page":"769","DOI":"10.1080\/09537287.2011.642155","volume":"23","author":"R Panizzolo","year":"2012","unstructured":"Panizzolo R, Garengo P, Sharma MK, Gore A (2012) Lean manufacturing in developing countries: evidence from Indian SMEs. Prod Plan Control 23(10\u201311):769\u2013788","journal-title":"Prod Plan Control"},{"issue":"2","key":"1375_CR99","doi-asserted-by":"publisher","first-page":"158","DOI":"10.1080\/09537287.2017.1397788","volume":"29","author":"A Panwar","year":"2018","unstructured":"Panwar A, Jain R, Rathore APS, Nepal B, Lyons AC (2018) The impact of lean practices on operational performance\u2014an empirical investigation of Indian process industries. Prod Plan Control 29(2):158\u2013169","journal-title":"Prod Plan Control"},{"issue":"1","key":"1375_CR100","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1002\/hfm.10000","volume":"12","author":"KS Park","year":"2002","unstructured":"Park KS, Han SW (2002) Performance obstacles in cellular manufacturing implementation\u2014empirical investigation. Hum Factors Ergon Manuf 12(1):17\u201329","journal-title":"Hum Factors Ergon Manuf"},{"issue":"2","key":"1375_CR101","first-page":"507","volume":"6","author":"P Puvanaswaran","year":"2013","unstructured":"Puvanaswaran P, Teoh YS, Tay CC (2013) Consideration of demand rate in overall equipment effectiveness (OEE) on equipment with constant process time. J Ind Eng Manag 6(2):507\u2013524","journal-title":"J Ind Eng Manag"},{"key":"1375_CR102","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1007\/s40092-016-0143-0","volume":"12","author":"R Rathi","year":"2016","unstructured":"Rathi R, Khanduja D, Sharma SK (2016) Efficacy of fuzzy MADM approach in Six Sigma analysis phase in automotive sector. J Ind Eng Int 12:377\u2013387","journal-title":"J Ind Eng Int"},{"issue":"1","key":"1375_CR103","first-page":"21","volume":"22","author":"MM Ravikumar","year":"2015","unstructured":"Ravikumar MM, Marimuthu K, Parthiban P (2015) Evaluating lean implementation performance in Indian MSMEs using ISM and AHP models. Int J Serv Oper Manag 22(1):21\u201339","journal-title":"Int J Serv Oper Manag"},{"issue":"1","key":"1375_CR104","doi-asserted-by":"publisher","first-page":"62","DOI":"10.1504\/IJSSS.2013.052007","volume":"5","author":"MAA Rehman","year":"2013","unstructured":"Rehman MAA, Shrivastava RL (2013) Development and validation of performance measures for green manufacturing (GM) practices in medium and small scale industries in Vidharbha region India. Int J Soc Syst Sci 5(1):62\u201381","journal-title":"Int J Soc Syst Sci"},{"issue":"6","key":"1375_CR105","doi-asserted-by":"publisher","first-page":"684","DOI":"10.1016\/j.rcim.2007.02.013","volume":"23","author":"L Rivera","year":"2007","unstructured":"Rivera L, Chen FF (2007) Measuring the impact of Lean tools on the cost\u2013time investment of a product using cost\u2013time profiles. Robot Comput-Integr Manuf 23(6):684\u2013689","journal-title":"Robot Comput-Integr Manuf"},{"key":"1375_CR106","doi-asserted-by":"crossref","unstructured":"Rivera L, Manotas DF (2014) Performance measurement in lean manufacturing environments. In: Lean manufacturing in the developing world. Springer, Cham, pp 445\u2013460","DOI":"10.1007\/978-3-319-04951-9_21"},{"key":"1375_CR107","first-page":"11554","volume-title":"Advances in neural networks\u2013ISNN 2019. Lecture notes in computer science","author":"R Rivera-Castro","year":"2019","unstructured":"Rivera-Castro R, Nazarov I, Xiang Y, Pletneev A, Maksimov I, Burnaev E (2019) Demand forecasting techniques for build-to-order lean manufacturing supply chains. In: Lu H, Tang H, Wang Z (eds) Advances in neural networks\u2013ISNN 2019. Lecture notes in computer science. Springer, Cham, p 11554"},{"issue":"5","key":"1375_CR108","doi-asserted-by":"publisher","first-page":"737","DOI":"10.1002\/bse.2277","volume":"28","author":"S Roscoe","year":"2019","unstructured":"Roscoe S, Subramanian N, Jabbour CJC, Chong T (2019) Green human resource management and the enablers of green organisational culture: enhancing a firms environmental performance for sustainable development. Bus Strateg Environ 28(5):737\u2013749","journal-title":"Bus Strateg Environ"},{"key":"1375_CR109","first-page":"33","volume":"3","author":"A Rosemary","year":"2009","unstructured":"Rosemary A (2009) Linkages access to finance and the performance of small-scale enterprises in Kenya. J Acc Bus Res 3:33\u201348","journal-title":"J Acc Bus Res"},{"key":"1375_CR110","volume-title":"The analytic hierarchy process: planning priority setting resources allocation","author":"TL Saaty","year":"1980","unstructured":"Saaty TL (1980) The analytic hierarchy process: planning priority setting resources allocation. McGraw, New York"},{"issue":"6","key":"1375_CR111","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1142\/S021962201550025X","volume":"14","author":"TL Saaty","year":"2015","unstructured":"Saaty TL, Ergu D (2015) When is a decision-making method trustworthy? Criteria for evaluating multi-criteria decision-making methods. Int J Inf Technol Decis Mak 14(6):1171\u20131187","journal-title":"Int J Inf Technol Decis Mak"},{"key":"1375_CR112","doi-asserted-by":"publisher","first-page":"957","DOI":"10.1016\/j.sbspro.2012.09.163","volume":"62","author":"A Sadeghi","year":"2018","unstructured":"Sadeghi A, Azar A, Rad RS (2018) Developing a fuzzy group AHP model for prioritizing the factors affecting success of High-Tech SME\u2019s in Iran: a case study. Proc Soc Behav Sci 62:957\u2013961","journal-title":"Proc Soc Behav Sci"},{"issue":"5\/6","key":"1375_CR113","doi-asserted-by":"publisher","first-page":"465","DOI":"10.1504\/IJSTM.2004.006278","volume":"5","author":"AM Sanchez","year":"2001","unstructured":"Sanchez AM, Perez MP (2001) The use of lean indicators for operations management in services. Int J Serv Technol Manag 5(5\/6):465\u2013478","journal-title":"Int J Serv Technol Manag"},{"issue":"5","key":"1375_CR114","doi-asserted-by":"publisher","first-page":"768","DOI":"10.1108\/JMTM-09-2017-0196","volume":"29","author":"NR Sangwa","year":"2018","unstructured":"Sangwa NR, Sangwan KS (2018a) Leanness assessment of organizational performance: a systematic literature review. J Manuf Technol Manag 29(5):768\u2013788","journal-title":"J Manuf Technol Manag"},{"issue":"1","key":"1375_CR115","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1108\/JMTM-06-2017-0098","volume":"29","author":"NR Sangwa","year":"2018","unstructured":"Sangwa NR, Sangwan KS (2018b) Development of an integrated performance measurement framework for lean organizations. J Manuf Technol Manag 29(1):41\u201384","journal-title":"J Manuf Technol Manag"},{"key":"1375_CR116","doi-asserted-by":"crossref","unstructured":"Schnellbach P, Reinhart G (2015) Evaluating the effects of energy productivity measures on lean production key performance indicators. In: 12th global conference on sustainable manufacturing, vol 26, pp 492\u2013497","DOI":"10.1016\/j.procir.2014.07.094"},{"issue":"12","key":"1375_CR117","first-page":"26","volume":"37","author":"RJ Schonberger","year":"2005","unstructured":"Schonberger RJ (2005) Lean extended: it\u2019s much more (and less) than you think. Ind Eng 37(12):26\u201339","journal-title":"Ind Eng"},{"issue":"5","key":"1375_CR118","first-page":"1605","volume":"26","author":"V Sharma","year":"2019","unstructured":"Sharma V, Gidwani BD, Sharma V, Meena ML (2019) Implementation model for cellular manufacturing system using AHP and ANP approach benchmarking. Int J 26(5):1605\u20131630","journal-title":"Int J"},{"issue":"7","key":"1375_CR119","doi-asserted-by":"publisher","first-page":"842","DOI":"10.1016\/j.jclepro.2007.05.002","volume":"16","author":"H Shi","year":"2008","unstructured":"Shi H, Peng SZ, Liu Y, Zhong P (2008) Barriers to the implementation of cleaner production in chinese SMEs: government, industry and expert stakeholders\u2019 perspectives. J Clean Prod 16(7):842\u2013852","journal-title":"J Clean Prod"},{"issue":"1","key":"1375_CR120","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1108\/IJPPM-03-2018-0117","volume":"69","author":"Y Shi","year":"2019","unstructured":"Shi Y, Wang X, Zhu X (2019) Lean manufacturing and productivity changes: the moderating role of R&D. Int J Product Perform Manag 69(1):169\u2013191","journal-title":"Int J Product Perform Manag"},{"issue":"1","key":"1375_CR124","first-page":"80","volume":"17","author":"RK Singh","year":"2013","unstructured":"Singh RK (2013) Prioritizing the factors for coordinated supply chain using analytic hierarchy process (AHP). Technol Econ Dev Econ 17(1):80\u201397","journal-title":"Technol Econ Dev Econ"},{"issue":"2","key":"1375_CR122","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1108\/MBE-07-2018-0041","volume":"24","author":"RK Singh","year":"2019","unstructured":"Singh RK, Modgil S (2019) Supplier selection using SWARA and WASPAS\u2014a case study of Indian cement industry. Meas Bus Excell 24(2):243\u2013265","journal-title":"Meas Bus Excell"},{"key":"1375_CR123","doi-asserted-by":"publisher","DOI":"10.1177\/0972150919890234","author":"RK Singh","year":"2020","unstructured":"Singh RK, Modgil S (2020) Assessment of lean supply chain practices in Indian automotive industry. Glob Bus Rev. https:\/\/doi.org\/10.1177\/0972150919890234","journal-title":"Glob Bus Rev"},{"issue":"1","key":"1375_CR121","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1108\/IJLSS-06-2018-0060","volume":"11","author":"J Singh","year":"2020","unstructured":"Singh J, Singh H (2020) Application of lean manufacturing in automotive manufacturing unit. Int J Lean Six Sigma 11(1):171\u2013210","journal-title":"Int J Lean Six Sigma"},{"issue":"5","key":"1375_CR125","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1108\/14635770810903132","volume":"15","author":"RK Singh","year":"2008","unstructured":"Singh RK, Garg SK, Deshmukh SG (2008) Strategic development by SMEs for competitiveness: a review. Benchmark Int J 15(5):525\u2013547","journal-title":"Benchmark Int J"},{"issue":"1","key":"1375_CR126","doi-asserted-by":"publisher","first-page":"112","DOI":"10.1504\/IJPQM.2012.047944","volume":"10","author":"KR Sinimole","year":"2012","unstructured":"Sinimole KR (2012) Performance evaluation of the hospital services\u2014a fuzzy analytic hierarchy process model. Int J Product Qual Manag 10(1):112\u2013129","journal-title":"Int J Product Qual Manag"},{"key":"1375_CR127","volume-title":"Planning and measurement in your organisation of the future","author":"DS Sink","year":"1989","unstructured":"Sink DS, Tuttle TC (1989) Planning and measurement in your organisation of the future. Industrial Engineering & Management Press, Norcross"},{"issue":"3","key":"1375_CR128","doi-asserted-by":"publisher","first-page":"577","DOI":"10.1061\/(ASCE)0733-9364(1992)118:3(577)","volume":"18","author":"MJ Skibniewski","year":"2007","unstructured":"Skibniewski MJ, Chao LC (2007) Evaluation of advanced construction technology with AHP method. J Constr Eng Manag 18(3):577\u2013593","journal-title":"J Constr Eng Manag"},{"key":"1375_CR129","doi-asserted-by":"publisher","first-page":"407","DOI":"10.1007\/s10479-014-1544-3","volume":"244","author":"M Smaeilikia","year":"2016","unstructured":"Smaeilikia M, Fahimnia B, Sarkis J (2016) Tactical supply chain planning models with inherent flexibility: definition and review. Ann Oper Res 244:407\u2013427","journal-title":"Ann Oper Res"},{"issue":"1","key":"1375_CR130","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1108\/01437720510587280","volume":"26","author":"D Sodenkamp","year":"2005","unstructured":"Sodenkamp D, Schmidt KH, Kleinbeck U (2005) Self-management of work groups through corporate values: from theory to practice. Int J Manpow 26(1):67\u201379","journal-title":"Int J Manpow"},{"issue":"12","key":"1375_CR131","doi-asserted-by":"publisher","first-page":"1215","DOI":"10.1108\/01443579710182954","volume":"17","author":"L Sriparavastu","year":"1997","unstructured":"Sriparavastu L, Gupta T (1997) An empirical study of just-in-time and total quality management principles implementation in manufacturing firms in the USA. Int J Oper Prod Manag 17(12):1215\u20131232","journal-title":"Int J Oper Prod Manag"},{"key":"1375_CR132","first-page":"1","volume":"12","author":"C Standard","year":"2000","unstructured":"Standard C, Davis D (2000) Lean thinking for competitive advantage. Automot Manuf Prod 12:1\u20133","journal-title":"Automot Manuf Prod"},{"issue":"10","key":"1375_CR133","first-page":"123","volume":"81","author":"CK Swank","year":"2003","unstructured":"Swank CK (2003) The lean service machine. Harv Bus Rev 81(10):123\u2013130","journal-title":"Harv Bus Rev"},{"issue":"1","key":"1375_CR134","first-page":"1","volume":"21","author":"S Taj","year":"2011","unstructured":"Taj S, Morosan C (2011) The impact of lean operations on the Chinese manufacturing performance. J Prod Eng 21(1):1\u20135","journal-title":"J Prod Eng"},{"issue":"1","key":"1375_CR135","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1590\/S0104-530X2010000100007","volume":"17","author":"R Tezza","year":"2010","unstructured":"Tezza R, Bornia AC, Vey IH (2010) Performance measurement systems: a review and classification of literature. Gestao Produ\u00e7ao 17(1):75\u201393","journal-title":"Gestao Produ\u00e7ao"},{"issue":"1","key":"1375_CR136","doi-asserted-by":"publisher","first-page":"284","DOI":"10.1016\/j.jclepro.2016.06.105","volume":"135","author":"S Thanki","year":"2016","unstructured":"Thanki S, Govindan K, Thakkar J (2016) An investigation on lean-green implementation practices in indian SMEs using analytical hierarchy process (AHP) approach. J Clean Prod 135(1):284\u2013298","journal-title":"J Clean Prod"},{"issue":"3","key":"1375_CR137","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1504\/IJBIR.2019.102713","volume":"20","author":"T Thomas","year":"2019","unstructured":"Thomas T, Saleeshya PG (2019) Application of lean manufacturing practices in the banking industry\u2014a case study. Int J Bus Innov Res 20(3):283\u2013304","journal-title":"Int J Bus Innov Res"},{"issue":"2","key":"1375_CR138","first-page":"69","volume":"9","author":"RK Tiwari","year":"2018","unstructured":"Tiwari RK, Tiwari JK (2018) Prioritization of barriers to lean implementation in Indian automotive small & medium sized enterprises. Manag Prod Eng Rev 9(2):69\u201379","journal-title":"Manag Prod Eng Rev"},{"key":"1375_CR139","first-page":"27","volume":"5","author":"M Todorov","year":"2019","unstructured":"Todorov M, Jovanoskiz B, Minovski R (2019) Key performance indicators for lean: literature review and recommendations. Int J Mod Stud Mech Eng 5:27\u201336","journal-title":"Int J Mod Stud Mech Eng"},{"issue":"6\/7\/8","key":"1375_CR140","first-page":"860","volume":"39","author":"GL Tortorella","year":"2019","unstructured":"Tortorella GL, Giglio R, van Dun DH (2019) Industry 4.0 adoption as a moderator of the impact of lean production practices on operational performance improvement. J Clean Prod 39(6\/7\/8):860\u2013886","journal-title":"J Clean Prod"},{"issue":"1","key":"1375_CR141","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1108\/JBIM-12-2012-0238","volume":"30","author":"N Tzempelikos","year":"2015","unstructured":"Tzempelikos N (2015) Top management commitment and investment and their link to key account management effectiveness. J Bus Ind Mark 30(1):32\u201344","journal-title":"J Bus Ind Mark"},{"issue":"5","key":"1375_CR142","first-page":"362","volume":"5","author":"N Upadhye","year":"2010","unstructured":"Upadhye N, Deshmukh SG, Garg S (2010) Lean manufacturing system for medium size manufacturing enterprises: an Indian case. Int J Manag Sci Eng Manag 5(5):362\u2013375","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"2","key":"1375_CR143","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1080\/14697010902879087","volume":"9","author":"RL Van Dijk","year":"2009","unstructured":"Van Dijk RL, Van Dick R (2009) Navigating organizational change: change leaders employee resistance and work-based identities. J Change Manag 9(2):143\u2013163","journal-title":"J Change Manag"},{"issue":"2","key":"1375_CR144","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1080\/00207540903471494","volume":"49","author":"S Vinodh","year":"2011","unstructured":"Vinodh S, Chintha SK (2011) Leanness assessment using multi-grade fuzzy approach. Int J Prod Res 49(2):431\u2013445","journal-title":"Int J Prod Res"},{"key":"1375_CR145","doi-asserted-by":"publisher","first-page":"1185","DOI":"10.1007\/s00170-011-3658-y","volume":"60","author":"S Vinodh","year":"2012","unstructured":"Vinodh S, Vimal KEK (2012) Thirty criteria based leanness assessment using fuzzy logic approach. Int J Adv Manuf Technol 60:1185\u20131195","journal-title":"Int J Adv Manuf Technol"},{"issue":"4","key":"1375_CR146","doi-asserted-by":"publisher","first-page":"541","DOI":"10.1016\/j.ijar.2010.12.004","volume":"52","author":"YM Wang","year":"2011","unstructured":"Wang YM, Chin KS (2011) Fuzzy analytic hierarchy process: a logarithmic fuzzy preference programming methodology. Int J Approx Reason 52(4):541\u2013553","journal-title":"Int J Approx Reason"},{"key":"1375_CR147","volume-title":"Using overall equipment effectiveness: the metric and the measures","author":"RM Williamson","year":"2006","unstructured":"Williamson RM (2006) Using overall equipment effectiveness: the metric and the measures. Strategic Work Systems, Columbus"},{"issue":"2","key":"1375_CR148","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1108\/00251740610650210","volume":"44","author":"JM Worley","year":"2006","unstructured":"Worley JM, Doolen TL (2006) The role if communication and management support in a lean manufacturing implementation. J Manag Decis 44(2):228\u2013245","journal-title":"J Manag Decis"},{"issue":"10","key":"1375_CR149","first-page":"775","volume":"2","author":"A Yadav","year":"2013","unstructured":"Yadav A, Jayswal SC (2013) Using geometric mean method of analytical hierarchy process for decision making in functional layout. Int J Eng Res Technol 2(10):775\u2013779","journal-title":"Int J Eng Res Technol"},{"issue":"1","key":"1375_CR151","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1108\/JMTM-12-2017-0262","volume":"30","author":"V Yadav","year":"2018","unstructured":"Yadav V, Jain R, Mittal ML, Panwar A, Sharma MK (2018) An appraisal on barriers to implement lean SMEs. J Manuf Technol Manag 30(1):195\u2013212","journal-title":"J Manuf Technol Manag"},{"issue":"2","key":"1375_CR152","first-page":"220","volume":"1","author":"A Yang Pingyu","year":"2010","unstructured":"Yang Pingyu A, Yu yu B (2010) The barriers to SMEs implementation of lean production and countermeasures\u2014based on SMS in Wenzhou. Int J Innov Manag Technol 1(2):220\u2013225","journal-title":"Int J Innov Manag Technol"},{"key":"1375_CR153","doi-asserted-by":"crossref","unstructured":"Zackrissona M, Kurdveab M, Shahbazib S, Wiktorssonb M, Winrothc M, Landstromc A, Almstromc P (2016) Sustainability performance indicators at shop floor level in large manufacturing companies. In: The 24th CIRP conference on life cycle engineering, vol 61, pp 457\u2013462","DOI":"10.1016\/j.procir.2016.11.199"},{"issue":"4","key":"1375_CR154","doi-asserted-by":"publisher","first-page":"96","DOI":"10.1287\/inte.16.4.96","volume":"16","author":"F Zahedi","year":"1986","unstructured":"Zahedi F (1986) The analytic hierarchy process\u2014a survey of the method and its applications. Interfaces 16(4):96\u2013108","journal-title":"Interfaces"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-021-01375-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-021-01375-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-021-01375-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,6]],"date-time":"2023-02-06T19:35:29Z","timestamp":1675712129000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-021-01375-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,9,22]]},"references-count":153,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2022,4]]}},"alternative-id":["1375"],"URL":"https:\/\/doi.org\/10.1007\/s13198-021-01375-6","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,9,22]]},"assertion":[{"value":"29 January 2021","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 September 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 September 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 September 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors have no potential conflicts of interest to declare that are relevant to the content of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"Authors do not involve any human\/animal participants in research.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Human and animal rights"}},{"value":"Research is conducted on data collected by the authors, and no formal consent is required from anywhere.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}