{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,23]],"date-time":"2026-06-23T02:17:00Z","timestamp":1782181020067,"version":"3.54.5"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2021,10,8]],"date-time":"2021-10-08T00:00:00Z","timestamp":1633651200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,10,8]],"date-time":"2021-10-08T00:00:00Z","timestamp":1633651200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"name":"mmec"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2022,6]]},"DOI":"10.1007\/s13198-021-01411-5","type":"journal-article","created":{"date-parts":[[2021,10,9]],"date-time":"2021-10-09T03:34:29Z","timestamp":1633750469000},"page":"1162-1169","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage"],"prefix":"10.1007","volume":"13","author":[{"given":"Deepak","family":"Gupta","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Sonia","family":"Goel","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5829-6068","authenticated-orcid":false,"given":"Neeraj","family":"Mangla","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2021,10,8]]},"reference":[{"key":"1411_CR1","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1007\/s10878-020-00591-3","volume":"40","author":"Z Adak","year":"2020","unstructured":"Adak Z, Ar\u0131o\u011flu Akan M\u00d6, Bulkan S (2020) Multiprocessor open shop problem: literature review and future directions. J Comb Optim 40:547\u2013569","journal-title":"J Comb Optim"},{"key":"1411_CR2","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2020\/7132469","volume":"2020","author":"J Belabid","year":"2020","unstructured":"Belabid J, Aqil S, Allali K (2020) Solving permutation flow shop scheduling problem with sequence-independent setup time. J Appl Math 2020:1\u201311","journal-title":"J Appl Math"},{"key":"1411_CR3","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1057\/jors.1966.25","volume":"17","author":"A Brown","year":"1966","unstructured":"Brown A, Lomnicki Z (1966) Some application of branch and bound algorithm to the machine scheduling problem. Oper Res Q 17:173\u2013186","journal-title":"Oper Res Q"},{"issue":"2","key":"1411_CR4","doi-asserted-by":"publisher","first-page":"362","DOI":"10.1016\/j.cie.2012.04.001","volume":"63","author":"SH Choi","year":"2012","unstructured":"Choi SH, Wang K (2012) Flexible flow shop scheduling with stochastic processing times: a decomposition-based approach. Comput Ind Eng 63(2):362\u2013373. https:\/\/doi.org\/10.1016\/j.cie.2012.04.001","journal-title":"Comput Ind Eng"},{"issue":"3","key":"1411_CR5","doi-asserted-by":"crossref","first-page":"68","DOI":"10.15446\/ing.investig.v38n3.75281","volume":"38","author":"IA Chaudhry","year":"2018","unstructured":"Chaudhry IA, Elbadawi IA, Usman M, TajammalChugtai M (2018) Minimising total flowtime in a no-wait flow shop (NWFS) using genetic algorithms. Ing Investig 38(3):68\u201379","journal-title":"Ing Investig"},{"issue":"1","key":"1411_CR6","first-page":"13","volume":"9","author":"SD Choudhari","year":"2017","unstructured":"Choudhari SD, Khanna R (2017) Flow shop scheduling problem with loading and unloading time with four machines. Int J Math Res 9(1):13\u201326","journal-title":"Int J Math Res"},{"issue":"4","key":"1411_CR7","first-page":"55","volume":"16","author":"H Gholizadeh","year":"2019","unstructured":"Gholizadeh H, Fazlollahtabar H, Gholizadeh R (2019) A modified branch and bound algorithm for a vague flow-shop scheduling problem. Iran J Fuzzy Syst 16(4):55\u201364","journal-title":"Iran J Fuzzy Syst"},{"issue":"3","key":"1411_CR8","doi-asserted-by":"publisher","first-page":"814","DOI":"10.1016\/j.ejor.2020.01.039","volume":"284","author":"J Gmys","year":"2020","unstructured":"Gmys J, Mezmaz M, Melab N, Tuyttens D (2020) A computationally efficient Branch-and-Bound algorithm for the permutation flow-shop scheduling problem. Eur J Oper Res 284(3):814\u2013833","journal-title":"Eur J Oper Res"},{"issue":"4","key":"1411_CR9","first-page":"399","volume":"8","author":"E Gonz\u00e1lez-Neira","year":"2017","unstructured":"Gonz\u00e1lez-Neira E, Montoya-Torres J, Barrera D (2017) Flow-shop scheduling problem under uncertainties: review and trends. Int J Ind Eng Comput 8(4):399\u2013426","journal-title":"Int J Ind Eng Comput"},{"key":"1411_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/s10033-020-00462-2","volume":"33","author":"L Gui","year":"2020","unstructured":"Gui L, Gao L, Li X (2020) Anomalies in special permutation flow shop scheduling problems. Chin J Mech Eng 33:1\u20137","journal-title":"Chin J Mech Eng"},{"issue":"5","key":"1411_CR11","doi-asserted-by":"publisher","first-page":"1399","DOI":"10.1080\/00207549608904972","volume":"34","author":"A Guinet","year":"1996","unstructured":"Guinet A, Solomon MM, Kedia PK, Dussauchoy A (1996) A computational study of heuristics for two-stage flexible flowshops. Int J Prod Res 34(5):1399\u20131415","journal-title":"Int J Prod Res"},{"issue":"8","key":"1411_CR12","doi-asserted-by":"publisher","first-page":"2309","DOI":"10.1080\/002075497194868","volume":"35","author":"JND Gupta","year":"1997","unstructured":"Gupta JND (1997) A flowshop scheduling problem with two operations per job. Int J Prod Res 35(8):2309\u20132325","journal-title":"Int J Prod Res"},{"issue":"10","key":"1411_CR13","doi-asserted-by":"publisher","first-page":"1037","DOI":"10.4236\/jep.2017.810066","volume":"8","author":"RH Huang","year":"2017","unstructured":"Huang RH, Yu SC, Chen PH (2017) Energy-saving scheduling in a flexible flow shop using a hybrid genetic algorithm. J Environ Prot 8(10):1037\u20131056","journal-title":"J Environ Prot"},{"issue":"1","key":"1411_CR14","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson SM (1954) Optimal two and three stage production schedules with setup times include. Naval Res Logist Q 1(1):61\u201368","journal-title":"Naval Res Logist Q"},{"key":"1411_CR15","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1287\/opre.13.3.400","volume":"13","author":"E Ignall","year":"1966","unstructured":"Ignall E, Scharge L (1966) Application of Branch and Bound technique to some flow shop problems. Oper Res 13:400\u2013412","journal-title":"Oper Res"},{"issue":"10","key":"1411_CR16","doi-asserted-by":"publisher","first-page":"2926","DOI":"10.1080\/00207543.2018.1550269","volume":"57","author":"GM Komaki","year":"2019","unstructured":"Komaki GM, Sheikh S, Malakooti B (2019) Flow shop scheduling problems with assembly operations: a review and new trends. Int J Prod Res 57(10):2926\u20132955","journal-title":"Int J Prod Res"},{"issue":"1","key":"1411_CR17","doi-asserted-by":"publisher","first-page":"351","DOI":"10.1051\/ro\/2018062","volume":"53","author":"I Krimi","year":"2019","unstructured":"Krimi I, Benmansour R, Hanafi S, Elhachemi N (2019) Two-machine flow shop with synchronized periodic maintenance. RAIRO-Oper Res 53(1):351\u2013365","journal-title":"RAIRO-Oper Res"},{"issue":"12","key":"1411_CR18","doi-asserted-by":"publisher","first-page":"1478","DOI":"10.1016\/j.ifacol.2016.07.780","volume":"49","author":"I Laribi","year":"2016","unstructured":"Laribi I, Yalaoui F, Belkaid F, Sari Z (2016) Heuristics for solving flow shop scheduling problem under resources constraints. IFAC-Papers on-Line 49(12):1478\u20131483","journal-title":"IFAC-Papers on-Line"},{"issue":"2","key":"1411_CR19","first-page":"136","volume":"13","author":"G Lebbar","year":"2018","unstructured":"Lebbar G, Abbassi I, Jabri A, Barkany A, Darcherif M (2018) Multi-criteria blocking flow shop scheduling problems: formulation and performance analysis. Adv Prod Eng Manag 13(2):136\u2013146","journal-title":"Adv Prod Eng Manag"},{"issue":"1","key":"1411_CR20","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/0166-218X(91)90013-M","volume":"30","author":"HT Lee","year":"1991","unstructured":"Lee HT (1991) Parallel machine scheduling with non-simultaneous machine available time. Discret Appl Math 30(1):53\u201361","journal-title":"Discret Appl Math"},{"issue":"1","key":"1411_CR21","doi-asserted-by":"publisher","first-page":"36","DOI":"10.1109\/3477.552184","volume":"27","author":"I Lee","year":"1997","unstructured":"Lee I, Sikora R, Shaw MJ (1997) A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes. IEEE Trans Syst Man Cybern Part B Cybern 27(1):36\u201354","journal-title":"IEEE Trans Syst Man Cybern Part B Cybern"},{"issue":"1","key":"1411_CR22","first-page":"89","volume":"16","author":"ZA Lomnieki","year":"1965","unstructured":"Lomnieki ZA (1965) A Branch and Bound algorithm for the exact solution of three machines sequence problem. Oper Quast 16(1):89\u2013100","journal-title":"Oper Quast"},{"key":"1411_CR23","doi-asserted-by":"crossref","unstructured":"Mazda CN, Kurniawati DA (2020) Branch and Bound method to overcome delay delivery order in flow shop scheduling problem. In: IOP conference series: materials science and engineering, vol 1003, No 1, IOP Publishing, p 012129","DOI":"10.1088\/1757-899X\/1003\/1\/012129"},{"key":"1411_CR24","doi-asserted-by":"publisher","first-page":"473","DOI":"10.1287\/opre.15.3.473","volume":"15","author":"GB Mc-Mahon","year":"1967","unstructured":"Mc-Mahon GB, Burton PG (1967) \u201cFlow shop scheduling with branch and bound method. Oper Res 15:473\u2013481","journal-title":"Oper Res"},{"issue":"1","key":"1411_CR25","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1504\/IJPMB.2019.097823","volume":"9","author":"KK Nailwal","year":"2019","unstructured":"Nailwal KK, Gupta D, Jeet K, Sharma S (2019) An improvement heuristic for permutation flow shop scheduling. Int J Process Manag Benchmarking 9(1):124\u2013148","journal-title":"Int J Process Manag Benchmarking"},{"key":"1411_CR26","first-page":"23","volume":"7","author":"L Narain","year":"2003","unstructured":"Narain L (2003) Minimizing total hiring cost of machines in n \u00d7 m flow shop problem. J Decis Math Sci 7:23\u201332","journal-title":"J Decis Math Sci"},{"issue":"3","key":"1411_CR27","doi-asserted-by":"publisher","first-page":"652","DOI":"10.1007\/s10033-017-0108-2","volume":"30","author":"ZH Ning","year":"2017","unstructured":"Ning ZH, Song YE, Kaidian LI, Siyu CH (2017) Effective iterated greedy algorithm for flow-shop scheduling problems with time lags. Chin J Mech Eng 30(3):652\u2013662","journal-title":"Chin J Mech Eng"},{"issue":"3","key":"1411_CR28","doi-asserted-by":"publisher","first-page":"1174","DOI":"10.3390\/app10031174","volume":"10","author":"X Pang","year":"2020","unstructured":"Pang X, Xue H, Tseng ML, Lim MK, Liu K (2020) Hybrid flow shop scheduling problems using improved fireworks algorithm for permutation. Appl Sci 10(3):1174","journal-title":"Appl Sci"},{"key":"1411_CR29","unstructured":"Prakash D (1977) Bicriteria scheduling problems on parallel Machines. [PhD thesis]. Birekshurg, Virginia"},{"issue":"1","key":"1411_CR30","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1007\/s00170-016-8477-8","volume":"87","author":"CA S\u00e1enz-Alan\u00eds","year":"2016","unstructured":"S\u00e1enz-Alan\u00eds CA, Jobish VD, Salazar-Aguilar MA, Boyer V (2016) A parallel machine batch scheduling problem in a brewing company. Int J Adv Manuf Technol 87(1):65\u201375","journal-title":"Int J Adv Manuf Technol"},{"issue":"7","key":"1411_CR31","first-page":"4791","volume":"17","author":"S Santhi","year":"2020","unstructured":"Santhi S, Selvakumari K (2020) Flow shop scheduling problems using branch and bound technique under LR-fuzzy number. PalArch\u2019s J Archaeol Egypt\/Egyptol 17(7):4791\u20134801","journal-title":"PalArch's J Archaeol Egypt\/Egyptol"},{"issue":"2","key":"1411_CR32","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1111\/j.1468-0394.2005.00297.x","volume":"22","author":"H Wang","year":"2005","unstructured":"Wang H (2005) Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutions. Expert Syst 22(2):78\u201385. https:\/\/doi.org\/10.1111\/j.1468-0394.2005.00297.x","journal-title":"Expert Syst"},{"issue":"15","key":"1411_CR33","doi-asserted-by":"publisher","first-page":"4297","DOI":"10.1007\/s00500-016-2062-9","volume":"21","author":"H Wang","year":"2017","unstructured":"Wang H, Wang W, Sun H, Cui Z, Rahnamayan S, Zeng S (2017) A new cuckoo search algorithm with hybrid strategies for flow shop scheduling problems. Soft Comput 21(15):4297\u20134307","journal-title":"Soft Comput"},{"issue":"4","key":"1411_CR34","doi-asserted-by":"publisher","first-page":"1143","DOI":"10.1080\/00207543.2014.949363","volume":"53","author":"S Wang","year":"2015","unstructured":"Wang S, Liu M, Chu C (2015) A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling. Int J Prod Res 53(4):1143\u20131167","journal-title":"Int J Prod Res"},{"issue":"5","key":"1411_CR35","doi-asserted-by":"publisher","first-page":"68","DOI":"10.3390\/a11050068","volume":"11","author":"VH Yaurima-Basaldua","year":"2018","unstructured":"Yaurima-Basaldua VH, Tchernykh A, Villalobos-Rodr\u00edguez F, Salomon-Torres R (2018) Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing. Algorithms 11(5):68","journal-title":"Algorithms"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-021-01411-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-021-01411-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-021-01411-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,11,10]],"date-time":"2023-11-10T16:26:57Z","timestamp":1699633617000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-021-01411-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,10,8]]},"references-count":35,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2022,6]]}},"alternative-id":["1411"],"URL":"https:\/\/doi.org\/10.1007\/s13198-021-01411-5","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,10,8]]},"assertion":[{"value":"22 June 2021","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"5 September 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"12 September 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 October 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}