{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,21]],"date-time":"2026-04-21T02:33:20Z","timestamp":1776738800367,"version":"3.51.2"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2023,4,19]],"date-time":"2023-04-19T00:00:00Z","timestamp":1681862400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,4,19]],"date-time":"2023-04-19T00:00:00Z","timestamp":1681862400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2024,4]]},"DOI":"10.1007\/s13198-023-01895-3","type":"journal-article","created":{"date-parts":[[2023,4,19]],"date-time":"2023-04-19T11:02:16Z","timestamp":1681902136000},"page":"1424-1433","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Performance analysis of wind\u2013hydro power plant under multi-state failures and repairs"],"prefix":"10.1007","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4066-7630","authenticated-orcid":false,"given":"Vaishali","family":"Tyagi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mangey","family":"Ram","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,4,19]]},"reference":[{"issue":"1","key":"1895_CR1","doi-asserted-by":"publisher","first-page":"190","DOI":"10.1016\/j.renene.2009.04.014","volume":"35","author":"H Arabian-Hoseynabadi","year":"2010","unstructured":"Arabian-Hoseynabadi H, Oraee H, Tavner PJ (2010) Wind turbine productivity considering electrical subassembly reliability. Renew Energy 35(1):190\u2013197","journal-title":"Renew Energy"},{"issue":"10","key":"1895_CR2","doi-asserted-by":"publisher","first-page":"657","DOI":"10.1080\/14786451.2013.855778","volume":"34","author":"TR Ayodele","year":"2015","unstructured":"Ayodele TR, Ogunjuyigbe ASO (2015) Wind energy resource, wind energy conversion system modelling and integration: a survey. Int J Sustain Energ 34(10):657\u2013671","journal-title":"Int J Sustain Energ"},{"issue":"4","key":"1895_CR3","first-page":"493","volume":"8","author":"NR Babu","year":"2013","unstructured":"Babu NR, Arulmozhivarman P (2013) Wind energy conversion systems-a technical review. J Eng Sci Technol 8(4):493\u2013507","journal-title":"J Eng Sci Technol"},{"key":"1895_CR4","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/j.enconman.2013.01.030","volume":"69","author":"G BoroumandJazi","year":"2013","unstructured":"BoroumandJazi G, Rismanchi B, Saidur R (2013) Technical characteristic analysis of wind energy conversion systems for sustainable development. Energy Convers Manage 69:87\u201394","journal-title":"Energy Convers Manage"},{"key":"1895_CR5","doi-asserted-by":"crossref","unstructured":"Cozorici F, Vadan I, Munteanu RA, Cozorici I, Karaissas P (2011) Design and simulation of a small wind\u2013hydro power plant. In: 2011 international conference on clean electrical power (ICCEP). IEEE. Ischia, Italy, pp 308\u2013311","DOI":"10.1109\/ICCEP.2011.6036304"},{"issue":"4","key":"1895_CR6","doi-asserted-by":"publisher","first-page":"1664","DOI":"10.1109\/TSTE.2018.2868565","volume":"10","author":"S Das","year":"2018","unstructured":"Das S, Subudhi B (2018) A robust active and reactive power control scheme with multiloop disturbance rejection for a wind energy conversion system. IEEE Trans Sustain Energy 10(4):1664\u20131671","journal-title":"IEEE Trans Sustain Energy"},{"issue":"5","key":"1895_CR7","doi-asserted-by":"publisher","first-page":"523","DOI":"10.1049\/iet-rpg.2017.0369","volume":"12","author":"G Denis","year":"2018","unstructured":"Denis G, Prevost T, Debry MS, Xavier F, Guillaud X, Menze A (2018) The Migrate project: the challenges of operating a transmission grid with only inverter-based generation: a grid-forming control improvement with transient current-limiting control. IET Renew Power Gen 12(5):523\u2013529","journal-title":"IET Renew Power Gen"},{"issue":"6","key":"1895_CR8","first-page":"1325","volume":"4","author":"S Ghosh","year":"2019","unstructured":"Ghosh S, Swarnkar P, Deshpande DM (2019) Comparative analysis based on simulation & design aspects of three phase four switch inverter for industrial applications. Int J Math Eng Manag Sci 4(6):1325\u20131340","journal-title":"Int J Math Eng Manag Sci"},{"issue":"1","key":"1895_CR9","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1108\/IJQRM-09-2015-0143","volume":"34","author":"N Goyal","year":"2017","unstructured":"Goyal N, Ram M (2017) Stochastic modelling of a wind electric generating power plant: performance under multi-approaches. Int J Qual Reliab Manag 34(1):103\u2013127","journal-title":"Int J Qual Reliab Manag"},{"issue":"4","key":"1895_CR10","doi-asserted-by":"publisher","first-page":"1696","DOI":"10.1109\/TSTE.2018.2869480","volume":"10","author":"T Jain","year":"2018","unstructured":"Jain T, Yame JJ (2018) Fault-tolerant economic model predictive control for wind turbines. IEEE Trans Sustain Energy 10(4):1696\u20131704","journal-title":"IEEE Trans Sustain Energy"},{"issue":"11","key":"1895_CR11","doi-asserted-by":"publisher","first-page":"2380","DOI":"10.1016\/j.renene.2009.03.020","volume":"34","author":"AK Kaviani","year":"2009","unstructured":"Kaviani AK, Riahy GH, Kouhsari SM (2009) Optimal design of a reliable hydrogen-based stand-alone wind\/PV generating system, considering component outages. Renew Energy 34(11):2380\u20132390","journal-title":"Renew Energy"},{"issue":"6","key":"1895_CR12","first-page":"1496","volume":"4","author":"D Kour","year":"2019","unstructured":"Kour D, Joorel JPS, Sharma N (2019) Effectiveness analysis of a two non-identical unit standby system with switching device and proviso of rest. Int J Math Eng Manag Sci 4(6):1496\u20131507","journal-title":"Int J Math Eng Manag Sci"},{"key":"1895_CR13","doi-asserted-by":"crossref","unstructured":"Kumar K, Ansari MA (2013) Design and development of hybrid wind-hydro power generation system. In: 2013 international conference on energy efficient technologies for sustainability. IEEE. Nagercoil, India, pp 406\u2013410","DOI":"10.1109\/ICEETS.2013.6533416"},{"issue":"4","key":"1895_CR14","doi-asserted-by":"publisher","first-page":"1493","DOI":"10.1109\/TPWRS.2006.881160","volume":"21","author":"AP Leite","year":"2006","unstructured":"Leite AP, Borges CL, Falcao DM (2006) Probabilistic wind farms generation model for reliability studies applied to Brazilian sites. IEEE Trans Power Syst 21(4):1493\u20131501","journal-title":"IEEE Trans Power Syst"},{"key":"1895_CR15","unstructured":"Liu X, Islam S, Chowdhury AA, Koval DO (2008) Reliability evaluation of a wind-diesel-battery hybrid power system. In: 2008 IEEE\/IAS industrial and commercial power systems technical conference. IEEE. Clearwater Beach, FL, USA, pp 1\u20138"},{"issue":"12","key":"1895_CR16","doi-asserted-by":"publisher","first-page":"5217","DOI":"10.1016\/j.energy.2010.07.044","volume":"35","author":"MC Mabel","year":"2010","unstructured":"Mabel MC, Raj RE, Fernandez E (2010) Adequacy evaluation of wind power generation systems. Energy 35(12):5217\u20135222","journal-title":"Energy"},{"key":"1895_CR17","doi-asserted-by":"crossref","unstructured":"Majeed AR, Sadiq NM (2006) Availability & Reliability evaluation of Dokan hydro power station. In: 2006 IEEE\/PES transmission & distribution conference and exposition: Latin America. IEEE. Caracas, Venezuela, pp 1\u20136","DOI":"10.1109\/TDCLA.2006.311494"},{"key":"1895_CR18","doi-asserted-by":"crossref","unstructured":"Manco T, Testa A (2007) A Markovian approach to model power availability of a wind turbine. In: 2007 IEEE Lausanne Power Tech. IEEE. Lausanne, Switzerland, pp 1256\u20131261","DOI":"10.1109\/PCT.2007.4538496"},{"issue":"2","key":"1895_CR19","doi-asserted-by":"publisher","first-page":"648","DOI":"10.1080\/00207543.2014.962114","volume":"53","author":"M Manglik","year":"2015","unstructured":"Manglik M, Ram M (2015) Behavioural analysis of a hydroelectric production power plant under reworking scheme. Int J Prod Res 53(2):648\u2013664","journal-title":"Int J Prod Res"},{"issue":"4","key":"1895_CR20","first-page":"663","volume":"8","author":"M Padhee","year":"2017","unstructured":"Padhee M, Karki R (2017) Reliability\/environmental impacts of wind energy curtailment due to ramping constraints. Int J Syst Assur Eng Manag 8(4):663\u2013672","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"1895_CR21","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0026-2714(93)E0019-6","volume":"35","author":"D Pandey","year":"1995","unstructured":"Pandey D, Jacob M (1995) Cost analysis, availability and MTTF of a three state standby complex system under common cause and human failures. Microelectron Reliab 35(1):91\u201395","journal-title":"Microelectron Reliab"},{"issue":"3","key":"1895_CR22","doi-asserted-by":"publisher","first-page":"1029","DOI":"10.1007\/s40430-014-0227-y","volume":"37","author":"M Ram","year":"2015","unstructured":"Ram M, Kumar A (2015) Performability analysis of a system under 1-out-of-2: G scheme with perfect reworking. J Braz Soc Mech Sci Eng 37(3):1029\u20131038","journal-title":"J Braz Soc Mech Sci Eng"},{"issue":"2","key":"1895_CR23","first-page":"192","volume":"3","author":"YS Rao","year":"2012","unstructured":"Rao YS, Laxmi AJ, Kazeminehad M (2012) Modeling and control of hybrid photovoltaic-wind energy conversion system. Int J Adv Eng Technol 3(2):192\u2013201","journal-title":"Int J Adv Eng Technol"},{"key":"1895_CR24","doi-asserted-by":"crossref","unstructured":"Reder MD, Gonzalez E, Melero JJ (2016) Wind turbine failures-tackling current problems in failure data analysis. In: Journal of Physics: Conference Series. IOP Publishing, vol 753, no 7, p 072027","DOI":"10.1088\/1742-6596\/753\/7\/072027"},{"key":"1895_CR25","doi-asserted-by":"publisher","DOI":"10.1007\/s13198-022-01754-7","author":"K Tamvada","year":"2022","unstructured":"Tamvada K, Babu R (2022) Control of doubly fed induction generator for power quality improvement: an overview. Int J Syst Assur Eng Manag. https:\/\/doi.org\/10.1007\/s13198-022-01754-7","journal-title":"Int J Syst Assur Eng Manag"},{"key":"1895_CR26","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1016\/j.egypro.2019.04.005","volume":"162","author":"KB Tawfiq","year":"2019","unstructured":"Tawfiq KB, Mansour AS, Ramadan HS, Becherif M, El-kholya EE (2019) Wind energy conversion system topologies and converters: comparative review. Energy Procedia 162:38\u201347","journal-title":"Energy Procedia"},{"issue":"2","key":"1895_CR28","doi-asserted-by":"publisher","first-page":"842","DOI":"10.1007\/s13198-021-01129-4","volume":"13","author":"S Tyagi","year":"2022","unstructured":"Tyagi S, Goyal N, Kumar A, Ram M (2022) Stochastic hybrid energy system modelling with component failure and repair. Int J Syst Assur Eng Manag 13(2):842\u2013852","journal-title":"Int J Syst Assur Eng Manag"},{"key":"1895_CR29","unstructured":"Velan SSS, Muthukumaran G, Balasubramaniyan S (2012) Windmill power generation using mult-generator and single rotor (horizontal and vertical blade). J Energy Technol Policy 2(2)"},{"key":"1895_CR30","doi-asserted-by":"publisher","DOI":"10.1142\/7489","volume-title":"Handbook of renewable energy technology","author":"AF Zobaa","year":"2011","unstructured":"Zobaa AF, Bansal RC (2011) Handbook of renewable energy technology. World Scientific"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-023-01895-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-023-01895-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-023-01895-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,5,1]],"date-time":"2024-05-01T13:32:51Z","timestamp":1714570371000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-023-01895-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,4,19]]},"references-count":29,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2024,4]]}},"alternative-id":["1895"],"URL":"https:\/\/doi.org\/10.1007\/s13198-023-01895-3","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,4,19]]},"assertion":[{"value":"12 September 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 February 2023","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 March 2023","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 April 2023","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors confirm that there is no conflict of interest to declare for this publication.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}