{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,29]],"date-time":"2026-05-29T11:19:39Z","timestamp":1780053579844,"version":"3.54.0"},"reference-count":43,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2023,8,15]],"date-time":"2023-08-15T00:00:00Z","timestamp":1692057600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,8,15]],"date-time":"2023-08-15T00:00:00Z","timestamp":1692057600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"funder":[{"DOI":"10.13039\/100020552","name":"MOHERI","doi-asserted-by":"crossref","award":["GFP-GRG-EI-21-075"],"award-info":[{"award-number":["GFP-GRG-EI-21-075"]}],"id":[{"id":"10.13039\/100020552","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2024,5]]},"DOI":"10.1007\/s13198-023-02042-8","type":"journal-article","created":{"date-parts":[[2023,8,15]],"date-time":"2023-08-15T06:01:27Z","timestamp":1692079287000},"page":"1735-1742","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["Reliability analysis of power transformers of a power distribution company"],"prefix":"10.1007","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2046-9143","authenticated-orcid":false,"given":"Nabila","family":"Al Balushi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S. M.","family":"Rizwan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S. Z.","family":"Taj","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Waleed","family":"Al Khairi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2023,8,15]]},"reference":[{"issue":"1","key":"2042_CR1","first-page":"257","volume":"16","author":"N Al Balushi","year":"2021","unstructured":"Al Balushi N (2021) Review of the reliability analysis of the complex industrial systems. Adv Dyn Syst Appl 16(1):257\u2013297","journal-title":"Adv Dyn Syst Appl"},{"key":"2042_CR2","doi-asserted-by":"publisher","unstructured":"Al Hemyari Z, and Rizwan SM (2007). Reliability analysis of a two-unit system. In: Proceedings of IEEE international conference on industrial engineering and engineering management, Singapore, ISBN: 978\u20131\u20134244\u20131529\u20138. https:\/\/doi.org\/10.1109\/1EEM.2007. 4419395, pp 1265\u20131268","DOI":"10.1109\/1EEM.2007"},{"key":"2042_CR3","doi-asserted-by":"crossref","unstructured":"Al Rahbi Y, Rizwan S, Alkali B, Cowell A and Taneja G (2017a). Reliability analysis of a subsystem in aluminium industry plant. In: 6th international conference on reliability, Infocom Technologies and Optimization (Trends and Future Directions. [online] Noida, UP, India: IEEE, pp 199\u2013203","DOI":"10.1109\/ICRITO.2017.8342424"},{"issue":"16","key":"2042_CR4","first-page":"5616","volume":"12","author":"Y Al Rahbi","year":"2017","unstructured":"Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2017b) Reliability analysis of rodding anode plant in aluminium industry. Int J Appl Eng Res 12(16):5616\u20135623","journal-title":"Int J Appl Eng Res"},{"issue":"4","key":"2042_CR5","first-page":"695","volume":"9","author":"Y Al Rahbi","year":"2018","unstructured":"Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2018a) Maintenance analysis of a butt thimble removal station in aluminium plant. Int J Mech Eng Technol 9(4):695\u2013703","journal-title":"Int J Mech Eng Technol"},{"issue":"5","key":"2042_CR6","first-page":"569","volume":"53","author":"Y Al Rahbi","year":"2018","unstructured":"Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2018b) Reliability analysis of rodding anode plant in an aluminium industry with multiple repairmen. Adv Appl Stat 53(5):569\u2013597","journal-title":"Adv Appl Stat"},{"issue":"1","key":"2042_CR7","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1007\/s13198-019-00771-3","volume":"10","author":"Y Al Rahbi","year":"2019","unstructured":"Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2019a) Reliability analysis of a rodding anode plant in aluminium industry with multiple units\u2019 failure and single repairman. Int J Syst Assur Eng Manag 10(1):97\u2013109","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"2042_CR8","first-page":"151","volume":"54","author":"Y Al Rahbi","year":"2019","unstructured":"Al Rahbi Y, Rizwan S, Alkali B, Cowell A, Taneja G (2019b) Reliability analysis of multiple units with multiple repairmen of rodding anode plant in aluminium industry. Adv Appl Stat 54(1):151\u2013178","journal-title":"Adv Appl Stat"},{"key":"2042_CR9","doi-asserted-by":"crossref","unstructured":"Al Rahbi Y, Rizwan S (2020). A comparative analysis between the models of a single component with single repairman & multiple repairmen of an aluminium industry. In: International conference on computational performance evaluation, North-Eastern Hill University, Shillong, Meghalaya, India","DOI":"10.1109\/ComPE49325.2020.9200048"},{"issue":"4","key":"2042_CR10","doi-asserted-by":"publisher","first-page":"436","DOI":"10.3844\/jmssp.2014.436.442","volume":"10","author":"S Dalip","year":"2014","unstructured":"Dalip S, Taneja G (2014) Reliability and economic analysis of a power generating system comprising one gas and one steam turbine with random inspection. J Math Stat 10(4):436\u2013442","journal-title":"J Math Stat"},{"issue":"2","key":"2042_CR11","doi-asserted-by":"publisher","first-page":"46","DOI":"10.21622\/resd.2019.05.2.046","volume":"5","author":"AA El-Bassiouny","year":"2019","unstructured":"El-Bassiouny AA, El-Shimy M, Hamouda R (2019) Probabilistic analysis of the reliability performance for power transformers in Egypt. Renew Energy Sustain Dev 5(2):46","journal-title":"Renew Energy Sustain Dev"},{"key":"2042_CR12","unstructured":"Mathew A, Rizwan SM, Majumder M and Ramachandran K (2009) MTSF and availability of a two-unit CC plant. In: 3rd international conference on modeling, simulation, and applied optimization. Sharjah, UAE: pp 1\u20135"},{"key":"2042_CR13","doi-asserted-by":"crossref","unstructured":"Mathew A, Rizwan SM, Majumder MC, Ramachandran KP & Gulshan T (2010) Comparative analysis between the profits of the two models of a CC plant. In: International conference on modeling, optimization and computing, national institute of technology, Durgapur, India, 28\u201330, AIP Conf. Proc. vol. 1298, pp 226\u2013231","DOI":"10.1063\/1.3516306"},{"issue":"7","key":"2042_CR14","doi-asserted-by":"publisher","first-page":"1488","DOI":"10.1016\/j.jfranklin.2010.04.016","volume":"348","author":"A Mathew","year":"2011","unstructured":"Mathew A, Rizwan SM, Majumder M, Ramachandran K (2011a) Reliability modelling and analysis of a two-unit continuous casting plant. J Franklin Inst 348(7):1488\u20131505","journal-title":"J Franklin Inst"},{"issue":"2","key":"2042_CR15","first-page":"179","volume":"7","author":"A Mathew","year":"2011","unstructured":"Mathew A, Rizwan SM, Majumder M, Ramachandran K, Taneja G (2011b) Reliability analysis of an identical two-unit parallel CC plant system operative with full installed capacity. Int J Perform Eng 7(2):179\u2013185","journal-title":"Int J Perform Eng"},{"key":"2042_CR16","volume-title":"Stochastic processes","author":"J Medhi","year":"2012","unstructured":"Medhi J (2012) Stochastic processes. New Academic Science Limited, Tunbridge Wells"},{"issue":"1","key":"2042_CR17","first-page":"1","volume":"2","author":"M Mirzai","year":"2006","unstructured":"Mirzai M, Gholami A, Aminifar F (2006) Failures analysis and reliability calculation for power transformers. J Electric Syst 2(1):1\u201312","journal-title":"J Electric Syst"},{"key":"2042_CR18","unstructured":"Neto AB, Costa EG, Moreas VS and Ferrira TV (2017) Methodology for reliability analysis of power transformers based on failure data. In: International symposium on high voltage engineering, pp 6"},{"issue":"1","key":"2042_CR19","first-page":"1","volume":"4","author":"N Padmavathi","year":"2012","unstructured":"Padmavathi N, Rizwan S, Pal A, Taneja G (2012) Reliability analysis of an evaporator of a desalination plant with online repair and emergency shutdowns. Arya J Math Inform 4(1):1\u201312","journal-title":"Arya J Math Inform"},{"key":"2042_CR20","unstructured":"Padmavathi, N., Rizwan, S., Pal, A. and Taneja, G. (2013a). Comparative analysis of the two models of an evaporator of a desalination plant. In: International conference on information and mathematical sciences. Bathinda, Punjab, India: pp 418\u2013422"},{"issue":"1","key":"2042_CR21","first-page":"1","volume":"4","author":"N Padmavathi","year":"2013","unstructured":"Padmavathi N, Rizwan S, Pal A, Taneja G (2013b) Probabilistic analysis of an evaporator of a desalination plant with priority for repair over maintenance. Int J Sci Stat Comput 4(1):1\u20138","journal-title":"Int J Sci Stat Comput"},{"issue":"1","key":"2042_CR22","first-page":"15","volume":"5","author":"N Padmavathi","year":"2014","unstructured":"Padmavathi N, Rizwan S, Pal A, Taneja G (2014a) Probabilistic analysis of a desalination plant with major and minor failures and shutdown during winter season. Int J Sci Stat Comput 5(1):15\u201323","journal-title":"Int J Sci Stat Comput"},{"issue":"1","key":"2042_CR23","first-page":"219","volume":"6","author":"N Padmavathi","year":"2014","unstructured":"Padmavathi N, Rizwan S, Pal A, Taneja G (2014b) Probabilistic analysis of a seven-unit desalination plant with minor\/major failures and priority given to repair over maintenance. Arya J Math Inf 6(1):219\u2013230","journal-title":"Arya J Math Inf"},{"issue":"12","key":"2042_CR24","first-page":"1","volume":"1","author":"N Padmavathi","year":"2015","unstructured":"Padmavathi N, Rizwan S, Senguttuvan A (2015) Comparative analysis between the reliability models portraying two operating conditions of a desalination plant. Int J Core Eng Manag 1(12):1\u201310","journal-title":"Int J Core Eng Manag"},{"key":"2042_CR25","doi-asserted-by":"publisher","unstructured":"Papada, V.T. and Dialynas, E.N. (2016). Probabilistic modelling of the effect of maintenance on reliability of power transformers. In: Mediterranean conference on power generation, transmission, distribution and energy conversion (MedPower 2016). https:\/\/doi.org\/10.1049\/cp.2016.1035","DOI":"10.1049\/cp.2016.1035"},{"issue":"5","key":"2042_CR26","first-page":"523","volume":"9","author":"SM Rizwan","year":"2013","unstructured":"Rizwan SM, Padmavathi N, Anita P, Taneja G (2013) Reliability analysis of a seven-unit desalination plant with shutdown during winter season and repair\/maintenance on FCFS basis. Int J Perform Eng 9(5):523\u2013528","journal-title":"Int J Perform Eng"},{"issue":"3","key":"2042_CR27","first-page":"3","volume":"17","author":"SM Rizwan","year":"2014","unstructured":"Rizwan SM, Thanikal J, Torrijos M (2014) A general model for reliability analysis of a domestic wastewater treatment plant. Int J Cond Monit Diagn Eng Manag 17(3):3\u20136","journal-title":"Int J Cond Monit Diagn Eng Manag"},{"issue":"24","key":"2042_CR28","first-page":"44075","volume":"10","author":"SM Rizwan","year":"2015","unstructured":"Rizwan SM, Thanikal J, Padmavathi N, Yazdi H (2015) Reliability and availability analysis of an anaerobic batch reactor treating fruit and vegetable waste. Int J Appl Eng Res 10(24):44075\u201344079","journal-title":"Int J Appl Eng Res"},{"issue":"6","key":"2042_CR29","doi-asserted-by":"publisher","first-page":"24","DOI":"10.14445\/22315381\/IJETT-V70I6P203","volume":"70","author":"SM Rizwan","year":"2022","unstructured":"Rizwan SM, Al Nabhani H, Al Rahbi Y, Alagiriswamy S (2022) Reliability analysis of a three-unit pumping system. Int J Eng Trends Technol 70(6):24\u201331","journal-title":"Int J Eng Trends Technol"},{"key":"2042_CR30","first-page":"24","volume":"17","author":"K Sachdeva","year":"2022","unstructured":"Sachdeva K, Taneja G, Manucha A (2022) Sensitivity and economic analysis of an insured system with extended conditional warranty. Reliab Theory Appl 17:24\u201331","journal-title":"Reliab Theory Appl"},{"key":"2042_CR31","first-page":"012008","volume":"1714","author":"M Saini","year":"2021","unstructured":"Saini M, Goyal D, Kumar A, Sinwar D (2021) Investigation of performance measures of power generating unit of sewage treatment plant. J Phys: Conf Ser 1714:012008","journal-title":"J Phys: Conf Ser"},{"issue":"7","key":"2042_CR32","first-page":"13965","volume":"6","author":"U Sharma","year":"2018","unstructured":"Sharma U, Sharma G (2018) Semi-markov model for a power plant system comprising of three low pressure boilers and fans. Int J Res Advent Technol 6(7):13965\u201321398","journal-title":"Int J Res Advent Technol"},{"issue":"3","key":"2042_CR33","doi-asserted-by":"publisher","first-page":"12","DOI":"10.26634\/jmat.6.3.13649","volume":"6","author":"S Taj","year":"2017","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2017a) Probabilistic modelling and analysis of a cable plant subsystem with priority to repair over preventive maintenance. I-Manager\u2019s J Math 6(3):12\u201321","journal-title":"I-Manager\u2019s J Math"},{"issue":"8","key":"2042_CR34","first-page":"1752","volume":"1","author":"S Taj","year":"2017","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2017b) Reliability analysis of a single machine subsystem of a cable plant with six maintenance categories. Int J Appl Eng Res 1(8):1752\u20131757","journal-title":"Int J Appl Eng Res"},{"key":"2042_CR35","doi-asserted-by":"crossref","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2017c) Reliability modelling and analysis of a single machine subsystem of a cable plant. In: 7th international conference on modeling, simulation, and applied optimization. Sharjah, UAE: IEEE, pp 1\u20134","DOI":"10.1109\/ICMSAO.2017.7934917"},{"issue":"6","key":"2042_CR36","first-page":"413","volume":"52","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2018a) Reliability analysis of a 3-unit subsystem of a cable plant. Adv Appl Stat 52(6):413\u2013429","journal-title":"Adv Appl Stat"},{"issue":"4","key":"2042_CR37","first-page":"1","volume":"9","author":"S Taj","year":"2018","unstructured":"Taj S, Rizwan S, Taneja G (2018b) Reliability analysis of a wire drawing system with mandatory rest period. Int J Mech Eng Technol 9(4):1\u201310","journal-title":"Int J Mech Eng Technol"},{"key":"2042_CR38","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D and Taneja G (2018c) Comparative analysis of reliability models of a cable plant portraying summer and winter operating strategy. In: International conference on quality, reliability, Infocom technology and business operations. Delhi, India: Springer"},{"issue":"3.4","key":"2042_CR39","doi-asserted-by":"publisher","first-page":"243","DOI":"10.14419\/ijet.v7i3.4.16782","volume":"7","author":"S Taj","year":"2018","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018d) Performance analysis of a rod breakdown system. Int J Eng Technol 7(3.4):243\u2013248","journal-title":"Int J Eng Technol"},{"issue":"8","key":"2042_CR40","first-page":"814","volume":"9","author":"S Taj","year":"2018","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018e) Performance and cost benefit analysis of a cable plant with storage of surplus produce. Int J Mech Eng Technol 9(8):814\u2013826","journal-title":"Int J Mech Eng Technol"},{"issue":"11","key":"2042_CR41","first-page":"370","volume":"9","author":"S Taj","year":"2018","unstructured":"Taj S, Rizwan S, Alkali B, Harrison D, Taneja G (2018f) Profit analysis of a cable manufacturing plant portraying the winter operating strategy. Int J Mech Eng Technol 9(11):370\u2013381","journal-title":"Int J Mech Eng Technol"},{"key":"2042_CR42","doi-asserted-by":"publisher","first-page":"43","DOI":"10.26634\/jmat.8.2.16711","volume":"8","author":"S Taj","year":"2019","unstructured":"Taj S, Rizwan S (2019) Reliability modeling and analysis of complex industrial systems \u2013 a review. I-Manager\u2019s J Math 8:43\u201360","journal-title":"I-Manager\u2019s J Math"},{"key":"2042_CR43","doi-asserted-by":"publisher","DOI":"10.1007\/s13198-020-01012-8","author":"SZ Taj","year":"2020","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2020) Three reliability models of a building cable manufacturing plant: a comparative analysis. Int J Syst Assur Eng Manag. https:\/\/doi.org\/10.1007\/s13198-020-01012-8","journal-title":"Int J Syst Assur Eng Manag"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-023-02042-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-023-02042-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-023-02042-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,19]],"date-time":"2024-07-19T14:48:57Z","timestamp":1721400537000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-023-02042-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,8,15]]},"references-count":43,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2024,5]]}},"alternative-id":["2042"],"URL":"https:\/\/doi.org\/10.1007\/s13198-023-02042-8","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,8,15]]},"assertion":[{"value":"31 March 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 June 2023","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 July 2023","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 August 2023","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflicts of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflicts of interest"}},{"value":"This study was performed in line with the principles of the Declaration of Helsinki. Approval was granted by the Ethics Committee at the National University of Science and Technology Oman.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Human participants and\/or animals"}},{"value":"Informed consent was obtained from all individuals included in the study.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}