{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,22]],"date-time":"2026-07-22T21:59:58Z","timestamp":1784757598951,"version":"3.55.0"},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2024,1,30]],"date-time":"2024-01-30T00:00:00Z","timestamp":1706572800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2024,1,30]],"date-time":"2024-01-30T00:00:00Z","timestamp":1706572800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"name":"Military Technical College"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2024,6]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>Egypt has witnessed a revolution in all fields and the establishment of giant projects, which require the selection of the appropriate contractor for their implementation. The major factor for evaluating contractors is the tender price of the project. The lowest price is not always a guarantee of the quality or time of a building project. Recently, there has been a shift away from the \u201clowest-price-wins\u201d concept and a subjective judgment towards multi-criteria decision-making of selecting the project's contractors aiming to help owners in making decisions. The manuscript presents a multi-criteria decision-making strategy to optimize the selection of contractors for construction projects. The calculation of this strategy is divided into two phases. The first phase is designed to identify contractor prequalification criteria and utilize the AHP approach based on current Egyptian practice to calculate their weight. The second phase provides two techniques: (1) technique for order preference by similarity to ideal solution (TOPSIS) and (2) vlsekriterijumska optimization I kompromisno resenje (VIKOR) to optimize the selection of the available contractors for construction projects. Contractor 2 has the highest prices and lower values in technical capability, economic status, and management capability, it emerges as the top-ranked contractor in both methods due to its exceptional expertise and safety standards. These elevated levels of expertise and safety, coupled with the higher weights assigned by decision-makers to these criteria, contribute significantly to Contractor 2's superior ranking. A real-life case study improvement and refurbishment project is examined to demonstrate the value and highlight capabilities.<\/jats:p>","DOI":"10.1007\/s13198-024-02249-3","type":"journal-article","created":{"date-parts":[[2024,1,30]],"date-time":"2024-01-30T06:02:05Z","timestamp":1706594525000},"page":"2351-2365","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":15,"title":["Contractor selection by using multi-criteria decision-making for Egyptian road maintenance"],"prefix":"10.1007","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-8101-605X","authenticated-orcid":false,"given":"Mohamed Mahmoud","family":"Fawzy","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ahmed Shawky","family":"Elsharkawy","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yasser Aly","family":"Khalifa","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Abbas Atef","family":"hassan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2024,1,30]]},"reference":[{"key":"2249_CR1","doi-asserted-by":"publisher","unstructured":"Agarwal V, Hameed AZ, Malhotra S, Mathiyazhagan K, Alathur S, Appolloni A (2022) Role of Industry 4.0 in agile manufacturing to achieve sustainable development. Bus Strategy Environ. https:\/\/doi.org\/10.1002\/bse.3321","DOI":"10.1002\/bse.3321"},{"key":"2249_CR2","doi-asserted-by":"publisher","unstructured":"Agarwal V, Mathiyazhagan K, Malhotra S, Pimpunchat B (2023) Building resilience for the sustainability of MSMEs post COVID-19 outbreak: an Indian handicraft industry outlook. Socio-Econ Plan Sci 85(September 2022):101443. https:\/\/doi.org\/10.1016\/j.seps.2022.101443","DOI":"10.1016\/j.seps.2022.101443"},{"issue":"1","key":"2249_CR3","doi-asserted-by":"publisher","first-page":"174","DOI":"10.1109\/TEM.2018.2866269","volume":"67","author":"H Alada\u011f","year":"2018","unstructured":"Alada\u011f H, I\u015fik Z (2018) The effect of stakeholder-associated risks in mega-engineering projects: a case study of a PPP airport project. IEEE Trans Eng Manage 67(1):174\u2013186","journal-title":"IEEE Trans Eng Manage"},{"issue":"4","key":"2249_CR4","doi-asserted-by":"publisher","first-page":"257","DOI":"10.5267\/j.uscm.2014.7.003","volume":"2","author":"A Alirezaie","year":"2014","unstructured":"Alirezaie A, Razavi Khosroshahi SJ (2014) Which contractor selection methodology? Uncertain Supply Chain Manage 2(4):257\u2013260. https:\/\/doi.org\/10.5267\/j.uscm.2014.7.003","journal-title":"Uncertain Supply Chain Manage"},{"issue":"6","key":"2249_CR5","first-page":"492","volume":"19","author":"F Antoniou","year":"2019","unstructured":"Antoniou F, Aretoulis G (2019) A multi-criteria decision-making support system for choice of method of compensation for highway construction contractors in Greece. Int J Constr Manag 19(6):492\u2013508","journal-title":"Int J Constr Manag"},{"issue":"2","key":"2249_CR6","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/ijerph18020373","volume":"18","author":"F Bahootoroody","year":"2021","unstructured":"Bahootoroody F, Khalaj S, Leoni L, De Carlo F, Di Bona G, Forcina A (2021) Reliability estimation of reinforced slopes to prioritize maintenance actions. Int J Environ Res Public Health 18(2):1\u201312. https:\/\/doi.org\/10.3390\/ijerph18020373","journal-title":"Int J Environ Res Public Health"},{"issue":"17","key":"2249_CR7","doi-asserted-by":"publisher","first-page":"13051","DOI":"10.1016\/j.eswa.2012.05.056","volume":"39","author":"M Behzadian","year":"2012","unstructured":"Behzadian M, Khanmohammadi Otaghsara S, Yazdani M, Ignatius J (2012) A state-of the-art survey of TOPSIS applications. Expert Syst Appl 39(17):13051\u201313069. https:\/\/doi.org\/10.1016\/j.eswa.2012.05.056","journal-title":"Expert Syst Appl"},{"issue":"4","key":"2249_CR8","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1080\/01446190500435457","volume":"24","author":"R Best","year":"2006","unstructured":"Best R, Langston C (2006) Evaluation of construction contractor performance: a critical analysis of some recent research. Constr Manag Econ 24(4):439\u2013445","journal-title":"Constr Manag Econ"},{"issue":"11","key":"2249_CR9","doi-asserted-by":"publisher","first-page":"213","DOI":"10.3390\/risks10110213","volume":"10","author":"F Bogn\u00e1r","year":"2022","unstructured":"Bogn\u00e1r F, Szentes B, Benedek P (2022) Development of the PRISM risk assessment method based on a multiple AHP-TOPSIS approach. Risks 10(11):213","journal-title":"Risks"},{"issue":"4","key":"2249_CR10","doi-asserted-by":"publisher","first-page":"60","DOI":"10.4018\/IJISSS.2020100104","volume":"12","author":"GD Bona","year":"2020","unstructured":"Bona GD, Falcone D, Forcina A, Silvestri A, Silvestri L (2020) A new model for maintenance strategy based on failure analysis and multicriteria approach. Int J Inform Syst Service Sector 12(4):60\u201390. https:\/\/doi.org\/10.4018\/IJISSS.2020100104","journal-title":"Int J Inform Syst Service Sector"},{"issue":"3","key":"2249_CR11","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1016\/S0263-7863(99)00070-8","volume":"19","author":"RJ Chapman","year":"2001","unstructured":"Chapman RJ (2001) The controlling influences on effective risk identification and assessment for construction design management. Int J Project Manage 19(3):147\u2013160. https:\/\/doi.org\/10.1016\/S0263-7863(99)00070-8","journal-title":"Int J Project Manage"},{"issue":"1\u20132","key":"2249_CR12","doi-asserted-by":"publisher","first-page":"693","DOI":"10.1007\/s10479-017-2701-2","volume":"273","author":"JD Darbari","year":"2019","unstructured":"Darbari JD, Kannan D, Agarwal V, Jha PC (2019) Fuzzy criteria programming approach for optimising the TBL performance of closed loop supply chain network design problem. Ann Oper Res 273(1\u20132):693\u2013738. https:\/\/doi.org\/10.1007\/s10479-017-2701-2","journal-title":"Ann Oper Res"},{"key":"2249_CR13","doi-asserted-by":"publisher","unstructured":"Demirkesen S, Bayhan HG (2019) Subcontractor Selection with Choosing-By-Advantages (CBA) Method. In: IOP Conference Series: Materials Science and Engineering, 471(2). https:\/\/doi.org\/10.1088\/1757-899X\/471\/2\/022020","DOI":"10.1088\/1757-899X\/471\/2\/022020"},{"issue":"3","key":"2249_CR14","first-page":"175","volume":"25","author":"G Di Bona","year":"2019","unstructured":"Di Bona G, Falcone D, Forcina A (2019) AHP-TOPSIS model to evaluate maintenance strategy using RAMS and production parameters. Int J Operat Quan Manage 25(3):175\u2013201","journal-title":"Int J Operat Quan Manage"},{"key":"2249_CR150","unstructured":"Efforts-economic-development-in-8-years. (n.d.). Retrieved November 1, 2022, from https:\/\/www.sis.gov.eg\/Efforts-economic-development-in-8-years?lang=ar"},{"issue":"7","key":"2249_CR15","doi-asserted-by":"publisher","first-page":"755","DOI":"10.1061\/(asce)co.1943-7862.0000647","volume":"139","author":"MS El-Abbasy","year":"2013","unstructured":"El-Abbasy MS, Zayed T, Ahmed M, Alzraiee H, Abouhamad M (2013) Contractor selection model for highway projects using integrated simulation and analytic network process. J Constr Eng Manag 139(7):755\u2013767. https:\/\/doi.org\/10.1061\/(asce)co.1943-7862.0000647","journal-title":"J Constr Eng Manag"},{"key":"2249_CR16","doi-asserted-by":"publisher","unstructured":"Gul M, Celik E, Aydin N, Gumus AT, Guneri AF (2016) A state of the art literature review of VIKOR and its fuzzy extensions on applications. Appl Soft Comput J, pp 1\u201330. https:\/\/doi.org\/10.1016\/j.asoc.2016.04.040","DOI":"10.1016\/j.asoc.2016.04.040"},{"key":"2249_CR17","doi-asserted-by":"crossref","unstructured":"Gurgun AP, Koc K (2020) Contractor prequalification for green buildings\u2014evidence from Turkey. Engineering, Construction and Architectural Management.","DOI":"10.1108\/ECAM-10-2019-0543"},{"key":"2249_CR18","doi-asserted-by":"publisher","first-page":"33492","DOI":"10.1109\/ACCESS.2022.3161742","volume":"10","author":"J Gyani","year":"2022","unstructured":"Gyani J, Ahmed A, Haq MA (2022) MCDM and various prioritization methods in AHP for CSS: a comprehensive review. IEEE Access 10:33492\u201333511","journal-title":"IEEE Access"},{"issue":"2\u20133","key":"2249_CR19","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1016\/S0360-1323(97)00016-4","volume":"33","author":"Z Hatush","year":"1998","unstructured":"Hatush Z, Skitmore M (1998) Contractor selection using multicriteria utility theory: an additive model. Build Environ 33(2\u20133):105\u2013115","journal-title":"Build Environ"},{"issue":"2","key":"2249_CR20","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1016\/0360-1323(94)90074-4","volume":"29","author":"GD Holt","year":"1994","unstructured":"Holt GD, Olomolaiye PO, Harris FC (1994) Factors influencing UK construction clients\u2019 choice of contractor. Build Environ 29(2):241\u2013248","journal-title":"Build Environ"},{"key":"2249_CR21","doi-asserted-by":"publisher","unstructured":"Horton P, Eaton D (2017). Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method. https:\/\/doi.org\/10.1088\/1757-899X\/245\/6\/062003","DOI":"10.1088\/1757-899X\/245\/6\/062003"},{"key":"2249_CR22","doi-asserted-by":"publisher","DOI":"10.1016\/j.techfore.2022.121524","volume":"177","author":"M Irfan","year":"2022","unstructured":"Irfan M, Elavarasan RM, Ahmad M, Mohsin M, Dagar V, Hao Y (2022) Prioritizing and overcoming biomass energy barriers: application of AHP and G-TOPSIS approaches. Technol Forecast Soc Chang 177:121524","journal-title":"Technol Forecast Soc Chang"},{"key":"2249_CR23","doi-asserted-by":"publisher","first-page":"125","DOI":"10.5267\/j.jpm.2018.1.001","volume":"3","author":"A Jabbarzadeh","year":"2018","unstructured":"Jabbarzadeh A (2018) Application of the AHP and TOPSIS in project management. J Project Manage 3:125\u2013130. https:\/\/doi.org\/10.5267\/j.jpm.2018.1.001","journal-title":"J Project Manage"},{"key":"2249_CR24","unstructured":"Javidi SR, Shamsi GM, Saghi H (2022) Developing multiple criteria decision-making model based on the Best-Worst-VIKOR Method for Evaluation of Civil Projects Contractors, Case Study of Civil Projects in Southern Khorasan Province."},{"issue":"3","key":"2249_CR25","doi-asserted-by":"publisher","first-page":"68","DOI":"10.3390\/info9030068","volume":"9","author":"M Keshavarz-Ghorabaee","year":"2018","unstructured":"Keshavarz-Ghorabaee M, Amiri M, Zavadskas EK, Turskis Z, Antucheviciene J (2018) A dynamic fuzzy approach based on the EDAS method for multi-criteria subcontractor evaluation. Information 9(3):68","journal-title":"Information"},{"issue":"2","key":"2249_CR26","first-page":"1019","volume":"2","author":"J Kumar","year":"2016","unstructured":"Kumar J, Singh GS (2016) Optimization of machining parameters of titanium alloy steel using: TOPSIS method. Ijsrset 2(2):1019\u20131022","journal-title":"Ijsrset"},{"key":"2249_CR27","doi-asserted-by":"publisher","unstructured":"Kumaraswamy MM, Walker DHT (2021) Multiple performance criteria for evaluating construction contractors. Procurement Syst, pp 231\u2013251. https:\/\/doi.org\/10.4324\/9780203982785-22","DOI":"10.4324\/9780203982785-22"},{"issue":"2","key":"2249_CR28","doi-asserted-by":"publisher","first-page":"128","DOI":"10.1080\/096132103200048497","volume":"32","author":"FYY Ling","year":"2004","unstructured":"Ling FYY (2004) Key determinants of performance of design-bid-build projects in Singapore. Build Res Inform 32(2):128\u2013139","journal-title":"Build Res Inform"},{"key":"2249_CR30","doi-asserted-by":"publisher","unstructured":"Mardani A, Zavadskas EK, Govindan K, Senin AA, Jusoh A (2016) VIKOR technique: A systematic review of the state of the art literature on methodologies and applications. Sustainability (Switzerland) 8(1). https:\/\/doi.org\/10.3390\/su8010037","DOI":"10.3390\/su8010037"},{"issue":"01","key":"2249_CR31","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1142\/S1609945102000059","volume":"3","author":"CJM Miller","year":"2002","unstructured":"Miller CJM, Packham GA, Thomas BC (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? J Constr Res 3(01):67\u201382","journal-title":"J Constr Res"},{"issue":"7","key":"2249_CR32","doi-asserted-by":"publisher","first-page":"5176","DOI":"10.1016\/j.rser.2012.05.006","volume":"16","author":"HR Quijano","year":"2012","unstructured":"Quijano HR, Botero BS, Dom\u00ednguez BJ (2012) MODERGIS application: Integrated simulation platform to promote and develop renewable sustainable energy plans, Colombian case study. Renew Sustain Energy Rev 16(7):5176\u20135187. https:\/\/doi.org\/10.1016\/j.rser.2012.05.006","journal-title":"Renew Sustain Energy Rev"},{"issue":"5","key":"2249_CR33","first-page":"60","volume":"69","author":"JS Russell","year":"1999","unstructured":"Russell JS, Hanna AS, Anderson SD, Wiseley PW, Smith RJ (1999) The warranty alternative. Civ Eng 69(5):60","journal-title":"Civ Eng"},{"issue":"2","key":"2249_CR37","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1061\/(asce)9742-597x(1988)4:2(148)","volume":"4","author":"JS Russell","year":"1988","unstructured":"Russell JS, Skibniewski MJ (1988) Decision criteria in contractor prequalification. J Manag Eng 4(2):148\u2013164. https:\/\/doi.org\/10.1061\/(asce)9742-597x(1988)4:2(148)","journal-title":"J Manag Eng"},{"key":"2249_CR34","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/j.autcon.2015.02.009","volume":"59","author":"M Safa","year":"2015","unstructured":"Safa M, Shahi A, Haas CT, Fiander-McCann D, Safa M, Hipel K, MacGillivray S (2015) Competitive intelligence (CI) for evaluation of construction contractors. Autom Constr 59:149\u2013157. https:\/\/doi.org\/10.1016\/j.autcon.2015.02.009","journal-title":"Autom Constr"},{"issue":"1","key":"2249_CR35","doi-asserted-by":"publisher","first-page":"62","DOI":"10.1061\/(asce)0733-9364(2005)131:1(62)","volume":"131","author":"D Singh","year":"2005","unstructured":"Singh D, Tiong RLK (2005) A fuzzy decision framework for contractor selection. J Constr Eng Manag 131(1):62\u201370. https:\/\/doi.org\/10.1061\/(asce)0733-9364(2005)131:1(62)","journal-title":"J Constr Eng Manag"},{"issue":"9","key":"2249_CR36","doi-asserted-by":"publisher","first-page":"998","DOI":"10.1061\/(ASCE)0733-9364(2006)132:9(998)","volume":"132","author":"D Singh","year":"2006","unstructured":"Singh D, Tiong RLK (2006) Contractor selection criteria: investigation of opinions of Singapore construction practitioners. J Constr Eng Manag 132(9):998\u20131008","journal-title":"J Constr Eng Manag"},{"key":"2249_CR38","doi-asserted-by":"crossref","unstructured":"Thompson Richard CJ, Lucko G (2012) Modeling measures of float monetization for quantitative risk management of construction projects. In: Construction Research Congress 2012: Construction Challenges in a Flat World, pp 485\u2013494.","DOI":"10.1061\/9780784412329.049"},{"issue":"2","key":"2249_CR39","doi-asserted-by":"publisher","first-page":"779","DOI":"10.1016\/j.engappai.2012.11.005","volume":"26","author":"B Vahdani","year":"2013","unstructured":"Vahdani B, Mousavi SM, Hashemi H, Mousakhani M, Tavakkoli-Moghaddam R (2013) A new compromise solution method for fuzzy group decision-making problems with an application to the contractor selection. Eng Appl Artif Intell 26(2):779\u2013788. https:\/\/doi.org\/10.1016\/j.engappai.2012.11.005","journal-title":"Eng Appl Artif Intell"},{"key":"2249_CR40","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/j.apenergy.2012.05.024","volume":"101","author":"B Vu\u010dijak","year":"2013","unstructured":"Vu\u010dijak B, Kupusovi\u0107 T, Mid\u017di\u0107-Kurtagi\u0107 S, \u0106eri\u0107 A (2013) Applicability of multicriteria decision aid to sustainable hydropower. Appl Energy 101:261\u2013267. https:\/\/doi.org\/10.1016\/j.apenergy.2012.05.024","journal-title":"Appl Energy"},{"issue":"4","key":"2249_CR41","doi-asserted-by":"publisher","first-page":"275","DOI":"10.1177\/0272989X03256006","volume":"23","author":"SN Whitney","year":"2003","unstructured":"Whitney SN (2003) A new model of medical decisions: exploring the limits of shared decision making. Med Decis Making 23(4):275\u2013280","journal-title":"Med Decis Making"},{"issue":"7","key":"2249_CR42","doi-asserted-by":"publisher","first-page":"767","DOI":"10.1080\/014461900433050","volume":"18","author":"CH Wong","year":"2000","unstructured":"Wong CH, Holt GD, Cooper PA (2000) Lowest price or value? Investigation of UK construction clients\u2019 tender selection process. Constr Manag Econ 18(7):767\u2013774","journal-title":"Constr Manag Econ"},{"key":"2249_CR43","doi-asserted-by":"publisher","unstructured":"Yang ZL, Bonsall S, Wang J (2009) Use of hybrid multiple uncertain attribute decision making techniques in safety management. Expert Syst Appl 36(2 PART 1): 1569\u20131586. https:\/\/doi.org\/10.1016\/j.eswa.2007.11.054","DOI":"10.1016\/j.eswa.2007.11.054"},{"issue":"7\u20138","key":"2249_CR44","doi-asserted-by":"publisher","first-page":"839","DOI":"10.1007\/s00170-004-2436-5","volume":"28","author":"D Yong","year":"2006","unstructured":"Yong D (2006) Plant location selection based on fuzzy TOPSIS. Int J Adv Manuf Technol 28(7\u20138):839\u2013844. https:\/\/doi.org\/10.1007\/s00170-004-2436-5","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"2249_CR45","doi-asserted-by":"publisher","first-page":"651","DOI":"10.3390\/su12020651","volume":"12","author":"Y Zhang","year":"2020","unstructured":"Zhang Y (2020) Construction of bid evaluation index system in government public project green procurement in China based on DS evidence theory. Sustainability 12(2):651","journal-title":"Sustainability"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-024-02249-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-024-02249-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-024-02249-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,14]],"date-time":"2024-06-14T12:18:20Z","timestamp":1718367500000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-024-02249-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,1,30]]},"references-count":45,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2024,6]]}},"alternative-id":["2249"],"URL":"https:\/\/doi.org\/10.1007\/s13198-024-02249-3","relation":{"has-preprint":[{"id-type":"doi","id":"10.21203\/rs.3.rs-3143636\/v1","asserted-by":"object"}]},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,1,30]]},"assertion":[{"value":"6 July 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"29 September 2023","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 January 2024","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"30 January 2024","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declaration"}},{"value":"All authors certify that they have no affiliations with or involvement in any organization or entity with any financial interest or non-financial interest in the subject matter or materials discussed in this manuscript.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}