{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,3]],"date-time":"2026-03-03T17:27:14Z","timestamp":1772558834278,"version":"3.50.1"},"reference-count":65,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2024,5,10]],"date-time":"2024-05-10T00:00:00Z","timestamp":1715299200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,5,10]],"date-time":"2024-05-10T00:00:00Z","timestamp":1715299200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2024,7]]},"DOI":"10.1007\/s13198-024-02348-1","type":"journal-article","created":{"date-parts":[[2024,5,10]],"date-time":"2024-05-10T15:01:50Z","timestamp":1715353310000},"page":"3385-3405","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Theoretical semi-quantitative risk assessment methodology for tunnel design and construction processes"],"prefix":"10.1007","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-4709-4334","authenticated-orcid":false,"given":"Ozgur","family":"Satici","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6784-182X","authenticated-orcid":false,"given":"Esra","family":"Satici","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,5,10]]},"reference":[{"key":"2348_CR1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2021.104111","author":"C Bai","year":"2021","unstructured":"Bai C, Xue Y, Qiu D, Su M, Ma X, Liu H (2021) Analysis of factors affecting the deformation of soft rock tunnels by data envelopment analysis and a risk assessment model. Tunn Undergr Space Technol. https:\/\/doi.org\/10.1016\/j.tust.2021.104111","journal-title":"Tunn Undergr Space Technol"},{"issue":"4","key":"2348_CR2","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1007\/BF01239496","volume":"6","author":"NR Barton","year":"1974","unstructured":"Barton NR, Lien R, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):189\u2013239. https:\/\/doi.org\/10.1007\/BF01239496","journal-title":"Rock Mech"},{"key":"2348_CR3","doi-asserted-by":"publisher","unstructured":"Bayes T (1763) An essay towards solving a problem in the doctrine of chance. Philosophical Transactions Royal Society of London 53: 370\u2013418. https:\/\/doi.org\/10.1098\/rstl.1763.0053","DOI":"10.1098\/rstl.1763.0053"},{"key":"2348_CR4","first-page":"p251","volume-title":"Engineering rock mass classifications: a complete manual for engineers and geologists in mining civil and petroleum engineering","author":"ZT Bieniawski","year":"1989","unstructured":"Bieniawski ZT (1989) Engineering rock mass classifications: a complete manual for engineers and geologists in mining civil and petroleum engineering. John Wiley and Sons, xii, New York, p p251"},{"key":"2348_CR5","unstructured":"Brierley G (2014) http:\/\/tunnelingonline.com\/tunneling-historical-perspective\/"},{"issue":"3","key":"2348_CR6","doi-asserted-by":"publisher","first-page":"193","DOI":"10.3724\/SP.J.1235.2012.00193","volume":"4","author":"TE Brown","year":"2012","unstructured":"Brown TE (2012) Risk assessment and management in underground rock engineering\u2014an overview. J Rock Mech Geotech Eng 4(3):193\u2013204. https:\/\/doi.org\/10.3724\/SP.J.1235.2012.00193","journal-title":"J Rock Mech Geotech Eng"},{"key":"2348_CR7","volume-title":"About Bayesian belief networks","author":"Charles River Analytics","year":"2008","unstructured":"Charles River Analytics (2008) About Bayesian belief networks. Charles River Analytics Inc., Cambridge MA"},{"issue":"9","key":"2348_CR8","doi-asserted-by":"publisher","first-page":"4846","DOI":"10.3390\/su13094846","volume":"13","author":"H Chung","year":"2021","unstructured":"Chung H, Park J, Kim B-K, Kwon K, Lee I-M, Choi H (2021) A causal network-based risk matrix model applicable to shield TBM tunneling projects. Sustainability 13(9):4846. https:\/\/doi.org\/10.3390\/su13094846","journal-title":"Sustainability"},{"key":"2348_CR9","unstructured":"Conrady S, Jouffe L., Introduction to Bayesian Networks: Practical and Technical Perspectives, Franklin TN: Conrady Applied Science, 2011"},{"key":"2348_CR10","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1201\/9780203963586.ch9","volume-title":"Risk control at the design of long railway tunnel in Austria geotechnical risks in rock tunnels","author":"J Daller","year":"2006","unstructured":"Daller J (2006) Risk control at the design of long railway tunnel in Austria geotechnical risks in rock tunnels. Taylor & Francis Group, London, pp 155\u2013163"},{"key":"2348_CR12","doi-asserted-by":"publisher","first-page":"112","DOI":"10.1016\/j.eng.2017.07.001","volume":"4","author":"M Deng","year":"2018","unstructured":"Deng M (2018) Challenges and thoughts on risk management and control for the group construction of a super-long tunnel by TBM. Engineering 4:112\u2013122. https:\/\/doi.org\/10.1016\/j.eng.2017.07.001","journal-title":"Engineering"},{"key":"2348_CR13","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1016\/j.tust.2004.01.001","volume":"19","author":"DS Eskesen","year":"2004","unstructured":"Eskesen DS, Tengborg P, Kampman J, Veichherts HT (2004) Guidelines for tunneling risk management: international tunneling association, working group . 2. Tunn Undergr Space Technol 19:217\u2013237","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR14","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2024.105593","author":"DS Guo","year":"2024","unstructured":"Guo DS, Meng FY, Wu HN, Yang XX, Liu Z (2024) Risk assessment of shield tunneling crossing building based on variable weight theory and cloud model. Tunn Undergr Space Technol. https:\/\/doi.org\/10.1016\/j.tust.2024.105593","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR15","doi-asserted-by":"publisher","first-page":"606","DOI":"10.1016\/j.trpro.2021.11.080","volume":"58","author":"JD Gutierrez-Fernandez","year":"2021","unstructured":"Gutierrez-Fernandez JD, Rodriguez SS, Gonzalo-Orden H, Perez-Acebo H (2021) Analysis of rock mass classifications for safer infrastructures. Transp Res Proced 58:606\u2013613","journal-title":"Transp Res Proced"},{"key":"2348_CR16","doi-asserted-by":"publisher","DOI":"10.1111\/j.1539-6924.2006.00755.x","author":"YY Haimes","year":"2006","unstructured":"Haimes YY (2006) On the definition of vulnerabilities in measuring risks to infrastructures. Risk Anal. https:\/\/doi.org\/10.1111\/j.1539-6924.2006.00755.x","journal-title":"Risk Anal"},{"key":"2348_CR17","doi-asserted-by":"publisher","first-page":"1647","DOI":"10.1111\/j.1539-6924.2009.01310.x","volume":"29","author":"YY Haimes","year":"2009","unstructured":"Haimes YY (2009a) On the complex definition of risk: a systems-based approach. Risk Anal 29:1647\u20131654. https:\/\/doi.org\/10.1111\/j.1539-6924.2009.01310.x","journal-title":"Risk Anal"},{"key":"2348_CR18","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1111\/j.1539-6924.2009.01216.x","volume":"29","author":"YY Haimes","year":"2009","unstructured":"Haimes YY (2009b) On the definition of resilience in systems. Risk Anal 29:498\u2013501. https:\/\/doi.org\/10.1111\/j.1539-6924.2009.01216.x","journal-title":"Risk Anal"},{"key":"2348_CR19","first-page":"127","volume-title":"Managing risk in projects Fundamentals of Project Management","author":"D Hillson","year":"2009","unstructured":"Hillson D (2009) Managing risk in projects Fundamentals of Project Management. Gower Publishing, Aldershot, p 127"},{"key":"2348_CR21","unstructured":"Hopkin P (2018) Fundamentals of Risk Management, Understanding Evaluating and Implementing Effective Risk Management, The Institute of Risk Management, Kogan Page Limited; London, p385"},{"key":"2348_CR22","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1016\/j.tust.2015.04.007","volume":"49","author":"K-C Hyun","year":"2015","unstructured":"Hyun K-C, Min S, Choi H, Park J, Lee I-M (2015) Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels. Tunn Undergr Space Technol 49:121\u2013129. https:\/\/doi.org\/10.1016\/j.tust.2015.04.007","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR23","unstructured":"Jaynes ET (1996) Probability Theory with Applications in Science and Engineering, Posthumous manuscript, placed online, http:\/\/bayes.wustl.edu\/etj\/science.pdf.html"},{"key":"2348_CR24","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1111\/j.1539-6924.1981.tb01350.x","volume":"1","author":"S Kaplan","year":"1981","unstructured":"Kaplan S, Garrick BJ (1981) On the quantitative definition of risk. Risk Anal 1:11\u201327. https:\/\/doi.org\/10.1111\/j.1539-6924.1981.tb01350.x","journal-title":"Risk Anal"},{"key":"2348_CR25","volume-title":"An insight into the new austrian tunneling method (NATM)","author":"M Karakus","year":"2004","unstructured":"Karakus M, Fowell RJ (2004) An insight into the new austrian tunneling method (NATM). B\u00f6lgesel Kaya Mekani\u011fi Sempozyumu, Sivas, T\u00fcrkiye"},{"key":"2348_CR26","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2021.104262","author":"J Kim","year":"2022","unstructured":"Kim J, Kim C, Kim G, Kim I, Abbas Q, Lee J (2022) Probabilistic tunnel collapse risk evaluation model using analytical hierarchy process (ahp) and delphi survey technique. Tunn Undergr Space Technol. https:\/\/doi.org\/10.1016\/j.tust.2021.104262","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR27","doi-asserted-by":"publisher","DOI":"10.1016\/j.heliyon.2023.e23486","author":"N Koohathongsumrit","year":"2024","unstructured":"Koohathongsumrit N, Meethom W (2024) Risk analysis in underground tunnel construction with tunnel boring machines using the best-worst method and data envelopment analysis. Heliyon. https:\/\/doi.org\/10.1016\/j.heliyon.2023.e23486","journal-title":"Heliyon"},{"key":"2348_CR28","doi-asserted-by":"publisher","first-page":"103819","DOI":"10.1016\/j.autcon.2021.103819","volume":"129","author":"GC Koseoglu Balta","year":"2021","unstructured":"Koseoglu Balta GC, Dikmen I, Birgonul MT (2021) Bayesian network-based decision support for predicting and mitigating delay risk in TBM tunnel projects. Autom Constr 129:103819. https:\/\/doi.org\/10.1016\/j.autcon.2021.103819","journal-title":"Autom Constr"},{"issue":"3","key":"2348_CR29","doi-asserted-by":"publisher","first-page":"5880","DOI":"10.1016\/j.eswa.2008.07.057","volume":"36","author":"E Lee","year":"2009","unstructured":"Lee E, Park Y, Shin JG (2009) Large engineering project risk management using a bayesian belief network. Expert Syst Appl 36(3):5880\u20135887. https:\/\/doi.org\/10.1016\/j.eswa.2008.07.057","journal-title":"Expert Syst Appl"},{"key":"2348_CR30","doi-asserted-by":"publisher","unstructured":"Lei X (2020) Risk assessment model of underground engineering based on delphi-AHP, In: 2nd International conference on oil & gas engineering and geological sciences, IOP Conf. Series: earth and environmental science 558, 032029, https:\/\/doi.org\/10.1088\/1755-1315\/558\/3\/032029","DOI":"10.1088\/1755-1315\/558\/3\/032029"},{"issue":"6","key":"2348_CR31","doi-asserted-by":"publisher","first-page":"1679","DOI":"10.1016\/j.gsf.2017.09.009","volume":"9","author":"X Li","year":"2018","unstructured":"Li X, Zhang L, Zhang S (2018) Efficient bayesian networks for slope safety evaluation with large quantity monitoring information. Geosci Front 9(6):1679\u20131687. https:\/\/doi.org\/10.1016\/j.gsf.2017.09.009","journal-title":"Geosci Front"},{"key":"2348_CR32","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2023.105193","author":"SS Lin","year":"2024","unstructured":"Lin SS, Zhou A, Shen SL (2024a) Multi-status bayesian network for analyzing collapse risk of excavation construction. Autom Constr. https:\/\/doi.org\/10.1016\/j.autcon.2023.105193","journal-title":"Autom Constr"},{"key":"2348_CR33","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2023.105373","author":"D Lin","year":"2024","unstructured":"Lin D, Zhou Z, Weng M, Broere W, Cui J (2024b) Metro systems: construction, operation and impacts. Tunn Undergr Space Technol. https:\/\/doi.org\/10.1016\/j.tust.2023.105373","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR34","volume-title":"Of acceptable risk","author":"WW Lowrance","year":"1976","unstructured":"Lowrance WW (1976) Of acceptable risk. William Kaufmann, Los Altos, CA"},{"key":"2348_CR35","volume-title":"Design and construction of tunnels, analysis of controlled deformation in rock and soils (ADECO-RS)","author":"P Lunardi","year":"2008","unstructured":"Lunardi P (2008) Design and construction of tunnels, analysis of controlled deformation in rock and soils (ADECO-RS). Springer, New york"},{"issue":"5","key":"2348_CR36","doi-asserted-by":"publisher","first-page":"734","DOI":"10.1016\/j.jrmge.2016.07.001","volume":"8","author":"A Mahmoodzadeh","year":"2016","unstructured":"Mahmoodzadeh A, Zare S (2016) Probabilistic prediction of expected ground condition and construction time and costs in road tunnels. J Rock Mech Geotech Eng 8(5):734\u2013745. https:\/\/doi.org\/10.1016\/j.jrmge.2016.07.001","journal-title":"J Rock Mech Geotech Eng"},{"issue":"5","key":"2348_CR37","doi-asserted-by":"publisher","first-page":"1951","DOI":"10.1007\/s00603-013-0464-x","volume":"47","author":"MR Moradi","year":"2014","unstructured":"Moradi MR, Farsangi MAE (2014) Application of the risk matrix method for geotechnical risk analysis and prediction of the advance rate in rock TBM tunneling. Rock Mech Rock Eng 47(5):1951\u20131960. https:\/\/doi.org\/10.1007\/s00603-013-0464-x","journal-title":"Rock Mech Rock Eng"},{"key":"2348_CR38","first-page":"262","volume-title":"Project management for environmental construction and manufacturing engineers, a manuel for putting theory into practice","author":"N Munier","year":"2013","unstructured":"Munier N (2013) Project management for environmental construction and manufacturing engineers, a manuel for putting theory into practice. Springer, New york, p 262"},{"key":"2348_CR39","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2021.104019","author":"GZ Ou","year":"2021","unstructured":"Ou GZ, Jiao YY, Zhang GH, Zou JP, Tan F, Zhang WS (2021) Collapse risk assessment of deep-buried tunnel during construction and its application. Tunn Undergr Space Technol. https:\/\/doi.org\/10.1016\/j.tust.2021.104019","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR40","first-page":"p246","volume-title":"North American tunneling","author":"L \u00d6zdemir","year":"2006","unstructured":"\u00d6zdemir L (2006) North American tunneling. Taylor&Francis, Washington, DC, p p246 (ISBN 0-415-40128-3)"},{"key":"2348_CR41","first-page":"69","volume":"1","author":"A Palmstrom","year":"1996","unstructured":"Palmstrom A (1996) RMi-a system for characterizing rock mass strength for use in rock engineering. J Rock Mech Tunn Technol 1:69\u2013108","journal-title":"J Rock Mech Tunn Technol"},{"key":"2348_CR42","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/S2212-5671(14)00463-8","volume":"15","author":"V Platon","year":"2014","unstructured":"Platon V, Constantinescu A (2014) Monte carlo method in risk analysis for investment projects. Proced Econ Finance 15:393\u2013400. https:\/\/doi.org\/10.1016\/S2212-5671(14)00463-8","journal-title":"Proced Econ Finance"},{"key":"2348_CR43","first-page":"145","volume-title":"Geotechnical risk in rock mass characterization\u2014a concept, geotechnical risks in rock tunnels","author":"I Poeschl","year":"2006","unstructured":"Poeschl I, Kleberger J (2006) Geotechnical risk in rock mass characterization\u2014a concept, geotechnical risks in rock tunnels. Taylor & Francis Group, London, pp 145\u2013154 (ISBN 0-415-40005-8)"},{"issue":"12","key":"2348_CR44","doi-asserted-by":"publisher","first-page":"903","DOI":"10.1080\/09537287.2011.586379","volume":"23","author":"KD Prasanta","year":"2012","unstructured":"Prasanta KD (2012) Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of indian oil refinery. Prod Plan Control 23(12):903\u2013921. https:\/\/doi.org\/10.1080\/09537287.2011.586379","journal-title":"Prod Plan Control"},{"key":"2348_CR45","doi-asserted-by":"crossref","unstructured":"Proag V., 2014, The concept of vulnerability and resilience, In: 4th International conference on building resilience, Procedia Economics and Finance, v18, pp369\u2013376","DOI":"10.1016\/S2212-5671(14)00952-6"},{"key":"2348_CR46","unstructured":"Rabcewicz L (1964) The new Austrian tunneling method, part one, water power , 453\u2013457, part two, Water Power, pp511\u2013515"},{"key":"2348_CR47","first-page":"19","volume":"5","author":"L Rabcewicz","year":"1965","unstructured":"Rabcewicz L (1965) The new Austrian tunneling method part three. Water Power 5:19\u201324","journal-title":"Water Power"},{"key":"2348_CR48","unstructured":"Sandstr\u00f6m GE (1963) The history of tunneling, underground workings through the ages, barrie and rockliff"},{"key":"2348_CR49","unstructured":"Sat\u0131c\u0131 \u00d6 (2021) Projeler nasil ba\u015farili olur, m\u00fchendisler i\u00e7in risk y\u00f6netim rehberi, se\u00e7kin yayinevi, Ankara, 156s"},{"key":"2348_CR50","unstructured":"Satici O, Topal T (2015) Evaluation of tunnel excavation methods in accordance with engineering geology and rock mass classification systems, Jour. Of Geo. Eng. 39 (1)"},{"key":"2348_CR51","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1201\/9780203963586.ch4","volume-title":"Geotechnical risk management in tunneling, geotechnical risks in rock tunnels","author":"P Schubert","year":"2006","unstructured":"Schubert P (2006) Geotechnical risk management in tunneling, geotechnical risks in rock tunnels. Taylor & Francis Group, London, pp 53\u201362 (ISBN-0-415-40005-8)"},{"key":"2348_CR52","first-page":"p278","volume-title":"Risk and decision analysis in projects","author":"J Schuyler","year":"2001","unstructured":"Schuyler J (2001) Risk and decision analysis in projects, 2nd edn. Project Management Institute Publication, Newtown Square, p p278","edition":"2"},{"key":"2348_CR53","doi-asserted-by":"publisher","first-page":"103860","DOI":"10.1016\/j.tust.2021.103860","volume":"111","author":"A Sharafat","year":"2021","unstructured":"Sharafat A, Latif K, Seo J (2021) Risk analysis of tbm tunneling projects based on generic bow tie risk analysis approach in difficult ground conditions. Tunn Undergr Space Technol 111:103860. https:\/\/doi.org\/10.1016\/j.tust.2021.103860","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR500","doi-asserted-by":"publisher","unstructured":"Shahriar K, Sharifzadeh M, Hamidi JK (2008) Geotechnical risk assessment based approach for rock tbm selection in difficult ground conditions. Tunn Undergr Space Technol 23(3):318\u2013325. https:\/\/doi.org\/10.1016\/j.tust.2007.06.012","DOI":"10.1016\/j.tust.2007.06.012"},{"key":"2348_CR54","doi-asserted-by":"publisher","first-page":"1805","DOI":"10.1016\/j.matpr.2022.04.855","volume":"65","author":"AG Shelake","year":"2022","unstructured":"Shelake AG, Gogate NG, Rajhans NR (2022) An integrated approach for identification and prioritization of risk factors in tunnel construction. Mater Today: Proceed 65:1805\u20131812. https:\/\/doi.org\/10.1016\/j.matpr.2022.04.855","journal-title":"Mater Today: Proceed"},{"key":"2348_CR56","unstructured":"Sousa RL (2010) Risk analysis for tunneling projects. PhD thesis. Massachusetts Institute of Technology"},{"key":"2348_CR57","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.tust.2011.07.003","volume":"27","author":"RL Sousa","year":"2012","unstructured":"Sousa RL, Einstein HH (2012) Risk analysis during tunnel construction using bayesian networks: porto metro case study. Tunn Undergr Space Technol 27:86\u2013100. https:\/\/doi.org\/10.1016\/j.tust.2011.07.003","journal-title":"Tunn Undergr Space Technol"},{"key":"2348_CR58","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/J.ENG.2017.04.002","volume":"3","author":"LR Sousa","year":"2017","unstructured":"Sousa LR, Miranda T, Sousa RL, Tinoco J (2017) The use of data mining techniques in rockburst risk assessment. Engineering 3:552\u2013558. https:\/\/doi.org\/10.1016\/J.ENG.2017.04.002","journal-title":"Engineering"},{"issue":"3","key":"2348_CR59","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1080\/17499518.2017.1416643","volume":"12","author":"J Spross","year":"2018","unstructured":"Spross J, Olsson L, Stille H (2018) The Swedish geotechnical society\u2019s methodology for risk management: a tool for engineers in their everyday work. Georisk Assess Manag Risk Eng Syst Geohazards 12(3):183\u2013189. https:\/\/doi.org\/10.1080\/17499518.2017.1416643","journal-title":"Georisk Assess Manag Risk Eng Syst Geohazards"},{"key":"2348_CR60","first-page":"p480","volume-title":"The black swan: the impact of the highly improbable","author":"NN Taleb","year":"2008","unstructured":"Taleb NN (2008) The black swan: the impact of the highly improbable. Penguin Books Ltd, London, p p480"},{"key":"2348_CR62","doi-asserted-by":"publisher","DOI":"10.1080\/17499518.2022.2046784","author":"M Tidlund","year":"2022","unstructured":"Tidlund M, Spross J, Larsson S (2022) Observational method as risk management tool the hvalfj\u00f6r\u00f0ur tunnel project Iceland. Georisk: Assess Manag Risk Eng Syst Geohazards. https:\/\/doi.org\/10.1080\/17499518.2022.2046784","journal-title":"Georisk: Assess Manag Risk Eng Syst Geohazards"},{"issue":"3","key":"2348_CR63","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1016\/j.tust.2009.12.004","volume":"25","author":"F Tonon","year":"2010","unstructured":"Tonon F (2010) Sequential excavation, NATM and ADECO: what they have in common and how they differ, tunneling and underground. Space Technol 25(3):245\u2013265. https:\/\/doi.org\/10.1016\/j.tust.2009.12.004","journal-title":"Space Technol"},{"key":"2348_CR65","doi-asserted-by":"publisher","DOI":"10.14311\/CEJ.2015.01.0003","author":"CL Vydrova","year":"2015","unstructured":"Vydrova CL (2015) Comparison of tunneling methods NATM and ADECO-RS. Civil Eng J. https:\/\/doi.org\/10.14311\/CEJ.2015.01.0003","journal-title":"Civil Eng J"},{"key":"2348_CR66","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2023.102056","author":"L Wang","year":"2023","unstructured":"Wang L, Chen H, Liu Y, Li H, Zhang W (2023) Application of Copula-Based Bayesian Network Method to Water Leakage Risk Analysis in Cross River Tunnel of Wuhan Rail Transit Line 3. Adv Eng Inform. https:\/\/doi.org\/10.1016\/j.aei.2023.102056","journal-title":"Adv Eng Inform"},{"key":"2348_CR68","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/j.undsp.2023.05.001","volume":"13","author":"Y Zeng","year":"2023","unstructured":"Zeng Y, Guy P, Njock A, Xiong W, Zhang XL, Shen SL (2023) Risks analysis of large diameter slurry shield tunneling in urban area. Underground Space 13:281\u2013300. https:\/\/doi.org\/10.1016\/j.undsp.2023.05.001","journal-title":"Underground Space"},{"key":"2348_CR69","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1016\/j.jrmge.2015.10.010","volume":"8","author":"C Zhang","year":"2016","unstructured":"Zhang C, Liu N, Chu W (2016) Key technologies and risk management of deep tunnel construction at jinping II hydropower station. J Rock Mech Geotech Eng 8:499\u2013512","journal-title":"J Rock Mech Geotech Eng"},{"key":"2348_CR70","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2022.104541","author":"Z Zhou","year":"2022","unstructured":"Zhou Z, Liu S, Qi H (2022) Mitigating subway construction collapse risk using bayesian network modeling. Autom Constr. https:\/\/doi.org\/10.1016\/j.autcon.2022.104541","journal-title":"Autom Constr"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-024-02348-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-024-02348-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-024-02348-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,11]],"date-time":"2024-07-11T13:20:38Z","timestamp":1720704038000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-024-02348-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,5,10]]},"references-count":65,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2024,7]]}},"alternative-id":["2348"],"URL":"https:\/\/doi.org\/10.1007\/s13198-024-02348-1","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,5,10]]},"assertion":[{"value":"6 December 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 March 2024","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 April 2024","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 May 2024","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"On behalf of all authors, the corresponding author states that there is no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"On behalf of all authors, the corresponding author states that there is no research in this study involving Human Participants and\/or Animals.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent to participate"}},{"value":"On behalf of all authors, the corresponding author states that there are no case reports requiring ethical approval.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}