{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,19]],"date-time":"2025-05-19T11:07:34Z","timestamp":1747652854305,"version":"3.37.3"},"reference-count":53,"publisher":"Springer Science and Business Media LLC","issue":"8","license":[{"start":{"date-parts":[[2024,7,17]],"date-time":"2024-07-17T00:00:00Z","timestamp":1721174400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,7,17]],"date-time":"2024-07-17T00:00:00Z","timestamp":1721174400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2024,8]]},"DOI":"10.1007\/s13198-024-02416-6","type":"journal-article","created":{"date-parts":[[2024,7,17]],"date-time":"2024-07-17T05:01:58Z","timestamp":1721192518000},"page":"4105-4123","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Probabilistic assessment of switchyard-centered LOOP event frequency and duration in an NPP"],"prefix":"10.1007","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2092-5513","authenticated-orcid":false,"given":"Rabah","family":"Benabid","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pierre","family":"Henneaux","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pierre-Etienne","family":"Labeau","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,7,17]]},"reference":[{"issue":"3","key":"2416_CR1","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1016\/0142-0615(88)90034-8","volume":"10","author":"RN Allan","year":"1988","unstructured":"Allan RN (1988) Effects of protection systems operation and failures in composite system reliability evaluation. Electr Power Energy Syst 10(3):180","journal-title":"Electr Power Energy Syst"},{"key":"2416_CR2","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/0951-8320(95)00101-8","volume":"51","author":"AH-S Ang","year":"1996","unstructured":"Ang AH-S, Pires JA, Vulaverde R (1996) A model for the seismic reliability assessment of electric power transmission systems. Reliab Eng Syst Saf 51:7\u201322","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR3","doi-asserted-by":"crossref","unstructured":"Arians R et al. (2016) Effects of external grid disturbances to nuclear power plants. In: Proceedings of the 2016 24th international conference on nuclear engineering (ICONE24), Charlotte, pp 26\u201330","DOI":"10.1115\/ICONE24-60563"},{"key":"2416_CR4","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1016\/j.ress.2020.107112","volume":"203","author":"AM Arigi","year":"2020","unstructured":"Arigi AM, Park G, Kim J (2020) Dependency analysis method for human failure events in multi-unit probabilistic safety assessments. Reliab Eng Syst Saf 203:107\u2013112","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR5","unstructured":"Bies M (2018) Loss of offsite power frequency estimates due to external events at a Finnish nuclear power plant. Probabilistic Safety Assessment and Management PSAM 14, Los Angeles"},{"key":"2416_CR6","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-7728-7","volume-title":"Reliability evaluation of engineering systems: concepts and techniques","author":"R Billinton","year":"1983","unstructured":"Billinton R, Allan RN (1983) Reliability evaluation of engineering systems: concepts and techniques. Plenum press, USA"},{"key":"2416_CR7","volume-title":"Reliability evaluation of power system","author":"R Billinton","year":"1994","unstructured":"Billinton R, Allan RN (1994) Reliability evaluation of power system, 2nd edn. Plenum press, New York","edition":"2"},{"issue":"5","key":"2416_CR8","doi-asserted-by":"publisher","first-page":"797","DOI":"10.1016\/0026-2714(94)00092-3","volume":"35","author":"R Billinton","year":"1995","unstructured":"Billinton R, Lian G (1995) A new technique for active minimal cut set selection used in substation reliability evaluation. Microelectron Reliab 35(5):797\u2013805","journal-title":"Microelectron Reliab"},{"key":"2416_CR9","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1016\/0951-8320(94)90048-5","volume":"46","author":"E Bourgade","year":"1994","unstructured":"Bourgade E, Desmas T (1994) Substation reliability evaluation: a specific tool for designers. Reliab Eng Syst Saf 46:63\u201373","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR10","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/S0951-8320(96)00107-X","volume":"55","author":"C Camensig","year":"1997","unstructured":"Camensig C, Bresesti L, Clementel S, Savertti M (1997) Seismic risk evaluation for high voltage air insulated substations. Reliab Eng Syst Saf 55:179\u2013191","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR11","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1016\/j.ress.2016.09.009","volume":"158","author":"F Cardini","year":"2017","unstructured":"Cardini F, Agliardi GL, Zio E (2017) Estimation of rare event probabilities in power transmission networks subjects to cascading failures. Reliab Eng Syst Saf 158:9\u201320","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR12","doi-asserted-by":"crossref","unstructured":"Cepin M (2011) Assessment of power system reliability. Springer","DOI":"10.1007\/978-0-85729-688-7"},{"key":"2416_CR13","doi-asserted-by":"publisher","first-page":"136","DOI":"10.1016\/j.nucengdes.2011.08.082","volume":"246","author":"M Cepin","year":"2012","unstructured":"Cepin M (2012) Advantages and difficulties with the application of methods probabilistic safety assessment to the power systems reliability. Nucl Eng Des 246:136\u2013140","journal-title":"Nucl Eng Des"},{"key":"2416_CR14","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1016\/j.ress.2018.05.012","volume":"178","author":"M Cepin","year":"2018","unstructured":"Cepin M (2018) Application of shutdown probabilistic safety assessment. Reliab Eng Syst Saf 178:147\u2013155","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR15","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1016\/j.ress.2019.106595","volume":"193","author":"M Cepin","year":"2020","unstructured":"Cepin M (2020) Probability of restoring power to the transmission power system and the time to restore power. Reliab Eng Syst Saf 193:1065\u20131095","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR16","doi-asserted-by":"publisher","first-page":"1410","DOI":"10.1016\/j.ijepes.2011.06.021","volume":"33","author":"L Chang","year":"2011","unstructured":"Chang L, Wu Z (2011) Performance and reliability of electrical power grids under cascading failures. Electr Power Energy Syst 33:1410\u20131419","journal-title":"Electr Power Energy Syst"},{"key":"2416_CR17","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2020.106501","volume":"187","author":"JGDC Costa","year":"2020","unstructured":"Costa JGDC, da Silva AML, Hamoud GA, Pureza IM, Neto NS (2020) Probabilistic evaluation of distribution power transformers reliability indices considering load transfers and mobile unit substations. Electr Power Syst Res 187:106501","journal-title":"Electr Power Syst Res"},{"key":"2416_CR18","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1016\/j.ress.2013.07.006","volume":"125","author":"E Ferrario","year":"2014","unstructured":"Ferrario E, Zio E (2014) Assessing nuclear power plant safety and recovery from earthquakes using a system of systems approach. Reliab Eng Syst Saf 125:103\u2013116","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR19","doi-asserted-by":"publisher","first-page":"304","DOI":"10.1016\/j.anucene.2014.04.011","volume":"71","author":"B Gjorgiev","year":"2014","unstructured":"Gjorgiev B, Volkanovski A, Kancev D, Cepin M (2014) Alternative off-site power supply improves nuclear power plant safety. Ann Nucl Energy 71:304\u2013312","journal-title":"Ann Nucl Energy"},{"key":"2416_CR20","doi-asserted-by":"publisher","first-page":"561","DOI":"10.1016\/S0045-7906(00)00064-1","volume":"28","author":"L Goel","year":"2002","unstructured":"Goel L, Shrestha GB (2002) A versatile tool for electric substation reliability assessment. Comput Electr Eng 28:561\u2013576","journal-title":"Comput Electr Eng"},{"key":"2416_CR21","first-page":"131","volume":"61","author":"H Grgani\u0107","year":"2013","unstructured":"Grgani\u0107 H, \u0160imi\u0107 Z (2013) On the estimation and reduction of the frequency of the loss of offsite power event. J Energy 61:131\u2013141","journal-title":"J Energy"},{"key":"2416_CR22","doi-asserted-by":"publisher","first-page":"277","DOI":"10.1016\/j.ress.2006.10.025","volume":"93","author":"L Haarla","year":"2008","unstructured":"Haarla L, Pulkkinen U, Koskinen M, Jyrinsalo J (2008) A method for analysing the reliability of a transmission grid. Reliab Eng Syst Saf 93:277\u2013287","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR23","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/j.ijepes.2015.04.015","volume":"73","author":"P Henneaux","year":"2015","unstructured":"Henneaux P (2015) Probability of failure of overloaded lines in cascading failures. Electr Power Energy Syst 73:141\u2013148","journal-title":"Electr Power Energy Syst"},{"key":"2416_CR24","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1016\/j.ress.2012.02.007","volume":"102","author":"P Henneaux","year":"2012","unstructured":"Henneaux P, Labeau P-E, Maun J-C (2012) A level-1 probabilistic risk assessment to blackout hazard in transmission power systems. Reliab Eng Syst Saf 102:41\u201352","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR25","doi-asserted-by":"publisher","unstructured":"Henneaux P, Labeau P-E (2018) Offsite power reliability assessment for nuclear power plants: an application of dynamic reliability to power systems. In: Advanced concepts in nuclear energy risk assessment and management, pp 257\u2013278. https:\/\/doi.org\/10.1142\/9789813225619-0007.","DOI":"10.1142\/9789813225619-0007"},{"key":"2416_CR26","doi-asserted-by":"crossref","unstructured":"Henneaux P, Labeau P-E, Obama J (2016) Reliability of offsite power of nuclear power plants in evolving power systems, In: Proceedings of the \u03bb\u03bc20 conference, Saint-Malo","DOI":"10.4267\/2042\/61785"},{"key":"2416_CR27","unstructured":"Horowitz SH, Phadke AG (2014) Power system relaying. 4th edn. Wiley"},{"key":"2416_CR28","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1016\/0951-8320(95)00141-7","volume":"52","author":"J Hortal","year":"1996","unstructured":"Hortal J, Izquierdo JM (1996) Application of the integrated safety assessment methodology to the protection of electric systems. Reliab Eng Syst 52:315\u2013326","journal-title":"Reliab Eng Syst"},{"key":"2416_CR29","unstructured":"International Atomic Energy Agency (2012) Electric grid reliability and interface with nuclear power plants, IAEA nuclear energy series. No. NG-T-3.8, IAEA, Vienna"},{"key":"2416_CR30","unstructured":"International Atomic Energy Agency (2016) Design of electrical power systems for nuclear power plants, IAEA nuclear energy series. No. SSG-34, IAEA, Vienna"},{"key":"2416_CR31","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2020.107012","volume":"203","author":"S Jang","year":"2020","unstructured":"Jang S, Jae M (2020) A development of methodology for assessing the inter-unit common cause failure in multi-unit PSA model. Reliab Eng Syst Saf 203:107012","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR32","doi-asserted-by":"crossref","unstructured":"Johnson N, Ma Z, Schroeder J-A (2019) Analysis of loss of offsite power events 1987\u20132017. Idaho National Laboratory, INL\/EXT-18-453559.","DOI":"10.2172\/1468434"},{"key":"2416_CR33","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/S0951-8320(03)00140-6","volume":"82","author":"WS Jung","year":"2003","unstructured":"Jung WS, Yang J-E, Ha J (2003) A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants. Reliab Eng Syst Saf 82:165\u2013172","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR34","doi-asserted-by":"publisher","first-page":"1072","DOI":"10.1016\/j.ress.2020.107298","volume":"206","author":"S Kamyab","year":"2021","unstructured":"Kamyab S, Nematollahi M, Henneaux P, Labeau P-E (2021a) Development of a hybrid method to assess grid-related LOOP scenarios for an NPP. Reliab Eng Syst Saf 206:1072\u20131098","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR35","doi-asserted-by":"publisher","DOI":"10.1016\/j.pnucene.2021.103870","volume":"139","author":"S Kamyab","year":"2021","unstructured":"Kamyab S, Nematollahi M, Henneaux P, Labeau P-E (2021b) Investigating the influence of the variation of the load characteristic on the occurrence frequency of grid-related loss of offsite power using a probabilistic-deterministic methodology. Prog Nucl Energy 139:103870","journal-title":"Prog Nucl Energy"},{"key":"2416_CR36","doi-asserted-by":"publisher","first-page":"791","DOI":"10.5516\/NET.02.2013.525","volume":"45","author":"E-C Lee","year":"2013","unstructured":"Lee E-C, Na J-H (2013) Establishment of a maintenance program to prevent loss of offsite power in nuclear power Plants. Nucl Eng Technol 45:791\u2013794","journal-title":"Nucl Eng Technol"},{"key":"2416_CR37","doi-asserted-by":"publisher","first-page":"160","DOI":"10.1016\/j.epsr.2015.08.010","volume":"129","author":"H Lei","year":"2015","unstructured":"Lei H, Singh C (2015) Power system reliability evaluation considering cyber-malfunctions in substations. Electr Power Syst Res 129:160\u2013169","journal-title":"Electr Power Syst Res"},{"key":"2416_CR38","doi-asserted-by":"publisher","first-page":"2812","DOI":"10.1016\/j.net.2020.05.018","volume":"52","author":"HK Lim","year":"2020","unstructured":"Lim HK, Park J-H (2020) Effects of house load operation on PSA based on operational experiences in Korea. Nucl Eng Technol 52:2812\u20132820","journal-title":"Nucl Eng Technol"},{"key":"2416_CR39","doi-asserted-by":"publisher","first-page":"987","DOI":"10.1016\/j.ijepes.2013.06.019","volume":"53","author":"M Moazzami","year":"2013","unstructured":"Moazzami M, Hemmati R, Fesharaki FH, Rad SR (2013) Reliability evaluation for different power plant busbar layouts by using sequential Monte Carlo simulation. Electr Power Energy Syst 53:987\u2013993","journal-title":"Electr Power Energy Syst"},{"key":"2416_CR40","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1016\/j.anucene.2018.01.030","volume":"116","author":"M Mohsendokht","year":"2018","unstructured":"Mohsendokht M, Hadad K, Jabbari M (2018) Reducing the loss of offsite power contribution in the core damage frequency of VVER-1000 reactor by extending the house load operation period. Ann Nucl Energy 116:303\u2013313","journal-title":"Ann Nucl Energy"},{"key":"2416_CR41","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1016\/j.net.2020.06.010","volume":"53","author":"MAMM Moustafa","year":"2021","unstructured":"Moustafa MAMM, Chang C-K (2021) Preventing cascading failure of electric power protection systems in nuclear power plant. Nucl Eng Technol 53:121\u2013130","journal-title":"Nucl Eng Technol"},{"key":"2416_CR42","unstructured":"Noor G, Stedall B, Atiah A (2016) Planning and design considerations associated with integration of the UAE\u2019s first nuclear power plant. In: Proceedings of CIGRE2016, Paris"},{"key":"2416_CR43","unstructured":"Nuclear Energy Agency (2015) Robustness of electrical systems of nuclear power plants in light of the Fukushima Daiichi accident (ROBELSYS), NEA\/CSNI\/R(2015)4, NEA, Paris"},{"key":"2416_CR44","doi-asserted-by":"publisher","unstructured":"P. M. Subcommittee (1979) IEEE reliability test system. In: IEEE transactions on power apparatus and systems, vol. PAS-98, pp 2047\u20132054. https:\/\/doi.org\/10.1109\/TPAS.1979.319398.","DOI":"10.1109\/TPAS.1979.319398"},{"key":"2416_CR45","doi-asserted-by":"publisher","first-page":"662","DOI":"10.1016\/j.ijepes.2005.08.008","volume":"27","author":"B Retterath","year":"2005","unstructured":"Retterath B, Chowdhury AA, Venkata SS (2005) Decoupled substation reliability assessment. Electr Power Energy Syst 27:662\u2013668","journal-title":"Electr Power Energy Syst"},{"key":"2416_CR46","doi-asserted-by":"publisher","first-page":"1151","DOI":"10.1016\/j.ress.2007.08.005","volume":"93","author":"C Smith","year":"2008","unstructured":"Smith C, Knudsen J, Kvarfordt K, Wood T (2008) Key attributes of the SAPHIRE risk and reliability analysis software for risk-informed probabilistic applications. Reliab Eng Syst Saf 93:1151\u20131164","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR47","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ress.2016.08.006","volume":"157","author":"M \u0160nipas","year":"2017","unstructured":"\u0160nipas M, Radziukynas V, Valakevicius E (2017) Modeling reliability of power systems substations by using stochastic automata networks. Reliab Eng Syst Saf 157:13\u201322","journal-title":"Reliab Eng Syst Saf"},{"issue":"2","key":"2416_CR48","doi-asserted-by":"publisher","first-page":"924","DOI":"10.1109\/TPWRS.2003.811174","volume":"18","author":"T-F Tsao","year":"2003","unstructured":"Tsao T-F, Chang H-C (2003) Composite reliability evaluation model for different types of distribution systems. IEEE Trans Power Syst 18(2):924","journal-title":"IEEE Trans Power Syst"},{"key":"2416_CR49","unstructured":"U.S. NRC (2005) Reevaluation of station blackout risk at nuclear power plants. NUREG\/CR-6890, Washington, 2005"},{"key":"2416_CR50","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/j.ress.2016.10.003","volume":"158","author":"A Volkanovski","year":"2017","unstructured":"Volkanovski A (2017) Wind generation impact on electricity generation adequacy and nuclear safety. Reliab Eng Syst Saf 158:85\u201392","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR51","doi-asserted-by":"publisher","first-page":"1116","DOI":"10.1016\/j.ress.2009.01.004","volume":"94","author":"A Volkanovski","year":"2009","unstructured":"Volkanovski A, Cepin M, Mavko B (2009) Application of the fault tree analysis for assessment of power system reliability. Reliab Eng Syst Saf 94:1116\u20131127","journal-title":"Reliab Eng Syst Saf"},{"key":"2416_CR52","doi-asserted-by":"publisher","DOI":"10.1155\/2016\/7692659","author":"A Volkanovski","year":"2016","unstructured":"Volkanovski A, Avila AB, Veira MP (2016a) Statistical analysis of loss of offsite power events. Sci Technol Nucl Install. https:\/\/doi.org\/10.1155\/2016\/7692659","journal-title":"Sci Technol Nucl Install"},{"key":"2416_CR53","doi-asserted-by":"publisher","first-page":"234","DOI":"10.1016\/j.nucengdes.2016.07.005","volume":"307","author":"A Volkanovski","year":"2016","unstructured":"Volkanovski A, Avila AB, Veira MP, Kancev D, Maqua M, Stephan JL (2016b) Analysis of loss of offsite power events reported in nuclear power plants. Nucl Eng Des 307:234\u2013248","journal-title":"Nucl Eng Des"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-024-02416-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-024-02416-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-024-02416-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,8,12]],"date-time":"2024-08-12T09:45:03Z","timestamp":1723455903000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-024-02416-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,7,17]]},"references-count":53,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2024,8]]}},"alternative-id":["2416"],"URL":"https:\/\/doi.org\/10.1007\/s13198-024-02416-6","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"type":"print","value":"0975-6809"},{"type":"electronic","value":"0976-4348"}],"subject":[],"published":{"date-parts":[[2024,7,17]]},"assertion":[{"value":"12 April 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 June 2024","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 July 2024","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 July 2024","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}