{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,18]],"date-time":"2026-07-18T16:21:17Z","timestamp":1784391677232,"version":"3.55.0"},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2025,1,25]],"date-time":"2025-01-25T00:00:00Z","timestamp":1737763200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,1,25]],"date-time":"2025-01-25T00:00:00Z","timestamp":1737763200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2025,3]]},"DOI":"10.1007\/s13198-025-02714-7","type":"journal-article","created":{"date-parts":[[2025,1,25]],"date-time":"2025-01-25T11:35:02Z","timestamp":1737804902000},"page":"883-892","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Optimisation of job shop scheduling problem using genetic algorithm and simulated annealing: a case study of manufacturing industry"],"prefix":"10.1007","volume":"16","author":[{"given":"Rakesh Kumar","family":"Phanden","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6309-8656","authenticated-orcid":false,"given":"Shrajal","family":"Gupta","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Biruk","family":"Wolde","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ravinder","family":"Kumar","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ayon","family":"Chakraborty","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2025,1,25]]},"reference":[{"key":"2714_CR1","doi-asserted-by":"publisher","first-page":"457","DOI":"10.1016\/j.procs.2017.08.023","volume":"112","author":"A Azzouz","year":"2017","unstructured":"Azzouz A, Ennigrou M, Said LB (2017) A self-adaptive hybrid algorithm for solving flexible job-shop problem with sequence dependent setup time. Procedia Comput Sci 112:457\u2013466. https:\/\/doi.org\/10.1016\/j.procs.2017.08.023","journal-title":"Procedia Comput Sci"},{"issue":"3","key":"2714_CR3","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1287\/mnsc.6.3.311","volume":"6","author":"CT Baker","year":"1960","unstructured":"Baker CT, Dzielinski BP (1960) Simulation of a simplified job shop. Manage Sci 6(3):311\u2013323. https:\/\/doi.org\/10.1287\/mnsc.6.3.311","journal-title":"Manage Sci"},{"issue":"12","key":"2714_CR4","doi-asserted-by":"publisher","first-page":"745","DOI":"10.1016\/j.ifacol.2016.07.863","volume":"49","author":"H Beneshti-Fakher","year":"2016","unstructured":"Beneshti-Fakher H, Nourelfath M, Gendreau M (2016) Joint planning of production and maintenance in a single machine deteriorating system. IFAC-PapersOnLine 49(12):745\u2013750. https:\/\/doi.org\/10.1016\/j.ifacol.2016.07.863","journal-title":"IFAC-PapersOnLine"},{"issue":"4","key":"2714_CR5","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1007\/s10845-008-0113-5","volume":"20","author":"A Berrichi","year":"2009","unstructured":"Berrichi A, Amodeo L, Yalaoui F, Ch\u00e2telet E, Mezghiche M (2009) Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J Intell Manuf 20(4):389\u2013400. https:\/\/doi.org\/10.1007\/s10845-008-0113-5","journal-title":"J Intell Manuf"},{"issue":"3","key":"2714_CR6","doi-asserted-by":"publisher","first-page":"1079","DOI":"10.1016\/j.ejor.2022.07.002","volume":"305","author":"M Bezoui","year":"2023","unstructured":"Bezoui M, Olteanu AL, Sevaux M (2023) Integrating preferences within multiobjective flexible job shop scheduling. Euro J Oper Res 305(3):1079\u20131086. https:\/\/doi.org\/10.1016\/j.ejor.2022.07.002","journal-title":"Euro J Oper Res"},{"issue":"2","key":"2714_CR7","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"CR Cassady","year":"2005","unstructured":"Cassady CR, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54(2):304\u2013309","journal-title":"IEEE Trans Reliab"},{"key":"2714_CR8","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/j.jmsy.2019.12.004","volume":"54","author":"X Chen","year":"2020","unstructured":"Chen X, An Y, Zhang Z, Li Y (2020) An approximate nondominated sorting genetic algorithm to integrate optimization of production scheduling and accurate maintenance based on reliability intervals. J Manuf Syst 54:227\u2013241. https:\/\/doi.org\/10.1016\/j.jmsy.2019.12.004","journal-title":"J Manuf Syst"},{"issue":"1\u20134","key":"2714_CR9","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1007\/s00170-009-2388-x","volume":"49","author":"FM Defersha","year":"2010","unstructured":"Defersha FM, Chen M (2010) A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups. Int J Adv Manuf Technol 49(1\u20134):263\u2013279. https:\/\/doi.org\/10.1007\/s00170-009-2388-x","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"2714_CR10","doi-asserted-by":"publisher","first-page":"82","DOI":"10.25126\/jitecs.20161215","volume":"1","author":"TN Fatyanosa","year":"2017","unstructured":"Fatyanosa TN, Sihananto AN, Alfarisy GAF, Burhan MS, Mahmudy WF (2017) Hybrid genetic algorithm and simulated annealing for function optimization. J Inf Technol Comput Sci 1(2):82. https:\/\/doi.org\/10.25126\/jitecs.20161215","journal-title":"J Inf Technol Comput Sci"},{"key":"2714_CR11","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/0925-5273(95)00168-9","volume":"46\u201347","author":"P Fortemps","year":"1996","unstructured":"Fortemps P, Ost C, Pirlot M, Teghem J, Tuyttens D (1996) Using metaheuristics for solving a production scheduling problem in a chemical firm. a case study. Int J Prod Econ 46\u201347:13\u201326. https:\/\/doi.org\/10.1016\/0925-5273(95)00168-9","journal-title":"Int J Prod Econ"},{"key":"2714_CR12","doi-asserted-by":"publisher","first-page":"493","DOI":"10.1007\/s10845-005-0021-x","volume":"17","author":"J Gao","year":"2006","unstructured":"Gao J, Gen M, Sun L (2006) Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm. J Intell Manuf 17:493\u2013507. https:\/\/doi.org\/10.1007\/s10845-005-0021-x","journal-title":"J Intell Manuf"},{"issue":"1","key":"2714_CR13","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1016\/j.ejor.2004.03.012","volume":"167","author":"JF Gon\u00e7alves","year":"2005","unstructured":"Gon\u00e7alves JF, de Magalh\u00e3es Mendes JJ, Resende MG (2005) A hybrid genetic algorithm for the job shop scheduling problem. Euro J Oper Res 167(1):77\u201395. https:\/\/doi.org\/10.1016\/j.ejor.2004.03.012","journal-title":"Euro J Oper Res"},{"key":"2714_CR14","doi-asserted-by":"crossref","unstructured":"Gupta S, Jain A, Chan FT, Phanden RK (2023) A study on simulation-based optimization of a stochastic flexible job shop scheduling undergoing preventive maintenance with sequence-dependent setup time. Int J Interact Design Manuf (IJIDeM). 1\u20138","DOI":"10.1007\/s12008-023-01651-8"},{"issue":"4","key":"2714_CR15","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1080\/23080477.2021.1938502","volume":"9","author":"S Gupta","year":"2021","unstructured":"Gupta S, Jain A (2021) Assessing the effect of reliability-based maintenance approach in job shop scheduling with setup time and energy consideration using simulation; a simulation study. Smart Sci 9(4):283\u2013304. https:\/\/doi.org\/10.1080\/23080477.2021.1938502","journal-title":"Smart Sci"},{"issue":"3","key":"2714_CR16","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1080\/23080477.2021.1992823","volume":"10","author":"S Gupta","year":"2022","unstructured":"Gupta S, Jain A (2022) Analysis of integrated preventive maintenance and machine failure in stochastic flexible job shop scheduling with sequence-dependent setup time. Smart Sci 10(3):175\u2013197. https:\/\/doi.org\/10.1080\/23080477.2021.1992823","journal-title":"Smart Sci"},{"key":"2714_CR17","unstructured":"Holi S and Shivakumar BP (2018) Routing flexibility in job shop scheduling problem-a genetic algorithm approach. Int J Res Sci Innov|, vol. V, no. Xi, pp 60\u201364 [Online]. Available: www.rsisinternational.org"},{"issue":"19","key":"2714_CR18","doi-asserted-by":"publisher","first-page":"5946","DOI":"10.1080\/00207543.2013.824627","volume":"51","author":"A Jain","year":"2013","unstructured":"Jain A, Jain PK, Chan FTS, Singh S (2013) A review on manufacturing flexibility. Int J Prod Res 51(19):5946\u20135970. https:\/\/doi.org\/10.1080\/00207543.2013.824627","journal-title":"Int J Prod Res"},{"key":"2714_CR19","first-page":"38","volume":"3","author":"D Jain","year":"2015","unstructured":"Jain D, Nair K, Jain V (2015) Factors affecting GDP (Manufacturing, Services, Industry): an Indian perspective. Annu Res J SCMS Pune 3:38\u201356","journal-title":"Annu Res J SCMS Pune"},{"issue":"2","key":"2714_CR20","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/j.cie.2007.06.024","volume":"53","author":"HZ Jia","year":"2007","unstructured":"Jia HZ, Fuh JYH, Nee AYC, Zhang YF (2007) Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems. Comput Ind Eng 53(2):313\u2013320. https:\/\/doi.org\/10.1016\/j.cie.2007.06.024","journal-title":"Comput Ind Eng"},{"key":"2714_CR21","doi-asserted-by":"publisher","unstructured":"Hasan SK, Sarker R, Cornforth D (2007) Hybrid genetic algorithm for solving job-shop scheduling problem. In: 6th IEEE\/ACIS International Conference on Computer and Information Science (ICIS 2007), IEEE. (pp 519\u2013524). https:\/\/doi.org\/10.1109\/ICIS.2007.107.","DOI":"10.1109\/ICIS.2007.107"},{"issue":"17","key":"2714_CR22","doi-asserted-by":"publisher","first-page":"5236","DOI":"10.1080\/00207543.2020.1775910","volume":"59","author":"YI Kim","year":"2021","unstructured":"Kim YI, Kim HJ (2021) Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown. Int J Product Res 59(17):5236\u20135258. https:\/\/doi.org\/10.1080\/00207543.2020.1775910","journal-title":"Int J Product Res"},{"issue":"6","key":"2714_CR23","doi-asserted-by":"publisher","first-page":"1628","DOI":"10.1080\/00207543.2019.1672900","volume":"58","author":"JG Kim","year":"2020","unstructured":"Kim JG, Song S, Jeong BJ (2020) Minimising total tardiness for the identical parallel machine scheduling problem with splitting jobs and sequence-dependent setup times. Int J Prod Res 58(6):1628\u20131643. https:\/\/doi.org\/10.1080\/00207543.2019.1672900","journal-title":"Int J Prod Res"},{"issue":"4598","key":"2714_CR24","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick S, Gelatt CD Jr, Vecchi MP (1983) Optimization by simulated annealing. Science 220(4598):671\u2013680. https:\/\/doi.org\/10.1126\/science.220.4598.671","journal-title":"Science"},{"key":"2714_CR25","unstructured":"Davis L (2014) Job shop scheduling with genetic algorithms. InProceedings of the first International Conference on Genetic Algorithms and their Applications. Psychology Press, (pp 136\u2013140)"},{"issue":"3","key":"2714_CR26","doi-asserted-by":"publisher","first-page":"269","DOI":"10.4304\/jsw.5.3.269-274","volume":"5","author":"Y Li","year":"2010","unstructured":"Li Y, Chen Y (2010) A genetic algorithm for job-shop scheduling. J Softw 5(3):269\u2013274. https:\/\/doi.org\/10.4304\/jsw.5.3.269-274","journal-title":"J Softw"},{"issue":"2","key":"2714_CR27","doi-asserted-by":"publisher","first-page":"116","DOI":"10.1080\/02286203.2017.1401418","volume":"38","author":"R Liu","year":"2018","unstructured":"Liu R, Xie X, Yu K, Hu Q (2018) A survey on simulation optimization for the manufacturing system operation. Int J Model Simul 38(2):116\u2013127. https:\/\/doi.org\/10.1080\/02286203.2017.1401418","journal-title":"Int J Model Simul"},{"issue":"18","key":"2714_CR28","doi-asserted-by":"publisher","first-page":"5217","DOI":"10.1080\/00207540701805646","volume":"47","author":"A Manikas","year":"2009","unstructured":"Manikas A, Chang YL (2009) A scatter search approach to sequence-dependent setup times job shop scheduling. Int J Prod Res 47(18):5217\u20135236. https:\/\/doi.org\/10.1080\/00207540701805646","journal-title":"Int J Prod Res"},{"issue":"1\u20132","key":"2714_CR41","doi-asserted-by":"publisher","first-page":"170","DOI":"10.1007\/s00170-008-1693-0","volume":"43","author":"B Naderi","year":"2009","unstructured":"Naderi B, Zandieh M, Fatemi Ghomi SMT (2009) Scheduling sequence-dependent setup time job shops with preventive maintenance. Int J Adv Manuf Technol 43(1\u20132):170\u2013181. https:\/\/doi.org\/10.1007\/s00170-008-1693-0","journal-title":"Int J Adv Manuf Technol"},{"issue":"6","key":"2714_CR29","doi-asserted-by":"publisher","first-page":"517","DOI":"10.1080\/0951192X.2011.562543","volume":"24","author":"RK Phanden","year":"2011","unstructured":"Phanden RK, Jain A, Verma R (2011) Integration of process planning and scheduling: a state-of-the-art review. Int J Comput Integr Manuf 24(6):517\u2013534. https:\/\/doi.org\/10.1080\/0951192X.2011.562543","journal-title":"Int J Comput Integr Manuf"},{"issue":"7","key":"2714_CR30","doi-asserted-by":"publisher","first-page":"937","DOI":"10.1108\/17410381211267745","volume":"23","author":"RK Phanden","year":"2012","unstructured":"Phanden RK, Jain A, Verma R (2012) A genetic algorithm-based approach for job shop scheduling. J Manuf Technol Manag 23(7):937\u2013946. https:\/\/doi.org\/10.1108\/17410381211267745","journal-title":"J Manuf Technol Manag"},{"key":"2714_CR31","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-387-78935-4","author":"ML Pinedo","year":"2008","unstructured":"Pinedo ML (2008) Scheduling: theory, algorithms, and systems. Third Edit Springer Cham. https:\/\/doi.org\/10.1007\/978-0-387-78935-4","journal-title":"Third Edit Springer Cham"},{"issue":"1","key":"2714_CR32","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.cie.2003.09.007","volume":"46","author":"R Rangsaritratsamee","year":"2004","unstructured":"Rangsaritratsamee R, Ferrell WG, Kurz MB (2004) Dynamic rescheduling that simultaneously considers efficiency and stability. Comput Ind Eng 46(1):1\u201315. https:\/\/doi.org\/10.1016\/j.cie.2003.09.007","journal-title":"Comput Ind Eng"},{"issue":"00","key":"2714_CR33","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/23080477.2022.2040205","volume":"00","author":"S Rani","year":"2022","unstructured":"Rani S, Jain A, Angra S (2022) Effect of routing flexibility on the performance of order release policies in a flexible job shop with sequence-dependent setup time: a simulation study. Smart Sci 00(00):1\u201316. https:\/\/doi.org\/10.1080\/23080477.2022.2040205","journal-title":"Smart Sci"},{"issue":"11","key":"2714_CR34","doi-asserted-by":"publisher","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R Ruiz","year":"2007","unstructured":"Ruiz R, Garc\u00eda-D\u00edaz JC, Maroto C (2007) Considering scheduling and preventive maintenance in the flowshop sequencing problem. Comput Oper Res 34(11):3314\u20133330. https:\/\/doi.org\/10.1016\/j.cor.2005.12.007","journal-title":"Comput Oper Res"},{"key":"2714_CR35","doi-asserted-by":"publisher","first-page":"110","DOI":"10.1016\/j.cirpj.2015.03.003","volume":"10","author":"P Sharma","year":"2015","unstructured":"Sharma P, Jain A (2015) Performance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach. CIRP J Manuf Sci Technol 10:110\u2013119. https:\/\/doi.org\/10.1016\/j.cirpj.2015.03.003","journal-title":"CIRP J Manuf Sci Technol"},{"issue":"1","key":"2714_CR36","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1177\/1063293X15599814","volume":"24","author":"P Sharma","year":"2016","unstructured":"Sharma P, Jain A (2016) New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times. Concurr Eng Res Appl 24(1):58\u201368. https:\/\/doi.org\/10.1177\/1063293X15599814","journal-title":"Concurr Eng Res Appl"},{"issue":"1","key":"2714_CR37","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1007\/s001700200126","volume":"20","author":"L Wang","year":"2002","unstructured":"Wang L, Zheng DZ (2002) A modified genetic algorithm for job shop scheduling. Int J Adv Manuf Technol 20(1):72\u201376. https:\/\/doi.org\/10.1007\/s001700200126","journal-title":"Int J Adv Manuf Technol"},{"issue":"19","key":"2714_CR38","doi-asserted-by":"publisher","first-page":"5797","DOI":"10.1080\/00207543.2015.1005768","volume":"53","author":"L Xu","year":"2015","unstructured":"Xu L, Wang Q, Huang S (2015) Dynamic order acceptance and scheduling problem with sequence-dependent setup time. Int J Prod Res 53(19):5797\u20135808. https:\/\/doi.org\/10.1080\/00207543.2015.1005768","journal-title":"Int J Prod Res"},{"issue":"10","key":"2714_CR39","doi-asserted-by":"publisher","first-page":"1646","DOI":"10.1080\/0305215X.2021.1949007","volume":"54","author":"H Zhang","year":"2022","unstructured":"Zhang H, Xu G, Pan R, Ge H (2022) A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time. Eng Optim 54(10):1646\u20131667. https:\/\/doi.org\/10.1080\/0305215X.2021.1949007","journal-title":"Eng Optim"},{"issue":"2","key":"2714_CR40","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1177\/0954405415573060","volume":"231","author":"H Zheng","year":"2017","unstructured":"Zheng H, Feng Y, Tan J, Zhang Z (2017) An integrated modular design methodology based on maintenance performance consideration. Proceed Inst Mech Eng, Part b: J Eng Manuf 231(2):313\u2013328. https:\/\/doi.org\/10.1177\/0954405415573060","journal-title":"Proceed Inst Mech Eng, Part b: J Eng Manuf"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-025-02714-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-025-02714-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-025-02714-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,4]],"date-time":"2025-04-04T23:10:34Z","timestamp":1743808234000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-025-02714-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,1,25]]},"references-count":40,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2025,3]]}},"alternative-id":["2714"],"URL":"https:\/\/doi.org\/10.1007\/s13198-025-02714-7","relation":{"has-preprint":[{"id-type":"doi","id":"10.21203\/rs.3.rs-4762389\/v1","asserted-by":"object"}]},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,1,25]]},"assertion":[{"value":"18 July 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 December 2024","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 January 2025","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 January 2025","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"Authors do not have any conflict of interest with this manuscript\u2019s content. The authors have followed all ethical responsibilities mentioned by the journal.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}