{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,26]],"date-time":"2026-02-26T15:34:02Z","timestamp":1772120042832,"version":"3.50.1"},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2025,5,16]],"date-time":"2025-05-16T00:00:00Z","timestamp":1747353600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,5,16]],"date-time":"2025-05-16T00:00:00Z","timestamp":1747353600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2025,6]]},"DOI":"10.1007\/s13198-025-02789-2","type":"journal-article","created":{"date-parts":[[2025,5,16]],"date-time":"2025-05-16T07:22:09Z","timestamp":1747380129000},"page":"2236-2245","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Reliability measures of a parallel-cold standby system with conditional priority for operation: a drainage system application"],"prefix":"10.1007","volume":"16","author":[{"ORCID":"https:\/\/orcid.org\/0009-0001-1147-1401","authenticated-orcid":false,"given":"Puran","family":"Rathi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. C.","family":"Malik","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Anuradha","family":"Bhardwaj","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2025,5,16]]},"reference":[{"key":"2789_CR1","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1007\/s13198-018-0752-7","volume":"10","author":"JN Biswal","year":"2019","unstructured":"Biswal JN, Muduli K, Satapathy S et al (2019) A TISM based study of SSCM enablers: an Indian coal- fired thermal power plant perspective. Int J Syst Assur Eng Manag 10:126\u2013141. https:\/\/doi.org\/10.1007\/s13198-018-0752-7","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"2789_CR2","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1016\/0026-2714(89)90561-1","volume":"29","author":"J Cao","year":"1989","unstructured":"Cao J, Wu Y (1989) Reliability analysis of a two-unit cold standby system with a replaceable repair facility. Microelectron Reliab 29(2):145\u2013150","journal-title":"Microelectron Reliab"},{"key":"2789_CR3","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1007\/s13198-011-0052-y","volume":"2","author":"FL de Lemos","year":"2011","unstructured":"de Lemos FL, Sullivan TM (2011) Addressing epistemic uncertainty in a radioactive waste disposal facility siting: examples of applications. Int J Syst Assur Eng Manag 2:59\u201365. https:\/\/doi.org\/10.1007\/s13198-011-0052-y","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"2789_CR4","first-page":"385","volume":"13","author":"S Kadyan","year":"2020","unstructured":"Kadyan S, Malik SC, Gitanjali (2020) Stochastic analysis of a three-unit non-identical repairable system with simultaneous working of cold standby units. J Reliab Stat Stud 13(2):385\u2013400","journal-title":"J Reliab Stat Stud"},{"key":"2789_CR5","doi-asserted-by":"publisher","first-page":"1687","DOI":"10.1007\/s11277-020-07446-4","volume":"114","author":"A Khanna","year":"2020","unstructured":"Khanna A, Kaur S (2020) Internet of things (IoT), applications and challenges: a comprehensive review. Wirel Pers Commun 114:1687\u20131762","journal-title":"Wirel Pers Commun"},{"key":"2789_CR6","doi-asserted-by":"publisher","first-page":"1542","DOI":"10.1016\/j.ress.2011.06.004","volume":"96","author":"KNF Leung","year":"2011","unstructured":"Leung KNF, Zhang YL, Lai KK (2011) Analysis for a two-dissimilar-component cold standby repairable system with repair priority. Reliab Eng Syst Saf 96:1542\u20131551","journal-title":"Reliab Eng Syst Saf"},{"issue":"1","key":"2789_CR7","first-page":"1","volume":"3","author":"SC Malik","year":"2010","unstructured":"Malik SC, Bhardwaj RK, Grewal AS (2010) Probabilistic analysis of a system of two non-identical parallel units with priority to repair subject to inspection. J Reliab Stat Stud 3(1):1\u201311","journal-title":"J Reliab Stat Stud"},{"key":"2789_CR8","doi-asserted-by":"publisher","DOI":"10.1080\/25742558.2018.1467208","author":"PS Pundir","year":"2018","unstructured":"Pundir PS, Patawa R, Gupta PK (2018) Stochastic outlook of two non-identical unit parallel system with priority in repair. Cogent Math Stat. https:\/\/doi.org\/10.1080\/25742558.2018.1467208","journal-title":"Cogent Math Stat"},{"issue":"4","key":"2789_CR9","first-page":"320","volume":"40","author":"PS Pundir","year":"2020","unstructured":"Pundir PS, Patawa R, Gupta PK (2020) Analysis of two non-identical unit cold standby system in presence of prior information. Am J Math Manag Sci 40(4):320\u2013335","journal-title":"Am J Math Manag Sci"},{"issue":"2","key":"2789_CR10","first-page":"563","volume":"17","author":"R Puran","year":"2021","unstructured":"Rathi P, Malik SC, Nandal N (2021a) Reliability characteristics of a parallel-cold standby system of pairwise identical four units with provision of priority. Int J Syst Assur Eng Manag 17(2):563\u2013572","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"2789_CR11","first-page":"161","volume":"8","author":"P Rathi","year":"2021","unstructured":"Rathi P, Gupta P, Nandal N (2021b) Reliability characteristics of a four unit parallel-cold standby system with operational priority. Int J Stat Reliab Eng 8(1):161\u2013170","journal-title":"Int J Stat Reliab Eng"},{"issue":"9","key":"2789_CR12","doi-asserted-by":"publisher","first-page":"1703","DOI":"10.1080\/00207728908910253","volume":"20","author":"G Rakesh","year":"1989","unstructured":"Rakesh G, Goel LR (1989) Profit analysis of two unit priority standby system with administrative delay in repair. Int J Syst Sci 20(9):1703\u20131712","journal-title":"Int J Syst Sci"},{"issue":"4","key":"2789_CR19","doi-asserted-by":"publisher","first-page":"497","DOI":"10.1016\/0026-2714(92)90480-9","volume":"32","author":"MC Rander","year":"1992","unstructured":"Rander MC, Kumar A, Tuteja RK (1992) Analysis of two-unit cold standby system with imperfect assistant repairman and perfect master repairman. Microelectron Reliab 32(4):497\u2013501","journal-title":"Microelectron Reliab"},{"key":"2789_CR13","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1007\/s13198-022-01705-2","volume":"15","author":"S Sathiyamurthi","year":"2024","unstructured":"Sathiyamurthi S, Saravanan S, Sankriti R et al (2024) Integrated GIS and AHP techniques for land suitability assessment of cotton crop in Perambalur district, South India. Int J Syst Assur Eng Manag 15:267\u2013278. https:\/\/doi.org\/10.1007\/s13198-022-01705-2","journal-title":"Int J Syst Assur Eng Manag"},{"key":"2789_CR14","doi-asserted-by":"publisher","DOI":"10.1177\/1748006X211051828","author":"E Serkan","year":"2021","unstructured":"Serkan E, Maxim F (2021) Reliability of the two-unit priority standby system revisited. Proc Inst Mech Eng Part O J Risk Reliab. https:\/\/doi.org\/10.1177\/1748006X211051828","journal-title":"Proc Inst Mech Eng Part O J Risk Reliab"},{"issue":"5","key":"2789_CR15","doi-asserted-by":"publisher","first-page":"747","DOI":"10.1016\/S0026-2714(96)00090-X","volume":"37","author":"V Sridharanand","year":"1997","unstructured":"Sridharanand V, Mohanavadivu P (1997) Reliability and availability analysis for two non-identical unit parallel system with conman cause failures and human errors. Microelectron Reliab 37(5):747\u20137526","journal-title":"Microelectron Reliab"},{"key":"2789_CR16","doi-asserted-by":"publisher","first-page":"1010","DOI":"10.1007\/s13198-019-00830-9","volume":"10","author":"DB Wakeyo","year":"2019","unstructured":"Wakeyo DB, Singh AP, Avvari M (2019) Influence of abattoir waste management practices on natural environment conservation. Int J Syst Assur Eng Manag 10:1010\u20131022. https:\/\/doi.org\/10.1007\/s13198-019-00830-9","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"Suppl 1","key":"2789_CR17","doi-asserted-by":"publisher","first-page":"225","DOI":"10.1007\/s13198-021-01370-x","volume":"13","author":"Q Wang","year":"2022","unstructured":"Wang Q, Koundal D (2022) Dynamics of food nutrient loss and prediction of nutrient loss under variable temperature conditions. Int J Syst Assur Eng Manag 13(Suppl 1):225\u2013235. https:\/\/doi.org\/10.1007\/s13198-021-01370-x","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"2789_CR18","first-page":"249","volume":"19","author":"VSS Yadavalli","year":"2002","unstructured":"Yadavalli VSS, Botha M, Bekker A (2002) Asymptotic confidence limits for the steady state availability of a two-unit parallel system with \u2018preparation time\u2019 for the repair facility. Asia Pac J Op Res 19(2):249\u2013256","journal-title":"Asia Pac J Op Res"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-025-02789-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-025-02789-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-025-02789-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,26]],"date-time":"2025-06-26T04:45:39Z","timestamp":1750913139000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-025-02789-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,5,16]]},"references-count":19,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2025,6]]}},"alternative-id":["2789"],"URL":"https:\/\/doi.org\/10.1007\/s13198-025-02789-2","relation":{"has-preprint":[{"id-type":"doi","id":"10.21203\/rs.3.rs-3406714\/v1","asserted-by":"object"}]},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,5,16]]},"assertion":[{"value":"4 October 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"13 April 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"16 May 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The work presented in this article is original to the best of our knowledge and has not been submitted elsewhere for publication. There is no conflict of interest about this research work.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"There is no human\/animal participation involved in the article.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Human or animal rights"}},{"value":"Since there is no human\/animal participation involved in the article, no need for consent.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Informed consent"}}]}}