{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,31]],"date-time":"2026-08-31T15:40:53Z","timestamp":1788190853976,"version":"build-2803163510"},"reference-count":36,"publisher":"Springer Science and Business Media LLC","issue":"8","license":[{"start":{"date-parts":[[2025,7,4]],"date-time":"2025-07-04T00:00:00Z","timestamp":1751587200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,7,4]],"date-time":"2025-07-04T00:00:00Z","timestamp":1751587200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2025,8]]},"DOI":"10.1007\/s13198-025-02830-4","type":"journal-article","created":{"date-parts":[[2025,7,4]],"date-time":"2025-07-04T06:29:57Z","timestamp":1751610597000},"page":"2832-2840","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Optimizing multi-level decision-making: M-TOPSIS approach for quadratic fractional multiobjective problems"],"prefix":"10.1007","volume":"16","author":[{"given":"Rozy","family":"Rani","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Vandana","family":"Goyal","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9461-8770","authenticated-orcid":false,"given":"Deepak","family":"Gupta","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2025,7,4]]},"reference":[{"issue":"1","key":"2830_CR1","first-page":"243","volume":"162","author":"MA Abo-Sinna","year":"2005","unstructured":"Abo-Sinna MA, Amer AH (2005) Extensions of TOPSIS for multi-objective large-scale nonlinear programming problems. Appl Math Comput 162(1):243\u2013256","journal-title":"Appl Math Comput"},{"issue":"2","key":"2830_CR2","first-page":"515","volume":"177","author":"MA Abo-Sinna","year":"2006","unstructured":"Abo-Sinna MA, Abou-El-Enien TH (2006) An interactive algorithm for large scale multiple objective programming problems with fuzzy parameters through TOPSIS approach. Appl Math Comput 177(2):515\u2013527","journal-title":"Appl Math Comput"},{"issue":"3","key":"2830_CR3","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1016\/j.apm.2006.12.001","volume":"32","author":"MA Abo-Sinna","year":"2008","unstructured":"Abo-Sinna MA, Amer AH, Ibrahim AS (2008) Extensions of TOPSIS for large scale multi-objective non-linear programming problems with block angular structure. Appl Math Modell 32(3):292\u2013302","journal-title":"Appl Math Modell"},{"issue":"4","key":"2830_CR4","doi-asserted-by":"publisher","first-page":"7353","DOI":"10.24297\/jam.v13i4.6243","volume":"13","author":"MA Abo-Sinna","year":"2018","unstructured":"Abo-Sinna MA, Amer AH (2018) TOPSIS approach for solving bi-level non-linear fractional MODM problems. J Adv Math 13(4):7353\u20137370","journal-title":"J Adv Math"},{"key":"2830_CR5","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1016\/j.techfore.2017.07.010","volume":"131","author":"D Aloini","year":"2018","unstructured":"Aloini D, Dulmin R, Mininno V, Pellegrini L, Farina G (2018) Technology assessment with IF-TOPSIS: an application in the advanced underwater system sector. Technol Forecast Social Change 131:38\u201348","journal-title":"Technol Forecast Social Change"},{"issue":"9","key":"2830_CR6","doi-asserted-by":"publisher","first-page":"2377","DOI":"10.1016\/j.apm.2009.11.004","volume":"34","author":"IA Baky","year":"2010","unstructured":"Baky IA (2010) Solving multi-level multi-objective linear programming problems through fuzzy goal programming approach. Appl Math Modell 34(9):2377\u20132387","journal-title":"Appl Math Modell"},{"issue":"3","key":"2830_CR7","doi-asserted-by":"publisher","first-page":"1004","DOI":"10.1016\/j.apm.2012.03.002","volume":"37","author":"IA Baky","year":"2013","unstructured":"Baky IA, Abo-Sinna MA (2013) TOPSIS for bi-level MODM problems. Appl Math Modell 37(3):1004\u20131015","journal-title":"Appl Math Modell"},{"issue":"5","key":"2830_CR8","first-page":"38","volume":"2","author":"IA Baky","year":"2014","unstructured":"Baky IA, El Sayed MA (2014) Bi-level multi-objective programming problems with fuzzy parameters: modified TOPSIS approach. Int J Manag Fuzzy Syst 2(5):38\u201350","journal-title":"Int J Manag Fuzzy Syst"},{"key":"2830_CR9","unstructured":"Bellman RE (1957). Dynamic programming, ser. Cambridge Studies in Speech Science and Communication. Princeton University Press, Princeton"},{"key":"2830_CR10","doi-asserted-by":"publisher","first-page":"1033","DOI":"10.1016\/j.sbspro.2012.09.176","volume":"62","author":"BK Bulgurcu","year":"2012","unstructured":"Bulgurcu BK (2012) Application of TOPSIS technique for financial performance evaluation of technology firms in Istanbul stock exchange market. Procedia-Social Behav Sci 62:1033\u20131040","journal-title":"Procedia-Social Behav Sci"},{"issue":"2","key":"2830_CR11","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.ijpe.2005.03.009","volume":"102","author":"CT Chen","year":"2006","unstructured":"Chen CT, Lin CT, Huang SF (2006) A fuzzy approach for supplier evaluation and selection in supply chain management. Int J Product Econ 102(2):289\u2013301","journal-title":"Int J Product Econ"},{"issue":"4","key":"2830_CR12","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1007\/s40092-014-0073-7","volume":"10","author":"Partha Pratim Dey","year":"2014","unstructured":"Dey Partha Pratim, Pramanik Surapati, Giri Bibhas C. (2014) TOPSIS approach to linear fractional bi-level MODM problem based on fuzzy goal programming. J Indust Eng Int 10(4):173\u2013184. https:\/\/doi.org\/10.1007\/s40092-014-0073-7","journal-title":"J Indust Eng Int"},{"issue":"4","key":"2830_CR13","first-page":"17","volume":"2","author":"PP Dey","year":"2014","unstructured":"Dey PP, Pramanik S, Giri BC (2014) Multi-level fractional programming problem based on fuzzy goal programming. Int J Innov Res Technol Sci 2(4):17\u201326","journal-title":"Int J Innov Res Technol Sci"},{"key":"2830_CR14","doi-asserted-by":"publisher","first-page":"36","DOI":"10.1016\/j.prevetmed.2019.02.006","volume":"165","author":"F El Allaki","year":"2019","unstructured":"El Allaki F, Christensen J, Valli\u00e8res A (2019) A modified TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) applied to choosing appropriate selection methods in ongoing surveillance for Avian Influenza in Canada. Prevent Veterinary Med 165:36\u201343","journal-title":"Prevent Veterinary Med"},{"issue":"3","key":"2830_CR15","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1007\/s12597-020-00497-y","volume":"58","author":"V Goyal","year":"2021","unstructured":"Goyal V, Rani N, Gupta D (2021) Parametric approach to quadratically constrained multi-level multi-objective quadratic fractional programming. OPSEARCH 58(3):557\u2013574","journal-title":"OPSEARCH"},{"issue":"2","key":"2830_CR16","doi-asserted-by":"publisher","first-page":"594","DOI":"10.1007\/s12597-021-00545-1","volume":"59","author":"V Goyal","year":"2022","unstructured":"Goyal V, Rani N, Gupta D (2022) FGP approach to quadratically constrained multi-objective quadratic fractional programming with parametric functions. OPSEARCH 59(2):594\u2013602","journal-title":"OPSEARCH"},{"key":"2830_CR17","doi-asserted-by":"crossref","unstructured":"Hwang CL, Yoon K, Hwang CL, & Yoon K (1981). Methods for multiple attribute decision making. Multiple attribute decision making: methods and applications a state-of-the-art survey, 58-191","DOI":"10.1007\/978-3-642-48318-9_3"},{"key":"2830_CR18","unstructured":"damghani KK, Sadi-nezhad S, Tavana M (2013) \u201cSolving multi-period project selection problems with fuzzy goal programming based on TOPSIS and a fuzzy preference relation,\u201d Inf. Sci. (Ny), Vol. 1"},{"key":"2830_CR19","doi-asserted-by":"crossref","unstructured":"Lachhwani K, Poonia MP (2012)\u201cMathematical solution of multilevel fractional programming problem with fuzzy goal programming approach\u201d Journal of Industrial Engineering International, vol. 8, no. 16, 2012, pp. 1-11","DOI":"10.1186\/2251-712X-8-16"},{"issue":"3","key":"2830_CR20","doi-asserted-by":"publisher","first-page":"486","DOI":"10.1016\/0377-2217(94)90282-8","volume":"76","author":"YJ Lai","year":"1994","unstructured":"Lai YJ, Liu TY, Hwang CL (1994) Topsis for MODM. European J Operation Res 76(3):486\u2013500","journal-title":"European J Operation Res"},{"key":"2830_CR21","doi-asserted-by":"publisher","first-page":"624","DOI":"10.1007\/s12597-013-0157-y","volume":"51","author":"K Lachhwani","year":"2014","unstructured":"Lachhwani K (2014) On solving multi-level multi objective linear programming problems through fuzzy goal programming approach. Opsearch 51:624\u2013637","journal-title":"Opsearch"},{"key":"2830_CR22","doi-asserted-by":"crossref","unstructured":"Yang L, Deuse J (2012) \u201cMultiple-attribute decision-making approach for an energy-efficient facility layout design,\u201d Publ. by Elsevier B.V, vol. 3, pp. 149-154","DOI":"10.1016\/j.procir.2012.07.027"},{"key":"2830_CR23","unstructured":"Mahmoud. A. Abo-Sinna (2000) Extensions of the TOPSIS for multi-objective dynamic programming problems under fuzziness, Adv. Model. Anal. (AMSE Press, France) B 43 (4) 1-24"},{"issue":"1","key":"2830_CR24","first-page":"3291","volume":"8","author":"M Muslihudin","year":"2019","unstructured":"Muslihudin M, Ilayaraja M, Sathesh Kumar K, Shankar K, Jamilah J, Novitasari D, Maseleno A (2019) Decision support system in kindergarten selection using TOPSIS method. Int J Recent Technol Eng 8(1):3291\u20133298","journal-title":"Int J Recent Technol Eng"},{"issue":"2","key":"2830_CR25","doi-asserted-by":"publisher","first-page":"1","DOI":"10.9734\/BJMCS\/2017\/30626","volume":"21","author":"MS Osman","year":"2017","unstructured":"Osman MS, Raslan KR, Emam OE, Farahat FA (2017) Solving multi-level multi-objective fractional programming problem with rough intervals in the objective functions. British J Math Comput Sci 21(2):1\u201317","journal-title":"British J Math Comput Sci"},{"issue":"4","key":"2830_CR26","first-page":"17","volume":"2","author":"PP Dey","year":"2014","unstructured":"Dey PP, Pramanik S, Giri BC (2014) Multi-level linear fractional programming problem based on fuzzy goal programming approach. Int J Innov Res Technol Sci 2(4):17\u201326","journal-title":"Int J Innov Res Technol Sci"},{"key":"2830_CR27","doi-asserted-by":"crossref","unstructured":"Pramanik S, Dey PP (2018) Smarandache, F. TOPSIS Based Algorithm for Solving Multi-objective Multi-level Programming Problem with Fuzzy Parameters. Preprints.org, 2018020105. https:\/\/doi.org\/10.20944\/preprints201802.0105.v1","DOI":"10.20944\/preprints201802.0105.v1"},{"issue":"7","key":"2830_CR28","first-page":"3262","volume":"20","author":"R Rani","year":"2022","unstructured":"Rani R, Gupta D, Goyal V (2022) A SOLUTION APPROACH TO QUADRATICALLY CONSTRAINED MULTI-OBJECTIVE DECISION MAKING PROBLEM WITH MTOPSIS PROGRAMMING. Neuro Quantol 20(7):3262\u20133266","journal-title":"Neuro Quantol"},{"key":"2830_CR29","doi-asserted-by":"crossref","unstructured":"Rahim R, Supiyandi S, Siahaan APU, Listyorini T, Utomo AP, Triyanto WA, & Khairunnisa K. (2018). TOPSIS method application for decision support system in internal control for selecting best employees. In Journal of Physics: Conference Series (Vol. 1028, p. 012052). IOP Publishing","DOI":"10.1088\/1742-6596\/1028\/1\/012052"},{"key":"2830_CR30","doi-asserted-by":"crossref","unstructured":"Krohling RA, Campanharo VC (2011)\u201cFuzzy TOPSIS for group decision making: A case study for accidents with oil spill in the sea,\u201d Expert Syst. Appl, Vol. 38, no. 4, pp. 4190-4197","DOI":"10.1016\/j.eswa.2010.09.081"},{"issue":"1","key":"2830_CR31","first-page":"200","volume":"6","author":"E Roszkowska","year":"2011","unstructured":"Roszkowska E (2011) Multi-criteria decision making models by applying the TOPSIS method to crisp and interval data. Multiple Criteria Decision Making\/Univ Econ Katowice 6(1):200\u2013230","journal-title":"Multiple Criteria Decision Making\/Univ Econ Katowice"},{"key":"2830_CR32","first-page":"643","volume":"4","author":"M Saraj","year":"2012","unstructured":"Saraj M, Safaei N (2012) Fuzzy linear fractional bi-level multi-objective programming problems. Int J Appl Math Res 4:643\u2013658","journal-title":"Int J Appl Math Res"},{"issue":"1","key":"2830_CR33","doi-asserted-by":"publisher","first-page":"1968741","DOI":"10.1080\/23311916.2021.1968741","volume":"8","author":"MA Shbool","year":"2021","unstructured":"Shbool MA, Arabeyyat OS, Al-Bazi A, AlAlaween WH (2021) An integrated multi-criteria decision-making framework for a medical device selection in the healthcare industry. Cogent Eng 8(1):1968741","journal-title":"Cogent Eng"},{"issue":"1","key":"2830_CR34","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/0305-0548(95)00007-9","volume":"23","author":"HS Shih","year":"1996","unstructured":"Shih HS, Lai YJ, Lee ES (1996) Fuzzy approach for multi-level programming problems. Comput Operat Res 23(1):73\u201391","journal-title":"Comput Operat Res"},{"issue":"10","key":"2830_CR35","doi-asserted-by":"publisher","first-page":"3117","DOI":"10.1080\/00207543.2012.754553","volume":"51","author":"X Wang","year":"2013","unstructured":"Wang X, Chan HK (2013) A hierarchical fuzzy TOPSIS approach to assess improvement areas when implementing green supply chain initiatives. Int J Prod Res 51(10):3117\u20133130","journal-title":"Int J Prod Res"},{"issue":"16","key":"2830_CR36","first-page":"116","volume":"4","author":"K Yang","year":"2022","unstructured":"Yang K (2022) Application of TOPSIS technique for financial performance evaluation of manufacturing firms in US market. Acad J Bus Manag 4(16):116\u2013122","journal-title":"Acad J Bus Manag"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-025-02830-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s13198-025-02830-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-025-02830-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,7]],"date-time":"2025-09-07T00:40:57Z","timestamp":1757205657000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s13198-025-02830-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,7,4]]},"references-count":36,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2025,8]]}},"alternative-id":["2830"],"URL":"https:\/\/doi.org\/10.1007\/s13198-025-02830-4","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,7,4]]},"assertion":[{"value":"17 July 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 May 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 July 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"All the authors declare that they have no Conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants or animals performed by any of the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethical Approval"}}]}}