{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,11]],"date-time":"2026-11-11T03:36:36Z","timestamp":1794368196956,"version":"4.9.0"},"reference-count":24,"publisher":"Elsevier BV","issue":"1-2","license":[{"start":{"date-parts":[[2017,3,1]],"date-time":"2017-03-01T00:00:00Z","timestamp":1488326400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2017,3,1]],"date-time":"2017-03-01T00:00:00Z","timestamp":1488326400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"}],"funder":[{"DOI":"10.13039\/501100003407","name":"Ministero dell\u2019Istruzione, dell\u2019Universit\u00e1 e della Ricerca (IT)","doi-asserted-by":"publisher","award":["PRIN 2012JXB3YF_003"],"award-info":[{"award-number":["PRIN 2012JXB3YF_003"]}],"id":[{"id":"10.13039\/501100003407","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100004963","name":"Seventh Framework Programme","doi-asserted-by":"publisher","award":["316647 Marie Curie Actions (ITN)"],"award-info":[{"award-number":["316647 Marie Curie Actions (ITN)"]}],"id":[{"id":"10.13039\/501100004963","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Catedra Iberdrola de Energ\u00eda e Innovaci\u00f3n"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["EURO Journal on Computational Optimization"],"published-print":{"date-parts":[[2017,3]]},"DOI":"10.1007\/s13675-016-0066-y","type":"journal-article","created":{"date-parts":[[2016,4,14]],"date-time":"2016-04-14T06:14:20Z","timestamp":1460614460000},"page":"177-201","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":74,"title":["A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints"],"prefix":"10.1016","volume":"5","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3757-6188","authenticated-orcid":false,"given":"C.","family":"Gentile","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6372-6197","authenticated-orcid":false,"given":"G.","family":"Morales-Espa\u00f1a","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8871-1872","authenticated-orcid":false,"given":"A.","family":"Ramos","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"3","key":"10.1007\/s13675-016-0066-y_CR1","doi-asserted-by":"crossref","first-page":"1371","DOI":"10.1109\/TPWRS.2006.876672","article-title":"A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem","volume":"21","author":"Carrion","year":"2006","journal-title":"IEEE Trans Power Syst"},{"key":"10.1007\/s13675-016-0066-y_CR2","unstructured":"Damci P, Kucukyavuz S, Rajan D, Atamtu A (2015) A polyhedral study of production ramping. Math Progr. 10.1007\/s10107-015-0919-9"},{"issue":"4","key":"10.1007\/s13675-016-0066-y_CR3","doi-asserted-by":"crossref","first-page":"767","DOI":"10.1287\/opre.1060.0309","article-title":"Solving nonlinear single-unit commitment problems with ramping constraints","volume":"54","author":"Frangioni","year":"2006","journal-title":"Oper Res"},{"key":"10.1007\/s13675-016-0066-y_CR4","unstructured":"Frangioni A, Gentile C (2015) An extended mip formulation for the single-unit commitment problem with ramping constraints. In: 17th British-French-German conference on Optimization, London, June 15\u201317"},{"issue":"5","key":"10.1007\/s13675-016-0066-y_CR5","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1016\/j.ijepes.2007.10.003","article-title":"Solving unit commitment problems with general ramp constraints","volume":"30","author":"Frangioni","year":"2008","journal-title":"Int J Electr Power Energy Syst"},{"issue":"1","key":"10.1007\/s13675-016-0066-y_CR6","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1109\/TPWRS.2008.2004744","article-title":"Tighter approximated MILP formulations for unit commitment problems","volume":"24","author":"Frangioni","year":"2009","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"10.1007\/s13675-016-0066-y_CR7","doi-asserted-by":"crossref","first-page":"1052","DOI":"10.1109\/TPWRS.2009.2037232","article-title":"Co-Optimization of generation unit commitment and transmission switching with N-1 reliability","volume":"25","author":"Hedman","year":"2010","journal-title":"IEEE Trans Power Syst"},{"key":"10.1007\/s13675-016-0066-y_CR8","unstructured":"Knueven B, Ostrowski J, Wang J (2015) Generating cuts from the ramping polytope for the unit commitment problem. http:\/\/www.optimization-online.org\/DB_HTML\/2015\/09\/5099.html. Accessed 7 Apr 2016"},{"issue":"1","key":"10.1007\/s13675-016-0066-y_CR9","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.disopt.2003.12.001","article-title":"Min-up\/min-down polytopes","volume":"1","author":"Lee","year":"2004","journal-title":"Discr Optim"},{"key":"10.1007\/s13675-016-0066-y_CR10","unstructured":"Malkin P (2003) Minimum runtime and stoptime polyhedra. Manuscript"},{"key":"10.1007\/s13675-016-0066-y_CR11","unstructured":"Morales-Espa\u00f1a G (2014) Unit commitment: computational performance, system representation and wind uncertainty management. Ph.D. thesis, Pontifical Comillas University, KTH Royal Institute of Technology, and Delft University of Technology, Spain"},{"key":"10.1007\/s13675-016-0066-y_CR12","doi-asserted-by":"crossref","unstructured":"Morales-Espa\u00f1a G, Correa-Posada CM, Ramos A (2015a) Tight and compact MIP formulation of configuration-based combined-cycle units. IEEE Trans Power Syst 31(2): 1\u201310","DOI":"10.1109\/TPWRS.2015.2425833"},{"key":"10.1007\/s13675-016-0066-y_CR13","doi-asserted-by":"crossref","unstructured":"Morales-Espa\u00f1a G, Gentile C, Ramos A (2015b) Tight MIP formulations of the power-based unit commitment problem. OR Spectr 37(4):929\u2013950","DOI":"10.1007\/s00291-015-0400-4"},{"issue":"4","key":"10.1007\/s13675-016-0066-y_CR14","doi-asserted-by":"crossref","first-page":"4897","DOI":"10.1109\/TPWRS.2013.2251373","article-title":"Tight and compact MILP formulation for the thermal unit commitment problem","volume":"28","author":"Morales-Espa\u00f1a","year":"2013","journal-title":"IEEE Trans Power Syst"},{"issue":"2","key":"10.1007\/s13675-016-0066-y_CR15","doi-asserted-by":"crossref","first-page":"1288","DOI":"10.1109\/TPWRS.2012.2222938","article-title":"Tight and compact MILP formulation of start-up and shut-down ramping in unit commitment","volume":"28","author":"Morales-Espa\u00f1a","year":"2013","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"10.1007\/s13675-016-0066-y_CR16","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1109\/TPWRS.2013.2259601","article-title":"An MIP formulation for joint market-clearing of energy and reserves based on ramp scheduling","volume":"29","author":"Morales-Espa\u00f1a","year":"2014","journal-title":"IEEE Trans Power Syst"},{"key":"10.1007\/s13675-016-0066-y_CR17","series-title":"Integer and combinatorial optimization","author":"Nemhauser","year":"1999"},{"issue":"1","key":"10.1007\/s13675-016-0066-y_CR18","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1109\/TPWRS.2011.2162008","article-title":"Tight mixed integer linear programming formulations for the unit commitment problem","volume":"27","author":"Ostrowski","year":"2012","journal-title":"IEEE Trans Power Syst"},{"key":"10.1007\/s13675-016-0066-y_CR19","unstructured":"Rajan D, Takriti S (2005) Minimum up\/down polytopes of the unit commitment problem with start-up costs. Research Report RC23628, IBM. http:\/\/domino.research.ibm.com\/library\/cyberdig.nsf\/1e4115aea78b6e7c85256b360066f0d4\/cdcb02a7c809d89e8525702300502ac0?OpenDocument. Accessed 7 Apr 2016"},{"key":"10.1007\/s13675-016-0066-y_CR20","unstructured":"Silbernagl M, Huber M, Brandenberg R (2014) Improving accuracy and efficiency of start-up cost formulations in MIP unit commitment by modeling power plant temperatures. IEEE Trans Power Syst PP(99):1\u20139. 10.1109\/TPWRS.2015.2450776"},{"key":"10.1007\/s13675-016-0066-y_CR21","doi-asserted-by":"crossref","unstructured":"Tahanan M, Ackooij Wv, Frangioni A, Lacalandra F (2015) Large-scale Unit Commitment under uncertainty. 4OR 13(2):115\u2013171","DOI":"10.1007\/s10288-014-0279-y"},{"key":"10.1007\/s13675-016-0066-y_CR22","series-title":"Model building in mathematical programming","author":"Williams","year":"2013"},{"key":"10.1007\/s13675-016-0066-y_CR23","series-title":"Integer programming","author":"Wolsey","year":"1998"},{"issue":"3","key":"10.1007\/s13675-016-0066-y_CR24","doi-asserted-by":"crossref","first-page":"1010","DOI":"10.1109\/59.780914","article-title":"The IEEE reliability test system-1996. A report prepared by the reliability test system task force of the application of probability methods subcommittee","volume":"14","author":"Wong","year":"1999","journal-title":"IEEE Trans Power Syst"}],"container-title":["EURO Journal on Computational Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13675-016-0066-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13675-016-0066-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2192440621000782?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2192440621000782?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13675-016-0066-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13675-016-0066-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T03:47:20Z","timestamp":1761882440000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2192440621000782"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,3]]},"references-count":24,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2017,3]]}},"alternative-id":["S2192440621000782"],"URL":"https:\/\/doi.org\/10.1007\/s13675-016-0066-y","relation":{},"ISSN":["2192-4406"],"issn-type":[{"value":"2192-4406","type":"print"}],"subject":[],"published":{"date-parts":[[2017,3]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints","name":"articletitle","label":"Article Title"},{"value":"EURO Journal on Computational Optimization","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1007\/s13675-016-0066-y","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2017 The author(s). Published by Elsevier B.V. on behalf of Association of European Operational Research Societies (EURO). Published by Elsevier Ltd All rights reserved.","name":"copyright","label":"Copyright"}]}}