{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,21]],"date-time":"2026-05-21T00:25:29Z","timestamp":1779323129233,"version":"3.51.4"},"reference-count":74,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2015,9,1]],"date-time":"2015-09-01T00:00:00Z","timestamp":1441065600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2015,9,1]],"date-time":"2015-09-01T00:00:00Z","timestamp":1441065600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2020,10,22]],"date-time":"2020-10-22T00:00:00Z","timestamp":1603324800000},"content-version":"vor","delay-in-days":1878,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["EURO Journal on Transportation and Logistics"],"published-print":{"date-parts":[[2015,9]]},"DOI":"10.1007\/s13676-014-0046-4","type":"journal-article","created":{"date-parts":[[2014,3,17]],"date-time":"2014-03-17T23:30:04Z","timestamp":1395099004000},"page":"285-320","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":63,"title":["A tutorial on non-periodic train timetabling and platforming problems"],"prefix":"10.1016","volume":"4","author":[{"given":"Valentina","family":"Cacchiani","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Laura","family":"Galli","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Paolo","family":"Toth","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1007\/s13676-014-0046-4_CR1","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/S0191-2615(98)00041-1","article-title":"On-line timetable rescheduling in regional train services","volume":"33","author":"Adenso-D\u00edaz","year":"1999","journal-title":"Transp Res Part B"},{"key":"10.1007\/s13676-014-0046-4_CR2","series-title":"Technical report","article-title":"Integrating timetabling, network and line design","author":"Barber","year":"2008"},{"key":"10.1007\/s13676-014-0046-4_CR3","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1287\/trsc.37.2.213.15250","article-title":"Using integer programming to solve the train platforming problem","volume":"37","author":"Billionnet","year":"2003","journal-title":"Transp Sci"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR4","first-page":"163","article-title":"An auctioning approach to railway slot allocation","volume":"7","author":"Bornd\u00f6rfer","year":"2006","journal-title":"Compet Regul Netw Ind"},{"key":"10.1007\/s13676-014-0046-4_CR5","series-title":"Operations research proceedings 2007","first-page":"117","article-title":"Solving railway track allocation problems","author":"Bornd\u00f6rfer","year":"2008"},{"key":"10.1007\/s13676-014-0046-4_CR6","doi-asserted-by":"crossref","first-page":"358","DOI":"10.1287\/trsc.32.4.358","article-title":"Railway timetabling using Lagrangian relaxation","volume":"32","author":"Br\u00e4nnlund","year":"1998","journal-title":"Transp Sci"},{"issue":"1","key":"10.1007\/s13676-014-0046-4_CR7","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/s00291-008-0143-6","article-title":"A sequencing approach for creating new train timetables","volume":"32","author":"Burdett","year":"2010","journal-title":"OR Spectr"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR8","first-page":"97","article-title":"Non-convex mixed-integer nonlinear programming: a survey","volume":"17","author":"Burer","year":"2012","journal-title":"Surv Oper Res Manag Sci"},{"key":"10.1007\/s13676-014-0046-4_CR9","series-title":"Assignment problems","author":"Burkard","year":"2009"},{"issue":"1","key":"10.1007\/s13676-014-0046-4_CR10","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1007\/s10288-008-0075-7","article-title":"Models and algorithms for combinatorial optimization problems arising in railway applications","volume":"7","author":"Cacchiani","year":"2009","journal-title":"4OR A Q J Oper Res"},{"issue":"1","key":"10.1007\/s13676-014-0046-4_CR11","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1287\/trsc.1110.0378","article-title":"A Lagrangian heuristic for robustness, with an application to train timetabling","volume":"46","author":"Cacchiani","year":"2012","journal-title":"Transp Sci"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR12","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1007\/s10288-007-0037-5","article-title":"A column generation approach to train timetabling on a corridor","volume":"6","author":"Cacchiani","year":"2008","journal-title":"4OR Q J Oper Res"},{"issue":"3","key":"10.1007\/s13676-014-0046-4_CR13","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/j.orl.2010.01.007","article-title":"Non-cyclic train timetabling and comparability graphs","volume":"38","author":"Cacchiani","year":"2010","journal-title":"Oper Res Lett"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR14","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/j.trb.2009.07.007","article-title":"Scheduling extra freight trains on railway networks","volume":"44B","author":"Cacchiani","year":"2010","journal-title":"Transp Res Part B"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR15","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/s11590-011-0416-x","article-title":"Finding cliques of maximum weight on a generalization of permutation graphs","volume":"7","author":"Cacchiani","year":"2013","journal-title":"Optim Lett"},{"key":"10.1007\/s13676-014-0046-4_CR16","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/j.trb.2014.01.009","article-title":"An overview of recovery models and algorithms for real-time railway rescheduling","volume":"63","author":"Cacchiani","year":"2014","journal-title":"Transp Res Part B"},{"issue":"3","key":"10.1007\/s13676-014-0046-4_CR17","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1016\/j.ejor.2011.11.003","article-title":"Nominal and robust train timetabling problems","volume":"219","author":"Cacchiani","year":"2012","journal-title":"Eur J Oper Res"},{"issue":"1","key":"10.1007\/s13676-014-0046-4_CR18","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1007\/s10479-011-0978-0","article-title":"Integration of timetable planning and rolling stock in rapid transit networks","volume":"199","author":"Cadarso","year":"2012","journal-title":"Ann Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR19","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1016\/0305-0548(94)90099-X","article-title":"A fast heuristic for the train scheduling problem","volume":"21","author":"Cai","year":"1994","journal-title":"Comput Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR20","series-title":"Proceedings of the 10th workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS)","first-page":"1","article-title":"Almost 20 years of combinatorial optimization for railway planning: from Lagrangian relaxation to column generation","author":"Caprara","year":"2010"},{"key":"10.1007\/s13676-014-0046-4_CR21","doi-asserted-by":"crossref","first-page":"851","DOI":"10.1287\/opre.50.5.851.362","article-title":"Modeling and solving the train timetabling problem","volume":"50","author":"Caprara","year":"2002","journal-title":"Oper Res"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR22","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1287\/trsc.1100.0366","article-title":"Solution of the train platforming problem","volume":"45","author":"Caprara","year":"2011","journal-title":"Transp Sci"},{"key":"10.1007\/s13676-014-0046-4_CR23","doi-asserted-by":"crossref","DOI":"10.1287\/opre.2014.1259","article-title":"Delay robust event scheduling","author":"Caprara","year":"2014","journal-title":"Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR24","series-title":"Transportation, handbooks in operations research and management science","first-page":"129","article-title":"Passenger railway optimization","author":"Kroon","year":"2007"},{"key":"10.1007\/s13676-014-0046-4_CR25","first-page":"3896","article-title":"Optimization problems in passenger railway systems","volume":"6","author":"Caprara","year":"2011","journal-title":"Wiley Encycl Oper Res Manag Sci"},{"key":"10.1007\/s13676-014-0046-4_CR26","doi-asserted-by":"crossref","first-page":"738","DOI":"10.1016\/j.dam.2005.05.026","article-title":"A Lagrangian heuristic approach to real-world train timetabling problems","volume":"154","author":"Caprara","year":"2006","journal-title":"Discret Appl Math"},{"key":"10.1007\/s13676-014-0046-4_CR27","first-page":"195","article-title":"Scheduling and platforming trains at busy complex stations","volume":"37","author":"Carey","year":"2003","journal-title":"Transp Res Part A"},{"key":"10.1007\/s13676-014-0046-4_CR28","doi-asserted-by":"crossref","first-page":"988","DOI":"10.1057\/jors.1995.136","article-title":"A model, algorithms and strategy for train pathing","volume":"46","author":"Carey","year":"1995","journal-title":"J Oper Res Soc"},{"key":"10.1007\/s13676-014-0046-4_CR29","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1007\/s10878-009-9247-4","article-title":"Recoverable robust timetabling for single delay: complexity and polynomial algorithms for special cases","volume":"18","author":"Cicerone","year":"2009","journal-title":"J Comb Optim"},{"key":"10.1007\/s13676-014-0046-4_CR30","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1287\/trsc.32.4.380","article-title":"A survey of optimization models for train routing and scheduling","volume":"32","author":"Cordeau","year":"1998","journal-title":"Transp Sci"},{"issue":"4","key":"10.1007\/s13676-014-0046-4_CR31","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1287\/trsc.1080.0247","article-title":"Reordering and local rerouting strategies to manage train traffic in real time","volume":"42","author":"D'Ariano","year":"2008","journal-title":"Transp Sci"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR32","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1016\/j.ejor.2006.10.034","article-title":"A branch and bound algorithm for scheduling trains on a railway network","volume":"183","author":"D'Ariano","year":"2007","journal-title":"Eur J Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR33","doi-asserted-by":"crossref","first-page":"160","DOI":"10.1016\/S0377-2217(98)00299-9","article-title":"k L-list T colouring of graphs","volume":"106","author":"De Luca","year":"1999","journal-title":"Eur J Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR34","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1287\/trsc.1110.0375","article-title":"Delay management with rerouting of passengers","volume":"46","author":"Dollevoet","year":"2012","journal-title":"Transp Sci"},{"key":"10.1007\/s13676-014-0046-4_CR35","series-title":"8th Workshop on algorithmic approaches for transportation modeling, optimization, and systems (ATMOS08)","first-page":"1","article-title":"Towards solving very large scale train timetabling problems by Lagrangian relaxation","author":"Fischer","year":"2008"},{"key":"10.1007\/s13676-014-0046-4_CR36","article-title":"Dynamic graph generation for the shortest path problem in time expanded networks","author":"Fischer","year":"2013","journal-title":"Math Program."},{"key":"10.1007\/s13676-014-0046-4_CR37","series-title":"Robust and online large-scale optimization, lecture notes in computer science","first-page":"61","article-title":"Light robustness","author":"Fischetti","year":"2009"},{"key":"10.1007\/s13676-014-0046-4_CR38","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1287\/trsc.1090.0264","article-title":"Fast approaches to improve the robustness of a railway timetable","volume":"43","author":"Fischetti","year":"2009","journal-title":"Transp Sci"},{"key":"10.1007\/s13676-014-0046-4_CR39","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1007\/s10288-010-0138-4","article-title":"Combinatorial and robust optimisation models and algorithms for railway applications","volume":"9","author":"Galli","year":"2011","journal-title":"4OR"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR40","first-page":"85","article-title":"A tutorial on fundamental model structures for railway timetable optimization","volume":"17","author":"Harrod","year":"2012","journal-title":"Surv Oper Res Manag Sci"},{"key":"10.1007\/s13676-014-0046-4_CR41","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1023\/A:1009672832658","article-title":"Heuristic techniques for single line train scheduling","volume":"3","author":"Higgings","year":"1997","journal-title":"J Heuristics"},{"key":"10.1007\/s13676-014-0046-4_CR42","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1111\/j.1467-9574.2005.00303.x","article-title":"Operations research in passenger railway transportation","volume":"59","author":"Huisman","year":"2005","journal-title":"Stat Neerl"},{"key":"10.1007\/s13676-014-0046-4_CR43","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1287\/trsc.25.1.46","article-title":"Tactical scheduling of rail operations: the SCAN I system","volume":"25","author":"Jovanovic","year":"1991","journal-title":"Transp Sci"},{"issue":"6","key":"10.1007\/s13676-014-0046-4_CR44","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1016\/j.trb.2007.11.002","article-title":"Stochastic improvement of cyclic railway timetables","volume":"42","author":"Kroon","year":"2008","journal-title":"Transp Res Part B"},{"key":"10.1007\/s13676-014-0046-4_CR45","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1287\/trsc.37.2.198.15247","article-title":"A variable trip time model for cyclic railway timetabling","volume":"37","author":"Kroon","year":"2003","journal-title":"Transp Sci"},{"key":"10.1007\/s13676-014-0046-4_CR46","doi-asserted-by":"crossref","first-page":"485","DOI":"10.1016\/S0377-2217(95)00342-8","article-title":"Routing trains through railway stations: complexity issues","volume":"98","author":"Kroon","year":"1997","journal-title":"Eur J Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR47","series-title":"Dissertation","article-title":"Periodic timetable optimization in public transport","author":"Liebchen","year":"2006"},{"key":"10.1007\/s13676-014-0046-4_CR48","series-title":"Robust and online large-scale optimization, lecture notes in computer science 5868","first-page":"1","article-title":"The concept of recoverable robustness, linear programming recovery, and railway applications","author":"Liebchen","year":"2009"},{"key":"10.1007\/s13676-014-0046-4_CR49","series-title":"Algorithmic methods for railway optimization, lecture notes in computer science","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-74247-0_1","article-title":"The modeling power of the periodic event scheduling problem: railway timetables\u2014and beyond","author":"Liebchen","year":"2007"},{"key":"10.1007\/s13676-014-0046-4_CR50","series-title":"Computer-aided systems in public transport (CASPT 2004), lecture notes in economics and mathematical systems","article-title":"Performance of algorithms for periodic timetable optimization","author":"Liebchen","year":"2007"},{"issue":"5","key":"10.1007\/s13676-014-0046-4_CR51","doi-asserted-by":"crossref","first-page":"857","DOI":"10.1016\/j.cor.2009.03.022","article-title":"Computing delay resistant railway timetables","volume":"37","author":"Liebchen","year":"2010","journal-title":"Comput Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR52","series-title":"Ph.D. Thesis","article-title":"Train schedule optimization in public rail transport","author":"Lindner","year":"2000"},{"key":"10.1007\/s13676-014-0046-4_CR53","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1007\/s00186-005-0001-0","article-title":"Cost optimal periodic train scheduling","volume":"62","author":"Lindner","year":"2005","journal-title":"Math Methods Oper Res"},{"issue":"4","key":"10.1007\/s13676-014-0046-4_CR54","doi-asserted-by":"crossref","first-page":"843","DOI":"10.1007\/s00291-009-0189-0","article-title":"Railway track allocation: models and methods","volume":"33","author":"Lusby","year":"2011","journal-title":"OR Spectr"},{"key":"10.1007\/s13676-014-0046-4_CR55","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1016\/j.cor.2011.12.004","article-title":"A set-packing inspired method for real-time junction train routing","volume":"40","author":"Lusby","year":"2013","journal-title":"Comput Oper Res"},{"issue":"4","key":"10.1007\/s13676-014-0046-4_CR56","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1287\/opre.1080.0642","article-title":"Optimal real-time traffic control in metro stations","volume":"57","author":"Mannino","year":"2009","journal-title":"Oper Res"},{"issue":"3","key":"10.1007\/s13676-014-0046-4_CR57","doi-asserted-by":"crossref","first-page":"498","DOI":"10.1016\/S0377-2217(01)00338-1","article-title":"Job-shop scheduling with blocking and no-wait constraints","volume":"143","author":"Mascis","year":"2002","journal-title":"Eur J Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR58","series-title":"Technical report 29","article-title":"A branch-and-cut approach for periodic network programming","author":"Nachtigall","year":"1994"},{"key":"10.1007\/s13676-014-0046-4_CR59","series-title":"Integer and combinatorial optimization (Vol. 18)","author":"Nemhauser","year":"1988"},{"key":"10.1007\/s13676-014-0046-4_CR60","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1016\/0191-2615(96)00005-7","article-title":"A constraint generation algorithm for the construction of periodic railway timetables","volume":"30","author":"Odijk","year":"1996","journal-title":"Transp Res Part B"},{"key":"10.1007\/s13676-014-0046-4_CR61","series-title":"Technical Report 2000.21","article-title":"A job-shop scheduling model for the single-track railway scheduling problem","author":"Oliveira","year":"2000"},{"key":"10.1007\/s13676-014-0046-4_CR62","series-title":"Ph.D Thesis","article-title":"Cyclic railway timetable optimization","author":"Peeters","year":"2003"},{"key":"10.1007\/s13676-014-0046-4_CR63","series-title":"Computer-aided transit scheduling, lecture notes in economics and mathematical systems","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1007\/978-3-642-56423-9_16","article-title":"A cycle based optimization model for the cyclic railway timetabling problem","author":"Peeters","year":"2001"},{"key":"10.1007\/s13676-014-0046-4_CR64","series-title":"Multiple criteria decision making for sustainable energy and transportation systems, lecture notes in economics and mathematical systems","first-page":"105","article-title":"Balancing efficiency and robustness-A Bi-criteria optimization approach to railway track allocation","author":"Schlechte","year":"2010"},{"issue":"2","key":"10.1007\/s13676-014-0046-4_CR65","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1007\/s12469-009-0010-0","article-title":"Capacity constraints in delay management","volume":"1","author":"Sch\u00f6bel","year":"2009","journal-title":"Public Transport"},{"key":"10.1007\/s13676-014-0046-4_CR66","series-title":"Robust and online large-scale optimization, lecture notes in computer science 5868","first-page":"119","article-title":"A bicriteria approach for robust timetabling","author":"Sch\u00f6bel","year":"2009"},{"key":"10.1007\/s13676-014-0046-4_CR67","series-title":"Technical report","article-title":"Timetable construction for railned","author":"Schrijver","year":"1994"},{"key":"10.1007\/s13676-014-0046-4_CR68","doi-asserted-by":"crossref","first-page":"550","DOI":"10.1137\/0402049","article-title":"A mathematical model for periodic event scheduling problems","volume":"2","author":"Serafini","year":"1989","journal-title":"SIAM J Discret Math"},{"key":"10.1007\/s13676-014-0046-4_CR69","series-title":"OR'72","first-page":"343","article-title":"Optimal train scheduling on a single track railway","author":"Szpigel","year":"1973"},{"key":"10.1007\/s13676-014-0046-4_CR70","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1016\/j.trc.2010.09.008","article-title":"Railway crew rescheduling with retiming","volume":"20","author":"Veelenturf","year":"2012","journal-title":"Transp Res Part C"},{"key":"10.1007\/s13676-014-0046-4_CR71","doi-asserted-by":"crossref","first-page":"2077","DOI":"10.1016\/j.cor.2004.02.001","article-title":"Simultaneous disruption recovery of a train timetable and crew roster in real time","volume":"32","author":"Walker","year":"2005","journal-title":"Comput Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR72","series-title":"Ph.D. Thesis","article-title":"Railway planning and allocation of passenger lines","author":"Zwaneveld","year":"1997"},{"key":"10.1007\/s13676-014-0046-4_CR73","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/S0377-2217(00)00087-4","article-title":"Routing trains through a railway station based on a node packing model","volume":"128","author":"Zwaneveld","year":"2001","journal-title":"Eur J Oper Res"},{"key":"10.1007\/s13676-014-0046-4_CR74","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1287\/trsc.30.3.181","article-title":"Routing trains through railway stations: model formulation and algorithm","volume":"30","author":"Zwaneveld","year":"1996","journal-title":"Transp Sci"}],"container-title":["EURO Journal on Transportation and Logistics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13676-014-0046-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13676-014-0046-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2192437620301205?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2192437620301205?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13676-014-0046-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T03:44:47Z","timestamp":1761882287000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2192437620301205"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,9]]},"references-count":74,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,9]]}},"alternative-id":["S2192437620301205"],"URL":"https:\/\/doi.org\/10.1007\/s13676-014-0046-4","relation":{},"ISSN":["2192-4376"],"issn-type":[{"value":"2192-4376","type":"print"}],"subject":[],"published":{"date-parts":[[2015,9]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A tutorial on non-periodic train timetabling and platforming problems","name":"articletitle","label":"Article Title"},{"value":"EURO Journal on Transportation and Logistics","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1007\/s13676-014-0046-4","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2014 THE AUTHORS. Published by Elsevier on behalf of the Association of European Operational Research Societies (EURO). Published by Elsevier B.V.","name":"copyright","label":"Copyright"}]}}