{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,6]],"date-time":"2026-06-06T15:48:34Z","timestamp":1780760914008,"version":"3.54.1"},"reference-count":26,"publisher":"Elsevier BV","issue":"5","license":[{"start":{"date-parts":[[2019,12,1]],"date-time":"2019-12-01T00:00:00Z","timestamp":1575158400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2019,12,1]],"date-time":"2019-12-01T00:00:00Z","timestamp":1575158400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2020,10,20]],"date-time":"2020-10-20T00:00:00Z","timestamp":1603152000000},"content-version":"vor","delay-in-days":324,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"name":"Erasmus+ Staff Mobility"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["EURO Journal on Transportation and Logistics"],"published-print":{"date-parts":[[2019,12]]},"DOI":"10.1007\/s13676-019-00148-3","type":"journal-article","created":{"date-parts":[[2019,11,19]],"date-time":"2019-11-19T13:02:51Z","timestamp":1574168571000},"page":"833-861","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":10,"title":["Resolving instability in railway timetabling problems"],"prefix":"10.1016","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-4111-2255","authenticated-orcid":false,"given":"Nikola","family":"Be\u0161inovi\u0107","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Egidio","family":"Quaglietta","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Rob M.P.","family":"Goverde","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"1","key":"10.1007\/s13676-019-00148-3_bib1","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1080\/03081067508717088","article-title":"Integer programming formulation for deriving minimum dispatch intervals on a guideway accommodating through and local public transportation services","volume":"3","author":"Bergmann","year":"1975","journal-title":"Transp Plann Technol"},{"key":"10.1007\/s13676-019-00148-3_bib2","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.trb.2016.02.004","article-title":"An integrated micro-macro approach to robust railway timetabling","volume":"87","author":"Be\u0161inovi\u0107","year":"2016","journal-title":"Transp Res Part B Methodol"},{"key":"10.1007\/s13676-019-00148-3_bib3","unstructured":"Be\u0161inovi\u0107 N, Goverde RMP (2016) Two-stage stability-for-robustness approach for periodic railway timetabling. In: The 9th Triennial symposium on transportation analysis (TRISTAN IX), 13\u201317 June 2016, Oranjestad, Aruba"},{"issue":"3","key":"10.1007\/s13676-019-00148-3_bib4","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1016\/j.ejor.2011.11.003","article-title":"Nominal and robust train timetabling problems","volume":"219","author":"Cacchiani","year":"2012","journal-title":"Eur J Oper Res"},{"issue":"1","key":"10.1007\/s13676-019-00148-3_bib5","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/net.20379","article-title":"Periodic railway timetabling with event flexibility","volume":"57","author":"Caimi","year":"2011","journal-title":"Networks"},{"issue":"2","key":"10.1007\/s13676-019-00148-3_bib6","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/j.trb.2006.02.003","article-title":"Railway timetable stability analysis using max-plus system theory","volume":"41","author":"Goverde","year":"2007","journal-title":"Transp Res Part B Methodol"},{"issue":"3","key":"10.1007\/s13676-019-00148-3_bib7","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1016\/j.trc.2010.01.002","article-title":"A delay propagation algorithm for large-scale railway traffic networks","volume":"18","author":"Goverde","year":"2010","journal-title":"Transp Res Part C Emerg Technol"},{"key":"10.1007\/s13676-019-00148-3_bib8","series-title":"Railway timetabling and operations","year":"2014"},{"key":"10.1007\/s13676-019-00148-3_bib9","series-title":"Max-Plus at work: modeling and analysis of synchronized systems: a course on Max-Plus algebra and its applications","author":"Heidergott","year":"2014"},{"issue":"1","key":"10.1007\/s13676-019-00148-3_bib10","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/j.cie.2013.06.003","article-title":"Mixed integer programming for minimizing the period of a cyclic railway timetable for a single track with two train types","volume":"66","author":"Heydar","year":"2013","journal-title":"Comput Ind Eng"},{"issue":"2","key":"10.1007\/s13676-019-00148-3_bib11","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1287\/trsc.37.2.198.15247","article-title":"A variable trip time model for cyclic railway timetabling","volume":"37","author":"Kroon","year":"2003","journal-title":"Transp Sci"},{"issue":"1","key":"10.1007\/s13676-019-00148-3_bib12","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1287\/trsc.1120.0453","article-title":"Flexible connections in PESP models for cyclic passenger railway timetabling","volume":"48","author":"Kroon","year":"2013","journal-title":"Transp Sci"},{"issue":"3","key":"10.1007\/s13676-019-00148-3_bib13","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1007\/s12469-015-0108-5","article-title":"A state-of-the-art realization of cyclic railway timetable computation","volume":"7","author":"K\u00fcmmling","year":"2015","journal-title":"Public Transport"},{"key":"10.1007\/s13676-019-00148-3_bib14","unstructured":"K\u00fcmmling M, Gro\u00dfmann P, Opitz J, Wei\u00df R, Nachtigall K (2015) Extraction of Significant Conflicts in Periodic Timetabling. In: The 13th conference on advanced systems in public transport (CASPT), 19\u201323 July 2015, Rotterdam, The Netherlands"},{"issue":"4","key":"10.1007\/s13676-019-00148-3_bib15","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1287\/trsc.1080.0240","article-title":"The first optimized railway timetable in practice","volume":"42","author":"Liebchen","year":"2008","journal-title":"Transp Sci"},{"key":"10.1007\/s13676-019-00148-3_bib16","unstructured":"Nachtigall K (1993) Exact solution methods for periodic programs. Technical Report 14\/93, Hildesheimer Informatik-Berichte"},{"key":"10.1007\/s13676-019-00148-3_bib17","unstructured":"Nachtigall K, Opitz J (2008) A modulo network simplex method for solving periodic timetable optimisation problems. In: Kalcsics J, Nickel S (eds) Operations research proceedings 2007. Operations Research Proceedings, vol 2007. Springer, Berlin, Heidelberg"},{"key":"10.1007\/s13676-019-00148-3_bib18","unstructured":"Peeters LWP (2003) Cyclic railway timetable optimization, Ph.D. thesis, Erasmus Universiteit Rotterdam, Rotterdam, The Netherlands"},{"issue":"3","key":"10.1007\/s13676-019-00148-3_bib19","doi-asserted-by":"crossref","first-page":"892","DOI":"10.1287\/trsc.2015.0652","article-title":"Mixed-integer programming for railway capacity analysis and cyclic, combined train timetabling and platforming","volume":"50","author":"Petering","year":"2015","journal-title":"Transp Sci"},{"key":"10.1007\/s13676-019-00148-3_bib20","unstructured":"Polinder GJ (2015) Resolving infeasibilities in the PESP model of the Dutch railway timetabling problem. MSc thesis, Delft University of Technology, Delft"},{"key":"10.1007\/s13676-019-00148-3_bib21","unstructured":"Schrijver A, Steenbeek A (1994) Dienstregelingontwikkeling voor Railned (Timetable construction for Railned). Technical report, Center for Mathematics and Computer Science, Amsterdam"},{"key":"10.1007\/s13676-019-00148-3_bib22","doi-asserted-by":"crossref","first-page":"550","DOI":"10.1137\/0402049","article-title":"A mathematical model for periodic event scheduling problems","volume":"2","author":"Serafini","year":"1989","journal-title":"SIAM J Discrete Math"},{"key":"10.1007\/s13676-019-00148-3_bib23","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1016\/j.trb.2016.12.020","article-title":"A cycle time optimization model for generating stable periodic railway timetables","volume":"98","author":"Sparing","year":"2017","journal-title":"Transp Res Part B Methodol"},{"key":"10.1007\/s13676-019-00148-3_bib24","series-title":"ETCS for engineers","author":"Stanley","year":"2011"},{"key":"10.1007\/s13676-019-00148-3_bib25","unstructured":"The Digital Railway Programme (2016) www.digitalrailway.co.uk. Accessed 28 Sept 2016"},{"key":"10.1007\/s13676-019-00148-3_bib26","doi-asserted-by":"crossref","first-page":"509","DOI":"10.1016\/j.trc.2016.05.005","article-title":"Integrating capacity analysis with high-speed railway timetabling: a minimum cycle time calculation model with flexible overtaking constraints and intelligent enumeration","volume":"68","author":"Zhang","year":"2016","journal-title":"Transp Res Part C Emerg Technol"}],"container-title":["EURO Journal on Transportation and Logistics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13676-019-00148-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13676-019-00148-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2192437620300467?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2192437620300467?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13676-019-00148-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T03:43:03Z","timestamp":1761882183000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2192437620300467"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12]]},"references-count":26,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2019,12]]}},"alternative-id":["S2192437620300467"],"URL":"https:\/\/doi.org\/10.1007\/s13676-019-00148-3","relation":{},"ISSN":["2192-4376"],"issn-type":[{"value":"2192-4376","type":"print"}],"subject":[],"published":{"date-parts":[[2019,12]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Resolving instability in railway timetabling problems","name":"articletitle","label":"Article Title"},{"value":"EURO Journal on Transportation and Logistics","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1007\/s13676-019-00148-3","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2019 THE AUTHORS. Published by Elsevier on behalf of the Association of European Operational Research Societies (EURO). Published by Elsevier B.V.","name":"copyright","label":"Copyright"}]}}