{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,24]],"date-time":"2025-10-24T12:34:16Z","timestamp":1761309256949,"version":"3.37.3"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2018,3,13]],"date-time":"2018-03-13T00:00:00Z","timestamp":1520899200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100003329","name":"Ministerio de Econom\u00eda y Competitividad","doi-asserted-by":"publisher","award":["TIN2014-57497-P"],"award-info":[{"award-number":["TIN2014-57497-P"]}],"id":[{"id":"10.13039\/501100003329","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prog Artif Intell"],"published-print":{"date-parts":[[2018,9]]},"DOI":"10.1007\/s13748-018-0144-x","type":"journal-article","created":{"date-parts":[[2018,3,13]],"date-time":"2018-03-13T05:11:28Z","timestamp":1520917888000},"page":"197-211","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["A GRASP algorithm for Quota sequences with minimum work overload and forced interruption of operations in a mixed-product assembly line"],"prefix":"10.1007","volume":"7","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2214-4991","authenticated-orcid":false,"given":"Joaqu\u00edn","family":"Bautista","sequence":"first","affiliation":[]},{"given":"Roc\u00edo","family":"Alfaro-Pozo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,3,13]]},"reference":[{"issue":"5","key":"144_CR1","doi-asserted-by":"publisher","first-page":"572","DOI":"10.1287\/mnsc.37.5.572","volume":"37","author":"CA Yano","year":"1991","unstructured":"Yano, C.A., Rachamadugu, R.: Sequencing to minimize work overload in assembly lines with product options. Manag. Sci. 37(5), 572\u2013586 (1991). \n                    https:\/\/doi.org\/10.1287\/mnsc.37.5.572","journal-title":"Manag. Sci."},{"issue":"4","key":"144_CR2","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1080\/09537289208919409","volume":"3","author":"A Bolat","year":"1992","unstructured":"Bolat, A., Yano, C.A.: Scheduling algorithms to minimize utility work at a single station on a paced assembly line. Prod. Plan. Control 3(4), 393\u2013405 (1992). \n                    https:\/\/doi.org\/10.1080\/09537289208919409","journal-title":"Prod. Plan. Control"},{"issue":"3","key":"144_CR3","doi-asserted-by":"publisher","first-page":"485","DOI":"10.1287\/mnsc.41.3.485","volume":"41","author":"LH Tsai","year":"1995","unstructured":"Tsai, L.H.: Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Manag. Sci. 41(3), 485\u2013495 (1995). \n                    https:\/\/doi.org\/10.1287\/mnsc.41.3.485","journal-title":"Manag. Sci."},{"issue":"2","key":"144_CR4","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1016\/j.ejor.2007.09.013","volume":"192","author":"N Boysen","year":"2009","unstructured":"Boysen, N., Fliedner, M., Scholl, A.: Sequencing mixed-model assembly lines: survey, classification and model critique. Eur. J. Oper. Res. 192(2), 349\u2013373 (2009). \n                    https:\/\/doi.org\/10.1016\/j.ejor.2007.09.013","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"144_CR5","doi-asserted-by":"publisher","first-page":"359","DOI":"10.1023\/A:1009613925523","volume":"4","author":"A Scholl","year":"1998","unstructured":"Scholl, A., Klein, R., Domschke, W.: Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. J. Heuristics 4(4), 359\u2013381 (1998). \n                    https:\/\/doi.org\/10.1023\/A:1009613925523","journal-title":"J. Heuristics"},{"issue":"3","key":"144_CR6","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1016\/j.ejor.2010.10.022","volume":"210","author":"J Bautista","year":"2011","unstructured":"Bautista, J., Cano, A.: Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules. Eur. J. Oper. Res. 210(3), 495\u2013513 (2011). \n                    https:\/\/doi.org\/10.1016\/j.ejor.2010.022","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"144_CR7","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1007\/s13748-015-0071-z","volume":"5","author":"J Bautista","year":"2016","unstructured":"Bautista, J., Alfaro-Pozo, R., Batalla-Garc\u00eda, C.: GRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity. Prog. Artif. Intell. 5(1), 27\u201333 (2016). \n                    https:\/\/doi.org\/10.1007\/s13748-015-0071-z","journal-title":"Prog. Artif. Intell."},{"issue":"12","key":"144_CR8","doi-asserted-by":"publisher","first-page":"11001","DOI":"10.1016\/j.eswa.2012.03.024","volume":"39","author":"J Bautista","year":"2012","unstructured":"Bautista, J., Cano, A., Alfaro, R.: Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan\u2019s Barcelona Plant. Expert Syst. Appl. 39(12), 11001\u201311010 (2012). \n                    https:\/\/doi.org\/10.1016\/j.eswa.2012.03.024","journal-title":"Expert Syst. Appl."},{"issue":"1","key":"144_CR9","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1007\/s13748-016-0101-5","volume":"6","author":"J Bautista","year":"2017","unstructured":"Bautista, J., Cano, A., Alfaro-Pozo, R.: A hybrid dynamic programming for solving a mixed-model sequencing problem with production mix restriction and free interruptions. Prog. Artif. Intell. 6(1), 27\u201339 (2017). \n                    https:\/\/doi.org\/10.1007\/s13748-016-0101-5","journal-title":"Prog. Artif. Intell."},{"issue":"2","key":"144_CR10","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1007\/s13748-017-0110-z","volume":"6","author":"J Bautista","year":"2017","unstructured":"Bautista, J., Alfaro-Pozo, R.: Free and regular mixed-model sequences by a linear program-assisted hybrid algorithm GRASP-LP. Prog. Artif. Intell. 6(2), 159\u2013169 (2017). \n                    https:\/\/doi.org\/10.1007\/s13748-017-0110-z","journal-title":"Prog. Artif. Intell."},{"key":"144_CR11","doi-asserted-by":"crossref","DOI":"10.1201\/b11731","volume-title":"Toyota Production System: An Integrated Approach to Just-In-Time","author":"Y Monden","year":"2011","unstructured":"Monden, Y.: Toyota Production System: An Integrated Approach to Just-In-Time, 4th edn. Productivity Press, New York (2011)","edition":"4"},{"key":"144_CR12","doi-asserted-by":"publisher","first-page":"2543","DOI":"10.1080\/002075497194651","volume":"35","author":"H Aigbedo","year":"1997","unstructured":"Aigbedo, H., Monden, Y.: A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines. Int. J. Prod. Res. 35, 2543\u20132564 (1997). \n                    https:\/\/doi.org\/10.1080\/002075497194651","journal-title":"Int. J. Prod. Res."},{"issue":"7\u20138","key":"144_CR13","doi-asserted-by":"publisher","first-page":"414","DOI":"10.1016\/j.jom.2014.09.002","volume":"32","author":"RR Fullerton","year":"2014","unstructured":"Fullerton, R.R., Kennedy, F.A., Widener, S.K.: Lean manufacturing and firm performance: the incremental contribution of lean management accounting practices. J. Oper. Manag. 32(7\u20138), 414\u2013428 (2014). \n                    https:\/\/doi.org\/10.1016\/j.jom.2014.09.002","journal-title":"J. Oper. Manag."},{"issue":"2","key":"144_CR14","doi-asserted-by":"publisher","first-page":"192","DOI":"10.1287\/mnsc.35.2.192","volume":"35","author":"J Miltenburg","year":"1989","unstructured":"Miltenburg, J.: Level schedules for mixed-model assembly lines in just-in-time production systems. Manag. Sci. 35(2), 192\u2013207 (1989). \n                    https:\/\/doi.org\/10.1287\/mnsc.35.2.192","journal-title":"Manag. Sci."},{"key":"144_CR15","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-40643-0_26","volume-title":"Advances in Artificial Intelligence. CAEPIA 2013. Lecture Notes in Computer Science","author":"J Bautista","year":"2013","unstructured":"Bautista, J., Cano, A., Alfaro, R., Batalla, C.: Impact of the production mix preservation on the ORV problem. In: Bielza, C., et al. (eds.) Advances in Artificial Intelligence. CAEPIA 2013. Lecture Notes in Computer Science, vol. 8109. Springer, Berlin (2013). \n                    https:\/\/doi.org\/10.1007\/978-3-642-40643-0_26"},{"issue":"2","key":"144_CR16","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1007\/BF01096763","volume":"6","author":"TA Feo","year":"1995","unstructured":"Feo, T.A., Resende, M.G.C.: Greedy randomized adaptive search procedures. J. Glob. Optim. 6(2), 109\u2013133 (1995). \n                    https:\/\/doi.org\/10.1007\/BF01096763","journal-title":"J. Glob. Optim."},{"key":"144_CR17","series-title":"International Series in Operations Research & Management Science","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-1665-5_10","volume-title":"Handbook of Metaheuristics","author":"MG Resende","year":"2010","unstructured":"Resende, M.G., Ribeiro, C.C.: Greedy randomized adaptive search procedures: advances, hybridizations, and applications. In: Gendreau, M., Potvin, J.Y. (eds.) Handbook of Metaheuristics. International Series in Operations Research & Management Science, vol. 146. Springer, Boston (2010). \n                    https:\/\/doi.org\/10.1007\/978-1-4419-1665-5_10"},{"issue":"1","key":"144_CR18","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1016\/0377-2217(94)00165-0","volume":"88","author":"J Bautista","year":"1996","unstructured":"Bautista, J., Companys, R., Corominas, A.: Heuristics and exact algorithms for solving the Monden problem. Eur. J. Oper. Res. 88(1), 495\u2013513 (1996). \n                    https:\/\/doi.org\/10.1016\/0377-2217(94)00165-0","journal-title":"Eur. J. Oper. Res."}],"container-title":["Progress in Artificial Intelligence"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13748-018-0144-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13748-018-0144-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13748-018-0144-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,3,12]],"date-time":"2019-03-12T20:54:48Z","timestamp":1552424088000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13748-018-0144-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,3,13]]},"references-count":18,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,9]]}},"alternative-id":["144"],"URL":"https:\/\/doi.org\/10.1007\/s13748-018-0144-x","relation":{},"ISSN":["2192-6352","2192-6360"],"issn-type":[{"type":"print","value":"2192-6352"},{"type":"electronic","value":"2192-6360"}],"subject":[],"published":{"date-parts":[[2018,3,13]]},"assertion":[{"value":"27 December 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 March 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"13 March 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}