{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,9]],"date-time":"2026-04-09T14:36:00Z","timestamp":1775745360330,"version":"3.50.1"},"reference-count":64,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2021,10,5]],"date-time":"2021-10-05T00:00:00Z","timestamp":1633392000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,10,5]],"date-time":"2021-10-05T00:00:00Z","timestamp":1633392000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper. Res. Forum"],"published-print":{"date-parts":[[2021,12]]},"DOI":"10.1007\/s43069-021-00098-5","type":"journal-article","created":{"date-parts":[[2021,11,18]],"date-time":"2021-11-18T12:09:53Z","timestamp":1637237393000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Developing a Flexible Manufacturing Control System Considering Mixed Uncertain Predictive Maintenance Model: a Simulation-Based Optimization Approach"],"prefix":"10.1007","volume":"2","author":[{"given":"Behrooz","family":"Shahbazi","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0276-7622","authenticated-orcid":false,"given":"Seyed Habib A.","family":"Rahmati","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,10,5]]},"reference":[{"key":"98_CR1","doi-asserted-by":"publisher","first-page":"894","DOI":"10.1016\/j.cie.2018.09.025","volume":"128","author":"L Sun","year":"2018","unstructured":"Sun L, Lin L, Lib H, Genc M (2018) Large scale flexible scheduling optimization by a distributed evolutionary algorithm. Comput Ind Eng 128:894\u2013904. https:\/\/doi.org\/10.1016\/j.cie.2018.09.025","journal-title":"Comput Ind Eng"},{"key":"98_CR2","doi-asserted-by":"publisher","first-page":"533","DOI":"10.1016\/j.future.2009.10.004","volume":"26","author":"A Bagheri","year":"2010","unstructured":"Bagheri A, Zandieh M, Mahdavi I, Yazdani M (2010) An artificial immune algorithm for the flexible job-shop scheduling problem. Futur Gener Comput Syst 26:533\u2013541. https:\/\/doi.org\/10.1016\/j.future.2009.10.004","journal-title":"Futur Gener Comput Syst"},{"key":"98_CR3","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.swevo.2018.02.010","volume":"40","author":"SHA Rahmati","year":"2017","unstructured":"Rahmati SHA, Ahmadi A, Karimi B (2017) Multi-objective evolutionary simulation based optimization mechanism for a novel stochastic reliability centered maintenance problem. Swarm Evol Comput 40:255\u2013271. https:\/\/doi.org\/10.1016\/j.swevo.2018.02.010","journal-title":"Swarm Evol Comput"},{"key":"98_CR4","doi-asserted-by":"publisher","unstructured":"Rahmati SHA, Ahmadi A, Karimi B (2018) Developing simulation based optimization mechanism for a novel stochastic reliability centered maintenance problem. Sci Iran 25:2788\u20132806. https:\/\/doi.org\/10.24200\/SCI.2017.4461","DOI":"10.24200\/SCI.2017.4461"},{"key":"98_CR5","volume-title":"Reliability-centered Maintenance II","author":"J Moubray","year":"1997","unstructured":"Moubray J (1997) Reliability-centered Maintenance II. Industrial Press, New York"},{"key":"98_CR6","volume-title":"Shock and Damage Models in Reliability Theory","author":"T Nakagawa","year":"2007","unstructured":"Nakagawa T (2007) Shock and Damage Models in Reliability Theory.\u00a0Springer Series in Reliability Engineering. Springer, London"},{"key":"98_CR7","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-4329-9","volume-title":"Maintenance, modeling and optimization","author":"M Ben-Daya","year":"2000","unstructured":"Ben-Daya M, Duffuaa S, Raouf A (2000) Maintenance, modeling and optimization. Kluwer Academic, London"},{"key":"98_CR8","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.ress.2014.09.024","volume":"134","author":"NC Caball\u00e9","year":"2015","unstructured":"Caball\u00e9 NC, Castro IT, P\u00e9rez CJ, Lanza-Guti\u00e9rrez JM (2015) A condition-based maintenance of a dependent degradation threshold-shock model in a system with multiple degradation processes. Reliab Eng Syst Saf 134:98\u2013109. https:\/\/doi.org\/10.1016\/j.ress.2014.09.024","journal-title":"Reliab Eng Syst Saf"},{"key":"98_CR9","doi-asserted-by":"publisher","first-page":"845","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#","volume":"46","author":"GH Graves","year":"1999","unstructured":"Graves GH, Lee CY (1999) Scheduling maintenance and semiresumable jobs on a single machine. Nav Res Logist 46:845\u2013863","journal-title":"Nav Res Logist"},{"key":"98_CR10","doi-asserted-by":"publisher","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"CR Cassady","year":"2005","unstructured":"Cassady CR, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54:304\u2013309. https:\/\/doi.org\/10.1109\/TR.2005.845967","journal-title":"IEEE Trans Reliab"},{"key":"98_CR11","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.compind.2004.06.005","volume":"56","author":"N Sortrakul","year":"2005","unstructured":"Sortrakul N, Nachtmann HL, Cassady CR (2005) Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Comput Ind 56:161\u2013168. https:\/\/doi.org\/10.1016\/j.compind.2004.06.005","journal-title":"Comput Ind"},{"issue":"3","key":"98_CR12","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1007\/s10951-005-6812-2","volume":"8","author":"PH Mauguiere","year":"2005","unstructured":"Mauguiere PH, Billaut JC, Bouquard JL (2005) New single machine and job-shop scheduling problems with availability constraints. J Sched 8(3):211\u2013231. https:\/\/doi.org\/10.1007\/s10951-005-6812-2","journal-title":"J Sched"},{"key":"98_CR13","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1016\/j.ejor.2007.06.029","volume":"190","author":"JS Chen","year":"2008","unstructured":"Chen JS (2008) Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. Eur J Oper Res 190:90\u2013102. https:\/\/doi.org\/10.1016\/j.ejor.2007.06.029","journal-title":"Eur J Oper Res"},{"key":"98_CR14","doi-asserted-by":"publisher","first-page":"592","DOI":"10.1016\/j.omega.2008.01.001","volume":"37","author":"WJ Chen","year":"2009","unstructured":"Chen WJ (2009) Minimizing number of tardy jobs on a single machine subject to periodic maintenance. Omega 37:592\u2013599. https:\/\/doi.org\/10.1016\/j.omega.2008.01.001","journal-title":"Omega"},{"key":"98_CR15","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1007\/s00170-009-2514-9","volume":"50","author":"E Pan","year":"2010","unstructured":"Pan E, Liao W, Xi L (2010) Single machine-based production scheduling model integrated preventive maintenance planning. The International Journal of Advanced Manufacturing Technology 50:365\u2013375. https:\/\/doi.org\/10.1007\/s00170-009-2514-9","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"98_CR16","doi-asserted-by":"publisher","first-page":"334","DOI":"10.1016\/j.apm.2009.04.014","volume":"34","author":"C Low","year":"2010","unstructured":"Low C, Ji M, Hsu CJ, Su CT (2010) Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Appl Math Model 34:334\u2013342. https:\/\/doi.org\/10.1016\/j.apm.2009.04.014","journal-title":"Appl Math Model"},{"key":"98_CR17","doi-asserted-by":"publisher","first-page":"753","DOI":"10.1007\/s00170-011-3303-9","volume":"57","author":"Y Ozturkoglu","year":"2011","unstructured":"Ozturkoglu Y, Bulfin RL (2011) A unique integer mathematical model for scheduling deteriorating jobs with rate modifying-activities on a single machine. The International Journal of Advanced Manufacturing Technology 57:753\u2013762. https:\/\/doi.org\/10.1007\/s00170-011-3303-9","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"98_CR18","doi-asserted-by":"publisher","first-page":"1127","DOI":"10.1007\/s00170-012-4553-x","volume":"67","author":"BS Kim","year":"2013","unstructured":"Kim BS, Ozturkoglu Y (2013) Scheduling a single machine with multiple preventive maintenance activities and position-based deteriorations using genetic algorithms. The International Journal of Advanced Manufacturing Technology 67:1127\u20131137. https:\/\/doi.org\/10.1007\/s00170-012-4553-x","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"98_CR19","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1016\/j.cie.2016.05.037","volume":"98","author":"KC Ying","year":"2016","unstructured":"Ying KC, Lu CC, Chen JC (2016) Exact algorithms for single-machine scheduling problems with a variable maintenance. Comput Ind Eng 98:427\u2013433. https:\/\/doi.org\/10.1016\/j.cie.2016.05.037","journal-title":"Comput Ind Eng"},{"key":"98_CR20","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/j.cor.2016.11.008","volume":"80","author":"WW Cui","year":"2017","unstructured":"Cui WW, Lu Z (2017) Minimizing the makespan on a single machine with flexible maintenances and jobs\u2019 release dates. Comput Oper Res 80:11\u201312. https:\/\/doi.org\/10.1016\/j.cor.2016.11.008","journal-title":"Comput Oper Res"},{"key":"98_CR21","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1016\/j.knosys.2017.12.021","volume":"144","author":"J Shen","year":"2018","unstructured":"Shen J, Zhu K (2018) An uncertain single machine scheduling problem with periodic maintenance. Knowl-Based Syst 144:32\u201341. https:\/\/doi.org\/10.1016\/j.knosys.2017.12.021","journal-title":"Knowl-Based Syst"},{"key":"98_CR22","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1016\/j.rcim.2018.01.002","volume":"55","author":"Q Liu","year":"2019","unstructured":"Liu Q, Dong M, Chen FF, Lv W, Ye C (2019) Single-machine-based joint optimization of predictive maintenance planning and production scheduling. Robotics and Computer-Integrated Manufacturing 55:173\u2013182. https:\/\/doi.org\/10.1016\/j.rcim.2018.01.002","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"2","key":"98_CR23","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3","volume":"47","author":"CY Lee","year":"2000","unstructured":"Lee CY, Chen ZL (2000) Scheduling of jobs and maintenance activities on parallel machines. Nav Res Logist 47(2):145\u2013165. https:\/\/doi.org\/10.1002\/(SICI)1520-6750(200003)47:2%3c145::AID-NAV5%3e3.0.CO;2-3","journal-title":"Nav Res Logist"},{"key":"98_CR24","doi-asserted-by":"publisher","first-page":"1024","DOI":"10.1007\/s00170-006-0524-4","volume":"33","author":"CH Lin","year":"2007","unstructured":"Lin CH, Liao CJ (2007) Makespan minimization for two parallel machines with an unavailable period on each machine. The International Journal of Advanced Manufacturing Technology 33:1024\u20131030. https:\/\/doi.org\/10.1007\/s00170-006-0524-4","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"98_CR25","doi-asserted-by":"publisher","first-page":"458","DOI":"10.1016\/j.ejor.2006.11.027","volume":"184","author":"LW Liao","year":"2008","unstructured":"Liao LW, Sheen GJ (2008) Parallel machine scheduling with machine availability and eligibility constraints. Eur J Oper Res 184:458\u2013467. https:\/\/doi.org\/10.1016\/j.ejor.2006.11.027","journal-title":"Eur J Oper Res"},{"key":"98_CR26","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1007\/s10845-008-0113-5","volume":"20","author":"A Berrichi","year":"2009","unstructured":"Berrichi A, Amodeo L, Yalaoui F, Ch\u00e2telet E, Mezghiche M (2009) Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J Intell Manuf 20:389. https:\/\/doi.org\/10.1007\/s10845-008-0113-5","journal-title":"J Intell Manuf"},{"key":"98_CR27","doi-asserted-by":"publisher","first-page":"1150","DOI":"10.1016\/j.ejor.2008.03.043","volume":"197","author":"R Mellouli","year":"2009","unstructured":"Mellouli R, Sadfi C, Chu C, Kacem I (2009) Identical parallel machine scheduling under availability constraints to minimize the sum of completion times. Eur J Oper Res 197:1150\u20131165. https:\/\/doi.org\/10.1016\/j.ejor.2008.03.043","journal-title":"Eur J Oper Res"},{"key":"98_CR28","doi-asserted-by":"publisher","first-page":"603","DOI":"10.1007\/s10845-012-0708-8","volume":"25","author":"CH Wang","year":"2014","unstructured":"Wang CH, Tsai SW (2014) Optimizing bi-objective imperfect preventive maintenance model for series-parallel system using established hybrid genetic algorithm. J Intell Manuf 25:603\u2013616. https:\/\/doi.org\/10.1007\/s10845-012-0708-8","journal-title":"J Intell Manuf"},{"key":"98_CR29","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1007\/s10845-013-0766-6","volume":"26","author":"V Ebrahimipour","year":"2015","unstructured":"Ebrahimipour V, Najjarbashi A, Sheikhalishahi M (2015) Multi-objective modeling for preventive maintenance scheduling in a multiple production line. J Intell Manuf 26:111\u2013122. https:\/\/doi.org\/10.1007\/s10845-013-0766-6","journal-title":"J Intell Manuf"},{"key":"98_CR30","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1016\/j.cie.2016.09.020","volume":"101","author":"J Yoo","year":"2016","unstructured":"Yoo J, Lee IS (2016) Parallel machine scheduling with maintenance activities. Comput Ind Eng 101:361\u2013371. https:\/\/doi.org\/10.1016\/j.cie.2016.09.020","journal-title":"Comput Ind Eng"},{"key":"98_CR31","doi-asserted-by":"publisher","first-page":"3171","DOI":"10.1007\/s12652-018-1032-8","volume":"10","author":"J Shen","year":"2019","unstructured":"Shen J, Zhu Y (2019) A parallel-machine scheduling problem with periodic maintenance under uncertainty. J Ambient Intell Humaniz Comput 10:3171\u20133179. https:\/\/doi.org\/10.1007\/s12652-018-1032-8","journal-title":"J Ambient Intell Humaniz Comput"},{"key":"98_CR32","doi-asserted-by":"publisher","first-page":"420","DOI":"10.1016\/S0377-2217(97)00452-9","volume":"114","author":"CY Lee","year":"1999","unstructured":"Lee CY (1999) Two-machine flow shop scheduling with availability constraints. Eur J Oper Res 114:420\u2013429. https:\/\/doi.org\/10.1016\/S0377-2217(97)00452-9","journal-title":"Eur J Oper Res"},{"key":"98_CR33","doi-asserted-by":"publisher","first-page":"116","DOI":"10.1057\/palgrave.jors.2601025","volume":"52","author":"M Espinouse","year":"2011","unstructured":"Espinouse M, Formanowlcz P, Penz B (2011) Complexity results and approximation algorithms for the two-machine no-wait flow-shop with limited machine availability. J Oper Res Soc 52:116\u2013121. https:\/\/doi.org\/10.1057\/palgrave.jors.2601025","journal-title":"J Oper Res Soc"},{"key":"98_CR34","doi-asserted-by":"publisher","first-page":"319","DOI":"10.1016\/S0167-6377(02)00230-4","volume":"31","author":"T Cheng","year":"2003","unstructured":"Cheng T, Liu Z (2003) Approximability of two-machine no-wait ow shop scheduling with availability constraints. Oper Res Lett 31:319\u2013322. https:\/\/doi.org\/10.1016\/S0167-6377(02)00230-4","journal-title":"Oper Res Lett"},{"key":"98_CR35","doi-asserted-by":"publisher","first-page":"534","DOI":"10.1016\/S0377-2217(03)00261-3","volume":"153","author":"R Aggoune","year":"2004","unstructured":"Aggoune R (2004) Minimizing the makespan for the flow shop scheduling problem with availability constraints. Eur J Oper Res 153:534\u2013543. https:\/\/doi.org\/10.1016\/S0377-2217(03)00261-3","journal-title":"Eur J Oper Res"},{"key":"98_CR36","doi-asserted-by":"publisher","first-page":"431","DOI":"10.1016\/j.cie.2004.09.002","volume":"47","author":"H Allaoui","year":"2004","unstructured":"Allaoui H, Artiba A (2004) Integrating simulation and optimization to schedule a hybrid ow shop with maintenance constraints. Eur J Oper Res 47:431\u2013450. https:\/\/doi.org\/10.1016\/j.cie.2004.09.002","journal-title":"Eur J Oper Res"},{"issue":"11","key":"98_CR37","doi-asserted-by":"publisher","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R Ruiz","year":"2007","unstructured":"Ruiz R, Garcia-Diaz JC, Maroto C (2007) Considering scheduling and preventive maintenance in the flow shop sequencing problem. Comput Oper Res 34(11):3314\u20133330. https:\/\/doi.org\/10.1016\/j.cor.2005.12.007","journal-title":"Comput Oper Res"},{"key":"98_CR38","doi-asserted-by":"publisher","first-page":"170","DOI":"10.1007\/s00170-008-1693-0","volume":"43","author":"B Naderi","year":"2009","unstructured":"Naderi B, Zandieh M, Fatemi Ghomi SMT (2009) Scheduling sequence-dependent setup time job shops with preventive maintenance. The International Journal of Advanced Manufacturing Technology 43:170\u2013181. https:\/\/doi.org\/10.1007\/s00170-008-1693-0","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"98_CR39","doi-asserted-by":"publisher","first-page":"757","DOI":"10.1007\/s00170-009-2151-3","volume":"46","author":"E Safari","year":"2010","unstructured":"Safari E, Sadjadi SJ, Shahanaghi K (2010) Scheduling flow shops with condition-based maintenance constraint to minimize expected makespan. The International Journal of Advanced Manufacturing Technology 46:757\u2013767. https:\/\/doi.org\/10.1007\/s00170-009-2151-3","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"98_CR40","doi-asserted-by":"publisher","first-page":"2020","DOI":"10.1016\/j.eswa.2010.07.138","volume":"38","author":"E Safari","year":"2011","unstructured":"Safari E, Sadjadi SJ (2011) A hybrid method for flow shops scheduling with condition based maintenance constraint and machines breakdown. Expert Syst Appl 38(3):2020\u20132029. https:\/\/doi.org\/10.1016\/j.eswa.2010.07.138","journal-title":"Expert Syst Appl"},{"key":"98_CR41","doi-asserted-by":"publisher","first-page":"276","DOI":"10.1016\/j.jclepro.2016.06.109","volume":"135","author":"RH Huang","year":"2016","unstructured":"Huang RH, Yu SC (2016) Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production. J Clean Prod 135:276\u2013283. https:\/\/doi.org\/10.1016\/j.jclepro.2016.06.109","journal-title":"J Clean Prod"},{"key":"98_CR42","doi-asserted-by":"publisher","first-page":"857","DOI":"10.1007\/s10845-014-1001-9","volume":"28","author":"M Khatami","year":"2017","unstructured":"Khatami M, Zegordi SH (2017) Coordinative production and maintenance scheduling problem with flexible maintenance time intervals. J Intell Manuf 28:857\u2013867. https:\/\/doi.org\/10.1007\/s10845-014-1001-9","journal-title":"J Intell Manuf"},{"issue":"1","key":"98_CR43","doi-asserted-by":"publisher","first-page":"106","DOI":"10.1109\/TASE.2020.2978890","volume":"18","author":"H Ye","year":"2020","unstructured":"Ye H, Wang X, Liu K (2020) Adaptive preventive maintenance for flow shop scheduling with resumable processing. IEEE Trans Autom Sci Eng 18(1):106\u2013113. https:\/\/doi.org\/10.1109\/TASE.2020.2978890","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"98_CR44","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1016\/j.ijpe.2007.01.014","volume":"112","author":"N Zribi","year":"2008","unstructured":"Zribi N, Kamel E, Borne P (2008) Minimizing the makespan for the MPM job-shop with availability constraints. Int J Prod Econ 112:151\u2013160. https:\/\/doi.org\/10.1016\/j.ijpe.2007.01.014","journal-title":"Int J Prod Econ"},{"key":"98_CR45","doi-asserted-by":"publisher","first-page":"537","DOI":"10.1016\/j.cie.2010.06.010","volume":"59","author":"Y Mati","year":"2010","unstructured":"Mati Y (2010) Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability. Eur J Oper Res 59:537\u2013543. https:\/\/doi.org\/10.1016\/j.cie.2010.06.010","journal-title":"Eur J Oper Res"},{"issue":"13","key":"98_CR46","doi-asserted-by":"publisher","first-page":"3891","DOI":"10.1080\/00207543.2010.492405","volume":"49","author":"M Ben Ali","year":"2011","unstructured":"Ben Ali M, Sassi M, Gossa M, Harrath Y (2011) Simultaneous scheduling of production and maintenance tasks in the job shop. Int J Prod Res 49(13):3891\u20133918. https:\/\/doi.org\/10.1080\/00207543.2010.492405","journal-title":"Int J Prod Res"},{"key":"98_CR47","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/j.ress.2012.01.005","volume":"101","author":"X Zhou","year":"2012","unstructured":"Zhou X, Lu Z, Xi L (2012) Preventive maintenance optimization for multi-component system under changing job shop schedule. Reliab Eng Syst Saf 101:14\u201320. https:\/\/doi.org\/10.1016\/j.ress.2012.01.005","journal-title":"Reliab Eng Syst Saf"},{"key":"98_CR48","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1007\/11539902_31","volume":"3612","author":"N Zribi","year":"2005","unstructured":"Zribi N, Borne P (2005) Hybrid genetic algorithm for the flexible job shop problem under maintenance constraints. Adv Natural Comput 3612:259\u2013268","journal-title":"Advances in Natural Computation"},{"key":"98_CR49","doi-asserted-by":"publisher","first-page":"493","DOI":"10.1007\/s10845-005-0021-x","volume":"17","author":"J Gao","year":"2006","unstructured":"Gao J, Gen M, Sun L (2006) Scheduling jobs and maintenance in flexible job shop with a hybrid genetic algorithm. J Intell Manuf 17:493\u2013507. https:\/\/doi.org\/10.1007\/s10845-005-0021-x","journal-title":"J Intell Manuf"},{"issue":"3","key":"98_CR50","doi-asserted-by":"publisher","first-page":"436","DOI":"10.1016\/j.cie.2010.05.016","volume":"59","author":"S Wang","year":"2010","unstructured":"Wang S, Yu J (2010) An effective heuristic for flexible job-shop scheduling problem with maintenance activities. Comput Ind Eng 59(3):436\u2013447. https:\/\/doi.org\/10.1016\/j.cie.2010.05.016","journal-title":"Comput Ind Eng"},{"key":"98_CR51","doi-asserted-by":"publisher","first-page":"7169","DOI":"10.1016\/j.eswa.2010.12.043","volume":"38","author":"E Moradi","year":"2011","unstructured":"Moradi E, Fatemi Ghomi SMT, Zandieh M (2011) Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Syst Appl 38:7169\u20137178. https:\/\/doi.org\/10.1016\/j.eswa.2010.12.043","journal-title":"Expert Syst Appl"},{"key":"98_CR52","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.cor.2015.02.014","volume":"61","author":"H Mokhtari","year":"2015","unstructured":"Mokhtari H, Dadgar M (2015) Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate. Computers & Operation Research 61:31\u201345. https:\/\/doi.org\/10.1016\/j.cor.2015.02.014","journal-title":"Computers & Operation Research"},{"key":"98_CR53","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1016\/j.cor.2014.08.023","volume":"54","author":"JJ Palacios","year":"2015","unstructured":"Palacios JJ, Gonz\u00e1lez MA, Vela CR, Rodr\u00edguez IG, Puente P (2015) Genetic tabu search for the fuzzy flexible job shop problem. Comput Oper Res 54:74\u201389. https:\/\/doi.org\/10.1016\/j.cor.2014.08.023","journal-title":"Comput Oper Res"},{"key":"98_CR54","doi-asserted-by":"publisher","first-page":"56","DOI":"10.1016\/j.cor.2016.03.009","volume":"73","author":"E Ahmadi","year":"2016","unstructured":"Ahmadi E, Zandieh M, Farrokh M, Emami SM (2016) A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms. Comput Oper Res 73:56\u201366. https:\/\/doi.org\/10.1016\/j.cor.2016.03.009","journal-title":"Comput Oper Res"},{"key":"98_CR55","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1007\/s12351-012-0130-1","volume":"13","author":"M Rebai","year":"2013","unstructured":"Rebai M, Kacem I, Adjallah KH (2013) Scheduling jobs and maintenance activities on parallel machines. Oper Res Int Journal 13:363\u2013383. https:\/\/doi.org\/10.1007\/s12351-012-0130-1","journal-title":"Oper Res Int Journal"},{"key":"98_CR56","doi-asserted-by":"publisher","first-page":"2111","DOI":"10.1016\/j.camwa.2012.04.007","volume":"64","author":"VM Dalfard","year":"2012","unstructured":"Dalfard VM, Mohammadi G (2012) Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints. Comput Math Appl 64:2111\u20132117. https:\/\/doi.org\/10.1016\/j.camwa.2012.04.007","journal-title":"Comput Math Appl"},{"key":"98_CR57","doi-asserted-by":"publisher","first-page":"2896","DOI":"10.1016\/j.asoc.2012.04.012","volume":"12","author":"JQ Li","year":"2012","unstructured":"Li JQ, Pan QK (2012) Chemical-reaction optimization for flexible job-shop scheduling problems with maintenance activity. Appl Soft Comput 12:2896\u20132912. https:\/\/doi.org\/10.1016\/j.asoc.2012.04.012","journal-title":"Appl Soft Comput"},{"key":"98_CR58","doi-asserted-by":"publisher","first-page":"1111","DOI":"10.1016\/j.apm.2013.07.038","volume":"38","author":"JQ Li","year":"2014","unstructured":"Li JQ, Pan QK, Tasgetiren MF (2014) A discrete artificial bee colony algorithm for the multi-objective flexible job shop scheduling problem with maintenance activities. Appl Math Model 38:1111\u20131132. https:\/\/doi.org\/10.1016\/j.apm.2013.07.038","journal-title":"Appl Math Model"},{"key":"98_CR59","doi-asserted-by":"publisher","first-page":"977","DOI":"10.1016\/j.apm.2012.03.020","volume":"37","author":"Y Demir","year":"2013","unstructured":"Demir Y, I\u015fleyen SK (2013) Evaluation of mathematical models for flexible job-shop scheduling problems. Appl Math Model 37:977\u2013988. https:\/\/doi.org\/10.1016\/j.apm.2012.03.020","journal-title":"Appl Math Model"},{"key":"98_CR60","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1016\/j.cie.2016.10.019","volume":"106","author":"FE Khoukhi","year":"2017","unstructured":"Khoukhi FE, Boukachour J, Alaoui AEH (2017) The \u201cDual-Ants Colony\u201d: a novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance. Comput Ind Eng 106:236\u2013255. https:\/\/doi.org\/10.1016\/j.cie.2016.10.019","journal-title":"Comput Ind Eng"},{"key":"98_CR61","doi-asserted-by":"publisher","first-page":"512","DOI":"10.1007\/s00500-004-0368-5","volume":"9","author":"J Buckley","year":"2005","unstructured":"Buckley J (2005) Fuzzy statistics: hypothesis testing. soft. Computing 9:512\u2013518. https:\/\/doi.org\/10.1007\/s00500-004-0368-5","journal-title":"Computing"},{"key":"98_CR62","doi-asserted-by":"publisher","DOI":"10.7551\/mitpress\/3927.001.0001","volume-title":"An introduction to genetic algorithms","author":"M Mitchell","year":"1998","unstructured":"Mitchell M (1998) An introduction to genetic algorithms. The MIT press, London"},{"key":"98_CR63","doi-asserted-by":"publisher","unstructured":"Atashpaz-Gargari E, Lucas C (2007) Imperialist competitive algorithm: an algorithm for optimization inspired by imperialistic competition IEEE Congress Evol Comput 4661\u20134667.\u00a0https:\/\/doi.org\/10.1109\/CEC.2007.4425083","DOI":"10.1109\/CEC.2007.4425083"},{"key":"98_CR64","doi-asserted-by":"publisher","first-page":"1115","DOI":"10.1007\/s00170-011-3437-9","volume":"58","author":"SHA Rahmati","year":"2012","unstructured":"Rahmati SHA, Zandieh M (2012) A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem. The International Journal of Advanced Manufacturing Technology 58:1115\u20131129. https:\/\/doi.org\/10.1007\/s00170-011-3437-9","journal-title":"The International Journal of Advanced Manufacturing Technology"}],"container-title":["Operations Research Forum"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-021-00098-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s43069-021-00098-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-021-00098-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,27]],"date-time":"2021-12-27T06:21:17Z","timestamp":1640586077000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s43069-021-00098-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,10,5]]},"references-count":64,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2021,12]]}},"alternative-id":["98"],"URL":"https:\/\/doi.org\/10.1007\/s43069-021-00098-5","relation":{},"ISSN":["2662-2556"],"issn-type":[{"value":"2662-2556","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,10,5]]},"assertion":[{"value":"14 June 2021","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 September 2021","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"5 October 2021","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"Not applicable.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethics Approval"}},{"value":"We confirm that the manuscript has been read and approved by all named authors and that there are no other persons who satisfied the criteria for authorship but are not listed. We further confirm that the order of authors listed in the manuscript has been approved by all of us.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent to Participate"}},{"value":"Not applicable.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent for Publication"}},{"value":"The authors declare no competing interests.","order":5,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of Interest"}}],"article-number":"51"}}