{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,7]],"date-time":"2026-04-07T16:43:21Z","timestamp":1775580201957,"version":"3.50.1"},"reference-count":55,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2024,1,3]],"date-time":"2024-01-03T00:00:00Z","timestamp":1704240000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2024,1,3]],"date-time":"2024-01-03T00:00:00Z","timestamp":1704240000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/100009043","name":"University of Patras","doi-asserted-by":"crossref","id":[{"id":"10.13039\/100009043","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper. Res. Forum"],"abstract":"<jats:title>Abstract<\/jats:title><jats:p>Consideration is given to the heuristic solution of the resource leveling problem (RLP) in project scheduling with limited resources. The objective is to minimize the changes in the level of resource usage from period to period over the planning horizon of the project while keeping the project duration fixed. First, we present two novel greedy schedule algorithms for the RLP solution. The performance of the proposed algorithms is investigated as low-level hybrids in the context of three famous population-based heuristics, namely <jats:italic>differential evolution<\/jats:italic> (DE), <jats:italic>genetic algorithm<\/jats:italic> (GA), and <jats:italic>particle swarm optimization<\/jats:italic> (PSO). Then, we additionally present two new high-level hybridization schemes (HS), referred to herein as <jats:italic>parallel<\/jats:italic> and <jats:italic>serial<\/jats:italic> HS, respectively, which combine DE, GA, and PSO in a single hybrid solution algorithm. Detailed experimentation over known complex datasets measures the efficiency of the new hybrids. Statistical analysis employed rank the hybrids according to their solution efficiency. Moreover, comparisons between the developed best hybrid and commercial project management software show a substantial higher performance for the former over real-world construction projects.<\/jats:p>","DOI":"10.1007\/s43069-023-00283-8","type":"journal-article","created":{"date-parts":[[2024,1,3]],"date-time":"2024-01-03T09:02:15Z","timestamp":1704272535000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["An Empirical Analysis of a Set of Hybrid Heuristics for the Solution of the Resource Leveling Problem"],"prefix":"10.1007","volume":"5","author":[{"given":"Marinos","family":"Aristotelous","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andreas C.","family":"Nearchou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2024,1,3]]},"reference":[{"key":"283_CR1","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz J, Lenstra JK, Rinnooy Kan AHG (1983) Scheduling subject to resource constraints: classification and complexity. Discret Appl Math 5:11\u201324","journal-title":"Discret Appl Math"},{"key":"283_CR2","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"AAB Pritsker","year":"1969","unstructured":"Pritsker AAB, Watters LJ, Wolfe PM (1969) Multiproject scheduling with limited resources: a zero-one programming approach. Manage Sci 16:93\u2013107","journal-title":"Manage Sci"},{"issue":"2","key":"283_CR3","first-page":"55","volume":"3","author":"F Habibi","year":"2018","unstructured":"Habibi F, Barzinpour F, Sadjadi S (2018) Resource-constrained project scheduling problem: review of past and recent developments. J Proj Manag 3(2):55\u201388","journal-title":"J Proj Manag"},{"key":"283_CR4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207:1\u201314","journal-title":"Eur J Oper Res"},{"issue":"3","key":"283_CR5","doi-asserted-by":"crossref","first-page":"591","DOI":"10.1016\/S0377-2217(98)00272-0","volume":"117","author":"K Neumann","year":"1999","unstructured":"Neumann K, Zimmermann J (1999) Resource leveling for projects with schedule-dependent time windows. Eur J Oper Res 117(3):591\u2013605","journal-title":"Eur J Oper Res"},{"key":"283_CR6","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project scheduling with time windows and scarce resources","author":"K Neumann","year":"2003","unstructured":"Neumann K, Schwindt C, Zimmermann J (2003) Project scheduling with time windows and scarce resources. Springer, Berlin"},{"key":"283_CR7","volume-title":"Effective resource management in manufacturing systems: optimization algorithms for production planning","author":"M Caramia","year":"2006","unstructured":"Caramia M, Dell\u2019 Olmo P (2006) Effective resource management in manufacturing systems: optimization algorithms for production planning. Springer-Verlag, London"},{"key":"283_CR8","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.autcon.2012.04.017","volume":"27","author":"H Alsayegh","year":"2012","unstructured":"Alsayegh H, Hariga M (2012) Hybrid meta-heuristic methods for the multi-resource leveling problem with activity splitting. Autom Constr 27:89\u201398","journal-title":"Autom Constr"},{"key":"283_CR9","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1061\/(ASCE)CO.1943-7862.0000251","volume":"137","author":"M Hariga","year":"2011","unstructured":"Hariga M, El-Sayegh S (2011) Cost optimization for the multi-resource leveling problem with allowed activity splitting. J Constr Eng Manag 137:56\u201364","journal-title":"J Constr Eng Manag"},{"issue":"2","key":"283_CR10","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1139\/l02-007","volume":"29","author":"SS Leu","year":"2002","unstructured":"Leu SS, Hung TH (2002) An optimal construction resource leveling scheduling simulation model. Can J Civ Eng 29(2):267\u2013275","journal-title":"Can J Civ Eng"},{"issue":"6","key":"283_CR11","doi-asserted-by":"crossref","first-page":"673","DOI":"10.1139\/l99-028","volume":"26","author":"SS Leu","year":"1999","unstructured":"Leu SS, Chen AT, Yang CH (1999) A fuzzy optimal model for construction resource leveling scheduling. Can J Civ Eng 26(6):673\u2013684","journal-title":"Can J Civ Eng"},{"key":"283_CR12","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1007\/s10951-015-0457-6","volume":"19","author":"H Li","year":"2016","unstructured":"Li H, Demeulemeester E (2016) A genetic algorithm for the robust resource leveling problem. J Sched 19:43\u201360","journal-title":"J Sched"},{"issue":"1","key":"283_CR13","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/j.engappai.2012.07.012","volume":"26","author":"M Masmoudi","year":"2013","unstructured":"Masmoudi M, Ha\u00eft A (2013) Project scheduling under uncertainty using fuzzy modelling and solving techniques. Eng Appl Artif Intell 26(1):135\u2013149","journal-title":"Eng Appl Artif Intell"},{"key":"283_CR14","doi-asserted-by":"crossref","first-page":"508","DOI":"10.1016\/j.ejor.2017.10.022","volume":"266","author":"T Atan","year":"2018","unstructured":"Atan T, Eren E (2018) Optimal project duration for resource leveling. Eur J Oper Res 266:508\u2013520","journal-title":"Eur J Oper Res"},{"key":"283_CR15","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1007\/978-3-319-05443-8_17","volume-title":"Handbook on project management and scheduling: 1","author":"J Rieck","year":"2015","unstructured":"Rieck J, Zimmermann J (2015) Exact methods for resource leveling problems. In: Schwindt C, Zimmermann J (eds) Handbook on project management and scheduling: 1. Springer, Switzerland, pp 361\u2013387"},{"issue":"2","key":"283_CR16","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1080\/01446190903369907","volume":"28","author":"KP Anagnostopoulos","year":"2010","unstructured":"Anagnostopoulos KP, Koulinas GK (2010) A simulated annealing hyperheuristic for construction resource levelling. Constr Manag Econ 28(2):163\u2013175","journal-title":"Constr Manag Econ"},{"key":"283_CR17","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/978-3-319-05443-8_18","volume-title":"Handbook on project management and scheduling: 1","author":"S Christodoulou","year":"2015","unstructured":"Christodoulou S, Michaelidou-Kamenou A, Ellinas G (2015) Heuristic methods for resource leveling problems. In: Schwindt C, Zimmermann J (eds) Handbook on project management and scheduling: 1. Springer, Switzerland, pp 389\u2013407"},{"key":"283_CR18","doi-asserted-by":"crossref","first-page":"173","DOI":"10.3233\/ICA-150508","volume":"23","author":"C Kyriklidis","year":"2016","unstructured":"Kyriklidis C, Dounias G (2016) Evolutionary computation for resource leveling optimization in project management. Integr Comp Aided Eng 23:173\u2013184","journal-title":"Integr Comp Aided Eng"},{"issue":"7","key":"283_CR19","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1057\/jors.2012.119","volume":"64","author":"M Ranjbar","year":"2013","unstructured":"Ranjbar M (2013) A path-relinking metaheuristic for the resource levelling problem. J Oper Res Soc 64(7):1071\u20131078","journal-title":"J Oper Res Soc"},{"key":"283_CR20","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-04131-4","volume-title":"How to solve it: modern heuristics","author":"Z Michalewicz","year":"2000","unstructured":"Michalewicz Z, Fogel DB (2000) How to solve it: modern heuristics. Springer-Verlag, Berlin"},{"key":"283_CR21","doi-asserted-by":"crossref","DOI":"10.1002\/9780470496916","volume-title":"Metaheuristics: from design to implementation","author":"EG Talbi","year":"2009","unstructured":"Talbi EG (2009) Metaheuristics: from design to implementation. Wiley publication, New Jersey"},{"key":"283_CR22","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1016\/j.autcon.2010.12.006","volume":"20","author":"TW Liao","year":"2011","unstructured":"Liao TW, Egbelu PJ, Sarker BR, Leu SS (2011) Metaheuristics for project and construction management\u2013a state-of-the-art review. Autom Constr 20:491\u2013505","journal-title":"Autom Constr"},{"key":"283_CR23","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1061\/(ASCE)0733-9364(1996)122:2(125)","volume":"122","author":"WT Chan","year":"1996","unstructured":"Chan WT, Chua DK, Kannan G (1996) Construction resource scheduling with genetic algorithms. J Const Eng Manag 122:125\u2013132","journal-title":"J Const Eng Manag"},{"key":"283_CR24","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(167)","volume":"125","author":"T Hegazy","year":"1999","unstructured":"Hegazy T (1999) Optimization of resource allocation and leveling using genetic algorithms. J Constr Eng Manag 125:167\u2013175","journal-title":"J Constr Eng Manag"},{"key":"283_CR25","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(23)","volume":"125","author":"J Son","year":"1999","unstructured":"Son J, Skibniewski MJ (1999) Multiheuristic approach for resource leveling problem in construction engineering: hybrid approach. J Constr Eng Manag 125:23\u201331","journal-title":"J Constr Eng Manag"},{"key":"283_CR26","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/S0926-5805(99)00011-4","volume":"10","author":"S-S Leu","year":"2000","unstructured":"Leu S-S, Yang C-H, Huang J-C (2000) Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Autom Constr 10:27\u201341","journal-title":"Autom Constr"},{"key":"283_CR27","doi-asserted-by":"crossref","first-page":"869","DOI":"10.1061\/(ASCE)0733-9364(2004)130:6(869)","volume":"130","author":"AB Senouci","year":"2004","unstructured":"Senouci AB, Eldin NN (2004) Use of genetic algorithms in resource scheduling of construction projects. J Constr Eng Manag 130:869\u2013877","journal-title":"J Constr Eng Manag"},{"issue":"5","key":"283_CR28","doi-asserted-by":"crossref","first-page":"317","DOI":"10.3844\/ajassp.2007.317.322","volume":"4","author":"K Raja","year":"2007","unstructured":"Raja K, Kumanan S (2007) Resource leveling using Petrinet and memetic approach. Am J Appl Sci 4(5):317\u2013322","journal-title":"Am J Appl Sci"},{"key":"283_CR29","doi-asserted-by":"crossref","first-page":"573","DOI":"10.1016\/j.autcon.2007.10.005","volume":"17","author":"ME Georgy","year":"2008","unstructured":"Georgy ME (2008) Evolutionary resource scheduler for linear projects. Autom Constr 17:573\u2013583","journal-title":"Autom Constr"},{"issue":"11","key":"283_CR30","doi-asserted-by":"crossref","first-page":"1172","DOI":"10.1061\/(ASCE)CO.1943-7862.0000097","volume":"135","author":"K El-Rayes","year":"2009","unstructured":"El-Rayes K, Jun DH (2009) Optimizing resource leveling in construction projects. J Constr Eng Manag 135(11):1172\u20131180","journal-title":"J Constr Eng Manag"},{"key":"283_CR31","first-page":"1916","volume":"5","author":"JW Huang","year":"2010","unstructured":"Huang JW, Wang XX, Chen R (2010) Genetic algorithms for optimization of resource allocation in large scale construction project management. J Comput 5:1916\u20131924","journal-title":"J Comput"},{"key":"283_CR32","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1016\/j.autcon.2012.11.002","volume":"31","author":"GK Koulinas","year":"2013","unstructured":"Koulinas GK, Anagnostopoulos KP (2013) A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities. Autom Constr 31:169\u2013175","journal-title":"Autom Constr"},{"key":"283_CR33","doi-asserted-by":"crossref","first-page":"2300","DOI":"10.1016\/j.camwa.2010.09.058","volume":"61","author":"JQ Geng","year":"2011","unstructured":"Geng JQ, Weng LP, Liu SH (2011) An improved ant colony optimization algorithm for nonlinear resource-leveling problems. Comput Math Appl 61:2300\u20132305","journal-title":"Comput Math Appl"},{"issue":"3","key":"283_CR34","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s12351-014-0145-x","volume":"14","author":"C Kyriklidis","year":"2014","unstructured":"Kyriklidis C, Vassiliadis V, Kirytopoulos K, Dounias G (2014) Hybrid nature inspired intelligence for the resource leveling problem. Oper Res Int J 14(3):387\u2013407","journal-title":"Oper Res Int J"},{"issue":"5","key":"283_CR35","doi-asserted-by":"crossref","first-page":"2054","DOI":"10.1080\/00207543.2017.1355120","volume":"56","author":"H Li","year":"2018","unstructured":"Li H, Li X, Liu Y, Li H (2018) An effective genetic algorithm for the resource levelling problem with generalised precedence relations. Int J Prod Res 56(5):2054\u20132075","journal-title":"Int J Prod Res"},{"key":"283_CR36","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03315-9","volume-title":"Genetic algorithms + data structures = evolution programs","author":"Z Michalewicz","year":"1996","unstructured":"Michalewicz Z (1996) Genetic algorithms + data structures = evolution programs, 3rd edn. Springer-Verlag, Berlin","edition":"3"},{"key":"283_CR37","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1023\/A:1008202821328","volume":"11","author":"R Storn","year":"1997","unstructured":"Storn R, Price K (1997) Differential evolution \u2013 a simple and efficient heuristic for global optimization over continues spaces. J Glob Optim 11:241\u2013354","journal-title":"J Glob Optim"},{"key":"283_CR38","unstructured":"Eberhart RC, Kennedy J (1995) A new optimizer using particle swarm theory. In Proc. of the 6th Int. Symposium on Micro Machine and Human Science, 39\u201343"},{"key":"283_CR39","volume-title":"Adaptation in natural and artificial systems: an introductory analysis with application to biology, control and artificial intelligence","author":"JH Holland","year":"1975","unstructured":"Holland JH (1975) Adaptation in natural and artificial systems: an introductory analysis with application to biology, control and artificial intelligence. University of Michigan Press, Ann Arbor, MI"},{"key":"283_CR40","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1016\/S0377-2217(99)00485-3","volume":"127","author":"S Hartmann","year":"2000","unstructured":"Hartmann S, Kolisch R (2000) Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. Eur J Oper Res 127:394\u2013407","journal-title":"Eur J Oper Res"},{"key":"283_CR41","volume-title":"Project scheduling \u2013 a research handbook","author":"EL Demeulemeester","year":"2002","unstructured":"Demeulemeester EL, Herroelen WS (2002) Project scheduling \u2013 a research handbook. Kluwer Academic Publishers, Boston"},{"key":"283_CR42","doi-asserted-by":"crossref","unstructured":"Kolisch R, Schwindt C, Sprecher A (1999) Benchmark instances for project scheduling problems. In: Weglarz J (ed) Handbook on recent advances in project scheduling, Kluwer Academic Publishers, Boston, 197\u2013212","DOI":"10.1007\/978-1-4615-5533-9_9"},{"issue":"10","key":"283_CR43","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","volume":"41","author":"R Kolisch","year":"1995","unstructured":"Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Manage Sci 41(10):1693\u20131703","journal-title":"Manage Sci"},{"key":"283_CR44","doi-asserted-by":"crossref","unstructured":"Deb K, Agrawal S (2000) A niched-penalty approach for constraint handling in genetic algorithms. In Proc. of the Int. Conference on Artificial Neural Networks and Genetic algorithms. In Parallel Problem Solving from Nature (PPSN-VI), 365\u2013374","DOI":"10.1007\/978-3-7091-6384-9_40"},{"key":"283_CR45","unstructured":"Schwefel H-P (1987) Collective phenomena in evolutionary systems. In: Checkland P, Kiss I (eds) Problems of Constancy and Change\u2013the Complementarity of Systems Approaches to Complexity, 1025\u20131033. Budapest: Int. Society for General System Research"},{"key":"283_CR46","first-page":"115","volume":"9","author":"K Deb","year":"1995","unstructured":"Deb K, Agrawal RB (1995) Simulated binary crossover for continuous search space. Complex Systems 9:115\u2013148","journal-title":"Complex Systems"},{"issue":"1","key":"283_CR47","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1109\/4235.985692","volume":"6","author":"M Clerc","year":"2002","unstructured":"Clerc M, Kennedy J (2002) The particle swarm explosion, stability, and convergence in a multi dimensional complex space. IEEE Trans Evol Comput 6(1):58\u201373","journal-title":"IEEE Trans Evol Comput"},{"key":"283_CR48","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1007\/s101070100263","volume":"91","author":"E Dolan","year":"2002","unstructured":"Dolan E, Mor\u00e9 J (2002) Benchmarking optimization software with performance profiles. Math Program 91:201\u2013213. https:\/\/doi.org\/10.1007\/s101070100263","journal-title":"Math Program"},{"key":"283_CR49","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.swevo.2011.02.002","volume":"1","author":"J Derrac","year":"2011","unstructured":"Derrac J, Garc\u00eda S, Molina D, Herrera F (2011) A practical tutorial on the use of nonparametric statistical tests as a methodology for comparing evolutionary and swarm intelligence algorithms. Swarm Evol Comput 1:3\u201318","journal-title":"Swarm Evol Comput"},{"issue":"1","key":"283_CR50","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1080\/0305215X.2013.868451","volume":"47","author":"AC Nearchou","year":"2015","unstructured":"Nearchou AC, Giannikos IC, Lagodimos AG (2015) Efficient greedy algorithms for economic manpower shift planning. Eng Optim 47(1):36\u201354","journal-title":"Eng Optim"},{"issue":"1","key":"283_CR51","first-page":"5","volume":"31","author":"AC Nearchou","year":"2020","unstructured":"Nearchou AC, Giannikos IC, Lagodimos AG (2020) Multisite and multishift personnel planning with set-up costs. IMA J Manag Math 31(1):5\u201331","journal-title":"IMA J Manag Math"},{"key":"283_CR52","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/s10489-012-0375-7","volume":"38","author":"HR Cheshmehgaz","year":"2013","unstructured":"Cheshmehgaz HR, Desa MI, Wibowo A (2013) Effective local evolutionary searches distributed on an island model solving bi-objective optimization problems. Appl Intell 38:331\u2013356","journal-title":"Appl Intell"},{"issue":"1","key":"283_CR53","first-page":"37","volume":"30","author":"Z Drezner","year":"2019","unstructured":"Drezner Z, Drezner TD (2019) The alpha male genetic algorithm. IMA J Manag Math 30(1):37\u201350","journal-title":"IMA J Manag Math"},{"key":"283_CR54","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1007\/s12293-019-00292-3","volume":"12","author":"MA Dulebenets","year":"2020","unstructured":"Dulebenets MA (2020) An Adaptive Island Evolutionary Algorithm for the berth scheduling problem. Memetic Comput 12:51\u201372","journal-title":"Memetic Comput"},{"key":"283_CR55","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1007\/s43069-021-00068-x","volume":"2","author":"W Korani","year":"2021","unstructured":"Korani W, Mouhoub M (2021) Review on nature-inspired algorithms. SN Oper Res Forum 2:36","journal-title":"SN Oper Res Forum"}],"container-title":["Operations Research Forum"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-023-00283-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s43069-023-00283-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-023-00283-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,26]],"date-time":"2024-03-26T06:19:13Z","timestamp":1711433953000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s43069-023-00283-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,1,3]]},"references-count":55,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2024,3]]}},"alternative-id":["283"],"URL":"https:\/\/doi.org\/10.1007\/s43069-023-00283-8","relation":{},"ISSN":["2662-2556"],"issn-type":[{"value":"2662-2556","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,1,3]]},"assertion":[{"value":"2 September 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 December 2023","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 January 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing Interests"}}],"article-number":"6"}}