{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,18]],"date-time":"2026-01-18T10:01:07Z","timestamp":1768730467888,"version":"3.49.0"},"reference-count":73,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2024,4,1]],"date-time":"2024-04-01T00:00:00Z","timestamp":1711929600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,4,1]],"date-time":"2024-04-01T00:00:00Z","timestamp":1711929600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper. Res. Forum"],"DOI":"10.1007\/s43069-024-00312-0","type":"journal-article","created":{"date-parts":[[2024,4,1]],"date-time":"2024-04-01T10:02:39Z","timestamp":1711965759000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["Artificial Intelligence Application in Production Scheduling Problem Systematic Literature Review: Bibliometric Analysis, Research Trend, and Knowledge Taxonomy"],"prefix":"10.1007","volume":"5","author":[{"given":"Mohamed","family":"Kriouich","sequence":"first","affiliation":[]},{"given":"Hicham","family":"Sarir","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,4,1]]},"reference":[{"key":"312_CR1","doi-asserted-by":"publisher","first-page":"463","DOI":"10.1016\/j.ijpe.2008.12.016","volume":"120","author":"ZA Banaszak","year":"2009","unstructured":"Banaszak ZA, Zaremba MB, Muszy\u0144ski W (2009) Constraint programming for project-driven manufacturing. Int J Prod Econ 120:463\u2013475. https:\/\/doi.org\/10.1016\/j.ijpe.2008.12.016","journal-title":"Int J Prod Econ"},{"key":"312_CR2","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1287\/inte.18.4.84","volume":"18","author":"KN McKay","year":"1988","unstructured":"McKay KN, Safayeni FR, Buzacott JA (1988) Job-shop scheduling theory: what is relevant? Interfaces (Providence) 18:84\u201390. https:\/\/doi.org\/10.1287\/inte.18.4.84","journal-title":"Interfaces (Providence)"},{"key":"312_CR3","doi-asserted-by":"publisher","first-page":"1561","DOI":"10.1287\/mnsc.20.12.1561","volume":"20","author":"KR Baker","year":"1974","unstructured":"Baker KR (1974) Scheduling a full-time workforce to meet cyclic staffing requirements. Manage Sci 20:1561\u20131568. https:\/\/doi.org\/10.1287\/mnsc.20.12.1561","journal-title":"Manage Sci"},{"key":"312_CR4","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1007\/s10462-011-9259-1","volume":"39","author":"AS Muhamad","year":"2013","unstructured":"Muhamad AS, Deris S (2013) An artificial immune system for solving production scheduling problems: a review. Artif Intell Rev 39:97\u2013108","journal-title":"Artif Intell Rev"},{"key":"312_CR5","doi-asserted-by":"crossref","unstructured":"Pournader M, Ghaderi H, Hassanzadegan A, Fahimnia B (2021) Artificial intelligence applications in supply chain management. Int J Prod Econ 241","DOI":"10.1016\/j.ijpe.2021.108250"},{"key":"312_CR6","doi-asserted-by":"crossref","unstructured":"Schutzer D (1990)\u00a0Business expert systems: the competitive edge. Expert Syst Appl 1(1):17\u201321","DOI":"10.1016\/0957-4174(90)90065-3"},{"key":"312_CR7","doi-asserted-by":"crossref","unstructured":"Parunak HV (1991) Characterizing the manufacturing scheduling problem. J Manuf Systems 10(3):241\u201359","DOI":"10.1016\/0278-6125(91)90037-3"},{"key":"312_CR8","doi-asserted-by":"crossref","unstructured":"B\u0142a\u017cewicz J, Domschke W, Pesch E (1996) The job shop scheduling problem: conventional and new solution techniques.\u00a0Eur\u00a0J\u00a0Oper\u00a0Res\u00a093(1):1\u201333","DOI":"10.1016\/0377-2217(95)00362-2"},{"key":"312_CR9","doi-asserted-by":"crossref","unstructured":"Lin S, Goodman ED, William D, Punch F III (1997) A genetic algorithm approach to dynamic job shop scheduling problems","DOI":"10.1007\/BFb0014827"},{"key":"312_CR10","doi-asserted-by":"crossref","unstructured":"Bierwirth C, Mattfeld DC, Kopfer H (1996) On permutation representations for scheduling problems. In: Lecture notes in computer science (including subseries lecture notes in artificial intelligence and lecture notes in bioinformatics). Springer Verlag 310\u2013318","DOI":"10.1007\/3-540-61723-X_995"},{"key":"312_CR11","doi-asserted-by":"publisher","first-page":"4732","DOI":"10.3390\/electronics12234732","volume":"12","author":"M Del Gallo","year":"2023","unstructured":"Del Gallo M, Mazzuto G, Ciarapica FE, Bevilacqua M (2023) Artificial intelligence to solve production scheduling problems in real industrial settings: systematic literature review. Electronics (Basel) 12:4732. https:\/\/doi.org\/10.3390\/electronics12234732","journal-title":"Electronics (Basel)"},{"key":"312_CR12","doi-asserted-by":"crossref","unstructured":"Ren R, Hu W, Dong J, Sun B, Chen Y, Chen Z (2020) A systematic literature review of green and sustainable logistics: bibliometric analysis, research trend, and knowledge taxonomy. Int J Environ Res Public Health 17","DOI":"10.3390\/ijerph17010261"},{"key":"312_CR13","doi-asserted-by":"publisher","first-page":"523","DOI":"10.1007\/s11192-009-0146-3","volume":"84","author":"NJ van Eck","year":"2010","unstructured":"van Eck NJ, Waltman L (2010) Software survey: VOSviewer, a computer program for bibliometric mapping. Scientometrics 84:523\u2013538. https:\/\/doi.org\/10.1007\/s11192-009-0146-3","journal-title":"Scientometrics"},{"key":"312_CR14","doi-asserted-by":"publisher","DOI":"10.1088\/1755-1315\/1101\/2\/022017","volume":"1101","author":"TTP Bui","year":"2022","unstructured":"Bui TTP, Domingo N, MacGregor C, Wilkinson S (2022) Zero carbon refurbishment for existing buildings: a literature review. IOP Conf Ser Earth Environ Sci 1101:022017. https:\/\/doi.org\/10.1088\/1755-1315\/1101\/2\/022017","journal-title":"IOP Conf Ser Earth Environ Sci"},{"key":"312_CR15","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1016\/j.resconrec.2018.09.029","volume":"140","author":"R Jin","year":"2019","unstructured":"Jin R, Yuan H, Chen Q (2019) Science mapping approach to assisting the review of construction and demolition waste management research published between 2009 and 2018. Resour Conserv Recycl 140:175\u2013188","journal-title":"Resour Conserv Recycl"},{"key":"312_CR16","doi-asserted-by":"publisher","first-page":"959","DOI":"10.1016\/j.joi.2017.08.007","volume":"11","author":"M Aria","year":"2017","unstructured":"Aria M, Cuccurullo C (2017) Bibliometrics: an R-tool for comprehensive science mapping analysis. J Informetr 11:959\u2013975. https:\/\/doi.org\/10.1016\/j.joi.2017.08.007","journal-title":"J Informetr"},{"key":"312_CR17","doi-asserted-by":"crossref","unstructured":"Riahi Y, Saikouk T, Gunasekaran A, Badraoui I (2021) Artificial intelligence applications in the supply chain: a descriptive bibliometric analysis and future research directions. Expert Syst Appl 173","DOI":"10.1016\/j.eswa.2021.114702"},{"key":"312_CR18","doi-asserted-by":"publisher","first-page":"18","DOI":"10.5539\/ass.v9n5p18","volume":"9","author":"A Aghaei Chadegani","year":"2013","unstructured":"Aghaei Chadegani A, Salehi H, Md Yunus MM, Farhadi H, Fooladi M, Farhadi M, Ale Ebrahim N (2013) A comparison between two main academic literature collections: web of science and Scopus databases. Asian Soc Sci 9:18\u201326. https:\/\/doi.org\/10.5539\/ass.v9n5p18","journal-title":"Asian Soc Sci"},{"key":"312_CR19","doi-asserted-by":"publisher","first-page":"655","DOI":"10.1287\/opre.1040.0109","volume":"52","author":"EK Burke","year":"2004","unstructured":"Burke EK, Kendall G, Whitwell G (2004) A new placement heuristic for the orthogonal stock-cutting problem. Oper Res 52:655\u2013672. https:\/\/doi.org\/10.1287\/opre.1040.0109","journal-title":"Oper Res"},{"key":"312_CR20","doi-asserted-by":"publisher","first-page":"587","DOI":"10.1287\/opre.1060.0293","volume":"54","author":"E Burke","year":"2006","unstructured":"Burke E, Hellier R, Kendall G, Whitwell G (2006) A new bottom-left-fill heuristic algorithm for the two-dimensional irregular packing problem. Oper Res 54:587\u2013601. https:\/\/doi.org\/10.1287\/opre.1060.0293","journal-title":"Oper Res"},{"key":"312_CR21","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1080\/002075497195605","volume":"35","author":"CY Lee","year":"1997","unstructured":"Lee CY, Piramuthu S, Tsai YK (1997) Job shop scheduling with a genetic algorithm and machine learning. Int J Prod Res 35:1171\u20131191. https:\/\/doi.org\/10.1080\/002075497195605","journal-title":"Int J Prod Res"},{"key":"312_CR22","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1016\/j.engappai.2011.08.003","volume":"25","author":"A Banharnsakun","year":"2012","unstructured":"Banharnsakun A, Sirinaovakul B, Achalakul T (2012) Job shop scheduling with the Best-so-far ABC. Eng Appl Artif Intell 25:583\u2013593. https:\/\/doi.org\/10.1016\/j.engappai.2011.08.003","journal-title":"Eng Appl Artif Intell"},{"key":"312_CR23","doi-asserted-by":"crossref","unstructured":"Mbrkus A, Kis Vbncza T, Monostori L (1996) A market approach to holonic manufacturing","DOI":"10.1016\/S0007-8506(07)63096-0"},{"key":"312_CR24","unstructured":"Shaw MJ Dynamic scheduling in cellular manufacturing systems: a framework for networked decision making"},{"key":"312_CR25","doi-asserted-by":"publisher","first-page":"1005","DOI":"10.1016\/j.engappai.2008.11.004","volume":"22","author":"SH Chung","year":"2009","unstructured":"Chung SH, Chan FTS, Chan HK (2009) A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling. Eng Appl Artif Intell 22:1005\u20131014. https:\/\/doi.org\/10.1016\/j.engappai.2008.11.004","journal-title":"Eng Appl Artif Intell"},{"key":"312_CR26","doi-asserted-by":"crossref","unstructured":"Metaxiotis KS, Askounis D, Psarras J (2002) Expert systems in production planning and scheduling: a state-of-the-art survey. J Intelligent Manuf 13:253\u201360","DOI":"10.1023\/A:1016064126976"},{"key":"312_CR27","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1016\/j.cie.2016.10.019","volume":"106","author":"F El Khoukhi","year":"2017","unstructured":"El Khoukhi F, Boukachour J, El Hilali AA (2017) The \u201cDual-Ants Colony\u201d: a novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance. Comput Ind Eng 106:236\u2013255. https:\/\/doi.org\/10.1016\/j.cie.2016.10.019","journal-title":"Comput Ind Eng"},{"key":"312_CR28","doi-asserted-by":"publisher","first-page":"1915","DOI":"10.1007\/s10845-015-1078-9","volume":"28","author":"C Chamnanlor","year":"2017","unstructured":"Chamnanlor C, Sethanan K, Gen M, Chien CF (2017) Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraints. J Intell Manuf 28:1915\u20131931. https:\/\/doi.org\/10.1007\/s10845-015-1078-9","journal-title":"J Intell Manuf"},{"key":"312_CR29","doi-asserted-by":"crossref","unstructured":"Chanas S, Kasperski A (2001) Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates","DOI":"10.1016\/S0952-1976(01)00011-2"},{"key":"312_CR30","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1108\/01439911211217071","volume":"39","author":"T Wang","year":"2012","unstructured":"Wang T, Ramik DM, Sabourin C, Madani K (2012) Intelligent systems for industrial robotics: application in logistic field. Ind Robot 39:251\u2013259. https:\/\/doi.org\/10.1108\/01439911211217071","journal-title":"Ind Robot"},{"key":"312_CR31","doi-asserted-by":"publisher","first-page":"685","DOI":"10.1016\/j.ijpe.2012.10.011","volume":"141","author":"RH Huang","year":"2013","unstructured":"Huang RH, Yang CL, Cheng WC (2013) Flexible job shop scheduling with due window - a two-pheromone ant colony approach. Int J Prod Econ 141:685\u2013697. https:\/\/doi.org\/10.1016\/j.ijpe.2012.10.011","journal-title":"Int J Prod Econ"},{"key":"312_CR32","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1080\/09511920110056550","volume":"15","author":"R Macchiaroli","year":"2002","unstructured":"Macchiaroli R, Riemma S (2002) A negotiation scheme for autonomous agents in job shop scheduling. Int J Comput Integr Manuf 15:222\u2013232. https:\/\/doi.org\/10.1080\/09511920110056550","journal-title":"Int J Comput Integr Manuf"},{"key":"312_CR33","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/j.compag.2012.01.009","volume":"83","author":"BJ Stray","year":"2012","unstructured":"Stray BJ, van Vuuren JH, Bezuidenhout CN (2012) An optimization-based seasonal sugarcane harvest scheduling decision support system for commercial growers in South Africa. Comput Electron Agric 83:21\u201331. https:\/\/doi.org\/10.1016\/j.compag.2012.01.009","journal-title":"Comput Electron Agric"},{"key":"312_CR34","doi-asserted-by":"publisher","first-page":"1705","DOI":"10.1080\/00207543.2019.1693656","volume":"58","author":"H Ren","year":"2020","unstructured":"Ren H, Zhou W, Guo Y, Huang L, Liu Y, Yu Y, Hong L, Ma T (2020) A GIS-based green supply chain model for assessing the effects of carbon price uncertainty on plastic recycling. Int J Prod Res 58:1705\u20131723. https:\/\/doi.org\/10.1080\/00207543.2019.1693656","journal-title":"Int J Prod Res"},{"key":"312_CR35","doi-asserted-by":"publisher","first-page":"366","DOI":"10.1016\/j.ijpe.2009.06.011","volume":"122","author":"G Hu","year":"2009","unstructured":"Hu G, Bidanda B (2009) Modeling sustainable product lifecycle decision support systems. Int J Prod Econ 122:366\u2013375. https:\/\/doi.org\/10.1016\/j.ijpe.2009.06.011","journal-title":"Int J Prod Econ"},{"key":"312_CR36","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ins.2016.01.001","volume":"340\u2013341","author":"L Zhang","year":"2016","unstructured":"Zhang L, Wong TN (2016) Solving integrated process planning and scheduling problem with constructive meta-heuristics. Inf Sci (N Y) 340\u2013341:1\u201316. https:\/\/doi.org\/10.1016\/j.ins.2016.01.001","journal-title":"Inf Sci (N Y)"},{"key":"312_CR37","doi-asserted-by":"publisher","unstructured":"Wang L, Cai J, Li M, Liu Z (2017) Flexible job shop scheduling problem using an improved ant colony optimization. Sci Program. https:\/\/doi.org\/10.1155\/2017\/9016303","DOI":"10.1155\/2017\/9016303"},{"key":"312_CR38","doi-asserted-by":"crossref","unstructured":"Trentesaux D, Pesin P, Tahon C (2001) Comparison of constraint logic programming and distributed problem solving: a case study for interactive, efficient and practicable job-shop scheduling.\u00a0Comput Ind Eng\u00a039(1\u20132):187\u2013211","DOI":"10.1016\/S0360-8352(00)00078-4"},{"key":"312_CR39","doi-asserted-by":"publisher","unstructured":"Kato ERR, de Aranha GD, A, Tsunaki RH (2018) A new approach to solving the flexible job shop problem based on a hybrid particle swarm optimization and Random-Restart Hill Climbing. Comput Ind Eng 125:178\u2013189. https:\/\/doi.org\/10.1016\/j.cie.2018.08.022","DOI":"10.1016\/j.cie.2018.08.022"},{"key":"312_CR40","doi-asserted-by":"crossref","unstructured":"Park J, Kang M, Lee K (1996) Advanced manufacturing technology. An intelligent operations scheduling system in a job shop. Springer-Verlag London Limited The International Journal","DOI":"10.1007\/BF01341559"},{"key":"312_CR41","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1108\/17563781111136720","volume":"4","author":"T Helmy","year":"2011","unstructured":"Helmy T, Rasheed Z (2011) Colony of cooperating agents based independent job scheduling in a computation grid. International Journal of Intelligent Computing and Cybernetics 4:243\u2013264. https:\/\/doi.org\/10.1108\/17563781111136720","journal-title":"International Journal of Intelligent Computing and Cybernetics"},{"key":"312_CR42","doi-asserted-by":"publisher","DOI":"10.1007\/s12351-019-00507-y","author":"W Jomaa","year":"2019","unstructured":"Jomaa W, Eddaly M, Jarboui B (2019) Variable neighborhood search algorithms for the permutation flow shop scheduling problem with the preventive maintenance. Oper Res Int J. https:\/\/doi.org\/10.1007\/s12351-019-00507-y","journal-title":"Oper Res Int J"},{"key":"312_CR43","doi-asserted-by":"publisher","first-page":"876","DOI":"10.1016\/j.cor.2006.04.007","volume":"35","author":"DL Yang","year":"2008","unstructured":"Yang DL, Hsu CJ, Kuo WH (2008) A two-machine flow shop scheduling problem with a separated maintenance constraint. Comput Oper Res 35:876\u2013883. https:\/\/doi.org\/10.1016\/j.cor.2006.04.007","journal-title":"Comput Oper Res"},{"key":"312_CR44","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1016\/j.ijpe.2006.08.017","volume":"112","author":"H Allaoui","year":"2008","unstructured":"Allaoui H, Lamouri S, Artiba A, Aghezzaf E (2008) Simultaneously scheduling jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. Int J Prod Econ 112:161\u2013167. https:\/\/doi.org\/10.1016\/j.ijpe.2006.08.017","journal-title":"Int J Prod Econ"},{"key":"312_CR45","doi-asserted-by":"publisher","first-page":"1809","DOI":"10.1016\/j.cor.2008.05.001","volume":"36","author":"D Xu","year":"2009","unstructured":"Xu D, Cheng Z, Yin Y, Li H (2009) Makespan minimization for two parallel machines scheduling with a periodic availability constraint. Comput Oper Res 36:1809\u20131812. https:\/\/doi.org\/10.1016\/j.cor.2008.05.001","journal-title":"Comput Oper Res"},{"key":"312_CR46","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1007\/s00170-010-3037-0","volume":"55","author":"M Mirabi","year":"2011","unstructured":"Mirabi M (2011) Ant colony optimization technique for the sequence-dependent flow shop scheduling problem. Int J Adv Manuf Technol 55:317\u2013326. https:\/\/doi.org\/10.1007\/s00170-010-3037-0","journal-title":"Int J Adv Manuf Technol"},{"key":"312_CR47","doi-asserted-by":"publisher","first-page":"276","DOI":"10.1016\/j.jclepro.2016.06.109","volume":"135","author":"RH Huang","year":"2016","unstructured":"Huang RH, Yu SC (2016) Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production. J Clean Prod 135:276\u2013283. https:\/\/doi.org\/10.1016\/j.jclepro.2016.06.109","journal-title":"J Clean Prod"},{"key":"312_CR48","doi-asserted-by":"crossref","unstructured":"Huang R-HYC-LLS-C (2015) 7. Math Probl Eng 2015","DOI":"10.1186\/s13661-015-0428-z"},{"key":"312_CR49","doi-asserted-by":"publisher","first-page":"135524","DOI":"10.1109\/ACCESS.2020.3011109","volume":"8","author":"S Zhang","year":"2020","unstructured":"Zhang S, Lu C, Jiang S, Shan L, Xiong NN (2020) An unmanned intelligent transportation scheduling system for open-pit mine vehicles based on 5G and big data. IEEE Access 8:135524\u2013135539. https:\/\/doi.org\/10.1109\/ACCESS.2020.3011109","journal-title":"IEEE Access"},{"key":"312_CR50","doi-asserted-by":"publisher","first-page":"2046","DOI":"10.1080\/0305215X.2016.1150470","volume":"48","author":"Y Tian","year":"2016","unstructured":"Tian Y, Li D, Zhou P, Wang L (2016) Coordinated scheduling of intercell production and intercell transportation in the equipment manufacturing industry. Eng Optim 48:2046\u20132063. https:\/\/doi.org\/10.1080\/0305215X.2016.1150470","journal-title":"Eng Optim"},{"key":"312_CR51","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1007\/s10951-011-0260-y","volume":"15","author":"CT Ng","year":"2012","unstructured":"Ng CT, Lu L (2012) On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time. J Sched 15:391\u2013398. https:\/\/doi.org\/10.1007\/s10951-011-0260-y","journal-title":"J Sched"},{"key":"312_CR52","unstructured":"Juan MS, Deporter EL (1987) IPSS: An Approach Towards Automated Decisions In CIM systems"},{"key":"312_CR53","doi-asserted-by":"publisher","first-page":"193","DOI":"10.1080\/00207543.2018.1437288","volume":"56","author":"L Lin","year":"2018","unstructured":"Lin L, Gen M (2018) Hybrid evolutionary optimization with learning for production scheduling: state-of-the-art survey on algorithms and applications. Int J Prod Res 56:193\u2013223. https:\/\/doi.org\/10.1080\/00207543.2018.1437288","journal-title":"Int J Prod Res"},{"key":"312_CR54","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1016\/j.cirp.2021.04.036","volume":"70","author":"N Stricker","year":"2021","unstructured":"Stricker N, Kuhnle A, Hofmann C, Deininger P (2021) Self-adjusting multi-objective scheduling based on Monte Carlo Tree Search for matrix production assembly systems. CIRP Ann 70:381\u2013384. https:\/\/doi.org\/10.1016\/j.cirp.2021.04.036","journal-title":"CIRP Ann"},{"key":"312_CR55","doi-asserted-by":"crossref","unstructured":"Schmidt G (1998) International Journal of Production Economics ELSEVIER Case-based reasoning for production scheduling","DOI":"10.1016\/S0925-5273(97)00141-2"},{"key":"312_CR56","doi-asserted-by":"crossref","unstructured":"Baumg\u00e4rtel H (2000) Distributed constraint processing for production logistics","DOI":"10.1109\/5254.820328"},{"key":"312_CR57","doi-asserted-by":"publisher","unstructured":"Bouzekri H, Bara N, Alpan G, Giard V (2022) An integrated decision support system for planning production, storage, and bulk port operations in a fertilizer supply chain. Int J Prod Econ 252. https:\/\/doi.org\/10.1016\/j.ijpe.2022.108561","DOI":"10.1016\/j.ijpe.2022.108561"},{"key":"312_CR58","doi-asserted-by":"crossref","unstructured":"Quelopana A, Navarra A (2021) Integration of strategic open-pit mine planning into hierarchical artificial intelligence. J South Afr Inst Min Metall 121","DOI":"10.17159\/2411-9717\/1367\/2021"},{"key":"312_CR59","first-page":"95","volume":"34","author":"Huang Y-C; CY-A; DY-A","year":"2019","unstructured":"Huang Y-C; CY-A; DY-A (2019) Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production. J Technol 34:95\u2013107","journal-title":"J Technol"},{"key":"312_CR60","first-page":"582","volume":"27","author":"LWWGX-WZJ Wang","year":"2010","unstructured":"Wang LWWGX-WZJ (2010) Model and algorithm of batch production scheduling of cold mill. Kongzhi Lilun Yu Yingyong\/Control Theory and Applications 27:582\u2013588","journal-title":"Kongzhi Lilun Yu Yingyong\/Control Theory and Applications"},{"key":"312_CR61","first-page":"332","volume":"33","author":"JJ Kanet","year":"1991","unstructured":"Kanet JJ, Sridharan V (1991) A genetic algorithm for production scheduling. Wirtschaftsinformatik 33:332\u2013336","journal-title":"Wirtschaftsinformatik"},{"key":"312_CR62","doi-asserted-by":"publisher","first-page":"10199","DOI":"10.1007\/s00500-018-3578-y","volume":"23","author":"SD Dao","year":"2019","unstructured":"Dao SD, Abhary K, Marian R, Goh M (2019) Optimisation of production scheduling for multi-product orders in VCIM systems using GA. Soft Comput 23:10199\u201310224. https:\/\/doi.org\/10.1007\/s00500-018-3578-y","journal-title":"Soft comput"},{"key":"312_CR63","doi-asserted-by":"publisher","first-page":"1014","DOI":"10.1016\/j.dss.2005.05.028","volume":"43","author":"PC Pendharkar","year":"2007","unstructured":"Pendharkar PC (2007) The theory and experiments of designing cooperative intelligent systems. Decis Support Syst 43:1014\u20131030. https:\/\/doi.org\/10.1016\/j.dss.2005.05.028","journal-title":"Decis Support Syst"},{"key":"312_CR64","doi-asserted-by":"crossref","unstructured":"De Toni A, Nassimbeni G, Tonchia S (1996) An artificial, intelligence\u2010based production scheduler.\u00a0Comput Integr Manuf Syst\u00a07(3):17\u201325","DOI":"10.1108\/09576069610116896"},{"key":"312_CR65","doi-asserted-by":"crossref","unstructured":"Smith SF, Ow PS, Potvin J, Muscettola N, Matthys DC (1990) An integrated framework for generating and revising factory schedules","DOI":"10.2307\/2583037"},{"key":"312_CR66","doi-asserted-by":"publisher","unstructured":"Shi Z, Ma H, Ren M, Wu T, Yu AJ (2021) A learning-based two-stage optimization method for customer order scheduling. Comput Oper Res 136. https:\/\/doi.org\/10.1016\/j.cor.2021.105488","DOI":"10.1016\/j.cor.2021.105488"},{"key":"312_CR67","doi-asserted-by":"publisher","first-page":"684","DOI":"10.1080\/18756891.2013.802874","volume":"6","author":"AC Nearchou","year":"2013","unstructured":"Nearchou AC, Omirou SL (2013) A particle swarm optimization algorithm for scheduling against restrictive common due dates. Int J Comput Intell Syst 6:684\u2013699. https:\/\/doi.org\/10.1080\/18756891.2013.802874","journal-title":"Int J Comput Intell Syst"},{"key":"312_CR68","doi-asserted-by":"publisher","first-page":"6005","DOI":"10.1080\/00207543.2011.640957","volume":"50","author":"P Hirsch","year":"2012","unstructured":"Hirsch P, Palfi A, Gronalt M (2012) Solving a time-constrained two-crane routing problem for material handling with an ant colony optimization approach: an application in the roof-tile industry. Int J Prod Res 50:6005\u20136021. https:\/\/doi.org\/10.1080\/00207543.2011.640957","journal-title":"Int J Prod Res"},{"key":"312_CR69","doi-asserted-by":"publisher","unstructured":"Shobaki G, Gordon VS, McHugh P, Dubois T, Kerbow A (2022) Register-pressure-aware instruction scheduling using ant colony optimization. ACM Transactions on Architecture and Code Optimization 19. https:\/\/doi.org\/10.1145\/3505558","DOI":"10.1145\/3505558"},{"key":"312_CR70","doi-asserted-by":"publisher","unstructured":"Bing-hai Z, Tao P (2017) Optimal schedule of just-in- time part distribution for mexed-model assembly lines. J Jilin Univ 47. https:\/\/doi.org\/10.13229\/j.cnki.jdxbgxb201704034","DOI":"10.13229\/j.cnki.jdxbgxb201704034"},{"key":"312_CR71","doi-asserted-by":"publisher","first-page":"1337","DOI":"10.1520\/JTE20140471","volume":"44","author":"Y-C Chang","year":"2016","unstructured":"Chang Y-C, Chang K-H, Kang T (2016) Applied variable neighborhood search-based approach to solving two-stage supply chain scheduling problems. J Test Eval 44:1337\u20131349","journal-title":"J Test Eval"},{"key":"312_CR72","unstructured":"Tu NW, Luo XC, Chai TY\u00a0(2011) Scheduling of walking beam reheating furnaces based on ant colony optimization algorithm. Dongbei Daxue Xuebao\/Journal of Northeastern University 32"},{"key":"312_CR73","doi-asserted-by":"publisher","first-page":"564","DOI":"10.1016\/j.sbspro.2015.06.134","volume":"195","author":"C Dirican","year":"2015","unstructured":"Dirican C (2015) The impacts of robotics, artificial intelligence on business and economics. Procedia Soc Behav Sci 195:564\u2013573. https:\/\/doi.org\/10.1016\/j.sbspro.2015.06.134","journal-title":"Procedia Soc Behav Sci"}],"container-title":["Operations Research Forum"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-024-00312-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s43069-024-00312-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-024-00312-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,2]],"date-time":"2024-07-02T11:08:54Z","timestamp":1719918534000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s43069-024-00312-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,4,1]]},"references-count":73,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2024,6]]}},"alternative-id":["312"],"URL":"https:\/\/doi.org\/10.1007\/s43069-024-00312-0","relation":{},"ISSN":["2662-2556"],"issn-type":[{"value":"2662-2556","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,4,1]]},"assertion":[{"value":"30 July 2023","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"12 March 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 April 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"This is not applicable.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethics Approval"}},{"value":"This is not applicable.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent to Participate"}},{"value":"This is not applicable.","order":4,"name":"Ethics","group":{"name":"EthicsHeading","label":"Consent for Publication"}},{"value":"The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.","order":5,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing Interests"}},{"value":"This is not applicable.","order":6,"name":"Ethics","group":{"name":"EthicsHeading","label":"Papers Reporting Experiments on Live Vertebrates and\/or Higher Invertebrates Missing Statements of Approval, Accordanc<!--Too long, content removed-->"}},{"value":"This is not applicable.","order":7,"name":"Ethics","group":{"name":"EthicsHeading","label":"Lack of Appropriate Permission and\/or Credit for Reproduced Images"}}],"article-number":"29"}}