{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,2]],"date-time":"2025-04-02T04:11:32Z","timestamp":1743567092921,"version":"3.40.3"},"reference-count":65,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2025,1,20]],"date-time":"2025-01-20T00:00:00Z","timestamp":1737331200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,1,20]],"date-time":"2025-01-20T00:00:00Z","timestamp":1737331200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper. Res. Forum"],"DOI":"10.1007\/s43069-025-00415-2","type":"journal-article","created":{"date-parts":[[2025,1,20]],"date-time":"2025-01-20T13:15:49Z","timestamp":1737378949000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["h-NSDE\u2014A Solution Algorithm for the Multi-objective Resource Leveling Problem"],"prefix":"10.1007","volume":"6","author":[{"given":"Marinos","family":"Aristotelous","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andreas C.","family":"Nearchou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2025,1,20]]},"reference":[{"key":"415_CR1","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1016\/j.autcon.2012.04.017","volume":"27","author":"H Alsayegh","year":"2012","unstructured":"Alsayegh H, Hariga M (2012) Hybrid meta-heuristic methods for the multi-resource leveling problem with activity splitting. Autom Constr 27:89\u201398","journal-title":"Autom Constr"},{"issue":"2","key":"415_CR2","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1080\/01446190903369907","volume":"28","author":"KP Anagnostopoulos","year":"2010","unstructured":"Anagnostopoulos KP, Koulinas GK (2010) A simulated annealing hyperheuristic for construction resource levelling. Constr Manag Econ 28(2):163\u2013175","journal-title":"Constr Manag Econ"},{"key":"415_CR3","doi-asserted-by":"publisher","first-page":"6","DOI":"10.1007\/s43069-023-00283-8","volume":"5","author":"M Aristotelous","year":"2024","unstructured":"Aristotelous M, Nearchou AC (2024) An empirical analysis of a set of hybrid heuristics for the solution of the resource leveling problem. Oper Res Forum 5:6. https:\/\/doi.org\/10.1007\/s43069-023-00283-8","journal-title":"Oper Res Forum"},{"key":"415_CR4","doi-asserted-by":"publisher","first-page":"508","DOI":"10.1016\/j.ejor.2017.10.022","volume":"266","author":"T Atan","year":"2018","unstructured":"Atan T, Eren E (2018) Optimal project duration for resource leveling. Eur J Oper Res 266:508\u2013520","journal-title":"Eur J Oper Res"},{"key":"415_CR5","doi-asserted-by":"crossref","unstructured":"Back T (1996) Evolutionary algorithms in theory and practice. Oxford University Press,\u00a0New York","DOI":"10.1093\/oso\/9780195099713.003.0007"},{"issue":"2","key":"415_CR6","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"J Bean","year":"1994","unstructured":"Bean J (1994) Genetics and random keys for sequencing and optimization. ORSA J Comput 6(2):154\u2013160","journal-title":"ORSA J Comput"},{"key":"415_CR7","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J Blazewicz","year":"1983","unstructured":"Blazewicz J, Lenstra JK, Rinnooy Kan AHG (1983) Scheduling subject to resource constraints: classification and complexity. Discret Appl Math 5:11\u201324","journal-title":"Discret Appl Math"},{"issue":"6","key":"415_CR8","doi-asserted-by":"publisher","first-page":"646","DOI":"10.1109\/TEVC.2006.872133","volume":"10","author":"J Brest","year":"2006","unstructured":"Brest J, Greiner S, Boskovic B, Mernik M, Zumer V (2006) Self-adapting control parameters in differential evolution: a comparative study on numerical benchmark problems. IEEE Trans Evol Comput 10(6):646\u2013657","journal-title":"IEEE Trans Evol Comput"},{"key":"415_CR9","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker P, Drexl A, Mohring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112:3\u201341","journal-title":"Eur J Oper Res"},{"key":"415_CR10","unstructured":"Caramia M, Dell\u2019 Olmo P (2006) Effective resource management in manufacturing systems: optimization algorithms for production planning,\u00a0Chapter 3. Springer-Verlag, London,\u00a0pp 65\u2013103"},{"key":"415_CR11","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1061\/(ASCE)0733-9364(1996)122:2(125)","volume":"122","author":"WT Chan","year":"1996","unstructured":"Chan WT, Chua DK, Kannan G (1996) Construction resource scheduling with genetic algorithms. J Constr Eng Manage 122:125\u2013132","journal-title":"J Constr Eng Manage"},{"key":"415_CR12","doi-asserted-by":"publisher","first-page":"389","DOI":"10.1007\/978-3-319-05443-8_18","volume-title":"Handbook on project management and scheduling: 1","author":"S Christodoulou","year":"2015","unstructured":"Christodoulou S, Michaelidou-Kamenou A, Ellinas G (2015) Heuristic methods for resource leveling problems C. In: Schwindt, Zimmermann J (eds) Handbook on project management and scheduling: 1. Springer, Switzerland, pp 389\u2013407"},{"key":"415_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.swevo.2016.01.004","volume":"27","author":"S Das","year":"2016","unstructured":"Das S, Mullick SS, Suganthan PN (2016) Recent advances in differential evolution-an updated survey. Swarm Evol Comput 27:1\u201330","journal-title":"Swarm Evol Comput"},{"key":"415_CR14","unstructured":"Deb K (2001) Multi-objective optimization using evolutionary algorithms, Wiley-Interscience Series in Systems and Optimization.\u00a0Wiley\u00a0Publisher"},{"issue":"2","key":"415_CR15","doi-asserted-by":"publisher","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K Deb","year":"2002","unstructured":"Deb K, Pratap A, Agarwal S, Meyarivan T (2002) A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans Evol Comput 6(2):182\u2013197","journal-title":"IEEE Trans Evol Comput"},{"key":"415_CR16","doi-asserted-by":"publisher","unstructured":"Dorigo M, St\u00fctzle T (2004) Ant colony optimization. MIT Press.\u00a0https:\/\/doi.org\/10.7551\/mitpress\/1290.001.0001","DOI":"10.7551\/mitpress\/1290.001.0001"},{"issue":"11","key":"415_CR17","doi-asserted-by":"publisher","first-page":"1172","DOI":"10.1061\/(ASCE)CO.1943-7862.0000097","volume":"135","author":"K El-Rayes","year":"2009","unstructured":"El-Rayes K, Jun DH (2009) Optimizing resource leveling in construction projects. J Constr Eng Manage 135(11):1172\u20131180","journal-title":"J Constr Eng Manage"},{"issue":"2","key":"415_CR18","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1177\/003754970107600201","volume":"76","author":"ZW Geem","year":"2001","unstructured":"Geem ZW, Kim JH, Loganathan GV (2001) A new heuristic optimization algorithm: harmony search. Simulation 76(2):60\u201368","journal-title":"Simulation"},{"key":"415_CR19","doi-asserted-by":"publisher","first-page":"2300","DOI":"10.1016\/j.camwa.2010.09.058","volume":"61","author":"JQ Geng","year":"2011","unstructured":"Geng JQ, Weng LP, Liu SH (2011) An improved ant colony optimization algorithm for nonlinear resource-leveling problems. Comput Math Appl 61:2300\u20132305","journal-title":"Comput Math Appl"},{"key":"415_CR20","doi-asserted-by":"publisher","first-page":"573","DOI":"10.1016\/j.autcon.2007.10.005","volume":"17","author":"ME Georgy","year":"2008","unstructured":"Georgy ME (2008) Evolutionary resource scheduler for linear projects. Autom Constr 17:573\u2013583","journal-title":"Autom Constr"},{"issue":"1","key":"415_CR21","first-page":"119","volume":"29","author":"N Giannopoulos","year":"2018","unstructured":"Giannopoulos N, Nearchou AC (2018) Bi-criteria scheduling against restrictive common due dates using a multi-objective differential evolution algorithm. IMA J Manag Math 29(1):119\u2013136","journal-title":"IMA J Manag Math"},{"issue":"5","key":"415_CR22","doi-asserted-by":"publisher","first-page":"533","DOI":"10.1016\/0305-0548(86)90048-1","volume":"13","author":"F Glover","year":"1986","unstructured":"Glover F (1986) Future paths for integer programming and links to artificial intelligence. Comput Oper Res 13(5):533\u2013549","journal-title":"Comput Oper Res"},{"issue":"3","key":"415_CR23","first-page":"653","volume":"29","author":"F Glover","year":"2000","unstructured":"Glover F, Laguna M, Marti R (2000) Fundamentals of scatter search and path relinking. Control Cybern 29(3):653\u2013684","journal-title":"Control Cybern"},{"issue":"2","key":"415_CR24","doi-asserted-by":"publisher","first-page":"55","DOI":"10.5267\/j.jpm.2018.1.005","volume":"3","author":"F Habibi","year":"2018","unstructured":"Habibi F, Barzinpour F, Sadjadi S (2018) Resource-constrained project scheduling problem: review of past and recent developments. J Project Manage 3(2):55\u201388","journal-title":"J Project Manage"},{"key":"415_CR25","doi-asserted-by":"publisher","first-page":"449","DOI":"10.1016\/S0377-2217(00)00100-4","volume":"130","author":"E Hansen","year":"2001","unstructured":"Hansen E, Mladenovic N (2001) Variable neighborhood search: Principles and applications. Eur J Oper Res 130:449\u2013467","journal-title":"Eur J Oper Res"},{"key":"415_CR26","doi-asserted-by":"publisher","first-page":"367","DOI":"10.1007\/s10479-009-0657-6","volume":"175","author":"P Hansen","year":"2010","unstructured":"Hansen P, Mladenovi\u0107 N, Perez JAM (2010) Variable neighbourhood search: methods and applications. Ann Oper Res 175:367\u2013407","journal-title":"Ann Oper Res"},{"key":"415_CR27","doi-asserted-by":"publisher","first-page":"56","DOI":"10.1061\/(ASCE)CO.1943-7862.0000251","volume":"137","author":"M Hariga","year":"2011","unstructured":"Hariga M, El-Sayegh S (2011) Cost optimization for the multi-resource leveling problem with allowed activity splitting. J Constr Eng Manage 137:56\u201364","journal-title":"J Constr Eng Manage"},{"key":"415_CR28","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207:1\u201314","journal-title":"Eur J Oper Res"},{"issue":"1","key":"415_CR29","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2021.05.004","volume":"297","author":"S Hartmann","year":"2022","unstructured":"Hartmann S, Briskorn D (2022) An updated survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 297(1):1\u201314","journal-title":"Eur J Oper Res"},{"key":"415_CR30","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(167)","volume":"125","author":"T Hegazy","year":"1999","unstructured":"Hegazy T (1999) Optimization of resource allocation and leveling using genetic algorithms. J Constr Eng Manage 125:167\u2013175","journal-title":"J Constr Eng Manage"},{"issue":"4","key":"415_CR31","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","volume":"25","author":"W Herroelen","year":"1998","unstructured":"Herroelen W, De Reyck B, Demeulemmester E (1998) Resource constrained project scheduling: a survey of recent developments. Comput Oper Res 25(4):279\u2013302","journal-title":"Comput Oper Res"},{"key":"415_CR32","unstructured":"Holland JH (1975) Adaptation in natural and artificial systems: an introductory analysis with application to biology, control and artificial intelligence. University of Michigan Press, Ann Arbor"},{"key":"415_CR33","doi-asserted-by":"publisher","first-page":"1916","DOI":"10.4304\/jcp.5.12.1916-1924","volume":"5","author":"JW Huang","year":"2010","unstructured":"Huang JW, Wang XX, Chen R (2010) Genetic algorithms for optimization of resource allocation in large scale construction project management. J Comput 5:1916\u20131924","journal-title":"J Comput"},{"key":"415_CR34","doi-asserted-by":"publisher","unstructured":"Kennedy J, Eberhart R (1995) Particle Swarm Optimization. In: Proceedings of ICNN'95 - International Conference on Neural Networks, Perth, WA, vol 4, pp 1942-1948.\u00a0https:\/\/doi.org\/10.1109\/ICNN.1995.488968","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"4598","key":"415_CR35","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick S, Gelatt CD Jr, Vecchi MP (1983) Optimization by simulated annealing. Science 220(4598):671\u2013680","journal-title":"Science"},{"issue":"2","key":"415_CR36","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1162\/106365600568167","volume":"8","author":"JD Knowles","year":"2000","unstructured":"Knowles JD, Corne DW (2000) Approximating the nondominated front using the pareto archived evolution strategy. Evol Comput 8(2):149\u2013172","journal-title":"Evol Comput"},{"key":"415_CR37","doi-asserted-by":"crossref","unstructured":"Kolisch R, Schwindt C, Sprecher A (1999) Benchmark instances for project scheduling problems. In: Weglarz J (ed) Project Scheduling. International Series in Operations Research & Management Science, vol 14. Springer, Boston, pp 197\u2013212","DOI":"10.1007\/978-1-4615-5533-9_9"},{"key":"415_CR38","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1016\/j.autcon.2012.11.002","volume":"31","author":"GK Koulinas","year":"2013","unstructured":"Koulinas GK, Anagnostopoulos KP (2013) A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities. Autom Constr 31:169\u2013175","journal-title":"Autom Constr"},{"key":"415_CR39","doi-asserted-by":"publisher","first-page":"173","DOI":"10.3233\/ICA-150508","volume":"23","author":"C Kyriklidis","year":"2016","unstructured":"Kyriklidis C, Dounias G (2016) Evolutionary computation for resource leveling optimization in project management. Integr Comput-Aided Eng 23:173\u2013184","journal-title":"Integr Comput-Aided Eng"},{"issue":"3","key":"415_CR40","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1007\/s12351-014-0145-x","volume":"14","author":"C Kyriklidis","year":"2014","unstructured":"Kyriklidis C, Vassiliadis V, Kirytopoulos K, Dounias G (2014) Hybrid nature inspired intelligence for the resource leveling problem. Oper Res Int J 14(3):387\u2013407","journal-title":"Oper Res Int J"},{"issue":"2","key":"415_CR41","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1139\/l02-007","volume":"29","author":"SS Leu","year":"2002","unstructured":"Leu SS, Hung TH (2002) An optimal construction resource leveling scheduling simulation model. Can J Civ Eng 29(2):267\u2013275","journal-title":"Can J Civ Eng"},{"issue":"6","key":"415_CR42","doi-asserted-by":"publisher","first-page":"673","DOI":"10.1139\/l99-028","volume":"26","author":"SS Leu","year":"1999","unstructured":"Leu SS, Chen AT, Yang CH (1999) A fuzzy optimal model for construction resource leveling scheduling. Can J Civ Eng 26(6):673\u2013684","journal-title":"Can J Civ Eng"},{"key":"415_CR43","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1016\/S0926-5805(99)00011-4","volume":"10","author":"S-S Leu","year":"2000","unstructured":"Leu S-S, Yang C-H, Huang J-C (2000) Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Autom Constr 10:27\u201341","journal-title":"Autom Constr"},{"key":"415_CR44","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1007\/s10951-015-0457-6","volume":"19","author":"H Li","year":"2016","unstructured":"Li H, Demeulemeester E (2016) A genetic algorithm for the robust resource leveling problem. J Sched 19:43\u201360","journal-title":"J Sched"},{"issue":"5","key":"415_CR45","doi-asserted-by":"publisher","first-page":"2054","DOI":"10.1080\/00207543.2017.1355120","volume":"56","author":"H Li","year":"2018","unstructured":"Li H, Li X, Liu Y, Li H (2018) An effective genetic algorithm for the resource levelling problem with generalised precedence relations. Int J Prod Res 56(5):2054\u20132075","journal-title":"Int J Prod Res"},{"key":"415_CR46","doi-asserted-by":"publisher","first-page":"491","DOI":"10.1016\/j.autcon.2010.12.006","volume":"20","author":"TW Liao","year":"2011","unstructured":"Liao TW, Egbelu PJ, Sarker BR, Leu SS (2011) Metaheuristics for project and construction management\u2013a state-of-the-art review. Autom Constr 20:491\u2013505","journal-title":"Autom Constr"},{"key":"415_CR47","doi-asserted-by":"crossref","unstructured":"Louren\u00e7o HR, Martin O, St\u00fctzle T (2010) Iterated local search: framework and applications. Handbook of Metaheuristics, 2nd. Edition. Kluwer Academic Publishers, International Series in Operations Research & Management Science. 146 pp. 363\u2013397","DOI":"10.1007\/978-1-4419-1665-5_12"},{"issue":"1","key":"415_CR48","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1016\/j.engappai.2012.07.012","volume":"26","author":"M Masmoudi","year":"2013","unstructured":"Masmoudi M, Ha\u00eft A (2013) Project scheduling under uncertainty using fuzzy modelling and solving techniques. Eng Appl Artif Intell 26(1):135\u2013149","journal-title":"Eng Appl Artif Intell"},{"key":"415_CR49","doi-asserted-by":"crossref","unstructured":"Michalewicz Z (1996) Genetic algorithms + data structures = evolution programs, 3rd Edition, Springer-Verlag, Berlin","DOI":"10.1007\/978-3-662-03315-9"},{"key":"415_CR50","doi-asserted-by":"publisher","unstructured":"Mladenovic N, Hansen E (1997) Variable neighborhood search. Comput Oper Res 24(11):1097\u20131100. https:\/\/doi.org\/10.1007\/978-3-662-03315-9","DOI":"10.1007\/978-3-662-03315-9"},{"issue":"8","key":"415_CR51","doi-asserted-by":"publisher","first-page":"651","DOI":"10.1080\/01969722.2012.717853","volume":"43","author":"AC Nearchou","year":"2012","unstructured":"Nearchou AC (2012) A hybrid metaheuristic for the single-machine total weighted tardiness problem. Cybern Syst 43(8):651\u2013668","journal-title":"Cybern Syst"},{"key":"415_CR52","doi-asserted-by":"publisher","first-page":"817","DOI":"10.1007\/s10732-018-9378-9","volume":"24","author":"AC Nearchou","year":"2018","unstructured":"Nearchou AC (2018) Multicriteria scheduling optimization using an elitist multiobjective population heuristic: the h-NSDE algorithm. J Heuristics 24:817\u2013851","journal-title":"J Heuristics"},{"issue":"3","key":"415_CR53","doi-asserted-by":"publisher","first-page":"591","DOI":"10.1016\/S0377-2217(98)00272-0","volume":"117","author":"K Neumann","year":"1999","unstructured":"Neumann K, Zimmermann J (1999) Resource leveling for projects with schedule-dependent time windows. Eur J Oper Res 117(3):591\u2013605","journal-title":"Eur J Oper Res"},{"key":"415_CR54","doi-asserted-by":"publisher","unstructured":"Neumann K, Schwindt C, Zimmermann J (2003) Project scheduling with time windows and scarce resources. Springer, Berlin.\u00a0https:\/\/doi.org\/10.1007\/978-3-540-24800-2","DOI":"10.1007\/978-3-540-24800-2"},{"issue":"2","key":"415_CR55","doi-asserted-by":"publisher","first-page":"395","DOI":"10.1016\/j.ejor.2019.01.063","volume":"280","author":"R Pellerin","year":"2020","unstructured":"Pellerin R, Perrier N, Berthaut F (2020) A survey of hybrid metaheuristics for the resource-constrained project scheduling problem. Eur J Oper Res 280(2):395\u2013416","journal-title":"Eur J Oper Res"},{"key":"415_CR56","doi-asserted-by":"publisher","first-page":"82","DOI":"10.1016\/j.autcon.2017.01.018","volume":"77","author":"JL Ponz-Tienda","year":"2017","unstructured":"Ponz-Tienda JL, Salcedo-Bernal A, Pellicer E, Benlloch-Marco J (2017) Improved Adaptive Harmony Search algorithm for the resource leveling problem with minimal lags. Autom Constr 77:82\u201392","journal-title":"Autom Constr"},{"key":"415_CR57","doi-asserted-by":"publisher","unstructured":"Price K, Storn RM, Lampinen JA (2005) Differential evolution: a practical approach to global optimization. Springer.\u00a0https:\/\/doi.org\/10.1007\/3-540-31306-0","DOI":"10.1007\/3-540-31306-0"},{"key":"415_CR58","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"AAB Pritsker","year":"1969","unstructured":"Pritsker AAB, Watters LJ, Wolfe PM (1969) Multiproject scheduling with limited resources: A zero-one programming approach. Manage Sci 16:93\u2013107","journal-title":"Manage Sci"},{"issue":"5","key":"415_CR59","doi-asserted-by":"publisher","first-page":"317","DOI":"10.3844\/ajassp.2007.317.322","volume":"4","author":"K Raja","year":"2007","unstructured":"Raja K, Kumanan S (2007) Resource leveling using Petrinet and memetic approach. Am J Appl Sci 4(5):317\u2013322","journal-title":"Am J Appl Sci"},{"issue":"7","key":"415_CR60","doi-asserted-by":"publisher","first-page":"1071","DOI":"10.1057\/jors.2012.119","volume":"64","author":"M Ranjbar","year":"2013","unstructured":"Ranjbar M (2013) A path-relinking metaheuristic for the resource levelling problem. J Oper Res Soc 64(7):1071\u20131078","journal-title":"J Oper Res Soc"},{"key":"415_CR61","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1007\/978-3-319-05443-8_17","volume-title":"Handbook on project management and scheduling: 1","author":"J Rieck","year":"2015","unstructured":"Rieck J, Zimmermann J (2015) Exact methods for resource leveling problems C. In: Schwindt, Zimmermann J (eds) Handbook on project management and scheduling: 1. Springer, Switzerland, pp 361\u2013387"},{"key":"415_CR62","doi-asserted-by":"publisher","first-page":"869","DOI":"10.1061\/(ASCE)0733-9364(2004)130:6(869)","volume":"130","author":"AB Senouci","year":"2004","unstructured":"Senouci AB, Eldin NN (2004) Use of genetic algorithms in resource scheduling of construction projects. J Constr Eng Manage 130:869\u2013877","journal-title":"J Constr Eng Manage"},{"key":"415_CR63","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(23)","volume":"125","author":"J Son","year":"1999","unstructured":"Son J, Skibniewski MJ (1999) Multiheuristic approach for resource leveling problem in construction engineering: hybrid approach. J Constr Eng Manage 125:23\u201331","journal-title":"J Constr Eng Manage"},{"key":"415_CR64","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1023\/A:1008202821328","volume":"11","author":"R Storn","year":"1997","unstructured":"Storn R, Price K (1997) Differential evolution \u2013 a simple and efficient heuristic for global optimization over continues spaces. J Global Optim 11:241\u2013354","journal-title":"J Global Optim"},{"key":"415_CR65","unstructured":"Zitzler E, Laumanns M, Thiele L (2001) SPEA2: improving the strength Pareto evolutionary algorithm for multiobjective optimization. In: Evolutionary Methods for Design, Optimisation and Control with Application to Industrial Problems. Proceedings of the EUROGEN\u20192001. Athens, September 19-21"}],"container-title":["Operations Research Forum"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-025-00415-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s43069-025-00415-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-025-00415-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,4,1]],"date-time":"2025-04-01T06:46:22Z","timestamp":1743489982000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s43069-025-00415-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,1,20]]},"references-count":65,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2025,3]]}},"alternative-id":["415"],"URL":"https:\/\/doi.org\/10.1007\/s43069-025-00415-2","relation":{},"ISSN":["2662-2556"],"issn-type":[{"type":"electronic","value":"2662-2556"}],"subject":[],"published":{"date-parts":[[2025,1,20]]},"assertion":[{"value":"18 May 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 January 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 January 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of Interest"}}],"article-number":"18"}}