{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,19]],"date-time":"2026-03-19T12:50:38Z","timestamp":1773924638866,"version":"3.50.1"},"reference-count":36,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2025,12,3]],"date-time":"2025-12-03T00:00:00Z","timestamp":1764720000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,12,3]],"date-time":"2025-12-03T00:00:00Z","timestamp":1764720000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper. Res. Forum"],"DOI":"10.1007\/s43069-025-00542-w","type":"journal-article","created":{"date-parts":[[2025,12,3]],"date-time":"2025-12-03T10:46:15Z","timestamp":1764758775000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Identification and prioritization of applications of building information modelling using an integrated BWM-VIKOR approach under rough set theory: A study of construction projects"],"prefix":"10.1007","volume":"6","author":[{"given":"Alireza","family":"Aminrad","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. Mohammad","family":"Mirhosseini","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohammad","family":"Ehsanifar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ehsanollah","family":"Zeighami","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2025,12,3]]},"reference":[{"key":"542_CR1","first-page":"148","volume":"19","author":"J Wang","year":"2004","unstructured":"Wang J, Liu E-L, Luo G (2004) Alalysis of time-cost-quality tradeoff optimization in construction project management. Xitong Gongcheng Xuebao 19:148\u2013153","journal-title":"Xitong Gongcheng Xuebao"},{"key":"542_CR2","unstructured":"BANIHASHEMI, S., E. Shourangiz, and M.S. Hassanabadi, Flexibility of BIM towards Design Change, in Construction and Project Management, ICCPM 2011. 2011, IACSIT Press. p. 79-83."},{"issue":"6","key":"542_CR3","doi-asserted-by":"publisher","first-page":"811","DOI":"10.1108\/IJPPM-10-2013-0169","volume":"64","author":"P Ghoddousi","year":"2015","unstructured":"Ghoddousi P et al (2015) Labour productivity in Iranian construction projects: perceptions of chief executive officers. Int J Prod Perform Manag 64(6):811\u2013830","journal-title":"Int J Prod Perform Manag"},{"key":"542_CR4","unstructured":"Eastman, C.M., BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. 2011: John Wiley & Sons."},{"issue":"1","key":"542_CR5","doi-asserted-by":"publisher","first-page":"04014025","DOI":"10.1061\/(ASCE)CP.1943-5487.0000205","volume":"29","author":"M Golparvar-Fard","year":"2015","unstructured":"Golparvar-Fard M, Pena-Mora F, Savarese S (2015) Automated progress monitoring using unordered daily construction photographs and IFC-based building information models. J Comput Civ Eng 29(1):04014025","journal-title":"J Comput Civ Eng"},{"key":"542_CR6","doi-asserted-by":"publisher","DOI":"10.32738\/JEPPM.201607.0002","author":"MR Hosseini","year":"2016","unstructured":"Hosseini MR et al (2016) Building information modeling (BIM) in Iran: an exploratory study. Journal of Engineering, Project & Production Management. https:\/\/doi.org\/10.32738\/JEPPM.201607.0002","journal-title":"Journal of Engineering, Project & Production Management"},{"key":"542_CR7","doi-asserted-by":"crossref","unstructured":"Aboushady, A. and M. Elbarkouky, Overview of building information modeling applications in construction projects, in AEI 2015. 2015. p. 445-456.","DOI":"10.1061\/9780784479070.039"},{"issue":"5","key":"542_CR8","doi-asserted-by":"publisher","first-page":"764","DOI":"10.3846\/20294913.2015.1087071","volume":"23","author":"C Sun","year":"2017","unstructured":"Sun C et al (2017) A literature review of the factors limiting the application of BIM in the construction industry. Technol Econ Dev Econ 23(5):764\u2013779","journal-title":"Technol Econ Dev Econ"},{"issue":"3","key":"542_CR9","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127","volume":"11","author":"S Azhar","year":"2011","unstructured":"Azhar S (2011) Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh Manag Eng 11(3):241\u2013252","journal-title":"Leadersh Manag Eng"},{"issue":"11","key":"542_CR10","doi-asserted-by":"publisher","first-page":"264","DOI":"10.3390\/sym9110264","volume":"9","author":"\u017d Stevi\u0107","year":"2017","unstructured":"Stevi\u0107 \u017d et al (2017) The selection of wagons for the internal transport of a logistics company: a novel approach based on rough BWM and rough SAW methods. Symmetry 9(11):264","journal-title":"Symmetry"},{"key":"542_CR11","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/j.ins.2022.04.040","volume":"603","author":"G Huang","year":"2022","unstructured":"Huang G et al (2022) Design alternative assessment and selection: a novel Z-cloud rough number-based BWM-MABAC model. Inf Sci 603:149\u2013189","journal-title":"Inf Sci"},{"key":"542_CR12","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107414","volume":"107","author":"J Qi","year":"2021","unstructured":"Qi J, Hu J, Peng Y (2021) Modified rough VIKOR based design concept evaluation method compatible with objective design and subjective preference factors. Appl Soft Comput 107:107414","journal-title":"Appl Soft Comput"},{"issue":"5","key":"542_CR13","first-page":"91","volume":"9","author":"I Kiani","year":"2015","unstructured":"Kiani I et al (2015) Barriers to implementation of building information modeling in scheduling and planning phase in Iran. Aust J Basic Appl Sci 9(5):91\u201397","journal-title":"Aust J Basic Appl Sci"},{"issue":"4","key":"542_CR14","first-page":"305","volume":"20","author":"M Khanzadi","year":"2020","unstructured":"Khanzadi M, Sheikhkhoshkar M, Banihashemi S (2020) BIM applications toward key performance indicators of construction projects in Iran. Int J Constr Manag 20(4):305\u2013320","journal-title":"Int J Constr Manag"},{"issue":"1","key":"542_CR15","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1016\/j.ijproman.2013.01.009","volume":"32","author":"X Zhang","year":"2014","unstructured":"Zhang X et al (2014) A prototype system dynamic model for assessing the sustainability of construction projects. Int J Proj Manag 32(1):66\u201376","journal-title":"Int J Proj Manag"},{"issue":"2","key":"542_CR16","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1108\/14635770410532624","volume":"11","author":"AP Chan","year":"2004","unstructured":"Chan AP, Chan AP (2004) Key performance indicators for measuring construction success. Benchmarking Int J 11(2):203\u2013221","journal-title":"Benchmarking Int J"},{"key":"542_CR17","doi-asserted-by":"crossref","unstructured":"Anjomshoa, E., The application of building information modeling (BIM) system in the smartification of green and sustainable buildings. Engineering, Construction and Architectural Management, 2024.","DOI":"10.1108\/ECAM-03-2024-0291"},{"issue":"3","key":"542_CR18","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1108\/17538370910971063","volume":"2","author":"G Aranda Mena","year":"2009","unstructured":"Aranda Mena G et al (2009) Building information modelling demystified: does it make business sense to adopt BIM? Int J Manag Proj Bus 2(3):419\u2013434","journal-title":"Int J Manag Proj Bus"},{"issue":"1","key":"542_CR19","first-page":"287","volume":"23","author":"AM Farouk","year":"2025","unstructured":"Farouk AM, Rahman RA (2025) Integrated applications of building information modeling in project cost management: a systematic review. J Eng Des Technol 23(1):287\u2013305","journal-title":"J Eng Des Technol"},{"issue":"2","key":"542_CR20","doi-asserted-by":"publisher","first-page":"847","DOI":"10.1108\/ECAM-04-2023-0335","volume":"32","author":"N Hatami","year":"2025","unstructured":"Hatami N, Rashidi A (2025) Enhancing the adoption of building information modeling in the Iranian AEC sector: insights from a Delphi study. Eng Constr Archit Manage 32(2):847\u2013869","journal-title":"Eng Constr Archit Manage"},{"issue":"4","key":"542_CR21","doi-asserted-by":"publisher","first-page":"04025019","DOI":"10.1061\/JCEMD4.COENG-15856","volume":"151","author":"Z Liu","year":"2025","unstructured":"Liu Z et al (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. J Constr Eng Manag 151(4):04025019","journal-title":"J Constr Eng Manag"},{"issue":"5","key":"542_CR22","doi-asserted-by":"publisher","first-page":"4035","DOI":"10.3390\/su15054035","volume":"15","author":"SMH Zakeri","year":"2023","unstructured":"Zakeri SMH et al (2023) Developing an MCDM model for the benefits, opportunities, costs and risks of BIM adoption. Sustainability 15(5):4035","journal-title":"Sustainability"},{"issue":"12","key":"542_CR23","first-page":"2077","volume":"23","author":"H Bapat","year":"2023","unstructured":"Bapat H, Sarkar D, Gujar R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. Int J Constr Manag 23(12):2077\u20132086","journal-title":"Int J Constr Manag"},{"issue":"15","key":"542_CR24","doi-asserted-by":"publisher","first-page":"9537","DOI":"10.3390\/su14159537","volume":"14","author":"S Tan","year":"2022","unstructured":"Tan S et al (2022) Modeling the critical success factors for BIM implementation in developing countries: sampling the Turkish AEC industry. Sustainability 14(15):9537","journal-title":"Sustainability"},{"issue":"12","key":"542_CR25","doi-asserted-by":"publisher","first-page":"293","DOI":"10.1016\/j.asej.2020.06.006","volume":"1","author":"A Haruna","year":"2021","unstructured":"Haruna A, Shafiq N, Montasir O (2021) Building information modelling application for developing sustainable building (multi criteria decision making approach). Ain Shams Eng J 1(12):293\u2013302","journal-title":"Ain Shams Eng J"},{"issue":"7","key":"542_CR26","doi-asserted-by":"publisher","first-page":"311","DOI":"10.3390\/buildings11070311","volume":"11","author":"T Patel","year":"2021","unstructured":"Patel T et al (2021) Identification of critical success factors (CSFs) of BIM software selection: a combined approach of FCM and fuzzy DEMATEL. Buildings 11(7):311","journal-title":"Buildings"},{"key":"542_CR27","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2021.103117","volume":"43","author":"S Tabatabaee","year":"2021","unstructured":"Tabatabaee S, Mahdiyar A, Ismail S (2021) Towards the success of building information modelling implementation: a fuzzy-based MCDM risk assessment tool. J Build Eng 43:p. 103117","journal-title":"J Build Eng"},{"key":"542_CR28","doi-asserted-by":"crossref","unstructured":"Pawlak, Z., Rough set theory and its applications. Journal of Telecommunications and information technology, 2002: p. 7-10.","DOI":"10.26636\/jtit.2002.140"},{"key":"542_CR29","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1016\/j.omega.2014.11.009","volume":"53","author":"J Rezaei","year":"2015","unstructured":"Rezaei J (2015) Best-worst multi-criteria decision-making method. Omega 53:49\u201357","journal-title":"Omega"},{"issue":"2","key":"542_CR30","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1016\/S0377-2217(03)00020-1","volume":"156","author":"S Opricovic","year":"2004","unstructured":"Opricovic S, Tzeng GH (2004) Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS. Eur J Oper Res 156(2):445\u2013455","journal-title":"Eur J Oper Res"},{"issue":"2","key":"542_CR31","doi-asserted-by":"publisher","first-page":"1529","DOI":"10.1007\/s10668-018-0261-5","volume":"22","author":"CP Garg","year":"2020","unstructured":"Garg CP, Sharma A (2020) Sustainable outsourcing partner selection and evaluation using an integrated BWM\u2013VIKOR framework. Environ Dev Sustain 22(2):1529\u20131557","journal-title":"Environ Dev Sustain"},{"key":"542_CR32","doi-asserted-by":"publisher","DOI":"10.1007\/s12652-024-04870-3","author":"K Debnath","year":"2025","unstructured":"Debnath K et al (2025) An integrated decision-making approach using best-worst method and VIKOR in uncertain environment. J Ambient Intell Humaniz Comput. https:\/\/doi.org\/10.1007\/s12652-024-04870-3","journal-title":"J Ambient Intell Humaniz Comput"},{"issue":"3","key":"542_CR33","doi-asserted-by":"publisher","first-page":"233","DOI":"10.5267\/j.dsl.2019.3.001","volume":"8","author":"A Parhizgarsharif","year":"2019","unstructured":"Parhizgarsharif A, Lork A, Telvari A (2019) A hybrid approach based on the BWM-VIKOR and GRA for ranking facility location in construction site layout for Mehr project in Tehran. Decis Sci Lett 8(3):233\u2013248","journal-title":"Decis Sci Lett"},{"issue":"70","key":"542_CR34","first-page":"65","volume":"24","author":"M Sabet Motlagh","year":"2018","unstructured":"Sabet Motlagh M (2018) Applying Concept of Rough Set Theory with Multi-Criteria Decision-Making Methods to Evaluate and Select the Most Appropriate Maintenance Strategy. Strategic Management Researches 24(70):65\u201389","journal-title":"Strategic Management Researches"},{"key":"542_CR35","doi-asserted-by":"crossref","unstructured":"Haqbin, A., P. Shojaei, and S. Radmanesh, Prioritising COVID-19 recovery solutions for tourism small and medium-sized enterprises: A rough best-worst method approach. Journal of Decision Systems (2-1)31, 102-115.","DOI":"10.1080\/12460125.2021.1927487"},{"issue":"1","key":"542_CR36","doi-asserted-by":"publisher","first-page":"16","DOI":"10.1016\/j.aei.2015.11.005","volume":"30","author":"V Tiwari","year":"2016","unstructured":"Tiwari V, Jain PK, Tandon P (2016) Product design concept evaluation using rough sets and VIKOR method. Adv Eng Inform 30(1):16\u201325","journal-title":"Adv Eng Inform"}],"container-title":["Operations Research Forum"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-025-00542-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s43069-025-00542-w","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s43069-025-00542-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,1,14]],"date-time":"2026-01-14T11:29:23Z","timestamp":1768390163000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s43069-025-00542-w"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,12,3]]},"references-count":36,"journal-issue":{"issue":"4","published-online":{"date-parts":[[2025,12]]}},"alternative-id":["542"],"URL":"https:\/\/doi.org\/10.1007\/s43069-025-00542-w","relation":{},"ISSN":["2662-2556"],"issn-type":[{"value":"2662-2556","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,12,3]]},"assertion":[{"value":"11 December 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 August 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 December 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interests"}}],"article-number":"169"}}