{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,11]],"date-time":"2025-09-11T05:53:16Z","timestamp":1757569996031,"version":"3.41.0"},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2025,7,1]],"date-time":"2025-07-01T00:00:00Z","timestamp":1751328000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0"},{"start":{"date-parts":[[2025,7,1]],"date-time":"2025-07-01T00:00:00Z","timestamp":1751328000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Comput Intell Syst"],"DOI":"10.1007\/s44196-025-00898-1","type":"journal-article","created":{"date-parts":[[2025,7,1]],"date-time":"2025-07-01T16:09:28Z","timestamp":1751386168000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Construction Scheduling Optimization of Prefabricated Buildings Under Resource Constraints Based on an Improved Whale Optimization Algorithm"],"prefix":"10.1007","volume":"18","author":[{"given":"Rui","family":"Su","sequence":"first","affiliation":[]},{"given":"Joey S.","family":"Aviles","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2025,7,1]]},"reference":[{"key":"898_CR1","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2021.103555","volume":"124","author":"L-K Chen","year":"2021","unstructured":"Chen, L.-K., Yuan, R.-P., Ji, X.-J., Lu, X.-Y., Xiao, J., Tao, J.-B., Kang, X., Li, X., He, Z.-H., Quan, S., et al.: Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of wuhan thunder god mountain\/leishenshan hospital to covid-19 pandemic. Autom. Constr. 124, 103555 (2021)","journal-title":"Autom. Constr."},{"key":"898_CR2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.118861","volume":"245","author":"Z Xu","year":"2020","unstructured":"Xu, Z., Zayed, T., Niu, Y.: Comparative analysis of modular construction practices in mainland china, hong kong and singapore. J. Clean. Prod. 245, 118861 (2020)","journal-title":"J. Clean. Prod."},{"key":"898_CR3","doi-asserted-by":"publisher","first-page":"240","DOI":"10.1016\/j.habitatint.2014.04.001","volume":"43","author":"Z Li","year":"2014","unstructured":"Li, Z., Shen, G.Q., Xue, X.: Critical review of the research on the management of prefabricated construction. Habitat Int. 43, 240\u2013249 (2014)","journal-title":"Habitat Int."},{"issue":"2","key":"898_CR4","doi-asserted-by":"publisher","first-page":"114","DOI":"10.1061\/(ASCE)AE.1943-5568.0000055","volume":"18","author":"A Alvanchi","year":"2012","unstructured":"Alvanchi, A., Azimi, R., Lee, S., AbouRizk, S.M., Zubick, P.: Off-site construction planning using discrete event simulation. J. Archit. Eng. 18(2), 114\u2013122 (2012)","journal-title":"J. Archit. Eng."},{"issue":"1","key":"898_CR5","doi-asserted-by":"publisher","first-page":"04018116","DOI":"10.1061\/(ASCE)CO.1943-7862.0001585","volume":"145","author":"J Lee","year":"2019","unstructured":"Lee, J., Hyun, H.: Multiple modular building construction project scheduling using genetic algorithms. J. Constr. Eng. Manag. 145(1), 04018116 (2019)","journal-title":"J. Constr. Eng. Manag."},{"issue":"3","key":"898_CR6","first-page":"68","volume":"12","author":"HA Ba\u2019Its","year":"2020","unstructured":"Ba\u2019Its, H.A., Puspita, I.A., Bay, A.F.: Combination of program evaluation and review technique (pert) and critical path method (cpm) for project schedule development. Int. J. Integr. Eng. 12(3), 68\u201375 (2020)","journal-title":"Int. J. Integr. Eng."},{"issue":"5","key":"898_CR7","doi-asserted-by":"publisher","first-page":"04014082","DOI":"10.1061\/(ASCE)ME.1943-5479.0000323","volume":"31","author":"\u00d6H Bettemir","year":"2015","unstructured":"Bettemir, \u00d6.H., Sonmez, R.: Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling. J. Manag. Eng. 31(5), 04014082 (2015)","journal-title":"J. Manag. Eng."},{"issue":"1","key":"898_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2021.05.004","volume":"297","author":"S Hartmann","year":"2022","unstructured":"Hartmann, S., Briskorn, D.: An updated survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 297(1), 1\u201314 (2022)","journal-title":"Eur. J. Oper. Res."},{"key":"898_CR9","doi-asserted-by":"publisher","first-page":"88","DOI":"10.1016\/j.autcon.2013.10.002","volume":"37","author":"M-Y Cheng","year":"2014","unstructured":"Cheng, M.-Y., Tran, D.-H., Wu, Y.-W.: Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems. Autom. Constr. 37, 88\u201397 (2014)","journal-title":"Autom. Constr."},{"issue":"2","key":"898_CR10","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1061\/(ASCE)CP.1943-5487.0000262","volume":"28","author":"H Taghaddos","year":"2014","unstructured":"Taghaddos, H., Hermann, U., AbouRizk, S., Mohamed, Y.: Simulation-based multiagent approach for scheduling modular construction. J. Comput. Civ. Eng. 28(2), 263\u2013274 (2014)","journal-title":"J. Comput. Civ. Eng."},{"key":"898_CR11","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1016\/j.jclepro.2017.12.188","volume":"177","author":"Z Wang","year":"2018","unstructured":"Wang, Z., Hu, H., Gong, J.: Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention. J. Clean. Prod. 177, 232\u2013244 (2018)","journal-title":"J. Clean. Prod."},{"key":"898_CR12","unstructured":"Elmaghraby, S.E.: Activity networks: project planning and control by network models (1977)"},{"issue":"2","key":"898_CR13","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/j.ejor.2014.05.036","volume":"239","author":"A Naber","year":"2014","unstructured":"Naber, A., Kolisch, R.: Mip models for resource-constrained project scheduling with flexible resource profiles. Eur. J. Oper. Res. 239(2), 335\u2013348 (2014)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"898_CR14","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1016\/j.ejor.2017.03.006","volume":"262","author":"M Tritschler","year":"2017","unstructured":"Tritschler, M., Naber, A., Kolisch, R.: A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles. Eur. J. Oper. Res. 262(1), 262\u2013273 (2017)","journal-title":"Eur. J. Oper. Res."},{"key":"898_CR15","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.114475","volume":"168","author":"F Xie","year":"2021","unstructured":"Xie, F., Li, H., Xu, Z.: Multi-mode resource-constrained project scheduling with uncertain activity cost. Expert Syst. Appl. 168, 114475 (2021)","journal-title":"Expert Syst. Appl."},{"issue":"4","key":"898_CR16","doi-asserted-by":"publisher","first-page":"1136","DOI":"10.1108\/JM2-06-2023-0123","volume":"19","author":"S Hessami","year":"2024","unstructured":"Hessami, S., Davari-Ardakani, H., Javid, Y., Ameli, M.: Bi-objective optimization of a multi-mode, multi-site resource-constrained project scheduling problem. J. Model. Manag. 19(4), 1136\u20131154 (2024)","journal-title":"J. Model. Manag."},{"key":"898_CR17","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1007\/s00607-018-00693-1","volume":"101","author":"EB Tirkolaee","year":"2019","unstructured":"Tirkolaee, E.B., Goli, A., Hematian, M., Sangaiah, A.K., Han, T.: Multi-objective multi-mode resource constrained project scheduling problem using pareto-based algorithms. Computing 101, 547\u2013570 (2019)","journal-title":"Computing"},{"issue":"1","key":"898_CR18","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1007\/s11750-016-0415-2","volume":"25","author":"N Zoraghi","year":"2017","unstructured":"Zoraghi, N., Shahsavar, A., Abbasi, B., Van Peteghem, V.: Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies. TOP 25(1), 49\u201379 (2017)","journal-title":"TOP"},{"issue":"2","key":"898_CR19","doi-asserted-by":"publisher","first-page":"454","DOI":"10.1016\/j.ejor.2017.07.027","volume":"265","author":"RL Kadri","year":"2018","unstructured":"Kadri, R.L., Boctor, F.F.: An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case. Eur. J. Oper. Res. 265(2), 454\u2013462 (2018)","journal-title":"Eur. J. Oper. Res."},{"key":"898_CR20","doi-asserted-by":"publisher","first-page":"258","DOI":"10.1016\/j.cie.2018.08.036","volume":"125","author":"L Changchun","year":"2018","unstructured":"Changchun, L., Xi, X., Canrong, Z., Qiang, W., Li, Z.: A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem. Comput. Ind. Eng. 125, 258\u2013278 (2018)","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"898_CR21","doi-asserted-by":"publisher","first-page":"174","DOI":"10.1108\/ECAM-03-2019-0133","volume":"28","author":"G Heravi","year":"2021","unstructured":"Heravi, G., Fazeli Kebria, M., Rostami, M.: Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Eng. Constr. Archit. Manag. 28(1), 174\u2013195 (2021)","journal-title":"Eng. Constr. Archit. Manag."},{"key":"898_CR22","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2022.116753","volume":"198","author":"J Luo","year":"2022","unstructured":"Luo, J., Vanhoucke, M., Coelho, J., Guo, W.: An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem. Expert Syst. Appl. 198, 116753 (2022)","journal-title":"Expert Syst. Appl."},{"key":"898_CR23","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2022.104256","volume":"139","author":"K Guo","year":"2022","unstructured":"Guo, K., Zhang, L.: Multi-objective optimization for improved project management: current status and future directions. Autom. Constr. 139, 104256 (2022)","journal-title":"Autom. Constr."},{"issue":"2","key":"898_CR24","doi-asserted-by":"publisher","first-page":"2173","DOI":"10.1109\/TII.2022.3190566","volume":"19","author":"D Yu","year":"2022","unstructured":"Yu, D., Lv, Q., Srivastava, G., et al.: Multiobjective evolutionary model of the construction industry based on network planning. IEEE Trans. Industr. Inf. 19(2), 2173\u20132182 (2022)","journal-title":"IEEE Trans. Industr. Inf."},{"issue":"4","key":"898_CR25","doi-asserted-by":"publisher","first-page":"593","DOI":"10.1007\/s12530-022-09420-w","volume":"14","author":"JC-W Lin","year":"2023","unstructured":"Lin, J.C.-W., Lv, Q., Yu, D., Srivastava, G., Chen, C.-H.: Adaptive particle swarm optimization model for resource leveling. Evol. Syst. 14(4), 593\u2013604 (2023)","journal-title":"Evol. Syst."},{"key":"898_CR26","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2024.105428","volume":"164","author":"LD Long","year":"2024","unstructured":"Long, L.D.: A non-unit repetitive construction project scheduling with uncertainties. Autom. Constr. 164, 105428 (2024)","journal-title":"Autom. Constr."},{"issue":"6","key":"898_CR27","doi-asserted-by":"publisher","first-page":"4529","DOI":"10.1007\/s42107-024-01063-3","volume":"25","author":"AK Agarwal","year":"2024","unstructured":"Agarwal, A.K., et al.: Development of time-cost trade-off optimization model for construction projects with mopso technique. Asian J. Civil Eng. 25(6), 4529\u20134539 (2024)","journal-title":"Asian J. Civil Eng."},{"key":"898_CR28","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2024.105598","volume":"166","author":"Y Pan","year":"2024","unstructured":"Pan, Y., Shen, Y., Qin, J., Zhang, L.: Deep reinforcement learning for multi-objective optimization in bim-based green building design. Autom. Constr. 166, 105598 (2024)","journal-title":"Autom. Constr."},{"key":"898_CR29","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2024.108830","volume":"86","author":"Z Yuan","year":"2024","unstructured":"Yuan, Z., Man, Q., Guan, Z., Yi, C., Zheng, M., Chang, Y., Li, H.X.: Simulation and optimization of prefabricated building construction considering multiple objectives and uncertain factors. J. Build. Eng. 86, 108830 (2024)","journal-title":"J. Build. Eng."},{"issue":"7","key":"898_CR30","doi-asserted-by":"publisher","first-page":"854","DOI":"10.1287\/mnsc.30.7.854","volume":"30","author":"JH Patterson","year":"1984","unstructured":"Patterson, J.H.: A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Manage. Sci. 30(7), 854\u2013867 (1984)","journal-title":"Manage. Sci."},{"issue":"5","key":"898_CR31","doi-asserted-by":"publisher","first-page":"1261","DOI":"10.1007\/s12205-014-0401-x","volume":"18","author":"M Rostami","year":"2014","unstructured":"Rostami, M., Moradinezhad, D., Soufipour, A.: Improved and competitive algorithms for large scale multiple resource-constrained project-scheduling problems. KSCE J. Civ. Eng. 18(5), 1261\u20131269 (2014)","journal-title":"KSCE J. Civ. Eng."},{"key":"898_CR32","doi-asserted-by":"crossref","unstructured":"Wang, Q., Liu, C., Zheng, L.: A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource. Eng. Optim. (2020)","DOI":"10.1080\/0305215X.2019.1610946"},{"issue":"2","key":"898_CR33","doi-asserted-by":"publisher","first-page":"212","DOI":"10.1016\/j.ijpe.2010.03.009","volume":"126","author":"TR Browning","year":"2010","unstructured":"Browning, T.R., Yassine, A.A.: Resource-constrained multi-project scheduling: priority rule performance revisited. Int. J. Prod. Econ. 126(2), 212\u2013228 (2010)","journal-title":"Int. J. Prod. Econ."},{"issue":"8","key":"898_CR34","doi-asserted-by":"publisher","first-page":"04018074","DOI":"10.1061\/(ASCE)CO.1943-7862.0001524","volume":"144","author":"CT Su","year":"2018","unstructured":"Su, C.T., Santoro, M.C., Mendes, A.B.: Constructive heuristics for project scheduling resource availability cost problem with tardiness. J. Construct. Eng. Manag. 144(8), 04018074 (2018)","journal-title":"J. Construct. Eng. Manag."},{"key":"898_CR35","doi-asserted-by":"publisher","first-page":"886","DOI":"10.1016\/j.procs.2017.08.105","volume":"112","author":"I Kaabachi","year":"2017","unstructured":"Kaabachi, I., Jriji, D., Madany, F., Krichen, S.: A bi-criteria ant colony optimization for minimizing fuel consumption and cost of the traveling salesman problem with time windows. Proc. Comput. Sci. 112, 886\u2013895 (2017)","journal-title":"Proc. Comput. Sci."},{"issue":"2","key":"898_CR36","doi-asserted-by":"publisher","first-page":"95","DOI":"10.5267\/j.jpm.2021.10.002","volume":"7","author":"A Golab","year":"2022","unstructured":"Golab, A., Gooya, E.S., Al Falou, A., Cabon, M.: Review of conventional metaheuristic techniques for resource-constrained project scheduling problem. Int. J. Project Manag. 7(2), 95\u2013110 (2022)","journal-title":"Int. J. Project Manag."},{"key":"898_CR37","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.114479","volume":"169","author":"KM Sallam","year":"2021","unstructured":"Sallam, K.M., Chakrabortty, R.K., Ryan, M.J.: A reinforcement learning based multi-method approach for stochastic resource constrained project scheduling problems. Expert Syst. Appl. 169, 114479 (2021)","journal-title":"Expert Syst. Appl."},{"key":"898_CR38","doi-asserted-by":"publisher","first-page":"38488","DOI":"10.1109\/ACCESS.2021.3062790","volume":"9","author":"HM Saad","year":"2021","unstructured":"Saad, H.M., Chakrabortty, R.K., Elsayed, S., Ryan, M.J.: Quantum-inspired genetic algorithm for resource-constrained project-scheduling. IEEE Access 9, 38488\u201338502 (2021)","journal-title":"IEEE Access"},{"key":"898_CR39","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/j.advengsoft.2016.01.008","volume":"95","author":"S Mirjalili","year":"2016","unstructured":"Mirjalili, S., Lewis, A.: The whale optimization algorithm. Adv. Eng. Softw. 95, 51\u201367 (2016)","journal-title":"Adv. Eng. Softw."},{"key":"898_CR40","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2021.104558","volume":"108","author":"W Yang","year":"2022","unstructured":"Yang, W., Xia, K., Fan, S., Wang, L., Li, T., Zhang, J., Feng, Y.: A multi-strategy whale optimization algorithm and its application. Eng. Appl. Artif. Intell. 108, 104558 (2022)","journal-title":"Eng. Appl. Artif. Intell."}],"container-title":["International Journal of Computational Intelligence Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s44196-025-00898-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s44196-025-00898-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s44196-025-00898-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,1]],"date-time":"2025-07-01T16:09:29Z","timestamp":1751386169000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s44196-025-00898-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,7,1]]},"references-count":40,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2025,12]]}},"alternative-id":["898"],"URL":"https:\/\/doi.org\/10.1007\/s44196-025-00898-1","relation":{},"ISSN":["1875-6883"],"issn-type":[{"value":"1875-6883","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,7,1]]},"assertion":[{"value":"7 May 2025","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 June 2025","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 June 2025","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 July 2025","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors have no relevant financial or non-financial interests to disclose.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}},{"value":"This article does not contain any studies with human participants or animals performed by any of the authors.","order":3,"name":"Ethics","group":{"name":"EthicsHeading","label":"Ethics Approval"}}],"article-number":"166"}}