{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,3]],"date-time":"2026-04-03T01:58:25Z","timestamp":1775181505295,"version":"3.50.1"},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T00:00:00Z","timestamp":1773792000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0"},{"start":{"date-parts":[[2026,4,3]],"date-time":"2026-04-03T00:00:00Z","timestamp":1775174400000},"content-version":"vor","delay-in-days":16,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0"}],"funder":[{"name":"Power CHINA Roadbridge Group CO., LTD (DJLQKJ2023). Supported by Power Construction Corporation of China, Ltd","award":["DJKJ2023"],"award-info":[{"award-number":["DJKJ2023"]}]},{"name":"Training Programme for Young Backbone Teachers of Higher Education Institutions in Henan Province","award":["2024GGJS061"],"award-info":[{"award-number":["2024GGJS061"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Comput Intell Syst"],"DOI":"10.1007\/s44196-026-01207-0","type":"journal-article","created":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T08:07:02Z","timestamp":1773821222000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Highway Engineering Construction Safety Risk Evaluation Based on Decision Tree Algorithm"],"prefix":"10.1007","volume":"19","author":[{"given":"Guibin","family":"Lv","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fudong","family":"Dong","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pengyuan","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuansen","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yongguo","family":"Sheng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Feng","family":"Cheng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bo","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2026,3,18]]},"reference":[{"key":"1207_CR1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2021.103860","volume":"111","author":"A Sharafat","year":"2021","unstructured":"Sharafat, A., Latif, K., Seo, J.: Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions. Tunnelling and Underground Space Technology 111, 103860 (2021)","journal-title":"Tunnelling and Underground Space Technology"},{"issue":"2","key":"1207_CR2","doi-asserted-by":"publisher","first-page":"04020068","DOI":"10.1061\/(ASCE)CP.1943-5487.0000955","volume":"35","author":"A Sharafat","year":"2021","unstructured":"Sharafat, A., Khan, M.S., Latif, K., et al.: BIM-based tunnel information modeling framework for visualization, management, and simulation of drill-and-blast tunneling projects. J. Comput. Civ. Eng. 35(2), 04020068 (2021)","journal-title":"J. Comput. Civ. Eng."},{"key":"1207_CR3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ssci.2025.106814","volume":"185","author":"H Qi","year":"2025","unstructured":"Qi, H., Zhou, Z., Manu, P., et al.: Falling risk analysis at workplaces through an accident data-driven approach based upon hybrid artificial intelligence (AI) techniques. Saf. Sci. 185, 106814 (2025)","journal-title":"Saf. Sci."},{"key":"1207_CR4","first-page":"50","volume":"23","author":"C Shi","year":"2015","unstructured":"Shi, C., Jia, Y.: Risk assessment of group incident management based on improved risk matrix method. Stat. Decis. 23, 50\u201352 (2015)","journal-title":"Stat. Decis."},{"key":"1207_CR5","first-page":"1","volume":"19","author":"A Sharafat","year":"2022","unstructured":"Sharafat, A., Latif, K., Park, S., et al.: Digital twin-driven optimization of blast design for underground construction. In: Proceedings of the KSCE, Yeosu, Republic of Korea 19, 1\u20132 (2022)","journal-title":"In: Proceedings of the KSCE, Yeosu, Republic of Korea"},{"issue":"16","key":"1207_CR6","doi-asserted-by":"publisher","first-page":"2834","DOI":"10.3390\/buildings15162834","volume":"15","author":"WA Tanoli","year":"2025","unstructured":"Tanoli, W.A., Ullah, A., Sharafat, A., et al.: A multi-model BIM-based framework for integrated digital transformation of design to construction of large complex underground caverns. Buildings 15(16), 2834 (2025)","journal-title":"Buildings"},{"issue":"20","key":"1207_CR7","doi-asserted-by":"publisher","DOI":"10.3390\/app132011435","volume":"13","author":"K Latif","year":"2023","unstructured":"Latif, K., Sharafat, A., Seo, J.: Digital twin-driven framework for TBM performance prediction, visualization, and monitoring through machine learning. Appl. Sci. 13(20), 11435 (2023)","journal-title":"Appl. Sci."},{"issue":"8","key":"1207_CR8","doi-asserted-by":"publisher","DOI":"10.3390\/app15084481","volume":"15","author":"A Sharafat","year":"2025","unstructured":"Sharafat, A., Tanoli, W.A., Zubair, M.U., et al.: Digital twin-driven stability optimization framework for large underground caverns. Applied Sciences 15(8), 4481 (2025)","journal-title":"Applied Sciences"},{"key":"1207_CR9","doi-asserted-by":"publisher","DOI":"10.1016\/j.enggeo.2025.108148","author":"Y Zheng","year":"2025","unstructured":"Zheng, Y., Li, J., Li, J., et al.: Quantitative risk assessment of road posed by levee slope failure: a novel framework integrating Monte Carlo simulation and material point method. Eng. Geo. (2025). https:\/\/doi.org\/10.1016\/j.enggeo.2025.108148","journal-title":"Eng. Geo."},{"issue":"2","key":"1207_CR10","first-page":"291","volume":"35","author":"XJ Zhang","year":"2015","unstructured":"Zhang, X.J., Xu, G.L., Yang, C., et al.: Safety risk assessment of foundation construction of expressway reconstruction and expansion project in karst area. J. China and Foreign Highway 35(2), 291\u2013296 (2015)","journal-title":"J. China and Foreign Highway"},{"issue":"5","key":"1207_CR11","first-page":"79","volume":"40","author":"Q Liao","year":"2018","unstructured":"Liao, Q., Xie, H.Y., Lu, C.W., et al.: Research on risk assessment of highway engineering based on improved mutation theory. J. Xiangtan Univ. (Nat. Sci. Ed.) 40(5), 79\u201385 (2018)","journal-title":"J. Xiangtan Univ. (Nat. Sci. Ed.)"},{"issue":"03","key":"1207_CR12","first-page":"163","volume":"63","author":"TY Wu","year":"2018","unstructured":"Wu, T.Y., Liang, K.Y., Song, L.L.: Research on construction risk evaluation of mountainous expressway based on CIM model. Highway 63(03), 163\u2013169 (2018)","journal-title":"Highway"},{"issue":"07","key":"1207_CR13","first-page":"81","volume":"39","author":"J Qiao","year":"2020","unstructured":"Qiao, J., Wang, W., Li, S.: Risk assessment of highway construction based on relative difference function. Journal of Chongqing Jiaotong University (Natural Science) 39(07), 81\u201385+99 (2020)","journal-title":"Journal of Chongqing Jiaotong University (Natural Science)"},{"issue":"03","key":"1207_CR14","first-page":"220","volume":"59","author":"Y Tang","year":"2022","unstructured":"Tang, Y.: Research on risk assessment and management methods for projects of railway tunnels passing under expressways. Modern Tunnelling Technology 59(03), 220\u2013226 (2022)","journal-title":"Modern Tunnelling Technology"},{"issue":"11","key":"1207_CR15","first-page":"106","volume":"39","author":"P Wang","year":"2022","unstructured":"Wang, P., Wei, Q., Wang, J., et al.: Risk assessment of railway tunnel construction based on grey fuzzy linguistic theory. J. Railway Eng. Soc. 39(11), 106\u2013112 (2022)","journal-title":"J. Railway Eng. Soc."},{"issue":"10","key":"1207_CR16","first-page":"3387","volume":"23","author":"Y Wang","year":"2023","unstructured":"Wang, Y., Yu, T., Liu, B., et al.: Safety risk prediction and time series analysis of highway engineering construction. J. Saf. Environ. 23(10), 3387\u20133397 (2023)","journal-title":"J. Saf. Environ."},{"key":"1207_CR17","unstructured":"Zhang,\u00a0F., Xu,\u00a0W., Wang, M., et al.: Risk assessment and trend research of railway tunnel construction safety. J. Saf. Environment: 1-11 (2023)"},{"key":"1207_CR18","unstructured":"\u00a0Xie, B., Liu,\u00a0Y., Cui,\u00a0L.: High altitude railway construction risk warning based on improved game Theory-2D cloud model. Railw. Stand. Design: 1\u201310 (2023)"},{"key":"1207_CR19","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2024.123621","volume":"249","author":"A Shehadeh","year":"2024","unstructured":"Shehadeh, A., Alshboul, O., Al-Shboul, K.F., et al.: An expert system for highway construction: multi-objective optimization using enhanced particle swarm for optimal equipment management. Expert Sys. Appl. 249, 123621 (2024)","journal-title":"Expert Sys. Appl."},{"issue":"06","key":"1207_CR20","first-page":"174","volume":"40","author":"S Xu","year":"2023","unstructured":"Xu, S.: Development of tunnel construction risk evaluation model and system under complex geology. J. Highw. Transp. Res. Dev. 40(06), 174\u2013181 (2023)","journal-title":"J. Highw. Transp. Res. Dev."},{"issue":"09","key":"1207_CR21","first-page":"990","volume":"49","author":"X Ruan","year":"2023","unstructured":"Ruan, X., Chen, X., Zhu, X.: Mobile robot exploration strategy based on multiple information gain. J. Beijing Univ. Technol. 49(09), 990\u2013998 (2023)","journal-title":"J. Beijing Univ. Technol."},{"key":"1207_CR22","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2023.121505","volume":"237","author":"A Shehadeh","year":"2024","unstructured":"Shehadeh, A., Alshboul, O., Almasabha, G.: Slope displacement detection in construction: an automated management algorithm for disaster prevention. Expert Sys. Appl. 237, 121505 (2024)","journal-title":"Expert Sys. Appl."},{"key":"1207_CR23","doi-asserted-by":"publisher","DOI":"10.1016\/j.istruc.2024.106009","author":"O Alshboul","year":"2024","unstructured":"Alshboul, O., Shehadeh, A., Al-Shboul, K.F., et al.: A comparative study of LightGBM, XGBoost, and GEP models in shear strength management of SFRC-SBWS. Structures (2024). https:\/\/doi.org\/10.1016\/j.istruc.2024.106009","journal-title":"Structures"},{"issue":"02","key":"1207_CR24","first-page":"244","volume":"56","author":"Y Qiu","year":"2017","unstructured":"Qiu, Y., Zhang, C., Chen, S.: Research of patent-value assessment indictor system based on classification and regression tree algorithm. J. Xiamen Univ. (Nat. Sci.) 56(02), 244\u2013251 (2017)","journal-title":"J. Xiamen Univ. (Nat. Sci.)"},{"key":"1207_CR25","first-page":"1","volume":"11","author":"D Ma","year":"2023","unstructured":"Ma, D., Luo, L., Wang, W., et al.: Extraction of decision association rules for bridge damage state based on DRSA and CART. J. Beijing Univ. Technol. 11, 1\u201313 (2023)","journal-title":"J. Beijing Univ. Technol."},{"key":"1207_CR26","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2025.111120","volume":"261","author":"K Cao","year":"2025","unstructured":"Cao, K., Chen, S., Chen, Y., et al.: Decision analysis of safety risks pre-control measures for falling accidents in mega hydropower engineering driven by accident case texts. Reliab. Eng. Syst. Saf. 261, 111120 (2025)","journal-title":"Reliab. Eng. Syst. Saf."},{"issue":"17","key":"1207_CR27","doi-asserted-by":"publisher","DOI":"10.3390\/rs15174175","volume":"15","author":"T Deng","year":"2023","unstructured":"Deng, T., Sharafat, A., Wie, Y.M., et al.: A geospatial analysis-based method for railway route selection in marine glaciers: a case study of the Sichuan-Tibet railway network. Remote Sens. 15(17), 4175 (2023)","journal-title":"Remote Sens."},{"issue":"01","key":"1207_CR28","first-page":"130","volume":"16","author":"Y Li","year":"2020","unstructured":"Li, Y., Liu, Y., Hu, D., et al.: Study on risk classification assessment method of hydropower station project based on risk matrix-taking Wudongde hydropower station as example. J. Saf. Sci. Technol. 16(01), 130\u2013134 (2020)","journal-title":"J. Saf. Sci. Technol."},{"issue":"11","key":"1207_CR29","doi-asserted-by":"publisher","first-page":"4307","DOI":"10.1007\/s00477-023-02509-x","volume":"37","author":"KF Al-Shboul","year":"2023","unstructured":"Al-Shboul, K.F., Almasabha, G., Shehadeh, A., et al.: Exploring the efficacy of machine learning models for predicting soil radon exhalation rates. Stoch. Environ. Res. Risk Assess. 37(11), 4307\u20134321 (2023)","journal-title":"Stoch. Environ. Res. Risk Assess."},{"key":"1207_CR30","unstructured":"Liu,\u00a0G., An,\u00a0P., Wu, Z., et al.: Ontology-based modeling and application of highway engineering safety knowledge. J. Tsinghua Univ. (Sci. Tech.): 1\u201311 (2023)"},{"key":"1207_CR31","doi-asserted-by":"publisher","first-page":"110046","DOI":"10.1016\/j.cie.2024.110046","volume":"190","author":"O Alshboul","year":"2024","unstructured":"Alshboul, O., Al-Shboul, K.F., Shehadeh, A., et al.: Empirical exploration of predictive maintenance in concrete manufacturing: Harnessing machine learning for enhanced equipment reliability in construction project management. Comput. Ind. Eng. 190, 110046 (2024)","journal-title":"Comput. Ind. Eng."},{"issue":"6","key":"1207_CR32","doi-asserted-by":"publisher","first-page":"770","DOI":"10.1080\/13588265.2022.2130608","volume":"28","author":"A Im Almadi","year":"2023","unstructured":"Im Almadi, A., Alshboul, O., Shehadeh, A., et al.: Vehicle collisions analysis on highways based on multi-user driving simulator and multinomial logistic regression model on US highways in Michigan. Int. J. Crashworthiness 28(6), 770\u2013785 (2023)","journal-title":"Int. J. Crashworthiness"},{"key":"1207_CR33","unstructured":"X. Huang, C. Ye, J. Chen, et al., (2023) Stability evaluation of filling body based on G1 method and cloud matter-element model. Min. Research Dev.: 1\u20136."},{"key":"1207_CR34","doi-asserted-by":"publisher","first-page":"012007","DOI":"10.1088\/1742-6596\/2497\/1\/012007","volume":"2497","author":"J Zhang","year":"2023","unstructured":"Zhang, J., Chen, X., Jin, G., et al.: Fuzzy evaluation of substation switching misoperation risk based on CRITIC-G1 method. J. Phys. Conf. Ser. 2497, 012007 (2023)","journal-title":"J. Phys. Conf. Ser."}],"container-title":["International Journal of Computational Intelligence Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s44196-026-01207-0","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s44196-026-01207-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s44196-026-01207-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,3]],"date-time":"2026-04-03T01:22:52Z","timestamp":1775179372000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s44196-026-01207-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,3,18]]},"references-count":34,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2026,12]]}},"alternative-id":["1207"],"URL":"https:\/\/doi.org\/10.1007\/s44196-026-01207-0","relation":{},"ISSN":["1875-6883"],"issn-type":[{"value":"1875-6883","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,3,18]]},"assertion":[{"value":"19 August 2025","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"5 January 2026","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 February 2026","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 March 2026","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"There are no relevant financial or non-financial competing interests to report","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}],"article-number":"166"}}