{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:22:53Z","timestamp":1759666973150},"reference-count":6,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540325376"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1007\/3-540-32539-5_48","type":"book-chapter","created":{"date-parts":[[2006,9,11]],"date-time":"2006-09-11T10:54:52Z","timestamp":1157972092000},"page":"303-308","source":"Crossref","is-referenced-by-count":7,"title":["Locating and Sizing Bank-Branches by Opening, Closing or Maintaining Facilities"],"prefix":"10.1007","author":[{"given":"Marta S. Rodrigues","family":"Monteiro","sequence":"first","affiliation":[]},{"given":"Dalila B. M. M.","family":"Fontes","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"48_CR1","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1111\/1475-3995.00272","volume":"8","author":"H. Min","year":"2001","unstructured":"Min H, Melachrinoudis E (2001) The three-hierarchical location-allocation of banking facilities with risk and uncertainty. Int Trans Oper Res 8:381\u2013401","journal-title":"Int Trans Oper Res"},{"key":"48_CR2","doi-asserted-by":"publisher","first-page":"549","DOI":"10.1111\/1475-3995.00373","volume":"9","author":"P. Miliotis","year":"2002","unstructured":"Miliotis P, Dimopoulou M, Giannikos I (2002) A hierarchical location model for locating bank branches in a competitive environment. Int Trans Oper Res 9:549\u2013565","journal-title":"Int Trans Oper Res"},{"key":"48_CR3","doi-asserted-by":"publisher","first-page":"2047","DOI":"10.1016\/S0305-0548(02)00123-5","volume":"30","author":"Q. Wang","year":"2003","unstructured":"Wang Q, Batta R, Bhadury J, Rump CM (2003) Budget constrained location problem with opening and closing of facilities. Comput Oper Res 30:2047\u20132069","journal-title":"Comput Oper Res"},{"key":"48_CR4","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1016\/S0167-6377(99)00004-8","volume":"24","author":"D. Kim","year":"1999","unstructured":"Kim D, Pardalos PM (1999) A Solution Approach to the Fixed Charge Network Flow Problem Using a Dynamic Slope Scaling Procedure. Oper Res Lett 24:195\u2013203","journal-title":"Oper Res Lett"},{"issue":"3","key":"48_CR5","doi-asserted-by":"publisher","first-page":"216","DOI":"10.1002\/(SICI)1097-0037(200005)35:3<216::AID-NET5>3.0.CO;2-E","volume":"35","author":"D. Kim","year":"2000","unstructured":"Kim D, Pardalos PM (2000) Dynamic slope scaling and trust interval techniques for solving concave piecewise linear network flow problems. Networks 35(3):216\u2013222","journal-title":"Networks"},{"key":"48_CR6","volume-title":"Bank-branch location and sizing under economies of scale","author":"M.S.R. Monteiro","year":"2005","unstructured":"Monteiro MSR (2005) Bank-branch location and sizing under economies of scale. Master Thesis, Faculdade de Economia do Porto, Portugal"}],"container-title":["Operations Research Proceedings","Operations Research Proceedings 2005"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/3-540-32539-5_48.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,28]],"date-time":"2021-04-28T00:57:35Z","timestamp":1619571455000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/3-540-32539-5_48"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"ISBN":["9783540325376"],"references-count":6,"URL":"https:\/\/doi.org\/10.1007\/3-540-32539-5_48","relation":{},"subject":[]}}