{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T08:09:40Z","timestamp":1743149380137,"version":"3.40.3"},"publisher-location":"Cham","reference-count":13,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030149727"},{"type":"electronic","value":"9783030149734"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-14973-4_14","type":"book-chapter","created":{"date-parts":[[2019,4,16]],"date-time":"2019-04-16T16:15:31Z","timestamp":1555431331000},"page":"149-156","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Improving the Availability of a Production Line Through TPM in an Automotive Gearbox Industrial Unit"],"prefix":"10.1007","author":[{"given":"In\u00eas M.","family":"Ribeiro","sequence":"first","affiliation":[]},{"given":"Radu","family":"Godina","sequence":"additional","affiliation":[]},{"given":"Jo\u00e3o C. O.","family":"Matias","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,4,17]]},"reference":[{"key":"14_CR1","doi-asserted-by":"publisher","first-page":"485","DOI":"10.1016\/j.sbspro.2012.11.153","volume":"65","author":"AH Bakri","year":"2012","unstructured":"Bakri, A.H., Rahim, A.R.A., Yusof, N.M., Ahmad, R.: Boosting lean production via TPM. Procedia\u2014Soc. Behav. Sci. 65, 485\u2013491 (2012)","journal-title":"Procedia\u2014Soc. Behav. Sci."},{"key":"14_CR2","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/978-1-84882-472-0_17","volume-title":"Handbook of Maintenance Management and Engineering","author":"I. P. S. Ahuja","year":"2009","unstructured":"Ahuja, I.P.S.: Total productive maintenance. In: Handbook of Maintenance Management and Engineering, pp. 417\u2013459. Springer London, London (2009)"},{"key":"14_CR3","doi-asserted-by":"publisher","first-page":"1013","DOI":"10.1007\/s00170-017-0052-4","volume":"92","author":"JDM M\u00e9ndez","year":"2017","unstructured":"M\u00e9ndez, J.D.M., Rodriguez, R.S.: Total productive maintenance (TPM) as a tool for improving productivity: a case study of application in the bottleneck of an auto-parts machining line. Int. J. Adv. Manuf. Technol. 92, 1013\u20131026 (2017)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"14_CR4","doi-asserted-by":"publisher","DOI":"10.1201\/b18641","volume-title":"Total Productive Maintenance","author":"Tina Kanti Agustiady","year":"2016","unstructured":"Agustiady, T., Cudney, E.: Total Productive Maintenance. CRC Press, Boca Raton (2015). \n                  https:\/\/doi.org\/10.1201\/b18641"},{"key":"14_CR5","unstructured":"Kumar Gupta, A., Garg, R.K.: OEE improvement by TPM implementation: a case study. Int. J. IT Eng. Appl. Sci. Res. Int. Res. J. Consort. 1, 2319\u20134413 (2012)"},{"key":"14_CR6","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1002\/sdr.335","volume":"22","author":"J-H Thun","year":"2006","unstructured":"Thun, J.-H.: Maintaining preventive maintenance and maintenance prevention: analysing the dynamic implications of total productive maintenance. Syst. Dyn. Rev. 22, 163\u2013179 (2006)","journal-title":"Syst. Dyn. Rev."},{"key":"14_CR7","doi-asserted-by":"crossref","unstructured":"Batumalay, K., Santhapparaj, A.S.: Overall equipment effectiveness (OEE) through total productive maintenance (TPM) practices\u2014a study across the Malaysian industries. In: 2009 International Conference for Technical Postgraduates (TECHPOS), pp. 1\u20135. IEEE (2009)","DOI":"10.1109\/TECHPOS.2009.5412049"},{"key":"14_CR8","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1007\/978-1-349-94948-9_3","volume-title":"Leading Beyond Lean","author":"Petter \u00d8stb\u00f8","year":"2016","unstructured":"\u00d8stb\u00f8, P., Wetherill, M., Cattermole, R.: Defining and understanding the core lean tools. In: Leading Beyond Lean, pp. 44\u201387. Palgrave Macmillan, London (2016)"},{"key":"14_CR9","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1108\/JQME-09-2013-0062","volume":"21","author":"SJ Benjamin","year":"2015","unstructured":"Benjamin, S.J., Marathamuthu, M.S., Murugaiah, U.: The use of 5-WHYs technique to eliminate OEE\u2019s speed loss in a manufacturing firm. J. Qual. Maint. Eng. 21, 419\u2013435 (2015)","journal-title":"J. Qual. Maint. Eng."},{"key":"14_CR10","doi-asserted-by":"publisher","first-page":"00028","DOI":"10.1051\/matecconf\/201713500028","volume":"135","author":"Nofri Eka Candra","year":"2017","unstructured":"Candra, N.E., Susilawati, A., Herisiswanto, Setiady, W.: Implementation of total productive maintenance (TPM) to improve sheeter machine performance. In: MATEC Web Conferences, vol. 135 (2017)","journal-title":"MATEC Web of Conferences"},{"key":"14_CR11","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1007\/s00170-017-0783-2","volume":"94","author":"N Ahmad","year":"2018","unstructured":"Ahmad, N., Hossen, J., Ali, S.M.: Improvement of overall equipment efficiency of ring frame through total productive maintenance: a textile case. Int. J. Adv. Manuf. Technol. 94, 239\u2013256 (2018)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"14_CR12","doi-asserted-by":"publisher","first-page":"506","DOI":"10.1108\/JQME-03-2014-0014","volume":"21","author":"JA Garza-Reyes","year":"2015","unstructured":"Garza-Reyes, J.A.: From measuring overall equipment effectiveness (OEE) to overall resource effectiveness (ORE). J. Qual. Maint. Eng. 21, 506\u2013527 (2015)","journal-title":"J. Qual. Maint. Eng."},{"issue":"3-4","key":"14_CR13","doi-asserted-by":"publisher","first-page":"466","DOI":"10.1080\/14783363.2017.1308821","volume":"30","author":"Ali-Asghar Dadashnejad","year":"2017","unstructured":"Dadashnejad, A.-A., Valmohammadi, C.: Investigating the effect of value stream mapping on overall equipment effectiveness: a case study. Total Qual. Manag. Bus. Excell. 30, 466\u2013482 (2019)","journal-title":"Total Quality Management & Business Excellence"}],"container-title":["Springer Proceedings in Mathematics &amp; Statistics","Industrial Engineering and Operations Management II"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-14973-4_14","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,10]],"date-time":"2019-09-10T06:08:35Z","timestamp":1568095715000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-14973-4_14"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030149727","9783030149734"],"references-count":13,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-14973-4_14","relation":{},"ISSN":["2194-1009","2194-1017"],"issn-type":[{"type":"print","value":"2194-1009"},{"type":"electronic","value":"2194-1017"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"17 April 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"IJCIEOM","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Joint conference on Industrial Engineering and Operations Management","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Lisbon","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2018","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"18 July 2018","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"20 July 2018","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"24","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"ijcieom2018","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/www.icieom.org\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}