{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,29]],"date-time":"2025-06-29T22:21:29Z","timestamp":1751235689653,"version":"3.40.3"},"publisher-location":"Cham","reference-count":38,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030177706"},{"type":"electronic","value":"9783030177713"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-17771-3_19","type":"book-chapter","created":{"date-parts":[[2019,4,30]],"date-time":"2019-04-30T13:06:30Z","timestamp":1556629590000},"page":"227-237","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Production Scheduling Requirements to Smart Manufacturing"],"prefix":"10.1007","author":[{"given":"Duarte","family":"Alem\u00e3o","sequence":"first","affiliation":[]},{"given":"Andr\u00e9 Dion\u00edsio","family":"Rocha","sequence":"additional","affiliation":[]},{"given":"Jos\u00e9","family":"Barata","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,4,16]]},"reference":[{"issue":"5","key":"19_CR1","doi-asserted-by":"publisher","first-page":"961","DOI":"10.1007\/s10845-013-0837-8","volume":"26","author":"B \u00c7ali\u015f","year":"2015","unstructured":"\u00c7ali\u015f, B., Bulkan, S.: A research survey: review of AI solution strategies of job shop scheduling problem. J. Intell. Manuf. 26(5), 961\u2013973 (2015)","journal-title":"J. Intell. Manuf."},{"issue":"4","key":"19_CR2","doi-asserted-by":"publisher","first-page":"130","DOI":"10.1016\/j.jmsy.2011.01.001","volume":"29","author":"Y Koren","year":"2010","unstructured":"Koren, Y., Shpitalni, M.: Design of reconfigurable manufacturing systems. J. Manuf. Syst. 29(4), 130\u2013141 (2010)","journal-title":"J. Manuf. Syst."},{"key":"19_CR3","doi-asserted-by":"publisher","first-page":"4","DOI":"10.1016\/j.procir.2016.04.107","volume":"44","author":"H ElMaraghy","year":"2016","unstructured":"ElMaraghy, H., ElMaraghy, W.: Smart adaptable assembly systems. Procedia CIRP 44, 4\u201313 (2016)","journal-title":"Procedia CIRP"},{"issue":"2","key":"19_CR4","doi-asserted-by":"publisher","first-page":"527","DOI":"10.1016\/S0007-8506(07)63232-6","volume":"48","author":"Y Koren","year":"1999","unstructured":"Koren, Y., et al.: Reconfigurable manufacturing systems. CIRP Ann. 48(2), 527\u2013540 (1999)","journal-title":"CIRP Ann."},{"issue":"7","key":"19_CR5","doi-asserted-by":"publisher","first-page":"639","DOI":"10.1016\/j.compind.2011.03.001","volume":"62","author":"L Ribeiro","year":"2011","unstructured":"Ribeiro, L., Barata, J.: Re-thinking diagnosis for future automation systems: an analysis of current diagnostic practices and their applicability in emerging IT based production paradigms. Comput. Ind. 62(7), 639\u2013659 (2011)","journal-title":"Comput. Ind."},{"key":"19_CR6","doi-asserted-by":"publisher","first-page":"599","DOI":"10.1016\/j.procir.2016.10.118","volume":"56","author":"Q Gao","year":"2016","unstructured":"Gao, Q., Shi, R., Wang, G.: Construction of intelligent manufacturing workshop based on lean management. Procedia CIRP 56, 599\u2013603 (2016)","journal-title":"Procedia CIRP"},{"key":"19_CR7","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/j.procir.2014.02.001","volume":"16","author":"J Lee","year":"2014","unstructured":"Lee, J., Kao, H.A., Yang, S.: Service innovation and smart analytics for Industry 4.0 and big data environment. Procedia CIRP 16, 3\u20138 (2014)","journal-title":"Procedia CIRP"},{"issue":"5","key":"19_CR8","doi-asserted-by":"publisher","first-page":"616","DOI":"10.1016\/J.ENG.2017.05.015","volume":"3","author":"RY Zhong","year":"2017","unstructured":"Zhong, R.Y., Xu, X., Klotz, E., Newman, S.T.: Intelligent manufacturing in the context of industry 4.0: a review. Engineering 3(5), 616\u2013630 (2017)","journal-title":"Engineering"},{"issue":"5","key":"19_CR9","doi-asserted-by":"publisher","first-page":"1079","DOI":"10.1007\/s10845-015-1042-8","volume":"28","author":"F Tao","year":"2017","unstructured":"Tao, F., Cheng, Y., Zhang, L., Nee, A.Y.C.: Advanced manufacturing systems: socialization characteristics and trends. J. Intell. Manuf. 28(5), 1079\u20131094 (2017)","journal-title":"J. Intell. Manuf."},{"key":"19_CR10","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1016\/j.promfg.2018.02.091","volume":"21","author":"Y Koren","year":"2018","unstructured":"Koren, Y., Gu, X., Badurdeen, F., Jawahir, I.S.: sustainable living factories for next generation manufacturing. Procedia Manuf. 21, 26\u201336 (2018)","journal-title":"Procedia Manuf."},{"key":"19_CR11","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1016\/j.asoc.2014.06.020","volume":"23","author":"V Kaplano\u01e7lu","year":"2014","unstructured":"Kaplano\u01e7lu, V.: Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance. Appl. Soft Comput. J. 23, 165\u2013179 (2014)","journal-title":"Appl. Soft Comput. J."},{"key":"19_CR12","doi-asserted-by":"publisher","unstructured":"Yao, X., Zhou, J., Lin, Y., Li, Y., Yu, H., Liu, Y.: Smart manufacturing based on cyber-physical systems and beyond. J. Intell. Manuf. 1\u201313 (2017). \n                    https:\/\/doi.org\/10.1007\/s10845-017-1384-5","DOI":"10.1007\/s10845-017-1384-5"},{"key":"19_CR13","doi-asserted-by":"publisher","first-page":"667","DOI":"10.1016\/j.apm.2016.09.022","volume":"41","author":"S Karimi","year":"2016","unstructured":"Karimi, S., Ardalan, Z., Naderi, B., Mohammadi, M.: Scheduling flexible job-shops with transportation times: mathematical models and a hybrid imperialist competitive algorithm. Appl. Math. Model. 41, 667\u2013682 (2016)","journal-title":"Appl. Math. Model."},{"key":"19_CR14","first-page":"1","volume":"2017","author":"F Hongying","year":"2017","unstructured":"Hongying, F., Qian, L., Dan, S.: A survey of recent research on optimization models and algorithms for operations management from the process view. Sci. Program. 2017, 1\u201319 (2017)","journal-title":"Sci. Program."},{"issue":"4","key":"19_CR15","doi-asserted-by":"publisher","first-page":"752","DOI":"10.1016\/j.jmsy.2013.01.005","volume":"32","author":"YC Chou","year":"2013","unstructured":"Chou, Y.C., Cao, H., Cheng, H.H.: A bio-inspired mobile agent-based integrated system for flexible autonomic job shop scheduling. J. Manuf. Syst. 32(4), 752\u2013763 (2013)","journal-title":"J. Manuf. Syst."},{"key":"19_CR16","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/j.cie.2017.05.026","volume":"110","author":"J Shahrabi","year":"2017","unstructured":"Shahrabi, J., Adibi, M.A., Mahootchi, M.: A reinforcement learning approach to parameter estimation in dynamic job shop scheduling. Comput. Ind. Eng. 110, 75\u201382 (2017)","journal-title":"Comput. Ind. Eng."},{"key":"19_CR17","doi-asserted-by":"publisher","first-page":"562","DOI":"10.1016\/j.jclepro.2018.02.061","volume":"185","author":"Y Zhang","year":"2018","unstructured":"Zhang, Y., et al.: The \u2018Internet of Things\u2019 enabled real-time scheduling for remanufacturing of automobile engines. J. Clean. Prod. 185, 562\u2013575 (2018)","journal-title":"J. Clean. Prod."},{"issue":"January","key":"19_CR18","doi-asserted-by":"publisher","first-page":"238","DOI":"10.1016\/j.rcim.2018.01.002","volume":"51","author":"Q Liu","year":"2018","unstructured":"Liu, Q., Dong, M., Chen, F.F.: Single-machine-based joint optimization of predictive maintenance planning and production scheduling. Robot. Comput. Integr. Manuf. 51(January), 238\u2013247 (2018)","journal-title":"Robot. Comput. Integr. Manuf."},{"issue":"2","key":"19_CR19","doi-asserted-by":"publisher","first-page":"503","DOI":"10.1016\/j.ejor.2017.08.021","volume":"265","author":"L Shen","year":"2018","unstructured":"Shen, L., Dauz\u00e8re-P\u00e9r\u00e8s, S., Neufeld, J.S.: Solving the flexible job shop scheduling problem with sequence-dependent setup times. Eur. J. Oper. Res. 265(2), 503\u2013516 (2018)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"19_CR20","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1007\/s10845-015-1083-z","volume":"29","author":"P-H Lu","year":"2018","unstructured":"Lu, P.-H., Wu, M.-C., Tan, H., Peng, Y.-H., Chen, C.-F.: A genetic algorithm embedded with a concise chromosome representation for distributed and flexible job-shop scheduling problems. J. Intell. Manuf. 29(1), 19\u201334 (2018)","journal-title":"J. Intell. Manuf."},{"issue":"8","key":"19_CR21","doi-asserted-by":"publisher","first-page":"1973","DOI":"10.1007\/s10845-015-1084-y","volume":"28","author":"H-C Chang","year":"2017","unstructured":"Chang, H.-C., Liu, T.-K.: Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithms. J. Intell. Manuf. 28(8), 1973\u20131986 (2017)","journal-title":"J. Intell. Manuf."},{"issue":"5","key":"19_CR22","doi-asserted-by":"publisher","first-page":"1083","DOI":"10.1007\/s10845-015-1161-2","volume":"29","author":"L Han","year":"2015","unstructured":"Han, L., Xing, K., Chen, X., Xiong, F.: A Petri net-based particle swarm optimization approach for scheduling deadlock-prone flexible manufacturing systems. J. Intell. Manuf. 29(5), 1083\u20131096 (2015)","journal-title":"J. Intell. Manuf."},{"key":"19_CR23","doi-asserted-by":"publisher","first-page":"728","DOI":"10.1016\/j.procir.2016.11.126","volume":"57","author":"A Alotaibi","year":"2016","unstructured":"Alotaibi, A., Lohse, N., Vu, T.M.: Dynamic agent-based bi-objective robustness for tardiness and energy in a dynamic flexible job shop. Procedia CIRP 57, 728\u2013733 (2016)","journal-title":"Procedia CIRP"},{"key":"19_CR24","doi-asserted-by":"publisher","first-page":"569","DOI":"10.1016\/j.eswa.2016.08.019","volume":"64","author":"M Petrovi\u0107","year":"2016","unstructured":"Petrovi\u0107, M., Vukovi\u0107, N., Miti\u0107, M., Miljkovi\u0107, Z.: Integration of process planning and scheduling using chaotic particle swarm optimization algorithm. Expert Syst. Appl. 64, 569\u2013588 (2016)","journal-title":"Expert Syst. Appl."},{"issue":"2","key":"19_CR25","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/j.cie.2007.06.024","volume":"53","author":"HZ Jia","year":"2007","unstructured":"Jia, H.Z., Fuh, J.Y.H., Nee, A.Y.C., Zhang, Y.F.: Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems. Comput. Ind. Eng. 53(2), 313\u2013320 (2007)","journal-title":"Comput. Ind. Eng."},{"key":"19_CR26","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/j.cie.2017.02.019","volume":"107","author":"M Yazdani","year":"2017","unstructured":"Yazdani, M., Aleti, A., Khalili, S.M., Jolai, F.: Optimizing the sum of maximum earliness and tardiness of the job shop scheduling problem. Comput. Ind. Eng. 107, 12\u201324 (2017)","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"19_CR27","doi-asserted-by":"publisher","first-page":"82","DOI":"10.1016\/j.ejor.2018.01.027","volume":"268","author":"R B\u00fcrgy","year":"2018","unstructured":"B\u00fcrgy, R., B\u00fclb\u00fcl, K.: The job shop scheduling problem with convex costs. Eur. J. Oper. Res. 268(1), 82\u2013100 (2018)","journal-title":"Eur. J. Oper. Res."},{"key":"19_CR28","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1016\/j.cor.2015.07.011","volume":"66","author":"J Kuhpfahl","year":"2016","unstructured":"Kuhpfahl, J., Bierwirth, C.: A study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objective. Comput. Oper. Res. 66, 44\u201357 (2016)","journal-title":"Comput. Oper. Res."},{"key":"19_CR29","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/j.cie.2016.05.028","volume":"98","author":"B Do Chung","year":"2016","unstructured":"Do Chung, B., Kim, B.S.: A hybrid genetic algorithm with two-stage dispatching heuristic for a machine scheduling problem with step-deteriorating jobs and rate-modifying activities. Comput. Ind. Eng. 98, 113\u2013124 (2016)","journal-title":"Comput. Ind. Eng."},{"key":"19_CR30","first-page":"1","volume":"0","author":"P Helo","year":"2018","unstructured":"Helo, P., Phuong, D., Hao, Y.: Cloud manufacturing \u2013 scheduling as a service for sheet metal manufacturing. Comput. Oper. Res. 0, 1\u201312 (2018)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"19_CR31","first-page":"99","volume":"18","author":"Y Zarook","year":"2014","unstructured":"Zarook, Y., Abedi, M.: JIT-scheduling in unrelated parallel-machine environment with aging effect and multi-maintenance activities. Int. J. Serv. Oper. Manag. 18(1), 99 (2014)","journal-title":"Int. J. Serv. Oper. Manag."},{"issue":"12","key":"19_CR32","doi-asserted-by":"publisher","first-page":"3516","DOI":"10.1080\/00207543.2012.751509","volume":"51","author":"L Zhang","year":"2013","unstructured":"Zhang, L., Gao, L., Li, X.: A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem. Int. J. Prod. Res. 51(12), 3516\u20133531 (2013)","journal-title":"Int. J. Prod. Res."},{"key":"19_CR33","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1016\/j.procir.2018.04.007","volume":"72","author":"N Nikolakis","year":"2018","unstructured":"Nikolakis, N., Kousi, N., Michalos, G., Makris, S.: Dynamic scheduling of shared human-robot manufacturing operations. Procedia CIRP 72, 9\u201314 (2018)","journal-title":"Procedia CIRP"},{"issue":"1","key":"19_CR34","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ejor.2016.07.030","volume":"257","author":"H Xiong","year":"2017","unstructured":"Xiong, H., Fan, H., Jiang, G., Li, G.: A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints. Eur. J. Oper. Res. 257(1), 13\u201324 (2017)","journal-title":"Eur. J. Oper. Res."},{"issue":"7","key":"19_CR35","doi-asserted-by":"publisher","first-page":"8703","DOI":"10.1016\/j.eswa.2011.01.078","volume":"38","author":"FTS Chan","year":"2011","unstructured":"Chan, F.T.S., Choy, K.L., Bibhushan, : A genetic algorithm-based scheduler for multiproduct parallel machine sheet metal job shop. Expert Syst. Appl. 38(7), 8703\u20138715 (2011)","journal-title":"Expert Syst. Appl."},{"issue":"9\u201312","key":"19_CR36","doi-asserted-by":"publisher","first-page":"3259","DOI":"10.1007\/s00170-017-1429-0","volume":"95","author":"A Azami","year":"2018","unstructured":"Azami, A., Demirli, K., Bhuiyan, N.: Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem. Int. J. Adv. Manuf. Technol. 95(9\u201312), 3259\u20133274 (2018)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"5","key":"19_CR37","doi-asserted-by":"publisher","first-page":"1944","DOI":"10.1109\/TCYB.2018.2817240","volume":"49","author":"K Gao","year":"2019","unstructured":"Gao, K., Yang, F., Zhou, M., Pan, Q.: Flexible job-shop rescheduling for new job insertion by using discrete Jaya algorithm. IEEE Trans. Cybern. 49(5), 1944\u20131955 (2019)","journal-title":"IEEE Trans. Cybern."},{"issue":"2","key":"19_CR38","first-page":"240","volume":"18","author":"H Lei","year":"2017","unstructured":"Lei, H., Xing, K., Han, L., Gao, Z.: Hybrid heuristic search approach for deadlock-free scheduling of flexible manufacturing systems using Petri nets. Appl. Soft Comput. 18(2), 240\u2013245 (2017)","journal-title":"Appl. Soft Comput."}],"container-title":["IFIP Advances in Information and Communication Technology","Technological Innovation for Industry and Service Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-17771-3_19","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,20]],"date-time":"2019-05-20T14:33:58Z","timestamp":1558362838000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-17771-3_19"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030177706","9783030177713"],"references-count":38,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-17771-3_19","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"16 April 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"DoCEIS","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Doctoral Conference on Computing, Electrical and Industrial Systems","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Costa de Caparica","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"8 May 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"10 May 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"10","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"doceis2019","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"http:\/\/doceis.dee.fct.unl.pt\/index.html","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Double-blind","order":1,"name":"type","label":"Type","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"EasyChair","order":2,"name":"conference_management_system","label":"Conference Management System","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"73","order":3,"name":"number_of_submissions_sent_for_review","label":"Number of Submissions Sent for Review","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"36","order":4,"name":"number_of_full_papers_accepted","label":"Number of Full Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"0","order":5,"name":"number_of_short_papers_accepted","label":"Number of Short Papers Accepted","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"49% - The value is computed by the equation \"Number of Full Papers Accepted \/ Number of Submissions Sent for Review * 100\" and then rounded to a whole number.","order":6,"name":"acceptance_rate_of_full_papers","label":"Acceptance Rate of Full Papers","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"3.17","order":7,"name":"average_number_of_reviews_per_paper","label":"Average Number of Reviews per Paper","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"n\/a","order":8,"name":"average_number_of_papers_per_reviewer","label":"Average Number of Papers per Reviewer","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}},{"value":"No","order":9,"name":"external_reviewers_involved","label":"External Reviewers Involved","group":{"name":"ConfEventPeerReviewInformation","label":"Peer Review Information"}}]}}