{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T17:23:13Z","timestamp":1743096193918,"version":"3.40.3"},"publisher-location":"Cham","reference-count":15,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030187149"},{"type":"electronic","value":"9783030187156"}],"license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019]]},"DOI":"10.1007\/978-3-030-18715-6_4","type":"book-chapter","created":{"date-parts":[[2019,4,25]],"date-time":"2019-04-25T14:09:50Z","timestamp":1556201390000},"page":"38-47","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Model Proposal to Evaluate the Quality of a Production Planning and Control Software in an Industrial Context"],"prefix":"10.1007","author":[{"given":"Ricardo M. P.","family":"Gon\u00e7alves","sequence":"first","affiliation":[]},{"given":"Maria L. R.","family":"Varela","sequence":"additional","affiliation":[]},{"given":"Ana M.","family":"Madureira","sequence":"additional","affiliation":[]},{"given":"Goran D.","family":"Putnik","sequence":"additional","affiliation":[]},{"given":"Jose","family":"Machado","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,4,26]]},"reference":[{"key":"4_CR1","doi-asserted-by":"crossref","unstructured":"Shuai, J.J., Su, Y.-F., Yang, C.: The impact of ERP implementation on corporate supply chain performance. In: 2007 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 1644\u20131648. IEEE (2007)","DOI":"10.1109\/IEEM.2007.4419471"},{"key":"4_CR2","unstructured":"Varela, M.L.R., Apar\u00edcio, J.N., Silva, S.C.: A Web-based application for manufacturing scheduling. In: IASTED International Conference on Intelligent Systems and Control, pp. 400\u2013405 (2003)"},{"issue":"6","key":"4_CR3","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1007\/978-3-642-24001-0_21","volume":"107","author":"G Campanella","year":"2011","unstructured":"Campanella, G., Ribeiro, R.A., Varela, L.R.: A model for B2B supplier selection. Adv. Intell. Soft Comput. 107(6), 221 (2011)","journal-title":"Adv. Intell. Soft Comput."},{"key":"4_CR4","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.simpat.2012.07.010","volume":"30","author":"M Glavan","year":"2013","unstructured":"Glavan, M., Gradi\u0161ar, D., Strmcnik, S., Mu\u0161ic, G.: Production modelling for holistic production control. Simul. Model. Pract. Theory 30, 1\u201320 (2013)","journal-title":"Simul. Model. Pract. Theory"},{"key":"4_CR5","doi-asserted-by":"crossref","unstructured":"Varela, M.L.R., Ribeiro, R.A.: Distributed manufacturing scheduling based on a dynamic multi-criteria decision model. In: Recent Developments and New Directions in Soft Computing, Springer, pp. 81\u201393 (2014)","DOI":"10.1007\/978-3-319-06323-2_6"},{"key":"4_CR6","doi-asserted-by":"crossref","unstructured":"Druzdzel, M.J., Flynn, R.R.: Decision Support Systems. Und Inf. Retr. Syst., 461\u201372 (2011)","DOI":"10.1201\/b11499-37"},{"issue":"18","key":"4_CR7","doi-asserted-by":"publisher","first-page":"553","DOI":"10.3182\/20070927-4-RO-3905.00092","volume":"40","author":"V Jovan","year":"2017","unstructured":"Jovan, V., Zorzut, S., Gradi\u0161ar, D., Dorneanu, B.: Closed-loop production control of polymerization plant using production KPIs. IFAC Proc. 40(18), 553\u2013558 (2017)","journal-title":"IFAC Proc."},{"issue":"1","key":"4_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.4018\/ijdsst.2015010101","volume":"7","author":"A Arrais-Castro","year":"2015","unstructured":"Arrais-Castro, A., Varela, M.L.R., Putnik, G.D., Ribeiro, R., Dargam, F.C.: Collaborative negotiation platform using a dynamic multi-criteria decision model. Int. J. Decis. Support. Syst. Technol. 7(1), 1\u201314 (2015)","journal-title":"Int. J. Decis. Support. Syst. Technol."},{"issue":"2","key":"4_CR9","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1016\/j.rcim.2012.08.001","volume":"29","author":"RY Zhong","year":"2013","unstructured":"Zhong, R.Y., Dai, Q.Y., Qu, T., Hu, G.J., Huang, G.Q.: RFID-enabled real-time manufacturing execution system for mass-customization production. Robot. Comput.-Integr. Manuf. 29(2), 283\u2013292 (2013)","journal-title":"Robot. Comput.-Integr. Manuf."},{"issue":"1","key":"4_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2004.04.028","volume":"169","author":"OS Vaidya","year":"2006","unstructured":"Vaidya, O.S., Kumar, S.: Analytic hierarchy process: an overview of applications. Eur. J. Oper. Res. 169(1), 1\u201329 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"5","key":"4_CR11","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1016\/j.ergon.2007.01.007","volume":"37","author":"B Sherehiy","year":"2007","unstructured":"Sherehiy, B., Karwowski, W., Layer, J.K.: A review of enterprise agility: concepts, frameworks, and attributes. Int. J. Ind. Ergon. 37(5), 445\u2013460 (2007)","journal-title":"Int. J. Ind. Ergon."},{"issue":"3","key":"4_CR12","first-page":"87","volume":"8","author":"J Trojanowska","year":"2017","unstructured":"Trojanowska, J., Dostatni, E.: Application of the theory of constraints for project management. Manag. Prod. Eng. Rev. 8(3), 87\u201395 (2017)","journal-title":"Manag. Prod. Eng. Rev."},{"key":"4_CR13","first-page":"111","volume-title":"Lecture Notes in Mechanical Engineering","author":"Paulina Rewers","year":"2017","unstructured":"Rewers, P., Trojanowska, J., Diakun, J., Rocha, A., Reis, L.P.: A study of priority rules for a levelled production plan; In: Hamrol, A., Ciszak, O., Legutko, S., Jurczyk, M. (eds.) Advances in Manufacturing. Lecture Notes in Mechanical Engineering, pp. 111\u2013120 (2018)"},{"key":"4_CR14","first-page":"23","volume-title":"Lecture Notes in Mechanical Engineering","author":"Justyna Trojanowska","year":"2017","unstructured":"Trojanowska, J., Kolinski, A., Galusik, D., Varela, M.L.R., Machado, J.: A methodology of improvement of manufacturing productivity through increasing operational efficiency of the production process. In: Hamrol, A., Ciszak, O., Legutko, S., Jurczyk, M. (eds.) Advances in Manufacturing. Lecture Notes in Mechanical Engineering, pp. 23\u201332 (2018)"},{"issue":"3","key":"4_CR15","first-page":"90","volume":"9","author":"MLR Varela","year":"2018","unstructured":"Varela, M.L.R., Putnik, G.D., Manupati, V.K., Rajyalakshmi, G., Trojanowska, J., Machado, J.: Collaborative manufacturing based on cloud, and on other i4.0 oriented principles and technologies: a systematic literature review and reflections. Manag. Prod. Eng. Rev. 9(3), 90\u201399 (2018)","journal-title":"Manag. Prod. Eng. Rev."}],"container-title":["Lecture Notes in Mechanical Engineering","Advances in Manufacturing II"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-18715-6_4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,29]],"date-time":"2019-05-29T08:03:37Z","timestamp":1559117017000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-18715-6_4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"ISBN":["9783030187149","9783030187156"],"references-count":15,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-18715-6_4","relation":{},"ISSN":["2195-4356","2195-4364"],"issn-type":[{"type":"print","value":"2195-4356"},{"type":"electronic","value":"2195-4364"}],"subject":[],"published":{"date-parts":[[2019]]},"assertion":[{"value":"26 April 2019","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}