{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,27]],"date-time":"2025-12-27T03:43:23Z","timestamp":1766807003500,"version":"3.40.3"},"publisher-location":"Cham","reference-count":28,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030467999"},{"type":"electronic","value":"9783030468002"}],"license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020]]},"DOI":"10.1007\/978-3-030-46800-2_5","type":"book-chapter","created":{"date-parts":[[2020,5,11]],"date-time":"2020-05-11T13:04:01Z","timestamp":1589202241000},"page":"117-133","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Data Templates\u2014Product Information Management Across Project Life-Cycle"],"prefix":"10.1007","author":[{"given":"Pedro","family":"M\u00eada","sequence":"first","affiliation":[]},{"given":"Hip\u00f3lito","family":"Sousa","sequence":"additional","affiliation":[]},{"given":"Eilif","family":"Hjelseth","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,5,12]]},"reference":[{"key":"5_CR1","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ijproman.2005.05.001","volume":"24","author":"BK Baiden","year":"2006","unstructured":"Baiden BK, Price ADF, Dainty ARJ (2006) The extent of team integration within construction projects. Int J Proj Manag 24:13\u201323","journal-title":"Int J Proj Manag"},{"key":"5_CR2","unstructured":"Chapman I (2016) Product data templates for manufacturers. NBS\u2014National Building Specification. [Online]. Available: \nhttps:\/\/toolkit.thenbs.com\/articles\/pdts\n\n. Accessed 1 Feb 2017"},{"key":"5_CR3","unstructured":"CIBSE (2017) Product data templates (CIBSE). Chartered institution of building services engineers (CIBSE) [Online]. Available: \nhttp:\/\/www.cibse.org\/knowledge\/bim-building-information-modelling\/product-data-templates\n\n Accessed 1 Feb 2017"},{"issue":"7","key":"5_CR4","doi-asserted-by":"publisher","first-page":"621","DOI":"10.1080\/01446190210163543","volume":"20","author":"A Dubois","year":"2002","unstructured":"Dubois A, Gadde L-E (2002) The construction industry as a loosely coupled system: implications for productivity and innovation. Constr Manag Econ 20(7):621\u2013631","journal-title":"Constr Manag Econ"},{"key":"5_CR5","unstructured":"European Comission (2012) Strategy for the sustainable competitiveness of the construction sector and its enterprises. Brussels"},{"key":"5_CR6","unstructured":"European Comission (2016) TARIC\u2014taxation and customs union. [Online]. Available: \nhttp:\/\/ec.europa.eu\/taxation_customs\/dds2\/taric\/taric_consultation.jsp?Lang=en&Expand=true&SimDate=20160413\n\n. Accessed 1 Jan 2016"},{"key":"5_CR7","unstructured":"European Commission (2018) Monitoring framework for the circular economy. Strasbourg"},{"key":"5_CR8","unstructured":"European Construction Sector Observatory (2019) EU construction sector: in transition towards circular economy. Brussels"},{"key":"5_CR9","unstructured":"European Parliament (2014) Directive 2014\/24\/UE of the European parliament and of the council"},{"key":"5_CR10","unstructured":"European Parliament and European Union Council (2011) Harmonised conditions for the marketing of construction products. 305:5\u201343"},{"key":"5_CR11","unstructured":"European Union (2019) LEVEL(S) Taking action on the total impact of the construction sector. Brussels"},{"key":"5_CR12","unstructured":"Forum WE (2016) Shaping the future of construction\u2014a breakthrough in mindset and technology. Geneva"},{"key":"5_CR13","unstructured":"Government H (2013) Construction 2025. London"},{"issue":"4","key":"5_CR14","first-page":"279","volume":"6","author":"E Hjelseth","year":"2010","unstructured":"Hjelseth E (2010) Exchange of relevant information in BIM objects defined by the role\u2014and life-cycle information model. Archit Eng Des Manag 6(4):279\u2013287","journal-title":"Archit Eng Des Manag"},{"key":"5_CR15","unstructured":"Hjelseth E, M\u00eada P (2016) Is BIM-based product documentation based on applicable principles?\u2014practical use in Norway and Portugal. In: eWork and eBusiness in architecture, Engineering and construction\u2014Proceedings of the 11th European conference on product and process modelling, ECPPM 2016"},{"key":"5_CR16","unstructured":"International Organization Standardization (2017) ISO\/DIS 19650-2:2017 Organization of information about construction works\u2014information management using Part 2: framework for classification. Switzerland"},{"key":"5_CR17","unstructured":"ISO (2018) EN ISO 23387 data templates for construction works entities of data templates, and how to link the data templates to industry foundation classes (IFC). Switzerland, p 18"},{"key":"5_CR18","unstructured":"ISO (2020) ISO\/FDIS 23386 building information modelling and other digital processes used in construction\u2014methodology to describe, author and maintain properties in interconnected data dictionaries, vol 2019. Switzerland, p 48"},{"key":"5_CR19","unstructured":"M\u00eada P (2014) Integrated construction organization\u2014contributions to the Portuguese framework. Porto university faculty of engineering"},{"key":"5_CR20","unstructured":"M\u00eada J, Sousa P, Moreira H (2015) Processo construtivo\u2014fases, atribui\u00e7\u00f5es, objetivos gerais e requisitos de informa\u00e7\u00e3o. In: Simp\u00f3sio gequaltec 2015\u2014tarefas e fun\u00e7\u00f5es futuras da engenharia civil: sustentabilidade e energia"},{"key":"5_CR21","unstructured":"M\u00eada P, Hjelseth E, Sousa H (2016) Construction information framework\u2014the role of classification systems. In: eWork and eBusiness in architecture, engineering and construction\u2014proceedings of the 11th European conference on product and process modelling, ECPPM 2016"},{"key":"5_CR22","unstructured":"Mukund S, Rajat A, Shankar C (2016) Imagining construction\u2019s digital future. McKinsey & Company. [Online]. Available: \nhttp:\/\/www.mckinsey.com\/industries\/capital-projects-and-infrastructure\/our-insights\/imagining-constructions-digital-future\n\n. Accessed 1 Jun 2016"},{"key":"5_CR23","unstructured":"Owen R (2013) Integrated Design & Delivery Solutions (IDDS). Rotterdam"},{"issue":"3","key":"5_CR24","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1017\/S026988890100008X","volume":"16","author":"Y Rezgui","year":"2001","unstructured":"Rezgui Y (2001) Review of information and the state of the art of knowledge management practices in the construction industry. Knowl Eng Rev 16(3):241\u2013254","journal-title":"Knowl Eng Rev"},{"key":"5_CR25","unstructured":"RIB (2013) Architects Guide to Using the RIBA Plan of Work 2013. RIBA Publi. RIBA Publishing, London"},{"key":"5_CR26","unstructured":"STPL (2016) On behalf of the B. T. Group. Product Data Definition. London"},{"key":"5_CR27","unstructured":"Tune N (2016) Product data template\u2014coBuilder. coBuilder [Online]. Available: \nhttp:\/\/gobim.com\/what-is-a-product-data-template\/\n\n. Accessed 1 Feb 2017"},{"key":"5_CR28","unstructured":"Wolstenholme A (2009) Never waste a good crisis\u2014a review of progress since rethinking construction and thoughts for our future. London"}],"container-title":["Building Pathology and Rehabilitation","Sustainable Materials in Building Construction"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-46800-2_5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,5,11]],"date-time":"2020-05-11T13:06:31Z","timestamp":1589202391000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-030-46800-2_5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"ISBN":["9783030467999","9783030468002"],"references-count":28,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-46800-2_5","relation":{},"ISSN":["2194-9832","2194-9840"],"issn-type":[{"type":"print","value":"2194-9832"},{"type":"electronic","value":"2194-9840"}],"subject":[],"published":{"date-parts":[[2020]]},"assertion":[{"value":"12 May 2020","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}