{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T18:59:45Z","timestamp":1742929185070,"version":"3.40.3"},"publisher-location":"Cham","reference-count":18,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783030854751"},{"type":"electronic","value":"9783030854768"}],"license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2021]]},"DOI":"10.1007\/978-3-030-85476-8_11","type":"book-chapter","created":{"date-parts":[[2021,11,7]],"date-time":"2021-11-07T06:05:32Z","timestamp":1636265132000},"page":"129-143","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Analysis and Optimisation of a Production Line Using Discrete Simulation"],"prefix":"10.1007","author":[{"given":"Fabiane K.","family":"Setti","sequence":"first","affiliation":[]},{"given":"Carla A. S.","family":"Geraldes","sequence":"additional","affiliation":[]},{"given":"Jo\u00e3o P.","family":"Almeida","sequence":"additional","affiliation":[]},{"given":"Marcelo G.","family":"Trentin","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,11,8]]},"reference":[{"key":"11_CR1","doi-asserted-by":"crossref","unstructured":"Banks, J.: Introduction to simulation. In: 2000 Winter Simulation Conference. IEEE (Cat. No. 00CH37165), pp. 9\u201316 (2000)","DOI":"10.1109\/WSC.2000.899690"},{"key":"11_CR2","doi-asserted-by":"crossref","unstructured":"Carson, Y., Maria, A.: Simulation optimization: methods and applications. In: 1997 Winter Simulation Conference; IEEE 1, 118\u2013126 (1997)","DOI":"10.1145\/268437.268460"},{"key":"11_CR3","doi-asserted-by":"crossref","unstructured":"Chiang, S.Y., Kuo, C.T., Meerkov, S.M.: c-Bottlenecks in serial production lines: identification and application. Math. Probl. Eng. 7(6), 543\u2013578 (2001)","DOI":"10.1155\/S1024123X01001776"},{"key":"11_CR4","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/j.compind.2018.09.005","volume":"103","author":"AMC Guimar\u00e3es","year":"2018","unstructured":"Guimar\u00e3es, A.M.C., Leal, J.E., Mendes, P.: Discrete-event simulation software selection for manufacturing based on the maturity model. Comput. Ind. 103, 14\u201327 (2018)","journal-title":"Comput. Ind."},{"key":"11_CR5","doi-asserted-by":"publisher","first-page":"1403","DOI":"10.1016\/j.protcy.2014.10.159","volume":"16","author":"SA Hassan","year":"2014","unstructured":"Hassan, S.A., Abdelsalam, H.M.: An exploratory simulation model for contraception methods\u2019 supply chain in Egypt. Procedia Technol. 16, 1403\u20131410 (2014)","journal-title":"Procedia Technol."},{"key":"11_CR6","doi-asserted-by":"crossref","unstructured":"Hern\u00e1ndez, M.A.G., Librantz, A.F.H.: Simulaci\u00f3n de eventos discretos de la cadena log\u00edstica de exportaci\u00f3n de commodities. Ingeniare. Revista chilena de ingenier\u00eda 22, 257\u2013262 (2014)","DOI":"10.4067\/S0718-33052014000200011"},{"key":"11_CR7","volume-title":"Simula\u00e7\u00e3o de sistemas de gest\u00e3o de produ\u00e7\u00e3o em manufatura sazonal","author":"AM Iucksch","year":"2005","unstructured":"Iucksch, A.M.: Simula\u00e7\u00e3o de sistemas de gest\u00e3o de produ\u00e7\u00e3o em manufatura sazonal. Rio Grande do Sul, Brasil (2005)"},{"key":"11_CR8","unstructured":"La Mota, I.F., Guasch, A., Mota, M.M., Piera, M.A.: Integration of SIMIO with Coloured Petri Nets. Springer, Berlin (2017)"},{"key":"11_CR9","unstructured":"Law, A.M., Kelton, W.D., Kelton, W.D.: Simulation modeling and analysis, 2nd edn. McGraw-Hill, New York (1991)"},{"issue":"12","key":"11_CR10","doi-asserted-by":"publisher","first-page":"2897","DOI":"10.1080\/00207549408957107","volume":"32","author":"CM Liu","year":"1994","unstructured":"Liu, C.M., Lin, C.L.: Performance evaluation of unbalanced serial production lines. Int. J. Prod. Res. 32(12), 2897\u20132914 (1994)","journal-title":"Int. J. Prod. Res."},{"issue":"44","key":"11_CR11","doi-asserted-by":"publisher","first-page":"133","DOI":"10.14483\/udistrital.jour.tecnura.2015.2.a10","volume":"19","author":"MEB Loaiza","year":"2015","unstructured":"Loaiza, M.E.B., Sarmiento, G.C., Correa, J.H.R.: Productividad en una celda de manufactura flexible simulada en promodel utilizando path networks type crane. Revista Tecnura 19(44), 133\u2013144 (2015)","journal-title":"Revista Tecnura"},{"key":"11_CR12","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.autcon.2005.12.001","volume":"16","author":"M Lu","year":"2007","unstructured":"Lu, M., Wong, L.-C.: Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA. Autom. Constr. 16, 86\u201395 (2007)","journal-title":"Autom. Constr."},{"key":"11_CR13","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1016\/j.procir.2014.10.032","volume":"25","author":"D Mourtzis","year":"2014","unstructured":"Mourtzis, D., Doukas, M., Bernidaki, D.: Simulation in manufacturing: review and challenges. Procedia CIRP 25, 213\u2013229 (2014)","journal-title":"Procedia CIRP"},{"key":"11_CR14","doi-asserted-by":"publisher","first-page":"49","DOI":"10.17058\/tecnolog.v19i2.5841","volume":"19","author":"MC M\u00fcller","year":"2015","unstructured":"M\u00fcller, M.C., Dalberto, R., Rebelatto, T., Botassoli, G.T., Furtado, J.C.: Simula\u00e7\u00e3o computacional discreta em uma linha de produ\u00e7\u00e3o de alimentos embutidos. Tecno-L\u00f3gica 19, 49\u201356 (2015)","journal-title":"Tecno-L\u00f3gica"},{"key":"11_CR15","doi-asserted-by":"publisher","first-page":"513","DOI":"10.1016\/j.promfg.2015.11.070","volume":"4","author":"S Sanjaya","year":"2015","unstructured":"Sanjaya, S., Perdana, T.: Logistics system model development on supply chain management of tomato commodities for structured market. Procedia Manuf. 4, 513\u2013520 (2015)","journal-title":"Procedia Manuf."},{"key":"11_CR16","doi-asserted-by":"crossref","unstructured":"Shannon, R.E.: Introduction to the art and science of simulation. In: Proceedings of the 1998 Winter Simulation Conference (Cat. No. 98CH36274), vol. 1, pp. 7\u201314 (1998)","DOI":"10.1109\/WSC.1998.744892"},{"key":"11_CR17","unstructured":"Smith, J.S., Sturrock, D.T., Kelton, W.D.: Simio and simulation: modeling, analysis, applications. Simio LLC (2018)"},{"key":"11_CR18","doi-asserted-by":"crossref","unstructured":"White, K.P., Ingalls, R.G.: Introduction to simulation. In: Proceedings of the 2009 Winter Simulation Conference (WSC), vol. 1, pp. 12\u201323. IEEE (2009)","DOI":"10.1109\/WSC.2009.5429315"}],"container-title":["Springer Proceedings in Mathematics &amp; Statistics","Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-030-85476-8_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,11]],"date-time":"2024-09-11T17:27:42Z","timestamp":1726075662000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-030-85476-8_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"ISBN":["9783030854751","9783030854768"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-3-030-85476-8_11","relation":{},"ISSN":["2194-1009","2194-1017"],"issn-type":[{"type":"print","value":"2194-1009"},{"type":"electronic","value":"2194-1017"}],"subject":[],"published":{"date-parts":[[2021]]},"assertion":[{"value":"8 November 2021","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"APDIO","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Congress of the Portuguese Association of Operational Research","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Tomar","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2019","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"22 July 2019","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"24 July 2019","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"20","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"apdio12019","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}