{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,6]],"date-time":"2026-02-06T05:53:39Z","timestamp":1770357219836,"version":"3.49.0"},"publisher-location":"Cham","reference-count":56,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783031143168","type":"print"},{"value":"9783031143175","type":"electronic"}],"license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022]]},"DOI":"10.1007\/978-3-031-14317-5_20","type":"book-chapter","created":{"date-parts":[[2022,8,13]],"date-time":"2022-08-13T08:03:02Z","timestamp":1660377782000},"page":"237-249","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["A Systematic Review of Manufacturing Scheduling for the Industry 4.0"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2299-1859","authenticated-orcid":false,"given":"Leonilde","family":"Varela","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3378-6866","authenticated-orcid":false,"given":"Goran D.","family":"Putnik","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6445-5475","authenticated-orcid":false,"given":"Catia F.","family":"Alves","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8897-5061","authenticated-orcid":false,"given":"Nuno","family":"Lopes","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7709-8777","authenticated-orcid":false,"given":"Maria M.","family":"Cruz-Cunha","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,8,14]]},"reference":[{"key":"20_CR1","doi-asserted-by":"crossref","unstructured":"Xu, L.D., Xu, E.L., Li, L.: Industry 4.0: state of the art and future trends. Int. J. Prod. Res. 56, 2941\u20132962 (2018)","DOI":"10.1080\/00207543.2018.1444806"},{"key":"20_CR2","doi-asserted-by":"publisher","unstructured":"Parunak, H.V.D.: Characterizing the manufacturing scheduling problem. J. Manuf. Syst. 10, 241\u2013259 (1991). https:\/\/doi.org\/10.1016\/0278-6125(91)90037-3","DOI":"10.1016\/0278-6125(91)90037-3"},{"key":"20_CR3","unstructured":"Varela, M.L.R., Apar\u00edcio, J.N., Silva, S.C.: A web-based application for manufacturing scheduling. In:\u00a0IASTED International. Conference on Intelligent Systems and Control, pp. 400\u2013405 (2003)"},{"key":"20_CR4","series-title":"IFIP \u2013 The International Federation for Information Processing","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1007\/978-0-387-09492-2_21","volume-title":"Innovation in Manufacturing Networks","author":"MLR Varela","year":"2008","unstructured":"Varela, M.L.R., Silva, S.C.: An ontology for a model of manufacturing scheduling problems to be solved on the web. In: Azevedo, A. (ed.) BASYS 2008. ITIFIP, vol. 266, pp. 197\u2013204. Springer, Boston (2008). https:\/\/doi.org\/10.1007\/978-0-387-09492-2_21"},{"key":"20_CR5","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1016\/j.ejor.2009.09.026","volume":"205","author":"JM Framinan","year":"2010","unstructured":"Framinan, J.M., Ruiz, R.: Architecture of manufacturing scheduling systems: literature review and an integrated proposal. Eur. J. Oper. Res. 205, 237\u2013246 (2010). https:\/\/doi.org\/10.1016\/j.ejor.2009.09.026","journal-title":"Eur. J. Oper. Res."},{"key":"20_CR6","doi-asserted-by":"publisher","unstructured":"Giret, A., Trentesaux, D., Prabhu, V.: Sustainability in manufacturing operations scheduling: a state of the art review. J. Manuf. Syst. 37, 126\u2013140 (2015). https:\/\/doi.org\/10.1016\/j.jmsy.2015.08.002","DOI":"10.1016\/j.jmsy.2015.08.002"},{"key":"20_CR7","doi-asserted-by":"publisher","first-page":"866","DOI":"10.1016\/j.jclepro.2018.09.100","volume":"205","author":"M Akbar","year":"2018","unstructured":"Akbar, M., Irohara, T.: Scheduling for sustainable manufacturing: a review. J. Clean. Prod. 205, 866\u2013883 (2018)","journal-title":"J. Clean. Prod."},{"key":"20_CR8","doi-asserted-by":"publisher","first-page":"744","DOI":"10.1016\/j.ejor.2015.07.017","volume":"248","author":"C Gahm","year":"2016","unstructured":"Gahm, C., Denz, F., Dirr, M., Tuma, A.: Energy-efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248, 744\u2013757 (2016)","journal-title":"Eur. J. Oper. Res."},{"key":"20_CR9","doi-asserted-by":"publisher","first-page":"4854","DOI":"10.1080\/00207543.2018.1449978","volume":"57","author":"Y Liu","year":"2019","unstructured":"Liu, Y., Wang, L., Wang, X.V., Xu, X., Zhang, L.: Scheduling in cloud manufacturing: state-of-the-art and research challenges. Int. J. Prod. Res. 57, 4854\u20134879 (2019). https:\/\/doi.org\/10.1080\/00207543.2018.1449978","journal-title":"Int. J. Prod. Res."},{"key":"20_CR10","doi-asserted-by":"crossref","unstructured":"Dogan, A., Birant, D.: Machine learning and data mining in manufacturing. Exp. Syst. Appl. 166, 114060 (2021)","DOI":"10.1016\/j.eswa.2020.114060"},{"key":"20_CR11","doi-asserted-by":"publisher","first-page":"9","DOI":"10.1016\/j.procir.2014.03.115","volume":"17","author":"L Monostori","year":"2014","unstructured":"Monostori, L.: Cyber-physical production systems: roots, expectations and R&D challenges. Procedia CIRP. 17, 9\u201313 (2014). https:\/\/doi.org\/10.1016\/j.procir.2014.03.115","journal-title":"Procedia CIRP."},{"key":"20_CR12","doi-asserted-by":"crossref","unstructured":"Varela, M.L., Putnik, G.D., Manupati, V.K., Rajyalakshmi, G., Trojanowska, J., Machado, J.: Integrated process planning and scheduling in networked manufacturing systems for I4. 0: a review and framework proposal. Wireless Netw. 27, 1587\u20131599 (2021)","DOI":"10.1007\/s11276-019-02082-8"},{"key":"20_CR13","doi-asserted-by":"publisher","unstructured":"Varela, L., et al.: Manufacturing and management paradigms, methods and tools for sustainable industry 4.0-oriented manufacturing systems. Sustainability 14, 1574 (2022). https:\/\/doi.org\/10.3390\/su14031574","DOI":"10.3390\/su14031574"},{"key":"20_CR14","doi-asserted-by":"publisher","unstructured":"Rossit, D.A., Tohm\u00e9, F., Frutos, M.: Industry 4.0: smart scheduling. Int. J. Prod. Res. 57, 3802\u20133813 (2019). https:\/\/doi.org\/10.1080\/00207543.2018.1504248","DOI":"10.1080\/00207543.2018.1504248"},{"key":"20_CR15","doi-asserted-by":"publisher","first-page":"3922","DOI":"10.1080\/00207543.2013.860251","volume":"52","author":"J-Y Moon","year":"2014","unstructured":"Moon, J.-Y., Park, J.: Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage. Int. J. Prod. Res. 52, 3922\u20133939 (2014). https:\/\/doi.org\/10.1080\/00207543.2013.860251","journal-title":"Int. J. Prod. Res."},{"key":"20_CR16","doi-asserted-by":"crossref","unstructured":"Leusin, M., Frazzon, E., Uriona Maldonado, M., K\u00fcck, M., Freitag, M.: Solving the job-shop scheduling problem in the industry 4.0 Era. Technologies 6, 107 (2018)","DOI":"10.3390\/technologies6040107"},{"key":"20_CR17","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/0925-5273(93)90007-8","volume":"32","author":"V Suresh","year":"1993","unstructured":"Suresh, V., Chaudhuri, D.: Dynamic scheduling\u2014a survey of research. Int. J. Prod. Econ. 32, 53\u201363 (1993)","journal-title":"Int. J. Prod. Econ."},{"key":"20_CR18","doi-asserted-by":"publisher","first-page":"357","DOI":"10.1016\/j.arcontrol.2021.04.008","volume":"51","author":"A Villalonga","year":"2021","unstructured":"Villalonga, A., et al.: A decision-making framework for dynamic scheduling of cyber-physical production systems based on digital twins. Annu. Rev. Control. 51, 357\u2013373 (2021)","journal-title":"Annu. Rev. Control."},{"key":"20_CR19","doi-asserted-by":"crossref","unstructured":"Ebufegha, A., Li, S.: Multi-agent system model for dynamic scheduling in flexibile job shops. In: 2021 Winter Simulation Conference (WSC), pp. 1\u201312 (2021)","DOI":"10.1109\/WSC52266.2021.9715441"},{"key":"20_CR20","doi-asserted-by":"crossref","unstructured":"Saboor, A., Imran, M., Agha, M.H., Ahmed, W.: Flexible cell formation and scheduling of robotics coordinated dynamic cellular manufacturing system: a gateway to Industry 4.0. In: 2019 International Conference on Robotics and Automation in Industry, pp. 1\u20136. IEEE (2019)","DOI":"10.1109\/ICRAI47710.2019.8967369"},{"key":"20_CR21","doi-asserted-by":"crossref","unstructured":"Hofer, F., Sehr, M. A., Russo, B., Sangiovanni-Vincentelli, A.: ODRE workshop: probabilistic dynamic hard real-time scheduling in HPC. In: IEEE 23rd International Symposium on Real-Time Distributed Computing (ISORC), pp. 207\u2013212. IEEE 23rd International Symposium on Real-Time Distributed Computing (ISORC), IEEE (2020)","DOI":"10.1109\/ISORC49007.2020.00043"},{"issue":"9","key":"20_CR22","doi-asserted-by":"publisher","first-page":"3979","DOI":"10.1007\/s00170-019-03940-7","volume":"105","author":"Q Tan","year":"2019","unstructured":"Tan, Q., Tong, Y., Wu, S., Li, D.: Modeling, planning, and scheduling of shop-floor assembly process with dynamic cyber-physical interactions: a case study for CPS-based smart industrial robot production. Int. J. Adv. Manuf. Technol. 105(9), 3979\u20133989 (2019). https:\/\/doi.org\/10.1007\/s00170-019-03940-7","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"20_CR23","doi-asserted-by":"crossref","unstructured":"Ferreirinha, L., et al.: An Industry 4.0 oriented tool for supporting dynamic selection of dispatching rules based on Kano model satisfaction scheduling. FME Trans. 47, 757\u2013764 (2019)","DOI":"10.5937\/fmet1904757F"},{"key":"20_CR24","doi-asserted-by":"crossref","unstructured":"Leit\u00e3o P., Restivo, F.: A holonic approach to dynamic manufacturing scheduling. Robot. Comput. Integr. Manuf. 24, 625\u2013634 (2008)","DOI":"10.1016\/j.rcim.2007.09.005"},{"key":"20_CR25","doi-asserted-by":"publisher","first-page":"3369","DOI":"10.1109\/ACCESS.2016.2616366","volume":"5","author":"CH Hsu","year":"2016","unstructured":"Hsu, C.H., Yang, H.C.: Real-time near-optimal scheduling with rolling horizon for automatic manufacturing cell. IEEE Access. 5, 3369\u20133375 (2016)","journal-title":"IEEE Access."},{"key":"20_CR26","doi-asserted-by":"crossref","unstructured":"Zhang, J., Ding, G., Zou, Y., Qin, S., Fu, J.: Review of job shop scheduling research and its new perspectives under I4.0. J. Intell. Manuf. 30, 1809\u20131830 (2019)","DOI":"10.1007\/s10845-017-1350-2"},{"key":"20_CR27","doi-asserted-by":"crossref","unstructured":"Jiang, Z., Yuan, S., Ma, J., Wang, Q.: The evolution of production scheduling from Industry 3.0 through Industry 4.0. Int. J. Prod. Res. 1\u201321 (2021)","DOI":"10.1080\/00207543.2021.1925772"},{"key":"20_CR28","doi-asserted-by":"publisher","unstructured":"D\u2019Aniello, G., De Falco, M., Mastrandrea, N.: Designing a multi-agent system architecture for managing distributed operations within cloud manufacturing 14, 2051\u20132058 (2021). https:\/\/doi.org\/10.1007\/s12065-020-00390-z","DOI":"10.1007\/s12065-020-00390-z"},{"key":"20_CR29","doi-asserted-by":"crossref","unstructured":"Sousa, A.L., Oliveira, A.S.: Distributed MAS with leaderless consensus to job-shop scheduler in a virtual smart factory with modular conveyors. In: 2020 Latin American Robotics Symposium (LARS), 2020 Brazilian Symposium on Robotics (SBR) and 2020 Workshop on Robotics in Education (WRE), pp. 1\u20136. IEEE (2020)","DOI":"10.1109\/LARS\/SBR\/WRE51543.2020.9307149"},{"key":"20_CR30","doi-asserted-by":"publisher","first-page":"2028","DOI":"10.1080\/00207543.2020.1797207","volume":"59","author":"J Lohmer","year":"2021","unstructured":"Lohmer, J., Lasch, R.: Production planning and scheduling in multi-factory production networks: a systematic literature review. Int. J. Prod. Res. 59, 2028\u20132054 (2021)","journal-title":"Int. J. Prod. Res."},{"key":"20_CR31","doi-asserted-by":"publisher","first-page":"108","DOI":"10.1287\/ijoc.6.2.108","volume":"6","author":"ED Taillard","year":"1994","unstructured":"Taillard, E.D.: Parallel taboo search techniques for the job shop scheduling problem. ORSA J. Comput. 6, 108\u2013117 (1994)","journal-title":"ORSA J. Comput."},{"key":"20_CR32","doi-asserted-by":"publisher","first-page":"1260","DOI":"10.1287\/mnsc.42.9.1260","volume":"42","author":"RL Daniels","year":"1996","unstructured":"Daniels, R.L., Hoopes, B.J., Mazzola, J.B.: Scheduling parallel manufacturing cells with resource flexibility. Manage. Sci. 42, 1260\u20131276 (1996)","journal-title":"Manage. Sci."},{"key":"20_CR33","first-page":"135","volume":"32","author":"S Olafsson","year":"2000","unstructured":"Olafsson, S., Shi, L.: A method for scheduling in parallel manufacturing systems with flexible resources. IIE Trans. 32, 135\u2013146 (2000)","journal-title":"IIE Trans."},{"key":"20_CR34","doi-asserted-by":"crossref","unstructured":"Coelho, P., Silva, C.: Parallel Metaheuristics for shop scheduling: enabling industry 4.0. Procedia Comput. Sci. 180, 778\u2013786 (2021)","DOI":"10.1016\/j.procs.2021.01.328"},{"key":"20_CR35","doi-asserted-by":"crossref","unstructured":"Rohaninejad, M., Tavakkoli-Moghaddam, R., Vahedi-Nouri, B., Hanzalek, Z., Shirazian, S.: A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines. Int. J. Prod. Res. 1\u201321 (2021)","DOI":"10.1080\/00207543.2021.1987550"},{"issue":"7","key":"20_CR36","doi-asserted-by":"publisher","first-page":"1503","DOI":"10.1007\/s10845-015-1139-0","volume":"28","author":"O Cardin","year":"2015","unstructured":"Cardin, O., Trentesaux, D., Thomas, A., Castagna, P., Berger, T., Bril El-Haouzi, H.: Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges. J. Intell. Manuf. 28(7), 1503\u20131517 (2015). https:\/\/doi.org\/10.1007\/s10845-015-1139-0","journal-title":"J. Intell. Manuf."},{"key":"20_CR37","doi-asserted-by":"publisher","first-page":"4","DOI":"10.1016\/j.compind.2020.103244","volume":"120","author":"C Morariu","year":"2020","unstructured":"Morariu, C., Morariu, O., Raileanu, S., Borangiu, T.: Machine learning for predictive scheduling and resource allocation in large scale manufacturing systems. Comput. Ind. 120, 4 (2020)","journal-title":"Comput. Ind."},{"key":"20_CR38","doi-asserted-by":"publisher","first-page":"298","DOI":"10.1080\/09537289108919359","volume":"2","author":"SY Nof","year":"1991","unstructured":"Nof, S.Y., Hank Grant, F.: Adaptive\/predictive scheduling: review and a general framework. Prod. Plan. Control. 2, 298\u2013312 (1991)","journal-title":"Prod. Plan. Control."},{"key":"20_CR39","doi-asserted-by":"publisher","first-page":"470","DOI":"10.4028\/www.scientific.net\/AMM.307.470","volume":"307","author":"K Kalinowski","year":"2013","unstructured":"Kalinowski, K., Krenczyk, D., Grabowik, C.: Predictive-reactive strategy for real time scheduling of manufacturing systems. Appl. Mech. Mater. 307, 470\u2013473 (2013)","journal-title":"Appl. Mech. Mater."},{"key":"20_CR40","doi-asserted-by":"publisher","first-page":"7027","DOI":"10.1080\/00207543.2016.1177237","volume":"54","author":"JF Jimenez","year":"2016","unstructured":"Jimenez, J.F., Bekrar, A., Trentesaux, D., Leit\u00e3o, P.: A switching mechanism framework for optimal coupling of predictive scheduling and reactive control in manufacturing hybrid control architectures. Int. J. Prod. Res. 54, 7027\u20137042 (2016)","journal-title":"Int. J. Prod. Res."},{"key":"20_CR41","series-title":"Advances in Intelligent Systems and Computing","doi-asserted-by":"publisher","first-page":"358","DOI":"10.1007\/978-3-319-64465-3_35","volume-title":"Intelligent Systems in Production Engineering and Maintenance \u2013 ISPEM 2017","author":"\u0141 Sobaszek","year":"2018","unstructured":"Sobaszek, \u0141, Gola, A., \u015awi\u0107, A.: Predictive scheduling as a part of intelligent job scheduling system. In: Burduk, A., Mazurkiewicz, D. (eds.) ISPEM 2017. AISC, vol. 637, pp. 358\u2013367. Springer, Cham (2018). https:\/\/doi.org\/10.1007\/978-3-319-64465-3_35"},{"key":"20_CR42","first-page":"11275","volume":"7","author":"HF Rahman","year":"2019","unstructured":"Rahman, H.F., Janardhanan, M.N., Nielsen, I.E.: Real-time order acceptance and scheduling problems in a flow shop environment using hybrid GA-PSO algorithm. IEEE Access. 7, 11275\u201312742 (2019)","journal-title":"IEEE Access."},{"key":"20_CR43","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1145\/3464429","volume":"20","author":"VP Modekurthy","year":"2021","unstructured":"Modekurthy, V.P., Saifullah, A., Madria, S.: A distributed real-time scheduling system for industrial wireless networks. ACM Trans. Embed. Comput. Syst. (TECS). 20, 1\u201328 (2021)","journal-title":"ACM Trans. Embed. Comput. Syst. (TECS)."},{"key":"20_CR44","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/j.infsof.2008.09.009","volume":"51","author":"B Kitchenham","year":"2009","unstructured":"Kitchenham, B., Brereton, O.P., Budgen, D., Turner, M., Bailey, J., Linkman, S.: Systematic literature reviews in software engineering -a systematic literature review. Inf. Softw. Technol. 51, 7\u201315 (2009)","journal-title":"Inf. Softw. Technol."},{"key":"20_CR45","unstructured":"Kitchenham, B.: Procedures for performing systematic reviews, version 1.0. Empirical Softw. Eng. 33, 1\u201326 (2004)"},{"key":"20_CR46","doi-asserted-by":"publisher","first-page":"4448","DOI":"10.3390\/en12234448","volume":"12","author":"M Nouiri","year":"2019","unstructured":"Nouiri, M., Trentesaux, D., Bekrar, A.: Towards energy efficient scheduling of manufacturing systems through collaboration between cyber physical production and energy systems. Energies 12, 4448 (2019)","journal-title":"Energies"},{"key":"20_CR47","doi-asserted-by":"publisher","first-page":"827","DOI":"10.5937\/fme2104827A","volume":"49","author":"C Alves","year":"2021","unstructured":"Alves, C., Putnik, G.D., Varela, M.L.R.: How environment dynamics affects production scheduling: requirements for development of CPPS models. FME Trans. 49, 827\u2013834 (2021)","journal-title":"FME Trans."},{"key":"20_CR48","doi-asserted-by":"publisher","first-page":"2491","DOI":"10.3390\/app10072491","volume":"10","author":"S Chen","year":"2020","unstructured":"Chen, S., Fang, S., Tang, R.: An ANN-based approach for real-time scheduling in cloud manufacturing. Appl. Sci. 10, 2491 (2020)","journal-title":"Appl. Sci."},{"key":"20_CR49","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1016\/j.promfg.2018.10.061","volume":"17","author":"J Delaram","year":"2018","unstructured":"Delaram, J., Valilai, O.F.: A mathematical model for task scheduling in cloud manufacturing systems focusing on global logistics. Procedia Manuf. 17, 387\u2013394 (2018)","journal-title":"Procedia Manuf."},{"key":"20_CR50","doi-asserted-by":"crossref","unstructured":"Fernandez-Viagas, V., Framinan, J.M.: Exploring the benefits of scheduling with advanced and real-time information integration in Industry 4.0: A computational study. J. Ind. Inf. Integr. 27, 100281 (2021)","DOI":"10.1016\/j.jii.2021.100281"},{"key":"20_CR51","doi-asserted-by":"crossref","unstructured":"Ghaleb, M., Zolfagharinia, H., Taghipour, S.: Real-time production scheduling in the industry-4.0 context: addressing uncertainties in job arrivals and machine breakdowns. Comput. Oper. Res. 123, 1 (2020)","DOI":"10.1016\/j.cor.2020.105031"},{"key":"20_CR52","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1016\/j.promfg.2018.10.066","volume":"17","author":"TH Hsu","year":"2018","unstructured":"Hsu, T.H., Wang, L.C., Chu, P.C.: Development of a cloud-based advanced planning and scheduling system. Procedia Manuf. 17, 427\u2013434 (2018)","journal-title":"Procedia Manuf."},{"key":"20_CR53","doi-asserted-by":"crossref","unstructured":"Kocsi, B., Matonya, M.M., Pusztai, L.P., Budai, I.: Real-time decision-support system for high-mix low-volume production scheduling in industry 4.0. Processes 8, 912 (2020)","DOI":"10.3390\/pr8080912"},{"issue":"3","key":"20_CR54","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1007\/s11518-021-5490-8","volume":"30","author":"A Tighazoui","year":"2021","unstructured":"Tighazoui, A., Sauvey, C., Sauer, N.: Predictive-reactive strategy for flowshop rescheduling problem: minimizing the total weighted waiting times and instability. J. Syst. Sci. Syst. Eng. 30(3), 253\u2013275 (2021). https:\/\/doi.org\/10.1007\/s11518-021-5490-8","journal-title":"J. Syst. Sci. Syst. Eng."},{"key":"20_CR55","doi-asserted-by":"crossref","unstructured":"Wenzelburger, P., Allg\u00f6wer, F.: Model predictive control for flexible job shop scheduling in industry 4.0. Appl. Sci. 11, 8145 (2021)","DOI":"10.3390\/app11178145"},{"key":"20_CR56","doi-asserted-by":"crossref","unstructured":"Yang, W., Takakuwa, S.: Simulation-based dynamic shop floor scheduling for a flexible manufacturing system in the industry 4. In: Winter Simulation Conference (WSC), pp. 3908\u20133916. IEEE (2017)","DOI":"10.1109\/WSC.2017.8248101"}],"container-title":["Lecture Notes in Networks and Systems","Managing and Implementing the Digital Transformation"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-14317-5_20","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,1]],"date-time":"2024-10-01T17:15:01Z","timestamp":1727802901000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-14317-5_20"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"ISBN":["9783031143168","9783031143175"],"references-count":56,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-14317-5_20","relation":{},"ISSN":["2367-3370","2367-3389"],"issn-type":[{"value":"2367-3370","type":"print"},{"value":"2367-3389","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022]]},"assertion":[{"value":"14 August 2022","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ISIEA","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Symposium on Industrial Engineering and Automation","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Bolzano","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Italy","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2022","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"21 June 2022","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"22 June 2022","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"isiea2022","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/isiea.events.unibz.it\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}