{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T08:02:16Z","timestamp":1769932936819,"version":"3.49.0"},"publisher-location":"Cham","reference-count":43,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783031202407","type":"print"},{"value":"9783031202414","type":"electronic"}],"license":[{"start":{"date-parts":[[2022,11,20]],"date-time":"2022-11-20T00:00:00Z","timestamp":1668902400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2022,11,20]],"date-time":"2022-11-20T00:00:00Z","timestamp":1668902400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023]]},"DOI":"10.1007\/978-3-031-20241-4_23","type":"book-chapter","created":{"date-parts":[[2022,11,19]],"date-time":"2022-11-19T18:03:00Z","timestamp":1668880980000},"page":"334-345","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Waste Elimination and Value Management Framework Based on Lean Design Methods"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3063-4998","authenticated-orcid":false,"given":"Mahmoud","family":"Karaz","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6694-4926","authenticated-orcid":false,"given":"Jos\u00e9 Cardoso","family":"Teixeira","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,11,20]]},"reference":[{"key":"23_CR1","unstructured":"Kestle, L., London, K.: Towards the development of a conceptual design management model for remote sites. In: 10th Annual Conference of the International Group for Lean Construction (2002). http:\/\/iglc.net\/Papers\/Details\/193\/pdf"},{"issue":"June","key":"23_CR2","doi-asserted-by":"publisher","first-page":"567","DOI":"10.1016\/j.proeng.2016.11.659","volume":"164","author":"M Tauriainen","year":"2016","unstructured":"Tauriainen, M., Marttinen, P., Dave, B., Koskela, L.: The effects of BIM and lean construction on design management practices. Proc. Eng. 164(June), 567\u2013574 (2016). https:\/\/doi.org\/10.1016\/j.proeng.2016.11.659","journal-title":"Proc. Eng."},{"issue":"2","key":"23_CR3","doi-asserted-by":"publisher","first-page":"189","DOI":"10.1016\/j.autcon.2010.09.016","volume":"20","author":"Y Arayici","year":"2011","unstructured":"Arayici, Y., et al.: Technology adoption in the BIM implementation for lean architectural practice. Autom. Constr. 20(2), 189\u2013195 (2011). https:\/\/doi.org\/10.1016\/j.autcon.2010.09.016","journal-title":"Autom. Constr."},{"key":"23_CR4","series-title":"Lecture Notes in Management and Industrial Engineering","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1007\/978-3-030-86248-0_16","volume-title":"Research on Project, Programme and Portfolio Management","author":"I Nechaeva","year":"2022","unstructured":"Nechaeva, I.: How construction projects can be agile. In: Ding, R., Wagner, R., Bodea, C.-N. (eds.) Research on Project, Programme and Portfolio Management. LNMIE, pp. 287\u2013299. Springer, Cham (2022). https:\/\/doi.org\/10.1007\/978-3-030-86248-0_16"},{"issue":"3","key":"23_CR5","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1111\/1467-8551.00375","volume":"14","author":"D Tranfield","year":"2003","unstructured":"Tranfield, D., Denyer, D., Smart, P.: Towards a methodology for developing evidence-informed management knowledge by means of systematic review. Br. J. Manag. 14(3), 207\u2013222 (2003). https:\/\/doi.org\/10.1111\/1467-8551.00375","journal-title":"Br. J. Manag."},{"key":"23_CR6","unstructured":"Koskela, L., Ballard, G., Howell, G., Tommelein, I.: The foundations of lean construction. Des. Constr. Build. Value 291(December 2015), 211\u2013226 (2002)"},{"key":"23_CR7","doi-asserted-by":"publisher","unstructured":"El. Reifi, M.H., Emmitt, S.: Perceptions of lean design management. Archit. Eng. Des. Manag. 9(3), 195\u2013208 (2013). https:\/\/doi.org\/10.1080\/17452007.2013.802979","DOI":"10.1080\/17452007.2013.802979"},{"key":"23_CR8","unstructured":"Thomson, D.B., Miner, R.G.: BIM: contractural risks are changing with technology. Consult. Specif. Eng. 40(2), 54\u201356 (2006). http:\/\/www.aepronet.org\/documents\/building-information-modeling-bim-contractual-risks-are-changing-with-technology\/"},{"key":"23_CR9","doi-asserted-by":"publisher","first-page":"1147","DOI":"10.1016\/j.wasman.2007.05.011","volume":"28","author":"M Osmani","year":"2008","unstructured":"Osmani, M., Glass, J., Price, A.D.F.: Architects\u2019 perspectives on construction waste reduction by design. Waste Manag. 28, 1147\u20131158 (2008). https:\/\/doi.org\/10.1016\/j.wasman.2007.05.011","journal-title":"Waste Manag."},{"key":"23_CR10","unstructured":"Koskela, L., B\u00f8lviken, T., Rooke, J.: Which are the wastes of construction?. In: 21st Annual Conference on International Group for Lean Construction 2013, IGLC 2013, pp. 905\u2013914 (2013). http:\/\/usir.salford.ac.uk\/id\/eprint\/30228"},{"issue":"2","key":"23_CR11","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1080\/09613210301997","volume":"31","author":"G Ballard","year":"2003","unstructured":"Ballard, G., Howell, G.A.: Lean project management. Build. Res. Inf. 31(2), 119\u2013133 (2003). https:\/\/doi.org\/10.1080\/09613210301997","journal-title":"Build. Res. Inf."},{"key":"23_CR12","doi-asserted-by":"publisher","unstructured":"Lappalainen, E., Uusitalo, P., Sepp\u00e4nen, O., Peltokorpi, A.: Design process stability: observations of batch size, throughput time and reliability in design. In: IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges, July 2021, pp. 605\u2013612 (2021). https:\/\/doi.org\/10.24928\/2021\/0144","DOI":"10.24928\/2021\/0144"},{"issue":"2","key":"23_CR13","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1080\/09613210301993","volume":"31","author":"RJ Arbulu","year":"2003","unstructured":"Arbulu, R.J., Tommelein, I.D., Walsh, K.D., Hershauer, J.C.: Value stream analysis of a re-engineered construction supply chain. Build. Res. Inf. 31(2), 161\u2013171 (2003). https:\/\/doi.org\/10.1080\/09613210301993","journal-title":"Build. Res. Inf."},{"key":"23_CR14","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.autcon.2018.03.024","volume":"92","author":"M Al Hattab","year":"2018","unstructured":"Al Hattab, M., Hamzeh, F.: Simulating the dynamics of social agents and information flows in BIM-based design. Autom. Constr. 92, 1\u201322 (2018). https:\/\/doi.org\/10.1016\/j.autcon.2018.03.024","journal-title":"Autom. Constr."},{"key":"23_CR15","doi-asserted-by":"crossref","unstructured":"Uusitalo, P., Lehtovaara, J., Peltokorpi, A.: Waste in design management operations from the viewpoint of project needs. In: Proceedings of the 28th Annual Conference of the International Group for Lean Construction (IGLC), Berkeley, California, USA, 6\u201310 July 2020, pp. 73\u201383 (2020)","DOI":"10.24928\/2020\/0068"},{"key":"23_CR16","doi-asserted-by":"crossref","unstructured":"Tzortzopoulos, P., dos Santos Hentschke, C., Kagioglou, M.: Lean product development and design management. In: Lean Construction, pp. 14\u201344. Routledge (2020)","DOI":"10.1201\/9780429203732-2"},{"issue":"4","key":"23_CR17","doi-asserted-by":"publisher","first-page":"316","DOI":"10.1061\/(ASCE)0733-9364(2002)128:4(316)","volume":"128","author":"CT Formoso","year":"2002","unstructured":"Formoso, C.T., Soibelman, L., De Cesare, C., Isatto, E.L.: Material waste in building industry: main causes and prevention. J. Constr. Eng. Manag. 128(4), 316\u2013325 (2002). https:\/\/doi.org\/10.1061\/(ASCE)0733-9364(2002)128:4(316)","journal-title":"J. Constr. Eng. Manag."},{"key":"23_CR18","doi-asserted-by":"crossref","unstructured":"Rooke, J.: People and knowledge: lean organization. In: Lean Construction, pp. 85\u2013101. Routledge (2020)","DOI":"10.1201\/9780429203732-5"},{"key":"23_CR19","unstructured":"Tommelein, I.D., Gholami, S.: Root causes of clashes in building information models. In: IGLC 2012 - 20th Conference of the International Group for Lean Construction, vol. 1, no. 510 (2012)"},{"key":"23_CR20","unstructured":"El. Reifi, M.H., Emmitt, S., Ruikar, K.: Exploring the lean briefing process for effective design management. In: 22nd Annual Conference of the International Group for Lean Construction, pp. 413\u2013424 (2014). http:\/\/iglc.net\/Papers\/Details\/1011\/pdf"},{"issue":"2","key":"23_CR21","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1080\/17452007.2011.582337","volume":"7","author":"S Emmitt","year":"2011","unstructured":"Emmitt, S.: Lean design management. Archit. Eng. Des. Manag. 7(2), 67\u201369 (2011). https:\/\/doi.org\/10.1080\/17452007.2011.582337","journal-title":"Archit. Eng. Des. Manag."},{"key":"23_CR22","doi-asserted-by":"publisher","unstructured":"Lappalainen, E., Uusitalo, P., Sepp\u00e4nen, O., Peltokorpi, A.: Design process stability: observations of batch size, throughput time and reliability in design. In: Proceedings of the 29th Annual Conference on International Group for Lean Construction, pp. 605\u2013612 (2021). https:\/\/doi.org\/10.24928\/2021\/0144","DOI":"10.24928\/2021\/0144"},{"key":"23_CR23","doi-asserted-by":"publisher","unstructured":"Uusitalo, P., Olivieri, H., Sepp\u00e4nen, O., Pikas, E., Peltokorpi, A.: Review of lean design management: processes, methods and technologies. In: 25th Annual Conference of the International Group for Lean Construction, pp. 571\u2013578 (2017). https:\/\/doi.org\/10.24928\/2017\/0224","DOI":"10.24928\/2017\/0224"},{"key":"23_CR24","unstructured":"Ballard, G.: Rethinking project definition in terms of target costing. In: Understanding and Managing the Construction Process: Theory and Practice - 14th Annual Conference of the International Group for Lean Construction, IGLC-14, pp. 77\u201389 (2006)"},{"issue":"5","key":"23_CR25","doi-asserted-by":"publisher","first-page":"383","DOI":"10.1080\/01446193.2012.676658","volume":"30","author":"D Zimina","year":"2012","unstructured":"Zimina, D., Ballard, G., Pasquire, C.: Target value design: using collaboration and a lean approach to reduce construction cost. Constr. Manag. Econ. 30(5), 383\u2013398 (2012). https:\/\/doi.org\/10.1080\/01446193.2012.676658","journal-title":"Constr. Manag. Econ."},{"key":"23_CR26","doi-asserted-by":"publisher","unstructured":"Ballard, G.: Target value delivery. In: Lean Construction, pp. 148\u2013161 (2020). https:\/\/doi.org\/10.1201\/9780429203732-23","DOI":"10.1201\/9780429203732-23"},{"key":"23_CR27","volume-title":"The Last Planner System of Production Control","author":"G Ballard","year":"2000","unstructured":"Ballard, G.: The Last Planner System of Production Control. University of Birmingham, UK (2000)"},{"key":"23_CR28","doi-asserted-by":"crossref","unstructured":"Ballard, G.: The last planner system. In: Lean Construction, pp. 45\u201353. Routledge (2020)","DOI":"10.1201\/9780429203732-3"},{"issue":"6","key":"23_CR29","doi-asserted-by":"publisher","first-page":"724","DOI":"10.1080\/09613218.2012.709373","volume":"40","author":"L Koskela","year":"2012","unstructured":"Koskela, L., Ballard, G.: Is production outside management? Build. Res. Inf. 40(6), 724\u2013737 (2012). https:\/\/doi.org\/10.1080\/09613218.2012.709373","journal-title":"Build. Res. Inf."},{"issue":"7","key":"23_CR30","doi-asserted-by":"publisher","first-page":"1387","DOI":"10.1108\/ECAM-03-2018-0135","volume":"26","author":"P Uusitalo","year":"2019","unstructured":"Uusitalo, P., Sepp\u00e4nen, O., Peltokorpi, A., Olivieri, H.: Solving design management problems using lean design management: the role of trust. Eng. Constr. Archit. Manag. 26(7), 1387\u20131405 (2019). https:\/\/doi.org\/10.1108\/ECAM-03-2018-0135","journal-title":"Eng. Constr. Archit. Manag."},{"issue":"5","key":"23_CR31","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/buildings9050109","volume":"9","author":"P Uusitalo","year":"2019","unstructured":"Uusitalo, P., Sepp\u00e4nen, O., Lappalainen, E., Peltokorpi, A., Olivieri, H.: Applying level of detail in a BIM-based project: an overall process for lean design management. Buildings 9(5), 1\u201313 (2019). https:\/\/doi.org\/10.3390\/buildings9050109","journal-title":"Buildings"},{"key":"23_CR32","doi-asserted-by":"publisher","unstructured":"Heigermoser, D., Garc\u00eda de Soto, B., Abbott, E.L.S., Chua, D.K.H.: BIM-based Last Planner System tool for improving construction project management. Autom. Constr. 104(June 2018), 246\u2013254 (2019). https:\/\/doi.org\/10.1016\/j.autcon.2019.03.019","DOI":"10.1016\/j.autcon.2019.03.019"},{"key":"23_CR33","doi-asserted-by":"publisher","DOI":"10.1002\/9781119287568","volume-title":"BIM Handbook","author":"R Sacks","year":"2018","unstructured":"Sacks, R., Eastman, C., Lee, G., Teicholz, P.: BIM Handbook, 3rd edn. Wiley, Hoboken (2018)","edition":"3"},{"issue":"9","key":"23_CR34","doi-asserted-by":"publisher","first-page":"968","DOI":"10.1061\/(ASCE)CO.1943-7862.0000203","volume":"136","author":"R Sacks","year":"2010","unstructured":"Sacks, R., Koskela, L., Dave, B.A., Owen, R.: Interaction of lean and building information modeling in construction. J. Constr. Eng. Manag. 136(9), 968\u2013980 (2010). https:\/\/doi.org\/10.1061\/(ASCE)CO.1943-7862.0000203","journal-title":"J. Constr. Eng. Manag."},{"key":"23_CR35","unstructured":"Dave, B.: Developing a Construction Management System Based on Lean Construction and Building Information Modelling. University of Salford (2013)"},{"key":"23_CR36","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.autcon.2015.10.009","volume":"61","author":"B Dave","year":"2016","unstructured":"Dave, B., Kubler, S., Fr\u00e4mling, K., Koskela, L.: Opportunities for enhanced lean construction management using Internet of Things standards. Autom. Constr. 61, 86\u201397 (2016). https:\/\/doi.org\/10.1016\/j.autcon.2015.10.009","journal-title":"Autom. Constr."},{"issue":"5","key":"23_CR37","doi-asserted-by":"publisher","first-page":"641","DOI":"10.1016\/j.autcon.2010.02.010","volume":"19","author":"R Sacks","year":"2010","unstructured":"Sacks, R., Radosavljevic, M., Barak, R.: Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19(5), 641\u2013655 (2010). https:\/\/doi.org\/10.1016\/j.autcon.2010.02.010","journal-title":"Autom. Constr."},{"issue":"2","key":"23_CR38","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1080\/17452007.2011.582332","volume":"7","author":"E Tribelsky","year":"2011","unstructured":"Tribelsky, E., Sacks, R.: An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Archit. Eng. Des. Manag. 7(2), 85\u2013101 (2011). https:\/\/doi.org\/10.1080\/17452007.2011.582332","journal-title":"Archit. Eng. Des. Manag."},{"key":"23_CR39","doi-asserted-by":"publisher","unstructured":"Michaud, M., Forgues, D., Meyer, J., Ouellet-Plamondon, C.: A case study on improving standardization in the conception phase by developing tools and protocols. In: 27th Annual Conference on International Group for Lean Construction, IGLC 2019, pp. 927\u2013936 (2020). https:\/\/doi.org\/10.24928\/2019\/0176","DOI":"10.24928\/2019\/0176"},{"issue":"1","key":"23_CR40","doi-asserted-by":"publisher","first-page":"04014029","DOI":"10.1061\/(ASCE)CP.1943-5487.0000366","volume":"29","author":"R Sacks","year":"2015","unstructured":"Sacks, R., Gurevich, U., Belaciano, B.: Hybrid discrete event simulation and virtual reality experimental setup for construction management research. J. Comput. Civ. Eng. 29(1), 04014029 (2015). https:\/\/doi.org\/10.1061\/(ASCE)CP.1943-5487.0000366","journal-title":"J. Comput. Civ. Eng."},{"key":"23_CR41","doi-asserted-by":"publisher","unstructured":"Pedo, B., Tezel, A., Koskela, L., Whitelock-Wainwright, A., Lenagan, D., Nguyen, Q.A.: Lean contributions to BIM processes: the case of clash management in highways design. In: Proceedings of the 29th Annual Conference of the International Group for Lean Construction (IGLC), pp. 116\u2013125 (2021). https:\/\/doi.org\/10.24928\/2021\/0164","DOI":"10.24928\/2021\/0164"},{"key":"23_CR42","doi-asserted-by":"crossref","unstructured":"Dave, B., Sacks, R.: Construction at the next nexus of Lean and BIM. In: Lean Construction: Core Concepts and New Frontiers, pp. 54\u201384. Routledge (2020)","DOI":"10.1201\/9780429203732-4"},{"key":"23_CR43","doi-asserted-by":"publisher","first-page":"103063","DOI":"10.1016\/j.autcon.2019.103063","volume":"111","author":"Z Wang","year":"2020","unstructured":"Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., Xiao, Q.: Blockchain-based framework for improving supply chain traceability and information sharing in precast construction. Autom. Constr. 111, 103063 (2020). https:\/\/doi.org\/10.1016\/j.autcon.2019.103063","journal-title":"Autom. Constr."}],"container-title":["Lecture Notes in Civil Engineering","Trends on Construction in the Digital Era"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-031-20241-4_23","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,11,19]],"date-time":"2022-11-19T18:06:12Z","timestamp":1668881172000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-031-20241-4_23"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,11,20]]},"ISBN":["9783031202407","9783031202414"],"references-count":43,"URL":"https:\/\/doi.org\/10.1007\/978-3-031-20241-4_23","relation":{},"ISSN":["2366-2557","2366-2565"],"issn-type":[{"value":"2366-2557","type":"print"},{"value":"2366-2565","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,11,20]]},"assertion":[{"value":"20 November 2022","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ISIC","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Trends on Construction in the Post-Digital Era","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Guimar\u00e3es","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2022","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"7 September 2022","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"9 September 2022","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"isic12022","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}