{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T14:15:25Z","timestamp":1777472125263,"version":"3.51.4"},"publisher-location":"Cham","reference-count":41,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319059143","type":"print"},{"value":"9783319059150","type":"electronic"}],"license":[{"start":{"date-parts":[[2014,10,8]],"date-time":"2014-10-08T00:00:00Z","timestamp":1412726400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2014,10,8]],"date-time":"2014-10-08T00:00:00Z","timestamp":1412726400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-05915-0_1","type":"book-chapter","created":{"date-parts":[[2015,1,13]],"date-time":"2015-01-13T20:18:47Z","timestamp":1421180327000},"page":"667-683","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["The Basic Multi-Project Scheduling Problem"],"prefix":"10.1007","author":[{"given":"Jos\u00e9 Fernando","family":"Gon\u00e7alves","sequence":"first","affiliation":[]},{"given":"Jorge Jos\u00e9","family":"de Magalh\u00e3es Mendes","sequence":"additional","affiliation":[]},{"given":"Mauricio G. C.","family":"Resende","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,10,8]]},"reference":[{"key":"1_CR1","doi-asserted-by":"crossref","unstructured":"Ash R (1999) Activity scheduling in the dynamic, multi-project setting: choosing heuristics through deterministic simulation. In: Proceedings of the 1999 winter simulation conference, Phoenix, pp\u00a0937\u2013941","DOI":"10.1145\/324898.324933"},{"key":"1_CR2","volume-title":"Introduction to sequencing and scheduling","author":"KR Baker","year":"1974","unstructured":"Baker KR (1974) Introduction to sequencing and scheduling. Wiley, New York"},{"key":"1_CR3","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"JC Bean","year":"1994","unstructured":"Bean JC (1994) Genetics and random keys for sequencing and optimization. ORSA J Comput 6:154\u2013160","journal-title":"ORSA J Comput"},{"key":"1_CR4","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","volume":"5","author":"J B\u0142a\u017cewicz","year":"1983","unstructured":"B\u0142a\u017cewicz J, Lenstra JK, Rinnooy Kan AHG (1983) Scheduling subject to resource constraints: classification and complexity. Discrete Appl Math 5:11\u201324","journal-title":"Discrete Appl Math"},{"key":"1_CR5","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1111\/j.1540-5915.1990.tb01692.x","volume":"21","author":"D Bock","year":"1990","unstructured":"Bock D, Patterson J (1990) A comparison of due date setting, resource assignment, and job preemption heuristics for the multi-project scheduling problem. Decis Sci 21:387\u2013402","journal-title":"Decis Sci"},{"issue":"2","key":"1_CR6","doi-asserted-by":"publisher","first-page":"212","DOI":"10.1016\/j.ijpe.2010.03.009","volume":"126","author":"TR Browning","year":"2010","unstructured":"Browning TR, Yassine AA (2010) Resource-constrained multi-project scheduling: priority rule performance revisited. Int J Prod Econ 126(2):212\u2013228","journal-title":"Int J Prod Econ"},{"key":"1_CR7","doi-asserted-by":"crossref","unstructured":"Cai Z, Li X (2012) A hybrid genetic algorithm for resource-constrained multi-project scheduling problem with resource transfer time. In: Proceedings of the 2012 IEEE international conference on automation science and engineering (CASE 2012), Seoul, pp\u00a0569\u2013574","DOI":"10.1109\/CoASE.2012.6386457"},{"key":"1_CR8","doi-asserted-by":"publisher","first-page":"110","DOI":"10.1016\/0377-2217(91)90150-T","volume":"51","author":"R Deckro","year":"1991","unstructured":"Deckro R, Winkofsky E, Hebert J, Gagnon R (1991) A decomposition approach to multi-project scheduling. Eur J Oper Res 51:110\u2013118","journal-title":"Eur J Oper Res"},{"issue":"12","key":"1_CR9","doi-asserted-by":"publisher","first-page":"1590","DOI":"10.1287\/mnsc.37.12.1590","volume":"37","author":"A Drexl","year":"1991","unstructured":"Drexl A (1991) Scheduling of project networks by job assignment. Manag Sci 37(12):1590\u20131602","journal-title":"Manag Sci"},{"issue":"1","key":"1_CR10","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1287\/mnsc.34.1.101","volume":"34","author":"J Dumond","year":"1988","unstructured":"Dumond J, Mabert V (1988) Evaluating project scheduling and due date assignment procedures: an experimental analysis. Manag Sci 34(1):101\u2013118","journal-title":"Manag Sci"},{"issue":"10","key":"1_CR11","first-page":"505","volume":"19","author":"L Fendley","year":"1968","unstructured":"Fendley L (1968) Towards the development of a complete multiproject scheduling system. J Ind Eng 19(10):505\u2013515","journal-title":"J Ind Eng"},{"key":"1_CR12","doi-asserted-by":"publisher","first-page":"629","DOI":"10.1023\/A:1020377910258","volume":"8","author":"JF Gon\u00e7alves","year":"2002","unstructured":"Gon\u00e7alves JF, Almeida JR (2002) A hybrid genetic algorithm for assembly line balancing. J Heuristics 8:629\u2013642","journal-title":"J Heuristics"},{"key":"1_CR13","first-page":"123","volume":"19","author":"JF Gon\u00e7alves","year":"1999","unstructured":"Gon\u00e7alves JF, Beir\u00e3o NC (1999) Um algoritmo gen\u00e9tico baseado em chaves aleat\u00f3rias para sequenciamento de opera\u00e7\u00f5es. Revista da Associa\u00e7\u00e3o Portuguesa de Investiga\u00e7\u00e3o Operacional 19:123\u2013137 (in Portuguese)","journal-title":"Revista da Associa\u00e7\u00e3o Portuguesa de Investiga\u00e7\u00e3o Operacional"},{"key":"1_CR14","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1016\/j.cie.2004.07.003","volume":"47","author":"JF Gon\u00e7alves","year":"2004","unstructured":"Gon\u00e7alves JF, Resende MGC (2004) An evolutionary algorithm for manufacturing cell formation. Comput Ind Eng 47:247\u2013273","journal-title":"Comput Ind Eng"},{"key":"1_CR15","doi-asserted-by":"publisher","first-page":"487","DOI":"10.1007\/s10732-010-9143-1","volume":"17","author":"JF Gon\u00e7alves","year":"2011","unstructured":"Gon\u00e7alves JF, Resende MGC (2011a) Biased random-key genetic algorithms for combinatorial optimization. J Heuristics 17:487\u2013525","journal-title":"J Heuristics"},{"key":"1_CR16","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1007\/s10878-009-9282-1","volume":"22","author":"JF Gon\u00e7alves","year":"2011","unstructured":"Gon\u00e7alves JF, Resende MGC (2011b) A parallel multi-population genetic algorithm for a constrained two-dimensional orthogonal packing problem. J Comb Optim 22:180\u2013201","journal-title":"J Comb Optim"},{"key":"1_CR17","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/j.cor.2011.03.009","volume":"39","author":"JF Gon\u00e7alves","year":"2012","unstructured":"Gon\u00e7alves JF, Resende MGC (2012) A parallel multi-population biased random-key genetic algorithm for a container loading problem. Comput Oper Res 39:179\u2013190","journal-title":"Comput Oper Res"},{"issue":"2","key":"1_CR18","doi-asserted-by":"publisher","first-page":"500","DOI":"10.1016\/j.ijpe.2013.04.019","volume":"145","author":"JF Gon\u00e7alves","year":"2013","unstructured":"Gon\u00e7alves JF, Resende MG (2013) A biased random key genetic algorithm for 2D and 3D bin packing problems. Int J Prod Econ 145(2):500\u2013510","journal-title":"Int J Prod Econ"},{"issue":"2","key":"1_CR19","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1111\/itor.12044","volume":"21","author":"JF Gon\u00e7alves","year":"2014","unstructured":"Gon\u00e7alves JF, Resende MG (2014) An extended akers graphical method with a biased random-key genetic algorithm for job-shop scheduling. Int Trans Oper Res 21(2):215\u2013246","journal-title":"Int Trans Oper Res"},{"key":"1_CR20","doi-asserted-by":"publisher","first-page":"2683","DOI":"10.1080\/00207543.2010.532936","volume":"49","author":"JF Gon\u00e7alves","year":"2011","unstructured":"Gon\u00e7alves JF, Sousa PSA (2011) A genetic algorithm for lot sizing and scheduling under capacity constraints and allowing backorders. Int J Prod Res 49:2683\u20132703","journal-title":"Int J Prod Res"},{"key":"1_CR21","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1016\/j.ejor.2004.03.012","volume":"167","author":"JF Gon\u00e7alves","year":"2005","unstructured":"Gon\u00e7alves JF, Mendes JJM, Resende MGC (2005) A hybrid genetic algorithm for the job shop scheduling problem. Eur J Oper Res 167:77\u201395","journal-title":"Eur J Oper Res"},{"key":"1_CR22","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1016\/j.ejor.2006.06.074","volume":"189","author":"JF Gon\u00e7alves","year":"2008","unstructured":"Gon\u00e7alves JF, Mendes JJM, Resende MGC (2008) A genetic algorithm for the resource constrained multi-project scheduling problem. Eur J Oper Res 189:1171\u20131190","journal-title":"Eur J Oper Res"},{"issue":"2","key":"1_CR23","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1007\/s00291-008-0144-5","volume":"32","author":"D Kr\u00fcger","year":"2010","unstructured":"Kr\u00fcger D, Scholl A (2010) Managing and modelling general resource transfers in (multi-) project scheduling. OR Spectr 32(2):369\u2013394","journal-title":"OR Spectr"},{"issue":"3\u20134","key":"1_CR24","first-page":"249","volume":"10","author":"S Kumanam","year":"2011","unstructured":"Kumanam S, Raja K (2011) Multi-project scheduling using a heuristic and memetic alogrithm. J Manuf Sci Prod 10(3\u20134):249\u2013256","journal-title":"J Manuf Sci Prod"},{"issue":"3","key":"1_CR25","doi-asserted-by":"publisher","first-page":"291","DOI":"10.1016\/0272-6963(85)90015-4","volume":"5","author":"I Kurtulus","year":"1985","unstructured":"Kurtulus I (1985) Multiproject scheduling: analysis of scheduling strategies under unequal delay penalties. J Oper Manag 5(3):291\u2013307","journal-title":"J Oper Manag"},{"key":"1_CR26","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1287\/mnsc.28.2.161","volume":"28","author":"I Kurtulus","year":"1982","unstructured":"Kurtulus I, Davis E (1982) Multi-project scheduling: categorization of heuristic rules performance. Manag Sci 28:161\u2013172","journal-title":"Manag Sci"},{"key":"1_CR27","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1080\/07408178508975272","volume":"17","author":"I Kurtulus","year":"1985","unstructured":"Kurtulus I, Narula S (1985) Multi-project scheduling: analysis of project performance. IIE Trans 17:58\u201366","journal-title":"IIE Trans"},{"key":"1_CR28","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1016\/0377-2217(93)90175-M","volume":"64","author":"S Lawrence","year":"1993","unstructured":"Lawrence S, Morton T (1993) Resource-constrained multi-project scheduling with tardy costs: comparing myopic bottleneck and resource pricing heuristics. Eur J Oper Res 64:168\u2013187","journal-title":"Eur J Oper Res"},{"issue":"1","key":"1_CR29","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1023\/A:1010966401888","volume":"102","author":"A Lova","year":"2001","unstructured":"Lova A, Tormos P (2001) Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Ann Oper Res 102(1):263\u2013286","journal-title":"Ann Oper Res"},{"key":"1_CR30","first-page":"244","volume-title":"Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling","author":"A Lova","year":"2002","unstructured":"Lova A, Tormos P (2002) Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling. In: Proceedings of the eight international workshop on project management and scheduling, Valencia, pp\u00a0244\u2013248"},{"key":"1_CR31","doi-asserted-by":"publisher","first-page":"408","DOI":"10.1016\/S0377-2217(99)00490-7","volume":"127","author":"A Lova","year":"2000","unstructured":"Lova A, Maroto C, Tormos P (2000) A multicriteria heuristic method to improve resource allocation in multiproject scheduling. Eur J Oper Res 127:408\u2013424","journal-title":"Eur J Oper Res"},{"key":"1_CR32","unstructured":"Mendes J (2003) Sistema de apoio \u00e0 decis\u00e3o para planeamento de sistemas de produ\u00e7\u00e3o do tipo projecto. Ph.D. dissertation, Universidade do Porto, Porto (in Portuguese)"},{"issue":"2","key":"1_CR33","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1080\/00207548908942546","volume":"27","author":"R Mohanthy","year":"1989","unstructured":"Mohanthy R, Siddiq M (1989) Multiple projects multiple resources-constrained scheduling: some studies. Int J Prod Res 27(2):261\u2013280","journal-title":"Int J Prod Res"},{"key":"1_CR34","doi-asserted-by":"publisher","first-page":"805","DOI":"10.1108\/09600039810248181","volume":"28","author":"L \u00d6zdamar","year":"1998","unstructured":"\u00d6zdamar L, Ulusoy G, Bayyigit M (1998) A heuristic treatment of tardiness and net present value criteria in resource constrained project scheduling. Int J Phys Distrib Logist Manag 28:805\u2013824","journal-title":"Int J Phys Distrib Logist Manag"},{"key":"1_CR35","doi-asserted-by":"publisher","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"A Pritsker","year":"1969","unstructured":"Pritsker A, Allan B, Watters L, Wolfe P (1969) Multiproject scheduling with limited resources: a zero-one programming approach. Manag Sci 16:93\u2013108","journal-title":"Manag Sci"},{"key":"1_CR36","unstructured":"Shankar V, Nagi R (1996) A flexible optimization approach to multi-resource, multi-project planning and scheduling. In: Proceedings of 5th industrial engineering research conference, Minneapolis, pp\u00a0263\u2013267"},{"key":"1_CR37","first-page":"230","volume-title":"On the virtues of parameterized uniform crossover","author":"WM Spears","year":"1991","unstructured":"Spears WM, Dejong KA (1991) On the virtues of parameterized uniform crossover. In: Proceedings of the fourth international conference on genetic algorithms, San Diego, pp\u00a0230\u2013236"},{"issue":"10","key":"1_CR38","doi-asserted-by":"publisher","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","volume":"28","author":"FB Talbot","year":"1982","unstructured":"Talbot FB (1982) Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case. Manag Sci 28(10):1197\u20131210","journal-title":"Manag Sci"},{"key":"1_CR39","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1016\/0377-2217(90)90122-R","volume":"49","author":"S Tsubakitani","year":"1990","unstructured":"Tsubakitani S, Deckro R (1990) A heuristic for multi-project scheduling with limited resources in the housing industry. Eur J Oper Res 49:80\u201391","journal-title":"Eur J Oper Res"},{"key":"1_CR40","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1016\/0377-2217(94)90389-1","volume":"78","author":"C Vercellis","year":"1994","unstructured":"Vercellis C (1994) Constrained multi-project planning problems: a Lagrangean decomposition approach. Eur J Oper Res 78:267\u2013275","journal-title":"Eur J Oper Res"},{"issue":"3","key":"1_CR41","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1111\/j.1540-5915.1975.tb01041.x","volume":"6","author":"BM Woodworth","year":"1975","unstructured":"Woodworth BM, Willie CJ (1975) A heuristic algorithm for resource leveling in multi-project, multi-resource scheduling. Decis Sci 6(3):525\u2013540","journal-title":"Decis Sci"}],"container-title":["Handbook on Project Management and Scheduling Vol. 2"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-05915-0_1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,10]],"date-time":"2023-02-10T06:31:51Z","timestamp":1676010711000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-05915-0_1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,10,8]]},"ISBN":["9783319059143","9783319059150"],"references-count":41,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-05915-0_1","relation":{},"subject":[],"published":{"date-parts":[[2014,10,8]]},"assertion":[{"value":"8 October 2014","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}