{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T19:38:20Z","timestamp":1725824300532},"publisher-location":"Cham","reference-count":51,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319172507"},{"type":"electronic","value":"9783319172514"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-17251-4_11","type":"book-chapter","created":{"date-parts":[[2015,6,26]],"date-time":"2015-06-26T12:06:11Z","timestamp":1435320371000},"page":"171-189","source":"Crossref","is-referenced-by-count":0,"title":["Integrated Management Systems: A Model for Maturity Assessment"],"prefix":"10.1007","author":[{"given":"Pedro","family":"Domingues","sequence":"first","affiliation":[]},{"given":"Paulo","family":"Sampaio","sequence":"additional","affiliation":[]},{"given":"Pedro","family":"Arezes","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"5\/6","key":"11_CR1","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1108\/17410400510604557","volume":"54","author":"E Aken","year":"2005","unstructured":"Aken, E., Letens, G., Coleman, G. D., Farris, J., & Goubergen, D. V. (2005). Assessing maturity and effectiveness of enterprise performance measurement systems. International Journal of Productivity and Performance Management, 54(5\/6), 400\u2013418.","journal-title":"International Journal of Productivity and Performance Management"},{"issue":"3\/4","key":"11_CR2","doi-asserted-by":"publisher","first-page":"338","DOI":"10.1080\/14783363.2013.867098","volume":"25","author":"J Almeida","year":"2014","unstructured":"Almeida, J., Domingues, P., & Sampaio, P. (2014). Different perspectives on management systems integration. Total Quality Management and Business Excellence, 25(3\/4), 338\u2013351.","journal-title":"Total Quality Management and Business Excellence"},{"key":"11_CR3","doi-asserted-by":"crossref","unstructured":"April, A., & Desharnais, J.-M. (2005). Software maintenance maturity model (SMMM): A software maintenance process model. In Proceedings of Statistic Canada Conference, Ottawa, Canada.","DOI":"10.1002\/smr.311"},{"key":"11_CR4","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1007\/s12599-009-0044-5","volume":"3","author":"J Becker","year":"2009","unstructured":"Becker, J., Knackstedt, R., & P\u00f6ppelbu\u03b2, J. (2009). Developing maturity models for IT management\u2014A procedure model and its application. Business and Information Systems Engineering, 3, 213\u2013222.","journal-title":"Business and Information Systems Engineering"},{"key":"11_CR5","doi-asserted-by":"crossref","unstructured":"Beckmerhagen, I. A., Berg, H. P., Karapetrovic, S. V., & Willborn, W. O. (2003a). Integration of management systems: Focus on safety in the nuclear industry. International Journal of Quality and Reliability Management, 20(2), 210\u2013218.","DOI":"10.1108\/02656710310456626"},{"issue":"6\u20137","key":"11_CR6","doi-asserted-by":"publisher","first-page":"560","DOI":"10.1108\/02686900310482696","volume":"18","author":"IA Beckmerhagen","year":"2003","unstructured":"Beckmerhagen, I. A., Berg, H. P., Karapetrovic, S. V., & Willborn, W. O. (2003b). Auditing in support of the integration of management systems: A case from the nuclear industry. Managerial Auditing Journal, 18(6\u20137), 560\u2013568.","journal-title":"Managerial Auditing Journal"},{"key":"11_CR7","unstructured":"Bernardo, M., Casades\u00fas, M., Karapetrovic, S., & Heras, I. (2008). Management systems: Integration degrees empirical study. In Proceedings of the 11th QMOD Conference 20\u201322 August, Helsingborg, Sweden."},{"key":"11_CR8","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/j.jclepro.2011.09.008","volume":"21","author":"M Bernardo","year":"2012","unstructured":"Bernardo, M., Casades\u00fas, M., Karapetrovic, S., & Heras, I. (2012). Do integration difficulties influence management system integration levels? Journal of Cleaner Production, 21, 23\u201333.","journal-title":"Journal of Cleaner Production"},{"key":"11_CR9","first-page":"37","volume":"39","author":"M Bernardo","year":"2009","unstructured":"Bernardo, M., Casades\u00fas, M., & Heras, I. (2009). Management systems integrated audits: An empirical study. Direcci\u00f3n y Organizaci\u00f3n, 39, 37\u201344.","journal-title":"Direcci\u00f3n y Organizaci\u00f3n"},{"issue":"3","key":"11_CR10","first-page":"213","volume":"5","author":"M Bernardo","year":"2011","unstructured":"Bernardo, M., Casades\u00fas, M., & Karapetrovic, S. (2011). Are methods used to integrate standardized management systems a conditioning factor of the level of integration? An empirical study. International Journal for Quality Research, 5(3), 213\u2013222.","journal-title":"International Journal for Quality Research"},{"key":"11_CR11","unstructured":"Bing, C., Shan, L., Tao, F., & Gang, W. (2010). Product maturity and its fuzzy evaluation model with entropy-AHP weight. In Proceedings of the International Conference on Management and Service Science, 10-12 August, Shangai, China."},{"key":"11_CR12","doi-asserted-by":"crossref","unstructured":"Burnstein, I., Suwanassart, T., & Carlson, R. (1996). Developing a testing maturity model for software test process evaluation and improvement. In Proceedings of the IEEE International Test Conference, paper 21.3 (pp. 581\u2013589).","DOI":"10.1109\/TEST.1996.557106"},{"key":"11_CR13","doi-asserted-by":"crossref","unstructured":"Chuah, M.-H. (2010). An enterprise business intelligence maturity model (EBIMM): Conceptual framework. In Proceedings of the 5th IEEE International Conference on Digital Information Management, ICDIM 2010, July 5\u20138, Lakehead University, Thunder Bay, Canada, 303\u2013308.","DOI":"10.1109\/ICDIM.2010.5664244"},{"key":"11_CR14","unstructured":"Cooke-Davies, T. (2002). Project management maturity models: Does it make sense to adopt one? Project Management Today, May, 1\u20134."},{"key":"11_CR15","doi-asserted-by":"publisher","first-page":"1641","DOI":"10.1016\/j.sbspro.2010.12.379","volume":"9","author":"C Demir","year":"2010","unstructured":"Demir, C., & Kocaba\u015f, I. (2010). Project management maturity model (PMMM) in educational organizations. Procedia Social and Behavioral Sciences, 9, 1641\u20131645.","journal-title":"Procedia Social and Behavioral Sciences"},{"key":"11_CR16","unstructured":"Domingues, J. P. T., Sampaio, P., & Arezes, P. M. (2011) Beyond \u201caudit\u201d definition: A framework proposal for integrated management systems. In Proceedings of 61st IEEE Annual Conference and Expo, Reno, Nevada, USA."},{"issue":"4","key":"11_CR17","doi-asserted-by":"publisher","first-page":"351","DOI":"10.1504\/IJHFE.2012.052009","volume":"1","author":"JPT Domingues","year":"2012","unstructured":"Domingues, J. P. T., Sampaio, P., & Arezes, P. (2012). New organisational issues and macroergonomics: Integrating management systems. International Journal of Human Factors and Ergonomics, 1(4), 351\u2013375.","journal-title":"International Journal of Human Factors and Ergonomics"},{"key":"11_CR18","doi-asserted-by":"publisher","DOI":"10.1080\/14783363.2014.931064","author":"JPT Domingues","year":"2014","unstructured":"Domingues, J. P. T., Sampaio, P., & Arezes, P. (2014a). Analysis of integrated management systems from various perspectives. Total Quality Management and Business Excellence. doi:\n                10.1080\/14783363.2014.931064\n                \n              .","journal-title":"Total Quality Management and Business Excellence"},{"key":"11_CR19","unstructured":"Domingues, J. P. T., Sampaio, P., & Arezes, P. M. (2014b). A model for assessing maturity of integrated management systems. In P. Arezes, J. S. Baptista, M. Barroso, P. Carneiro, P. Cordeiro, N. Costa, R. Melo, A. S. Miguel, & G. Perestrelo (Eds.), Occupational Safety and Hygiene II (p. 818). London: CRC Press, Taylor & Francis. ISBN 978-1-138-00144-2."},{"key":"11_CR20","first-page":"435","volume":"41","author":"H Essmann","year":"2009","unstructured":"Essmann, H., & Preez, N. (2009). An innovation capability maturity model\u2014Development and initial application. Engineering and Technology, 41, 435\u2013446.","journal-title":"Engineering and Technology"},{"key":"11_CR21","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1007\/s10257-009-0121-9","volume":"8","author":"R Fitterer","year":"2010","unstructured":"Fitterer, R., & Rohner, P. (2010). Towards assessing the networkability of health care providers: A maturity model approach. Information Systems E-business Management, 8, 309\u2013333.","journal-title":"Information Systems E-business Management"},{"key":"11_CR22","unstructured":"Gareis, R. (2002). A process-based maturity model for the assessment of the competences of project-oriented companies. In Proceedings of the 2nd SENET Conference, Cavtat, Vienna, Austria."},{"key":"11_CR23","doi-asserted-by":"crossref","unstructured":"Gianni, M., & Gotzamani, K. (2015). Management systems integration: Lessons from an abandonment case. Journal of Cleaner Production, 86, 265\u2013276.","DOI":"10.1016\/j.jclepro.2014.08.023"},{"key":"11_CR24","doi-asserted-by":"crossref","unstructured":"Guangshe, J., Li, C., Jiangguo, C., Shuisen, Z., & Jin, W. (2008). Application of organizational project management maturity model (OPM3) to construction in China: An empirical study. In Proceedings of the International Conference on Information Management, Innovation Management and Industrial Engineering (pp. 56\u201362).","DOI":"10.1109\/ICIII.2008.182"},{"issue":"4","key":"11_CR25","doi-asserted-by":"publisher","first-page":"410","DOI":"10.1108\/09544780610671075","volume":"18","author":"M Ivanovic","year":"2006","unstructured":"Ivanovic, M., & Majstorovic, V. (2006). Model developed for the assessment of quality management level in manufacturing systems. The TQM Magazine, 18(4), 410\u2013423.","journal-title":"The TQM Magazine"},{"key":"11_CR26","doi-asserted-by":"crossref","unstructured":"Jiankang, W., Jiuling, X., Qianwen, L., & Kun, L. (2011). Knowledge management maturity models: A systemic comparison. In Proceedings of the 2011 International Conference on Information Management, Innovation Management and Industrial Engineering, 26\u201326 November, Shenzen, China, 606\u2013609.","DOI":"10.1109\/ICIII.2011.420"},{"key":"11_CR27","doi-asserted-by":"publisher","first-page":"713","DOI":"10.1016\/j.jclepro.2005.04.005","volume":"14","author":"TH J\u00f8rgensen","year":"2006","unstructured":"J\u00f8rgensen, T. H., Remmen, A., & Mellado, M. D. (2006). Integrated Management Systems\u2014Three different levels of integration. Journal of Cleaner Production, 14, 713\u2013722.","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"11_CR28","first-page":"51","volume":"3","author":"N Karanikas","year":"2014","unstructured":"Karanikas, N. (2014). Defining the interrelationship between safety and quality management systems. The International Journal of Management, 3(1), 51\u201360.","journal-title":"The International Journal of Management"},{"issue":"1","key":"11_CR29","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1108\/09544780210414254","volume":"14","author":"S Karapetrovic","year":"2002","unstructured":"Karapetrovic, S. (2002). Strategics for the integration of management systems and standards. The TQM Magazine, 14(1), 61\u201367.","journal-title":"The TQM Magazine"},{"key":"11_CR30","unstructured":"Karapetrovic, S. (2007). Integrative augmentation of standardized systems. In Proceedings of 12-ICIT April, Taiwan, China."},{"key":"11_CR31","doi-asserted-by":"crossref","unstructured":"Karapetrovic, S., & Casades\u00fas, M. (2009). Implementing environmental with other standardized management systems: Scope, sequence, time and integration. Journal of Cleaner Production, 17(5), 533\u2013540.","DOI":"10.1016\/j.jclepro.2008.09.006"},{"issue":"3","key":"11_CR32","doi-asserted-by":"publisher","first-page":"204","DOI":"10.1108\/09544789810214800","volume":"10","author":"S Karapetrovic","year":"1998","unstructured":"Karapetrovic, S., & Willborn, W. (1998). Integration of quality and environmental management systems. The TQM Magazine, 10(3), 204\u2013213.","journal-title":"The TQM Magazine"},{"key":"11_CR33","doi-asserted-by":"crossref","unstructured":"Kraus, J. L., & Grosskopf, J. (2008). Auditing integrated management systems: Considerations and practice tips. Environmental Quality Management, Winter, 7\u201316","DOI":"10.1002\/tqem.20202"},{"key":"11_CR34","unstructured":"L\u00f6fgren, B. (2012). The green engineer as an enabler of life-cycle management in manufacturing: Models and practices. Doctoral thesis, Chalmers University of Technology, G\u00f6teborg, Sweden."},{"key":"11_CR35","doi-asserted-by":"publisher","first-page":"663","DOI":"10.1016\/j.eswa.2006.01.003","volume":"31","author":"AM Maier","year":"2006","unstructured":"Maier, A. M., Eckert, C. M., & Clarkson, P. J. (2006). Identifying requirements for communication support: A maturity grid-inspired approach. Expert Systems with Applications, 31, 663\u2013672.","journal-title":"Expert Systems with Applications"},{"key":"11_CR36","doi-asserted-by":"crossref","unstructured":"Mayer, J., & Fagundes, L. L. (2009). A model to assess the maturity level of the risk management process in information security. In Proceedings of the IFIP\/IEEE International Symposium on Integrated Network Management, 1\u20135 June, Long Island, New York, USA, 61\u201370.","DOI":"10.1109\/INMW.2009.5195935"},{"key":"11_CR37","unstructured":"Mettler, T. (2010). Measuring the maturity of supplier relationship management systems. In Proceedings of the IADIS Conference Ecommerce (pp. 11\u201318)."},{"issue":"466","key":"11_CR38","first-page":"1155","volume":"465","author":"F Mohamad","year":"2014","unstructured":"Mohamad, F., Abdulllah, N. H., Mohammad, M., & Kamaruddin, N. K. (2014). Management systems integration for organizational sustainability: Quality, environmental, occupational health and safety, and energy. Applied Mechanics and Materials, 465(466), 1155\u20131159.","journal-title":"Applied Mechanics and Materials"},{"key":"11_CR39","doi-asserted-by":"crossref","unstructured":"Pojasek, R. B. (2006). Is your integrated management system really integrated?. Environmental Quality Management, Winter, 89\u201397.","DOI":"10.1002\/tqem.20124"},{"issue":"3","key":"11_CR40","first-page":"356","volume":"10","author":"MF Rebelo","year":"2014","unstructured":"Rebelo, M. F., Santos, G., & Silva, R. (2014). Integration of individualized management systems (MSs) as an aggregating factor of sustainable value for organizations: An overview through a review of literature. Journal of Modern Accounting and Auditing, 10(3), 356\u2013383.","journal-title":"Journal of Modern Accounting and Auditing"},{"key":"11_CR41","first-page":"10","volume":"24","author":"D Renfrew","year":"1998","unstructured":"Renfrew, D., & Muir, G. (1998). QUENSHing the thirst for integration. Quality World, 24, 10\u201313.","journal-title":"Quality World"},{"key":"11_CR42","unstructured":"R\u00f6glinger, M., & P\u00f6ppelbu\u03b2, J. (2011). What makes a useful maturity model? A framework for general design principles for maturity models and its demonstration in business process management. In Proceedings of the 19th European Conference on Information Systems, June, Helsinki, Finland."},{"issue":"4","key":"11_CR43","doi-asserted-by":"publisher","first-page":"402","DOI":"10.1108\/02656711211224857","volume":"29","author":"P Sampaio","year":"2012","unstructured":"Sampaio, P., Saraiva, P., & Domingues, P. (2012). Management systems: Integration or addition? International Journal of Quality and Reliability Management, 29(4), 402\u2013424.","journal-title":"International Journal of Quality and Reliability Management"},{"key":"11_CR44","doi-asserted-by":"crossref","unstructured":"Sen, A., Ramammurthy, K., & Sinha, A. P. (2012). A model of data warehousing process maturity. IEEE Transactions of Software Engineering. IEEE Transactions on Software Engineering, 38(2), March-April, 336\u2013353.","DOI":"10.1109\/TSE.2011.2"},{"issue":"5","key":"11_CR45","doi-asserted-by":"publisher","first-page":"828","DOI":"10.1108\/02635571211232406","volume":"112","author":"A Simon","year":"2012","unstructured":"Simon, A., Karapetrovic, S., & Casadesus, M. (2012). Difficulties and benefits of integrated management systems. Industrial Management and Data Systems, 112(5), 828\u2013846.","journal-title":"Industrial Management and Data Systems"},{"issue":"2","key":"11_CR46","first-page":"275","volume":"18","author":"AC Tonini","year":"2008","unstructured":"Tonini, A. C., Carvalho, M. M., & Sp\u00ednola, M. M. (2008). Contribui\u00e7\u00e3o dos modelos de qualidade e maturidade na melhoria dos processos de software. Produ\u00e7\u00e3o, 18(2), 275\u2013286.","journal-title":"Produ\u00e7\u00e3o"},{"key":"11_CR47","doi-asserted-by":"publisher","first-page":"92","DOI":"10.1109\/MS.2010.96","volume":"27","author":"CG Wangenheim","year":"2010","unstructured":"Wangenheim, C. G., Hauck, J. C. R., Zoucas, A., Salviano, F., McCaffery, F., & Shull, F. (2010). Creating software capability\/maturity models. IEEE Software, 27, 92\u201394.","journal-title":"IEEE Software"},{"key":"11_CR48","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1007\/s11548-010-0414-y","volume":"5","author":"R Wetering","year":"2010","unstructured":"Wetering, R., Batenburg, R., & Lederman, R. (2010). Evolutionistic or revolutionary paths? A PACS maturity model for strategic situational planning. International Journal CARS, 5, 401\u2013409.","journal-title":"International Journal CARS"},{"key":"11_CR49","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1002\/1099-1786(200009)4:3<137::AID-QAJ110>3.0.CO;2-C","volume":"4","author":"T Wright","year":"2000","unstructured":"Wright, T. (2000). IMS-Three into one will go!: The advantages of a single integrated quality, health and safety and environmental management system. Quality Assurance Journal, 4, 137\u2013142.","journal-title":"Quality Assurance Journal"},{"key":"11_CR50","doi-asserted-by":"publisher","first-page":"1760","DOI":"10.1016\/j.jclepro.2006.03.007","volume":"15","author":"SX Zeng","year":"2007","unstructured":"Zeng, S. X., Shi, J. J., & Lou, G. X. (2007). A synergetic model for implementing an integrated management system: An empirical study in China. Journal of Cleaner Production, 15, 1760\u20131767.","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"11_CR51","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1080\/14783363.2010.530797","volume":"22","author":"SX Zeng","year":"2011","unstructured":"Zeng, S. X., Xie, X. M., Tam, C. M., & Shen, L. Y. (2011). An empirical examination of benefits from implementing integrated management systems (IMS). Total Quality Management and Business Excellence, 22(1), 173\u2013186.","journal-title":"Total Quality Management and Business Excellence"}],"container-title":["Achieving Competitive Advantage through Quality Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-17251-4_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T08:35:12Z","timestamp":1559205312000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-17251-4_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319172507","9783319172514"],"references-count":51,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-17251-4_11","relation":{},"subject":[],"published":{"date-parts":[[2015]]}}}