{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T05:56:48Z","timestamp":1743141408531,"version":"3.40.3"},"publisher-location":"Cham","reference-count":26,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319185668"},{"type":"electronic","value":"9783319185675"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-18567-5_7","type":"book-chapter","created":{"date-parts":[[2015,7,30]],"date-time":"2015-07-30T08:28:02Z","timestamp":1438244882000},"page":"139-152","source":"Crossref","is-referenced-by-count":1,"title":["A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure"],"prefix":"10.1007","author":[{"given":"Dalila B. M. M.","family":"Fontes","sequence":"first","affiliation":[]},{"given":"Jos\u00e9 Fernando","family":"Gon\u00e7alves","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"7_CR1","doi-asserted-by":"crossref","unstructured":"Bean, J.C.: Genetic algorithms and random keys for sequencing and optimization. ORSA J. Comput. 6, 154\u2013160 (1994)","DOI":"10.1287\/ijoc.6.2.154"},{"key":"7_CR2","doi-asserted-by":"crossref","unstructured":"Colvin, M., Maravelias, C.T.: R&d pipeline management: task interdependencies and risk management. Eur. J. Oper. Res. 215(3), 616\u2013628 (2011)","DOI":"10.1016\/j.ejor.2011.06.023"},{"key":"7_CR3","doi-asserted-by":"crossref","unstructured":"Coolen, K., Wei, W., Nobibon, F.T., Leus, R.: Scheduling modular projects on a bottleneck resource. J. Sched. 17(1), 67\u201385 (2014)","DOI":"10.1007\/s10951-012-0294-9"},{"key":"7_CR4","doi-asserted-by":"crossref","unstructured":"Creemers, S., Leus, R., De\u00a0Reyck, B., Lambrecht, M.: Project scheduling for maximum npv with variable activity durations and uncertain activity outcomes. In: IEEE International Conference on Industrial Engineering and Engineering Management, 2008. IEEM 2008, pp.\u00a0183\u2013187, 2008","DOI":"10.1109\/IEEM.2008.4737856"},{"key":"7_CR5","doi-asserted-by":"crossref","unstructured":"Creemers, S., De\u00a0Reyck, B., Leus, R.: R&d project planning with multiple trials in uncertain environments. In: IEEE International Conference on Industrial Engineering and Engineering Management, 2009. IEEM 2009, pp. 325\u2013329, 2009","DOI":"10.1109\/IEEM.2009.5373349"},{"key":"7_CR6","doi-asserted-by":"crossref","unstructured":"Creemers, S., De Reyck, B., Leus, R.: Project planning with alternative technologies in uncertain environments. FEB Research Report KBI_1314, 2013","DOI":"10.2139\/ssrn.2381839"},{"key":"7_CR7","doi-asserted-by":"crossref","unstructured":"De\u00a0Reyck, B., Leus, R.: R&d project scheduling when activities may fail. IIE Trans. 40(4), 367\u2013384 (2008)","DOI":"10.1080\/07408170701413944"},{"key":"7_CR8","unstructured":"De\u00a0Reyck, B., Grushka-Cockayne, Y., Leus, R.: A new challenge in project scheduling: the incorporation of activity failures. Tijdschrift voor economie en management 52(3), 411 (2007)"},{"key":"7_CR9","doi-asserted-by":"crossref","unstructured":"Demeulemeester, E., Vanhoucke, M., Herroelen, W.: Rangen: a random network generator for activity-on-the-node networks. J. Sched. 6(1), 17\u201338 (2003)","DOI":"10.1023\/A:1022283403119"},{"key":"7_CR10","doi-asserted-by":"crossref","unstructured":"Fontes, D.B.M.M., Gon\u00e7alves, J.F.: A multi-population hybrid biased random key genetic algorithm for hop-constrained trees in nonlinear cost flow networks. Optim. Lett. 7(6), 1303\u20131324 (2013)","DOI":"10.1007\/s11590-012-0505-5"},{"key":"7_CR12","doi-asserted-by":"crossref","unstructured":"Gon\u00e7alves, J.F., Resende, M.G.C.: An evolutionary algorithm for manufacturing cell formation. Comput. Ind. Eng. 47, 247\u2013273 (2004)","DOI":"10.1016\/j.cie.2004.07.003"},{"key":"7_CR13","doi-asserted-by":"crossref","unstructured":"Gon\u00e7alves, J.F., Resende, M.G.C.: Biased random-key genetic algorithms for combinatorial optimization. J. Heuristics 17, 487\u2013525 (2011)","DOI":"10.1007\/s10732-010-9143-1"},{"key":"7_CR14","doi-asserted-by":"crossref","unstructured":"Gon\u00e7alves, J.F., Resende, M.G.C.: A parallel multi-population biased random-key genetic algorithm for a container loading problem. Comput. Oper. Res. 39(2), 179\u2013190 (2012)","DOI":"10.1016\/j.cor.2011.03.009"},{"key":"7_CR17","doi-asserted-by":"crossref","unstructured":"Gon\u00e7alves, J.F., Mendes, J.J.M., Resende, M.G.C.: A genetic algorithm for the resource constrained multi-project scheduling problem. Eur. J. Oper. Res. 189, 1171\u20131190 (2009)","DOI":"10.1016\/j.ejor.2006.06.074"},{"key":"7_CR18","doi-asserted-by":"crossref","unstructured":"Gon\u00e7alves, J.F., Costa, M.D., Resende, M.G.C.: A biased random-key genetic algorithm for the minimization of open stacks problem. Int. Trans. Oper. Res. (2014, to appear) DOI:\u00a010.1111\/itor.12109","DOI":"10.1111\/itor.12109"},{"key":"7_CR19","doi-asserted-by":"crossref","unstructured":"Maravelias, C.T., Grossmann, I.E.: Simultaneous planning for new product development and batch manufacturing facilities. Ind. Eng. Chem. Res. 40(26), 6147\u20136164 (2001)","DOI":"10.1021\/ie010301x"},{"key":"7_CR20","doi-asserted-by":"crossref","unstructured":"Mastor, A.A.: An experimental investigation and comparative evaluation of production line balancing techniques. Manag. Sci. 16(11), 728\u2013746 (1970)","DOI":"10.1287\/mnsc.16.11.728"},{"key":"7_CR21","doi-asserted-by":"crossref","unstructured":"Miguel, J.L., Schaefer, E., Reklaitis, G.V.: Challenges and opportunities in enterprise-wide optimization in the pharmaceutical industry. Comput. Chem. Eng. 47, 19\u201328 (2012)","DOI":"10.1016\/j.compchemeng.2012.07.002"},{"key":"7_CR22","doi-asserted-by":"crossref","unstructured":"Ranjbar, M.: A branch-and-bound algorithm for scheduling of new product development projects. Int. Trans. Oper. Res. 20(2), 251\u2013266 (2013)","DOI":"10.1111\/j.1475-3995.2012.00873.x"},{"key":"7_CR23","doi-asserted-by":"crossref","unstructured":"Ranjbar, M., Davari, M.: An exact method for scheduling of the alternative technologies in r&d projects. Comput. Oper. Res. 40(1), 395\u2013405 (2013)","DOI":"10.1016\/j.cor.2012.07.005"},{"key":"7_CR24","doi-asserted-by":"crossref","unstructured":"Roque, L.A.C., Fontes, D.B.M.M., Fontes, F.A.C.C.: A hybrid biased random key genetic algorithm approach for the unit commitment problem. J. Comb. Opt. 28(1), 140\u2013166 (2014)","DOI":"10.1007\/s10878-014-9710-8"},{"key":"7_CR25","doi-asserted-by":"crossref","unstructured":"Schmidt, C.W., Grossmann, I.E.: Optimization models for the scheduling of testing tasks in new product development. Ind. Eng. Chem. Res. 35(10), 3498\u20133510 (1996)","DOI":"10.1021\/ie9601099"},{"key":"7_CR26","doi-asserted-by":"crossref","unstructured":"Schmidt, C.W., Grossmann, I.E., Blau, G.E.: Optimization of industrial scale scheduling problems in new product development. Comput. Chem. Eng. 22, S1027\u2013S1030 (1998)","DOI":"10.1016\/S0098-1354(98)00206-3"},{"key":"7_CR27","unstructured":"Sobek, D.K., Ward, A.C., Liker, J.K.: Toyota\u2019s principles of set-based concurrent engineering. Sloan Manag. Rev. 40(2), 67\u201384 (1999)"},{"key":"7_CR28","doi-asserted-by":"crossref","unstructured":"Sommer, S.C., Loch, C.H.: Selectionism and learning in projects with complexity and unforeseeable uncertainty. Manag. Sci. 50(10), 1334\u20131347 (2004)","DOI":"10.1287\/mnsc.1040.0274"},{"key":"7_CR29","unstructured":"Spears, W.M., Dejong, K.A.: On the virtues of parameterized uniform crossover. In: Proceedings of the Fourth International Conference on Genetic Algorithms, pp. 230\u2013236, 1991"}],"container-title":["Springer Proceedings in Mathematics &amp; Statistics","Optimization, Control, and Applications in the Information Age"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-18567-5_7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,8]],"date-time":"2023-02-08T13:44:16Z","timestamp":1675863856000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-18567-5_7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319185668","9783319185675"],"references-count":26,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-18567-5_7","relation":{},"ISSN":["2194-1009","2194-1017"],"issn-type":[{"type":"print","value":"2194-1009"},{"type":"electronic","value":"2194-1017"}],"subject":[],"published":{"date-parts":[[2015]]}}}