{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,31]],"date-time":"2025-05-31T04:11:41Z","timestamp":1748664701549,"version":"3.41.0"},"publisher-location":"Cham","reference-count":20,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319203270"},{"type":"electronic","value":"9783319203287"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-20328-7_11","type":"book-chapter","created":{"date-parts":[[2015,10,1]],"date-time":"2015-10-01T14:47:36Z","timestamp":1443710856000},"page":"171-189","source":"Crossref","is-referenced-by-count":0,"title":["A Tool to Manage Tasks of R&amp;D Projects"],"prefix":"10.1007","author":[{"given":"Joana","family":"Fialho","sequence":"first","affiliation":[]},{"given":"Pedro","family":"Godinho","sequence":"additional","affiliation":[]},{"given":"Jo\u00e3o Paulo","family":"Costa","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"11_CR1","doi-asserted-by":"publisher","first-page":"1389","DOI":"10.1109\/TPWRS.2010.2094211","volume":"26","author":"G. Blanco","year":"2011","unstructured":"Blanco, G., Olsina, F.: Real option valuation of FACTS investments based on the least square Monte Carlo method. IEEE Trans. Power Syst. 26(3), 1389\u20131398 (2011)","journal-title":"IEEE Trans. Power Syst."},{"key":"11_CR2","doi-asserted-by":"crossref","unstructured":"Brach, M., Paxson, D.: A gene to drug venture: Poisson options analysis. R&D Manag. 31(2), 203\u2013214 (2001)","DOI":"10.1111\/1467-9310.00210"},{"key":"11_CR3","doi-asserted-by":"publisher","first-page":"240","DOI":"10.1016\/j.technovation.2010.12.004","volume":"31","author":"D. Cassimon","year":"2011","unstructured":"Cassimon, D., Engelen, P.J., Yordanov, V.: Compound real option valuation with phase-specific volatility: a multi-phase mobile payments case study. Technovation 31, 240\u2013255 (2011)","journal-title":"Technovation"},{"key":"11_CR4","doi-asserted-by":"crossref","unstructured":"Choudhurry, A., King, A., Kumar, S., Sabharwal, Y.: Optimizations in financial engineering: the least-squares Monte Carlo method of Longstaff and Schwartz. In: Parallel and Distributed Processing, IEEE International Symposium on IPDPS 2008, Miami, vol. 1, no. 11, pp.\u00a014\u201318 (2008)","DOI":"10.1109\/IPDPS.2008.4536290"},{"key":"11_CR5","volume-title":"Real Options","author":"T. Copeland","year":"2001","unstructured":"Copeland, T., Antikarov, V.: Real Options. Texere, New York (2001)"},{"key":"11_CR6","doi-asserted-by":"crossref","unstructured":"Cortazar, G., Schwartz, E., Casassus, J.: Optimal exploration investments under price and geological-technical uncertainty: a real options model. R&D Manag. 31(2), 181\u2013189 (2001)","DOI":"10.1111\/1467-9310.00208"},{"key":"11_CR7","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/j.cor.2006.02.016","volume":"35","author":"G. Cortazar","year":"2008","unstructured":"Cortazar, G., Gravet, M., Urzua, J.: The valuation of multidimensional American real options using the LSM simulation method. Comput. Oper. Res. 35, 113\u2013129 (2008)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"11_CR8","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1002\/smj.209","volume":"23","author":"T. Folta","year":"2002","unstructured":"Folta, T., Miller, K.: Real options in equity partnerships. Strateg. Manag. J. 23(1), 77\u201388 (2002)","journal-title":"Strateg. Manag. J."},{"key":"11_CR9","doi-asserted-by":"crossref","unstructured":"Lint, O., Pennings, E.: An option approach to the new product development process: a case study at Philips electronics. R&D Manag. 31(2), 163\u2013172 (2001)","DOI":"10.1111\/1467-9310.00206"},{"key":"11_CR10","first-page":"1113","volume":"14","author":"F. Longstaff","year":"2001","unstructured":"Longstaff, F., Schwartz, E.: Valuing American options by simulation: a simple least-square approach. Rev. Financ. Stud. 14, 1113\u20131147 (2001)","journal-title":"Rev. Financ. Stud."},{"issue":"1","key":"11_CR11","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1287\/inte.14.1.126","volume":"14","author":"S. Myers","year":"1984","unstructured":"Myers, S.: Finance theory and finance strategy. Interfaces 14(1), 126\u2013137 (1984)","journal-title":"Interfaces"},{"key":"11_CR12","doi-asserted-by":"crossref","unstructured":"Peng, H., Liu, M.: Valuation research of real options on the basis of life cycles R&D projects. In: International Conference on Management Science & Engineering (15th), Long Beach, pp.\u00a01457\u20131462 (2008)","DOI":"10.1109\/ICMSE.2008.4669098"},{"key":"11_CR13","doi-asserted-by":"crossref","unstructured":"Pennings, E., Sereno, L.: Evaluating pharmaceutical R&D under technical and economic uncertainty. Eur. J. Oper. Res. 212, 374\u2013385 (2011)","DOI":"10.1016\/j.ejor.2011.01.055"},{"key":"11_CR14","doi-asserted-by":"crossref","unstructured":"Perlitz, M., Peske, T., Schrank, R.: Real options valuation: the new frontier in R&D project evaluation? R&D Manag. 29(3), 255\u2013269 (1999)","DOI":"10.1111\/1467-9310.00135"},{"key":"11_CR15","doi-asserted-by":"crossref","unstructured":"Santiago, L., Bifano, T.G.: Management of R&D projects under uncertainty: a multidimensional approach to managerial flexibility. IEEE Trans. Eng. Manag. 52(2), 269\u2013280 (2005)","DOI":"10.1109\/TEM.2005.844465"},{"issue":"3","key":"11_CR16","doi-asserted-by":"publisher","first-page":"62","DOI":"10.2469\/faj.v56.n3.2361","volume":"56","author":"E. Schwartz","year":"2000","unstructured":"Schwartz, E., Moon, M.: Rational pricing of internet companies. Financ. Anal. J. 56(3), 62\u201375 (2000)","journal-title":"Financ. Anal. J."},{"issue":"1","key":"11_CR17","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1287\/mnsc.49.1.57.12753","volume":"49","author":"E. Schwartz","year":"2003","unstructured":"Schwartz, E., Zozaya-Gorostiza, C.: Investment under uncertainty in information technology: acquisition and development projects. Manag. Sci. 49(1), 57\u201370 (2003)","journal-title":"Manag. Sci."},{"issue":"9","key":"11_CR18","doi-asserted-by":"publisher","first-page":"1193","DOI":"10.1287\/mnsc.1030.0155","volume":"80","author":"L. Stentoft","year":"2004","unstructured":"Stentoft, L.: Convergence of the least squares Monte Carlo approach to American option valuation. Manag. Sci. 80(9), 1193\u20131203 (2004)","journal-title":"Manag. Sci."},{"key":"11_CR19","doi-asserted-by":"crossref","unstructured":"Tolga, A., Kahraman, C.: Fuzzy multi-criteria evaluation of R&D projects and a fuzzy trinomial lattice approach for real options. In: Proceedings of 3rd International Conference on Intelligent System and Knowledge Engineering, Xiamen, China, pp.\u00a0418\u2013423 (2008)","DOI":"10.1109\/ISKE.2008.4730966"},{"key":"11_CR20","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1016\/S0263-7863(02)00025-X","volume":"21","author":"K. Yeo","year":"2003","unstructured":"Yeo, K., Qiu, F.: The value of management flexibility \u2013 a real option approach to investment evaluation. Int. J. Proj. Manag. 21, 243\u2013250 (2003)","journal-title":"Int. J. Proj. Manag."}],"container-title":["CIM Series in Mathematical Sciences","Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-20328-7_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,30]],"date-time":"2025-05-30T21:51:11Z","timestamp":1748641871000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-20328-7_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319203270","9783319203287"],"references-count":20,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-20328-7_11","relation":{},"ISSN":["2364-950X","2364-9518"],"issn-type":[{"type":"print","value":"2364-950X"},{"type":"electronic","value":"2364-9518"}],"subject":[],"published":{"date-parts":[[2015]]}}}