{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T05:25:12Z","timestamp":1743053112979,"version":"3.40.3"},"publisher-location":"Cham","reference-count":10,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319204291"},{"type":"electronic","value":"9783319204307"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-20430-7_30","type":"book-chapter","created":{"date-parts":[[2015,12,22]],"date-time":"2015-12-22T08:48:30Z","timestamp":1450774110000},"page":"233-238","source":"Crossref","is-referenced-by-count":0,"title":["A Matheuristic Based on Column Generation for Parallel Machine Scheduling with Sequence Dependent Setup Times"],"prefix":"10.1007","author":[{"given":"Filipe","family":"Alvelos","sequence":"first","affiliation":[]},{"given":"Manuel","family":"Lopes","sequence":"additional","affiliation":[]},{"given":"Henrique","family":"Lopes","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"30_CR1","doi-asserted-by":"publisher","first-page":"978","DOI":"10.1016\/j.ejor.2006.09.010","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi, A., Soroush, H.M.: The significance of reducing setup times\/setup costs. Eur. J. Oper. Res. 187(3), 978\u2013984 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"30_CR2","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M.: A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187(3), 985\u20131032 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"30_CR3","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1007\/978-3-642-30671-6_11","volume-title":"Hybrid Metaheuristics. Studies in Computational Intelligence","author":"F. Alvelos","year":"2013","unstructured":"Alvelos, F., Sousa, A., Santos, D.: Combining column generation and metaheuristics. In: Talbi, E.G. (ed.) Hybrid Metaheuristics. Studies in Computational Intelligence, vol. 434, pp. 285\u2013334. Springer, Berlin\/Heidelberg (2013)"},{"issue":"2","key":"30_CR4","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R.L. Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., Kan, A.R.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5(2), 287\u2013326 (1979)","journal-title":"Ann. Discret. Math."},{"key":"30_CR5","unstructured":"ILOG: IBM ILOG CPLEX Optimization Studio V12.4 (2012)"},{"key":"30_CR6","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","volume":"1","author":"J.K. Lenstra","year":"1977","unstructured":"Lenstra, J.K., Rinnooy Kan, A.H.G., Brucker, P.: Complexity of machine scheduling problems. Ann. Discret. Math. 1, 343\u2013362 (1977)","journal-title":"Ann. Discret. Math."},{"issue":"3","key":"30_CR7","doi-asserted-by":"publisher","first-page":"1508","DOI":"10.1016\/j.ejor.2005.11.001","volume":"176","author":"M.J.P. Lopes","year":"2007","unstructured":"Lopes, M.J.P., de Carvalho, J.M.V.: A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times. Eur. J. Oper. Res. 176(3), 1508\u20131527 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"30_CR8","doi-asserted-by":"publisher","first-page":"290","DOI":"10.1007\/978-3-319-09129-7_22","volume":"8580","author":"M. Lopes","year":"2014","unstructured":"Lopes, M., Alvelos, F., Lopes, H.: Improving branch-and-price for parallel machine scheduling. Lect. Notes Comput. Sci. 8580, 290\u2013300 (2014)","journal-title":"Lect. Notes Comput. Sci."},{"issue":"2","key":"30_CR9","first-page":"193","volume":"18","author":"E. Mokotoff","year":"2001","unstructured":"Mokotoff, E.: Parallel machine scheduling problems: a survey. Asia-Pacific J. Oper. Res. 18(2), 193\u2013243 (2001)","journal-title":"Asia-Pacific J. Oper. Res."},{"key":"30_CR10","unstructured":"SearchCol++: http:\/\/searchcol.dps.uminho.pt\/ (2014)"}],"container-title":["Lecture Notes in Economics and Mathematical Systems","Computational Management Science"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-20430-7_30","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,20]],"date-time":"2023-01-20T20:12:09Z","timestamp":1674245529000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-3-319-20430-7_30"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319204291","9783319204307"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-20430-7_30","relation":{},"ISSN":["0075-8442","2196-9957"],"issn-type":[{"type":"print","value":"0075-8442"},{"type":"electronic","value":"2196-9957"}],"subject":[],"published":{"date-parts":[[2016]]}}}