{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,8]],"date-time":"2024-09-08T21:07:04Z","timestamp":1725829624336},"publisher-location":"Cham","reference-count":9,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319241524"},{"type":"electronic","value":"9783319241548"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-24154-8_2","type":"book-chapter","created":{"date-parts":[[2015,9,11]],"date-time":"2015-09-11T08:22:47Z","timestamp":1441959767000},"page":"9-14","source":"Crossref","is-referenced-by-count":0,"title":["A Fix-and-Relax Algorithm for Solving Parallel and Sequential Versions of a Multi-period Multi-product Closed Loop Supply Chain Design and Operation Planning Model"],"prefix":"10.1007","author":[{"given":"Susana","family":"Baptista","sequence":"first","affiliation":[]},{"given":"Maria Isabel","family":"Gomes","sequence":"additional","affiliation":[]},{"given":"Laureano","family":"Escudero","sequence":"additional","affiliation":[]},{"given":"Pedro","family":"Medeiros","sequence":"additional","affiliation":[]},{"given":"Filipe","family":"Cabrita","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,8]]},"reference":[{"key":"2_CR1","doi-asserted-by":"publisher","first-page":"318","DOI":"10.1108\/09600030510607328","volume":"35","author":"K. Inderfurth","year":"2005","unstructured":"Inderfurth, K.: Impact of uncertainties on recovery behavior in a remanufacturing environment: A numerical analysis. Int. J. Phys. Distrib.\u00a035, 318\u2013336 (2005)","journal-title":"Int. J. Phys. Distrib."},{"issue":"2","key":"2_CR2","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1016\/j.cor.2005.03.007","volume":"34","author":"O. Listes","year":"2007","unstructured":"Listes, O.: A generic stochastic model for supply-and-return network design. Comput. Oper. Res.\u00a034(2), 417\u2013442 (2007)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"2_CR3","doi-asserted-by":"publisher","first-page":"1063","DOI":"10.1016\/j.ejor.2005.05.032","volume":"179","author":"M.I.G. Salema","year":"2007","unstructured":"Salema, M.I.G., Barbosa-Povoa, A.P., Novais, A.Q.: An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty. Eur. J. Oper. Res.\u00a0179(3), 1063\u20131077 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"2_CR4","doi-asserted-by":"publisher","first-page":"436","DOI":"10.1016\/j.ejor.2012.11.035","volume":"226","author":"S.R. Cardoso","year":"2013","unstructured":"Cardoso, S.R., Barbosa-P\u00f3voa, A.P.F.D., Relvas, S.: Design and Planning of Supply Chains with Integration of Reverse Logistics Activities under Demand Uncertainty. Eur. J. Oper. Res.\u00a0226, 436\u2013451 (2013)","journal-title":"Eur. J. Oper. Res."},{"key":"2_CR5","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1016\/j.compchemeng.2014.02.027","volume":"66","author":"L.J. Zeballos","year":"2014","unstructured":"Zeballos, L.J., M\u00e9ndez, C.A., Barbosa-Povoa, A.P., Novais, A.Q.: Multi-period design and planning of closed-loop supply chains with uncertain supply and demand. Comput. Chem. Eng.\u00a066, 151\u2013164 (2014)","journal-title":"Comput. Chem. Eng."},{"issue":"3","key":"2_CR6","doi-asserted-by":"publisher","first-page":"603","DOI":"10.1016\/j.ejor.2014.07.012","volume":"240","author":"K. Govindan","year":"2015","unstructured":"Govindan, K., Soleimani, H., Kannan, D.: Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future. Eur. J. Oper. Res.\u00a0240(3), 603\u2013626 (2015)","journal-title":"Eur. J. Oper. Res."},{"key":"2_CR7","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1007\/s10479-005-3970-8","volume":"140","author":"L.F. Escudero","year":"2005","unstructured":"Escudero, L.F., Salmeron, J.: On a fix-and-relax framework for a class of project scheduling problems. Ann. Oper. Res.\u00a0140, 163\u2013188 (2005)","journal-title":"Ann. Oper. Res."},{"issue":"2","key":"2_CR8","doi-asserted-by":"publisher","first-page":"336","DOI":"10.1016\/j.ejor.2009.08.002","volume":"203","author":"M.I.G. Salema","year":"2010","unstructured":"Salema, M.I.G., Barbosa-Povoa, A.P., Novais, A.Q.: Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework. Eur. J. Oper. Res.\u00a0203(2), 336\u2013349 (2010)","journal-title":"Eur. J. Oper. Res."},{"key":"2_CR9","unstructured":"Baptista, S., Barbosa-Povoa, A.P., Escudero, L.F., Gomes, M.I.: A metaheuristic for solving large-scale two-stage stochastic mixed. programs with the time stochastic dominance risk averse strategy. In: 12th PSE and 25th ESCAPE (to appear, 2015)"}],"container-title":["Studies in Big Data","Operations Research and Big Data"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-24154-8_2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T19:03:43Z","timestamp":1559243023000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-24154-8_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319241524","9783319241548"],"references-count":9,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-24154-8_2","relation":{},"ISSN":["2197-6503","2197-6511"],"issn-type":[{"type":"print","value":"2197-6503"},{"type":"electronic","value":"2197-6511"}],"subject":[],"published":{"date-parts":[[2015]]}}}