{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T22:18:53Z","timestamp":1759702733375},"publisher-location":"Cham","reference-count":20,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319241524"},{"type":"electronic","value":"9783319241548"}],"license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015]]},"DOI":"10.1007\/978-3-319-24154-8_9","type":"book-chapter","created":{"date-parts":[[2015,9,11]],"date-time":"2015-09-11T08:22:47Z","timestamp":1441959767000},"page":"67-77","source":"Crossref","is-referenced-by-count":1,"title":["Modeling Lot Sizing and Scheduling in Practice"],"prefix":"10.1007","author":[{"given":"Luis","family":"Guimar\u00e3es","sequence":"first","affiliation":[]},{"given":"Gon\u00e7alo","family":"Figueira","sequence":"additional","affiliation":[]},{"given":"Pedro","family":"Amorim","sequence":"additional","affiliation":[]},{"given":"Bernardo","family":"Almada-Lobo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,10,8]]},"reference":[{"issue":"20","key":"9_CR1","doi-asserted-by":"crossref","first-page":"4873","DOI":"10.1080\/00207540601094465","volume":"45","author":"B. Almada-Lobo","year":"2007","unstructured":"Almada-Lobo, B., Klabjan, D., Oliveira, J.F., Carravilla, M.A.: Single machine multi-product capacitated lot sizing with sequence-dependent setups. International Journal of Production Research\u00a045(20), 4873\u20134894 (2007)","journal-title":"International Journal of Production Research"},{"issue":"24","key":"9_CR2","doi-asserted-by":"crossref","first-page":"7315","DOI":"10.1080\/00207543.2010.535570","volume":"49","author":"C. Almeder","year":"2011","unstructured":"Almeder, C., Almada-Lobo, B.: Synchronisation of scarce resources for a parallel machine lotsizing problem. International Journal of Production Research\u00a049(24), 7315\u20137335 (2011)","journal-title":"International Journal of Production Research"},{"issue":"3","key":"9_CR3","doi-asserted-by":"crossref","first-page":"669","DOI":"10.1007\/s00291-013-0324-9","volume":"36","author":"P. Amorim","year":"2013","unstructured":"Amorim, P., Costa, A.M., Almada-Lobo, B.: Influence of consumer purchasing behaviour on the production planning of perishable food. OR Spectrum\u00a036(3), 669\u2013692 (2013)","journal-title":"OR Spectrum"},{"issue":"7","key":"9_CR4","doi-asserted-by":"crossref","first-page":"993","DOI":"10.1287\/mnsc.47.7.993.9800","volume":"47","author":"G. Belvaux","year":"2001","unstructured":"Belvaux, G., Wolsey, L.A.: Modelling practical lot-sizing problems as mixed-integer programs. Management Science\u00a047(7), 993\u20131007 (2001)","journal-title":"Management Science"},{"issue":"11","key":"9_CR5","doi-asserted-by":"crossref","first-page":"1613","DOI":"10.1057\/jors.2011.159","volume":"63","author":"V.C.B. Camargo","year":"2012","unstructured":"Camargo, V.C.B., Toledo, F.M.B., Almada-Lobo, B.: Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries. Journal of the Operational Research Society\u00a063(11), 1613\u20131630 (2012)","journal-title":"Journal of the Operational Research Society"},{"issue":"2","key":"9_CR6","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1007\/s10951-009-0135-7","volume":"13","author":"A. Clark","year":"2010","unstructured":"Clark, A., Morabito, R., Toso, E.: Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching. Journal of Scheduling\u00a013(2), 111\u2013121 (2010)","journal-title":"Journal of Scheduling"},{"issue":"10","key":"9_CR7","doi-asserted-by":"crossref","first-page":"2287","DOI":"10.1080\/00207540050028106","volume":"38","author":"A.R. Clark","year":"2000","unstructured":"Clark, A.R., Clark, S.J.: Rolling-horizon lot-sizing when set-up times are sequence-dependent. International Journal of Production Research\u00a038(10), 2287\u20132307 (2000)","journal-title":"International Journal of Production Research"},{"issue":"2","key":"9_CR8","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A. Drexl","year":"1997","unstructured":"Drexl, A., Kimms, A.: Lot sizing and scheduling - survey and extensions. European Journal of Operational Research\u00a099(2), 221\u2013235 (1997)","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"9_CR9","doi-asserted-by":"crossref","first-page":"1804","DOI":"10.1016\/j.cor.2013.01.015","volume":"40","author":"G. Figueira","year":"2013","unstructured":"Figueira, G., Oliveira Santos, M., Almada-Lobo, B.: A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry. Computers & Operations Research\u00a040(7), 1804\u20131818 (2013)","journal-title":"Computers & Operations Research"},{"issue":"1","key":"9_CR10","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B. Fleischmann","year":"1997","unstructured":"Fleischmann, B., Meyr, H.: The general lotsizing and scheduling problem. OR Spektrum\u00a019(1), 11\u201321 (1997)","journal-title":"OR Spektrum"},{"key":"9_CR11","doi-asserted-by":"crossref","unstructured":"Fleischmann, B., Meyr, H.: Planning hierarchy, modeling and advanced planning systems. In: Graves, S., de Kok, A. (eds.) Supply Chain Management: Design, Coordination and Operation. Handbooks in Operations Research and Management Science, vol.\u00a011, pp. 455\u2013523. Elsevier (2003)","DOI":"10.1016\/S0927-0507(03)11009-2"},{"issue":"2","key":"9_CR12","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1016\/j.ejor.2013.04.030","volume":"230","author":"L. Guimar\u00e3es","year":"2013","unstructured":"Guimar\u00e3es, L., Klabjan, D., Almada-Lobo, B.: Pricing, relaxing and fixing under lot sizing and scheduling. European Journal of Operational Research\u00a0230(2), 399\u2013411 (2013)","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"9_CR13","doi-asserted-by":"crossref","first-page":"644","DOI":"10.1016\/j.ejor.2014.05.018","volume":"239","author":"L. Guimar\u00e3es","year":"2014","unstructured":"Guimar\u00e3es, L., Klabjan, D., Almada-Lobo, B.: Modeling lotsizing and scheduling problems with sequence dependent setups. European Journal of Operational Research\u00a0239(3), 644\u2013662 (2014)","journal-title":"European Journal of Operational Research"},{"issue":"18-19","key":"9_CR14","doi-asserted-by":"crossref","first-page":"3711","DOI":"10.1080\/00207540600589127","volume":"44","author":"H.-O. G\u00fcnther","year":"2006","unstructured":"G\u00fcnther, H.-O., Grunow, M., Neuhaus, U.: Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO. International Journal of Production Research\u00a044(18-19), 3711\u20133726 (2006)","journal-title":"International Journal of Production Research"},{"issue":"2","key":"9_CR15","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/S0925-5273(99)00119-X","volume":"66","author":"K. Haase","year":"2000","unstructured":"Haase, K., Kimms, A.: Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of Production Economics\u00a066(2), 159\u2013169 (2000)","journal-title":"International Journal of Production Economics"},{"issue":"6","key":"9_CR16","doi-asserted-by":"crossref","first-page":"1619","DOI":"10.1080\/00207540600902262","volume":"46","author":"R. Jans","year":"2008","unstructured":"Jans, R., Degraeve, Z.: Modeling industrial lot sizing problems: a review. International Journal of Production Research\u00a046(6), 1619\u20131643 (2008)","journal-title":"International Journal of Production Research"},{"issue":"3","key":"9_CR17","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J. Kallrath","year":"2002","unstructured":"Kallrath, J.: Planning and scheduling in the process industry. OR Spectrum\u00a024(3), 219\u2013250 (2002)","journal-title":"OR Spectrum"},{"issue":"2","key":"9_CR18","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1287\/mnsc.45.2.273","volume":"45","author":"S. Kang","year":"1999","unstructured":"Kang, S., Malik, K., Thomas, L.J.: Lotsizing and scheduling on parallel machines with sequence-dependent setup costs. Management Science\u00a045(2), 273\u2013289 (1999)","journal-title":"Management Science"},{"issue":"2","key":"9_CR19","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1007\/s10951-010-0197-6","volume":"14","author":"A. Menezes","year":"2011","unstructured":"Menezes, A., Clark, A., Almada-Lobo, B.: Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups. Journal of Scheduling\u00a014(2), 209\u2013219 (2011)","journal-title":"Journal of Scheduling"},{"key":"9_CR20","doi-asserted-by":"crossref","unstructured":"Pochet, Y.: Mathematical programming models and formulations for deterministic production planning problems. In: J\u00fcnger, M., Naddef, D. (eds.) Computat. Comb. Optimization. LNCS, vol.\u00a02241, pp. 57\u2013111. Springer, Heidelberg (2001)","DOI":"10.1007\/3-540-45586-8_3"}],"container-title":["Studies in Big Data","Operations Research and Big Data"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-24154-8_9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,5,20]],"date-time":"2017-05-20T07:27:35Z","timestamp":1495265255000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-24154-8_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"ISBN":["9783319241524","9783319241548"],"references-count":20,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-24154-8_9","relation":{},"ISSN":["2197-6503","2197-6511"],"issn-type":[{"type":"print","value":"2197-6503"},{"type":"electronic","value":"2197-6511"}],"subject":[],"published":{"date-parts":[[2015]]}}}