{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,4]],"date-time":"2025-06-04T04:16:41Z","timestamp":1749010601669,"version":"3.41.0"},"publisher-location":"Cham","reference-count":29,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319296753"},{"type":"electronic","value":"9783319296777"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-29677-7_9","type":"book-chapter","created":{"date-parts":[[2016,5,27]],"date-time":"2016-05-27T07:49:57Z","timestamp":1464335397000},"page":"133-146","source":"Crossref","is-referenced-by-count":4,"title":["Improving Production Flexibility in an Industrial Company by Shortening Changeover Time: A Triple Helix Collaborative Project"],"prefix":"10.1007","author":[{"given":"Justyna","family":"Trojanowska","sequence":"first","affiliation":[]},{"given":"Krzysztof","family":"\u017bywicki","sequence":"additional","affiliation":[]},{"given":"Maria Leonilde R.","family":"Varela","sequence":"additional","affiliation":[]},{"given":"Jos\u00e9","family":"Machado","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,5,28]]},"reference":[{"key":"9_CR29","unstructured":"Courtois A, Martin-Bonnefois C, Pillet M (1997) Gest\u00e3o da Produ\u00e7\u00e3o (4\u00aa ed.). Lisboa: LIDEL - Edi\u00e7\u00f5es T\u00e9cnicas, Lda"},{"key":"9_CR1","first-page":"215","volume-title":"Innovations in management and production engineering","author":"R Doma\u0144ski","year":"2012","unstructured":"Doma\u0144ski R, Adamczak M, Cyplik P (2012) Manufacturing costs in conventional and lean manufacturing. In: Knosala R (ed) Innovations in management and production engineering. Oficyna Wydawnicza Polskiego Towarzystwa Zarz\u0105dzania Produkcj\u0105, Poland, pp 215\u2013225"},{"issue":"2","key":"9_CR2","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1080\/095372897235415","volume":"8","author":"DS Ha","year":"1997","unstructured":"Ha DS, Kim SL (1997) Implementation of JIT purchasing: an integrated approach. Prod Plann Contr 8(2):152\u2013157. doi: 10.1080\/095372897235415","journal-title":"Prod Plann Contr"},{"key":"9_CR3","volume-title":"Kaizen event field book: foundation, framework, and standard work for effective events","author":"MR Hamel","year":"2010","unstructured":"Hamel MR (2010) Kaizen event field book: foundation, framework, and standard work for effective events., SME"},{"key":"9_CR4","doi-asserted-by":"crossref","DOI":"10.1201\/b10492","volume-title":"Staying lean: thriving, Not just surviving","author":"P Hines","year":"2011","unstructured":"Hines P, Found P, Griffiths G, Harrison R (2011) Staying lean: thriving, Not just surviving, 2nd edn. Productivity Press, New York","edition":"2"},{"key":"9_CR5","doi-asserted-by":"crossref","first-page":"501","DOI":"10.1016\/j.ijpe.2008.12.014","volume":"118","author":"A Huttmeir","year":"2009","unstructured":"Huttmeir A, de Treville S, van Ackere A, Monnier L, Prenninger J (2009) Trading off between Heijunka and just-in-sequence. Int J Prod Econ 118:501\u2013507","journal-title":"Int J Prod Econ"},{"issue":"2","key":"9_CR6","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1016\/j.ijpe.2007.07.005","volume":"112","author":"MA Karim","year":"2008","unstructured":"Karim MA, Smith AJR, Halgamuge SK, Islam MM (2008) A comparative study of manufacturing practices and performance variables. Int J Prod Econ 112(2):841\u2013859. doi: 10.1016\/j.ijpe.2007.07.005","journal-title":"Int J Prod Econ"},{"issue":"10","key":"9_CR7","doi-asserted-by":"publisher","first-page":"1032","DOI":"10.3923\/jas.2012.1032.1037","volume":"12","author":"BS Kumar","year":"2012","unstructured":"Kumar BS, Abuthakeer SS (2012) Implementation of lean tools and techniques in an automotive industry. J Appl Sci 12(10):1032\u20131037. doi: 10.3923\/jas.2012.1032.1037","journal-title":"J Appl Sci"},{"key":"9_CR8","volume-title":"Production and operation managements","author":"SA Kumar","year":"2008","unstructured":"Kumar SA, Suresh N (2008) Production and operation managements. New Age International, New Delhi"},{"key":"9_CR9","volume-title":"The Toyota way: 14 management principles from the world's greatest manufacturer","author":"JK Liker","year":"2004","unstructured":"Liker JK (2004) The Toyota way: 14 management principles from the world's greatest manufacturer. McGraw-Hill Professional, New York"},{"key":"9_CR10","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/978-0-387-77249-3_2","volume-title":"Lean business systems and beyond","author":"CR Lippolt","year":"2008","unstructured":"Lippolt CR, Furmans K (2008) Sizing of Heijunka-controlled production systems with unreliable production processes. In: Koch T (ed) Lean business systems and beyond. Springer, Boston, pp 11\u201319"},{"issue":"A6","key":"9_CR11","doi-asserted-by":"publisher","first-page":"662","DOI":"10.1205\/cherd.04351","volume":"83","author":"T Melton","year":"2005","unstructured":"Melton T (2005) The benefits of lean manufacturing\u2014what lean thinking has to offer the process industries. Chem Eng Res Des 83(A6):662\u2013673. doi: 10.1205\/cherd.04351","journal-title":"Chem Eng Res Des"},{"key":"9_CR12","volume-title":"Toyota production system: beyond large-scale production","author":"T Ohno","year":"1988","unstructured":"Ohno T (1988) Toyota production system: beyond large-scale production. Productivity Press, New York"},{"issue":"4","key":"9_CR13","first-page":"30","volume":"38","author":"C Ortiz","year":"2006","unstructured":"Ortiz C (2006) All-out kaizen. Ind Eng 38(4):30\u201334","journal-title":"Ind Eng"},{"issue":"13","key":"9_CR14","doi-asserted-by":"publisher","first-page":"3075","DOI":"10.1080\/0020754021000049817","volume":"41","author":"SJ Pavnaskar","year":"2003","unstructured":"Pavnaskar SJ, Gershenson JK, Jambekar AB (2003) Classification scheme for lean manufacturing tools. Int J Prod Res 41(13):3075\u20133090. doi: 10.1080\/0020754021000049817","journal-title":"Int J Prod Res"},{"issue":"7\u20138","key":"9_CR15","doi-asserted-by":"publisher","first-page":"800","DOI":"10.1108\/01443570510608619","volume":"25","author":"IA Rawabdeh","year":"2005","unstructured":"Rawabdeh IA (2005) A model for the assessment of waste in job shop environments. Int J Oper Prod Manage 25(7\u20138):800\u2013822. doi: 10.1108\/01443570510608619","journal-title":"Int J Oper Prod Manage"},{"key":"9_CR16","volume-title":"Lean thinking: Introdu\u00e7\u00e3o ao pensamento magro","author":"JP Pinto","year":"2008","unstructured":"Pinto JP (2008) Lean thinking: Introdu\u00e7\u00e3o ao pensamento magro. Comunidade Lean Thinking, Portugal"},{"key":"9_CR17","volume-title":"Creating continuous flow","author":"M Rother","year":"2001","unstructured":"Rother M, Harris R (2001) Creating continuous flow. Lean Enterprise Institute, Brookline"},{"key":"9_CR18","volume-title":"Learning to see: value stream mapping to add value and eliminate MUDA","author":"M Rother","year":"2003","unstructured":"Rother M, Shook J (2003) Learning to see: value stream mapping to add value and eliminate MUDA. Lean Enterprise Institute, Brookline"},{"issue":"20","key":"9_CR19","first-page":"147","volume":"37","author":"P Salgado","year":"2010","unstructured":"Salgado P, Varela LR (2010a) Cellular manufacturing with Kanbans optimization in Bosch production system. Roman Rev Precis Mech Opt Mechatron 37(20):147\u2013158","journal-title":"Roman Rev Precis Mech Opt Mechatron"},{"key":"9_CR20","doi-asserted-by":"crossref","unstructured":"Salgado P, Varela MLR (2010b) Kanban sharing and optimization in Bosch production system. In: Proceedings of the international conference on Knowledge Management and Information Sharing 2010 (KMIS 2010), Valencia, Spain, 25\u201328 October 2010, pp 81\u201391","DOI":"10.5220\/0003102600810091"},{"issue":"2","key":"9_CR21","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1016\/s0272-6963(02)00108-0","volume":"21","author":"R Shah","year":"2003","unstructured":"Shah R, Ward PT (2003) Lean manufacturing: context, practice bundles, and performance. J Oper Manage 21(2):129\u2013149. doi: 10.1016\/s0272-6963(02)00108-0","journal-title":"J Oper Manage"},{"key":"9_CR22","volume-title":"A revolution in manufacturing: the SMED system","author":"S Shingo","year":"1985","unstructured":"Shingo S (1985) A revolution in manufacturing: the SMED system. Productivity Press, Portland"},{"issue":"5","key":"9_CR23","doi-asserted-by":"publisher","first-page":"376","DOI":"10.1016\/j.jom.2010.11.005","volume":"29","author":"BR Staats","year":"2011","unstructured":"Staats BR, Brunner DJ, Upton DM (2011) Lean principles, learning, and knowledge work: evidence from a software services provider. J Oper Manage 29(5):376\u2013390. doi: 10.1016\/j.jom.2010.11.005","journal-title":"J Oper Manage"},{"issue":"3","key":"9_CR24","doi-asserted-by":"publisher","first-page":"237","DOI":"10.1016\/S0925-5273(00)00067-0","volume":"70","author":"L Swanson","year":"2001","unstructured":"Swanson L (2001) Linking maintenance strategies to performance. Int J Prod Econ 70(3):237\u2013244. doi: 10.1016\/S0925-5273(00)00067-0","journal-title":"Int J Prod Econ"},{"key":"9_CR25","volume-title":"Management of food quality","author":"M Wi\u015bniewska","year":"2011","unstructured":"Wi\u015bniewska M, Malinowska E (2011) Management of food quality. Difin, Warsaw"},{"key":"9_CR26","volume-title":"Elimination of waste\u2014the key to success","author":"JP Womack","year":"2001","unstructured":"Womack JP, Jones DT (2001) Elimination of waste\u2014the key to success. Lean Companies, Warsaw"},{"key":"9_CR27","volume-title":"Lean thinking: banish waste and create wealth in your corporation","author":"JP Womack","year":"2003","unstructured":"Womack JP, Jones DT (2003) Lean thinking: banish waste and create wealth in your corporation, 2nd edn. Free Press, New York","edition":"2"},{"key":"9_CR28","volume-title":"The machine that changed the world: the story of lean production","author":"JP Womack","year":"1990","unstructured":"Womack JP, Jones DT, Roos D (1990) The machine that changed the world: the story of lean production. Rawson Associates, New York"}],"container-title":["Innovation, Technology, and Knowledge Management","Multiple Helix Ecosystems for Sustainable Competitiveness"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-29677-7_9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,3]],"date-time":"2025-06-03T19:45:35Z","timestamp":1748979935000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-29677-7_9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319296753","9783319296777"],"references-count":29,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-29677-7_9","relation":{},"ISSN":["2197-5698","2197-5701"],"issn-type":[{"type":"print","value":"2197-5698"},{"type":"electronic","value":"2197-5701"}],"subject":[],"published":{"date-parts":[[2016]]}}}