{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,2]],"date-time":"2025-09-02T10:49:26Z","timestamp":1756810166721,"version":"3.40.3"},"publisher-location":"Cham","reference-count":29,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319453897"},{"type":"electronic","value":"9783319453903"}],"license":[{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2016,1,1]],"date-time":"2016-01-01T00:00:00Z","timestamp":1451606400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016]]},"DOI":"10.1007\/978-3-319-45390-3_46","type":"book-chapter","created":{"date-parts":[[2016,9,19]],"date-time":"2016-09-19T02:24:40Z","timestamp":1474251880000},"page":"545-556","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Layout Design and Reconfiguration in a Collaborative Manufacturing Network"],"prefix":"10.1007","author":[{"given":"Maria Manuela","family":"Azevedo","sequence":"first","affiliation":[]},{"given":"Jos\u00e9 Ant\u00f3nio","family":"Crispim","sequence":"additional","affiliation":[]},{"given":"Jorge Pinho","family":"de Sousa","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,9,20]]},"reference":[{"issue":"2","key":"46_CR1","doi-asserted-by":"publisher","first-page":"209","DOI":"10.1016\/j.arcontrol.2009.05.007","volume":"33","author":"H Afsarmanesh","year":"2009","unstructured":"Afsarmanesh, H., Camarinha-Matos, L.M., Msanjila, S.S.: On management of 2nd generation virtual organizations breeding environments. Annu. Rev. Control 33(2), 209\u2013219 (2009)","journal-title":"Annu. Rev. Control"},{"issue":"1","key":"46_CR2","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1016\/j.cie.2008.11.024","volume":"57","author":"LM Camarinha-Matos","year":"2009","unstructured":"Camarinha-Matos, L.M., Afsarmanesh, H., Galeano, N., Molina, A.: Collaborative networked organizations - concepts and practice in manufacturing enterprises. Comput. Ind. Eng. 57(1), 46\u201360 (2009)","journal-title":"Comput. Ind. Eng."},{"key":"46_CR3","series-title":"IFIP Advances in Information and Communication Technology","doi-asserted-by":"crossref","first-page":"484","DOI":"10.1007\/978-3-642-40352-1_61","volume-title":"Advances in Production Management Systems","author":"MM Azevedo","year":"2013","unstructured":"Azevedo, M.M., Crispim, J.A., de Sousa, J.P.: Flexible and reconfigurable layouts in complex manufacturing systems. In: Emmanouilidis, C., Taisch, M., Kiritsis, D. (eds.) Advances in Production Management Systems. IFIP AICT, vol. 397, pp. 484\u2013493. Springer, Heidelberg (2013)"},{"unstructured":"Vartiainen, M.: The functionality of virtual organizations. In: Proceedings of T-world 2001, Helsinki, 13 September 2001, pp. 273\u2013292 (2001)","key":"46_CR4"},{"issue":"3","key":"46_CR5","doi-asserted-by":"publisher","first-page":"408","DOI":"10.1108\/09574090911002841","volume":"20","author":"X Li","year":"2009","unstructured":"Li, X., Goldsby, T.J., Holsapple, C.W.: Supply chain agility: scale development. Int. J. Logist. Manag. 20(3), 408\u2013424 (2009)","journal-title":"Int. J. Logist. Manag."},{"issue":"1","key":"46_CR6","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/S0925-5273(98)00219-9","volume":"62","author":"YY Yusuf","year":"1999","unstructured":"Yusuf, Y.Y., Sarhadi, M., Gunasekaran, A.: Agile manufacturing: the drivers, concepts and attributes. Int. J. Prod. Econ. 62(1), 33\u201343 (1999)","journal-title":"Int. J. Prod. Econ."},{"issue":"4","key":"46_CR7","doi-asserted-by":"publisher","first-page":"660","DOI":"10.1016\/j.ijproman.2016.01.007","volume":"34","author":"EC Conforto","year":"2016","unstructured":"Conforto, E.C., Amaral, D.C., Silva, S.L., Di Felippo, A., Kamikawachi, D.S.L.: The agility construct on project management theory. Int. J. Proj. Manag. 34(4), 660\u2013674 (2016)","journal-title":"Int. J. Proj. Manag."},{"issue":"3","key":"46_CR8","doi-asserted-by":"publisher","first-page":"392","DOI":"10.1108\/IJOPM-03-2013-0146","volume":"35","author":"Y Cheng","year":"2015","unstructured":"Cheng, Y., Farooq, S., Johansen, J.: International manufacturing network: past, present and future. Int. J. Oper. Prod. Manag. 35(3), 392\u2013429 (2015)","journal-title":"Int. J. Oper. Prod. Manag."},{"issue":"5\u20136","key":"46_CR9","doi-asserted-by":"publisher","first-page":"447","DOI":"10.1016\/j.rcim.2005.11.002","volume":"22","author":"G Aiello","year":"2006","unstructured":"Aiello, G., Enea, M., Galante, G.: A multi-objective approach to facility layout problem by genetic search algorithm and electre method. Robot. Comput. Integr. Manuf. 22(5\u20136), 447\u2013455 (2006)","journal-title":"Robot. Comput. Integr. Manuf."},{"issue":"1","key":"46_CR10","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.cie.2011.02.011","volume":"61","author":"A Taghavi","year":"2011","unstructured":"Taghavi, A., Murat, A.: A heuristic procedure for the integrated facility layout design and flow assignment problem. Comput. Ind. Eng. 61(1), 55\u201363 (2011)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"46_CR11","doi-asserted-by":"publisher","first-page":"629","DOI":"10.1016\/j.ejor.2015.03.016","volume":"245","author":"B Keller","year":"2015","unstructured":"Keller, B., Buscher, U.: Single row layout models. Eur. J. Oper. Res. 245(3), 629\u2013644 (2015)","journal-title":"Eur. J. Oper. Res."},{"issue":"11","key":"46_CR12","doi-asserted-by":"publisher","first-page":"2642","DOI":"10.1016\/j.cor.2012.01.012","volume":"39","author":"R Kia","year":"2012","unstructured":"Kia, R., Baboli, A., Javadian, N., Tavakkoli-Moghaddam, R., Kazemi, M., Khorrami, J.: Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing. Comput. Oper. Res. 39(11), 2642\u20132658 (2012)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"46_CR13","doi-asserted-by":"publisher","first-page":"218","DOI":"10.1016\/j.jmsy.2013.12.005","volume":"33","author":"R Kia","year":"2014","unstructured":"Kia, R., Khaksar-Haghani, F., Javadian, N., Tavakkoli-Moghaddam, R.: Solving a multi-floor layout design model of a dynamic cellular manufacturing system by an efficient genetic algorithm. J. Manuf. Syst. 33(1), 218\u2013232 (2014)","journal-title":"J. Manuf. Syst."},{"issue":"21","key":"46_CR14","doi-asserted-by":"publisher","first-page":"4475","DOI":"10.1080\/00207540412331325567","volume":"42","author":"S Kulturel-Konak","year":"2004","unstructured":"Kulturel-Konak, S., Smith, E., Norman, B.: Layout optimization considering production uncertainty and routing flexibility. Int. J. Prod. Res. 42(21), 4475\u20134493 (2004)","journal-title":"Int. J. Prod. Res."},{"unstructured":"Jaafari, A.A., Krishnan, K.K., Doulabi, S.H.H., Davoudpour, H.: A multi-objective formulation for facility layout problem. In: World Congress on Engineering and Computer Science, vol. II (2009)","key":"46_CR15"},{"issue":"22","key":"46_CR16","doi-asserted-by":"publisher","first-page":"6530","DOI":"10.1080\/00207543.2011.653837","volume":"50","author":"D Ko\u015fucuo\u011flu","year":"2012","unstructured":"Ko\u015fucuo\u011flu, D., Bilge, U.: Material handling considerations in the FMS loading problem with full routing flexibility. Int. J. Prod. Res. 50(22), 6530\u20136552 (2012)","journal-title":"Int. J. Prod. Res."},{"issue":"9\u201312","key":"46_CR17","doi-asserted-by":"publisher","first-page":"2215","DOI":"10.1007\/s00170-013-4820-5","volume":"68","author":"S Emami","year":"2013","unstructured":"Emami, S., Nookabadi, A.S.: Managing a new multi-objective model for the dynamic facility layout problem. Int. J. Adv. Manuf. Technol. 68(9\u201312), 2215\u20132228 (2013)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"2","key":"46_CR18","doi-asserted-by":"publisher","first-page":"308","DOI":"10.1016\/j.cie.2010.04.013","volume":"59","author":"R \u015eahin","year":"2010","unstructured":"\u015eahin, R., Erto\u011fral, K., T\u00fcrkbey, O.: A simulated annealing heuristic for the dynamic layout problem with budget constraint. Comput. Ind. Eng. 59(2), 308\u2013313 (2010)","journal-title":"Comput. Ind. Eng."},{"issue":"7","key":"46_CR19","doi-asserted-by":"publisher","first-page":"1877","DOI":"10.1080\/00207541003614371","volume":"49","author":"S Kulturel-Konak","year":"2011","unstructured":"Kulturel-Konak, S., Konak, A.: Unequal area flexible bay facility layout using ant colony optimisation. Int. J. Prod. Res. 49(7), 1877\u20131902 (2011)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"46_CR20","doi-asserted-by":"publisher","first-page":"1095","DOI":"10.1080\/002075497195560","volume":"35","author":"TA Lacksonen","year":"1997","unstructured":"Lacksonen, T.A.: Preprocessing for static and dynamic facility layout problems. Int. J. Prod. Res. 35(4), 1095\u20131106 (1997)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"46_CR21","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1016\/j.compind.2004.06.003","volume":"56","author":"MJ Wang","year":"2005","unstructured":"Wang, M.J., Hu, M.H., Ku, M.Y.: A solution to the unequal area facilities layout problem by genetic algorithm. Comput. Ind. 56(2), 207\u2013220 (2005)","journal-title":"Comput. Ind."},{"issue":"2","key":"46_CR22","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.arcontrol.2007.04.001","volume":"31","author":"A Drira","year":"2007","unstructured":"Drira, A., Pierreval, H., Hajri-Gabouj, S.: Facility layout problems: a survey. Annu. Rev. Control 31(2), 255\u2013267 (2007)","journal-title":"Annu. Rev. Control"},{"key":"46_CR23","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1007\/s00170-011-3614-x","volume":"60","author":"G Moslemipour","year":"2011","unstructured":"Moslemipour, G., Lee, T.S., Rilling, D.: A review of intelligent approaches for designing dynamic and robust layouts in flexible manufacturing systems. Int. J. Adv. Manuf. Technol. 60, 11\u201327 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."},{"unstructured":"Raschke, R.L. David, J.S.: Business Process Agility Business Process Agility (2005)","key":"46_CR24"},{"issue":"2","key":"46_CR25","doi-asserted-by":"publisher","first-page":"410","DOI":"10.1016\/j.ijpe.2008.12.009","volume":"118","author":"A Ganguly","year":"2009","unstructured":"Ganguly, A., Nilchiani, R., Farr, J.V.: Evaluating agility in corporate enterprises. Int. J. Prod. Econ. 118(2), 410\u2013423 (2009)","journal-title":"Int. J. Prod. Econ."},{"key":"46_CR26","doi-asserted-by":"publisher","first-page":"689","DOI":"10.1007\/s00170-014-6460-9","volume":"77","author":"N Bozorgi","year":"2014","unstructured":"Bozorgi, N. Abedzadeh, M. Zeinali, M.: Tabu search heuristic for efficiency of dynamic facility layout problem. Int. J. Adv. Manuf. Technol. 77, 689\u2013703 (2014)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"3","key":"46_CR27","doi-asserted-by":"publisher","first-page":"730","DOI":"10.1016\/j.ejor.2009.06.016","volume":"202","author":"KY Wong","year":"2010","unstructured":"Wong, K.Y.: Applying ant system for solving unequal area facility layout problems. Eur. J. Oper. Res. 202(3), 730\u2013746 (2010)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"46_CR28","doi-asserted-by":"publisher","first-page":"95","DOI":"10.5539\/mas.v5n4p95","volume":"5","author":"A Shahin","year":"2011","unstructured":"Shahin, A., Poormostafa, M.: Facility layout simulation and optimization: an integration of advanced quality and decision making tools and techniques. Mod. Appl. Sci. 5(4), 95 (2011)","journal-title":"Mod. Appl. Sci."},{"issue":"1","key":"46_CR29","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1016\/j.ejor.2009.02.028","volume":"201","author":"AR McKendall","year":"2010","unstructured":"McKendall, A.R., Hakobyan, A.: Heuristics for the dynamic facility layout problem with unequal-area departments. Eur. J. Oper. Res. 201(1), 171\u2013182 (2010)","journal-title":"Eur. J. Oper. Res."}],"container-title":["IFIP Advances in Information and Communication Technology","Collaboration in a Hyperconnected World"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-45390-3_46","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,19]],"date-time":"2020-09-19T00:52:33Z","timestamp":1600476753000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-45390-3_46"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016]]},"ISBN":["9783319453897","9783319453903"],"references-count":29,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-45390-3_46","relation":{},"ISSN":["1868-4238","1868-422X"],"issn-type":[{"type":"print","value":"1868-4238"},{"type":"electronic","value":"1868-422X"}],"subject":[],"published":{"date-parts":[[2016]]},"assertion":[{"value":"20 September 2016","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"PRO-VE","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Working Conference on Virtual Enterprises","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Porto","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Portugal","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2016","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3 October 2016","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"5 October 2016","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"17","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"pro-ve2016","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"This content has been made available to all.","name":"free","label":"Free to read"}]}}