{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T12:04:51Z","timestamp":1725883491028},"publisher-location":"Cham","reference-count":26,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319565378"},{"type":"electronic","value":"9783319565385"}],"license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-56538-5_41","type":"book-chapter","created":{"date-parts":[[2017,3,27]],"date-time":"2017-03-27T22:10:58Z","timestamp":1490652658000},"page":"406-415","source":"Crossref","is-referenced-by-count":1,"title":["Bottleneck-Oriented Order Release: An Assessment by Simulation"],"prefix":"10.1007","author":[{"given":"S\u00edlvio","family":"Carmo-Silva","sequence":"first","affiliation":[]},{"given":"Nuno O.","family":"Fernandes","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,3,29]]},"reference":[{"key":"41_CR1","volume-title":"The Goal: Excellence in Manufacturing","author":"EM Goldratt","year":"1984","unstructured":"Goldratt, E.M., Cox, J.: The Goal: Excellence in Manufacturing. North River Press, New York (1984)"},{"key":"41_CR2","volume-title":"The Race","author":"EM Goldratt","year":"1986","unstructured":"Goldratt, E.M., Fox, R.E.: The Race. North River Press, Great Barrington (1986)"},{"key":"41_CR3","volume-title":"What is This Thing Called Theory of Constraints and How Should it be Implemented?","author":"EM Goldratt","year":"1990","unstructured":"Goldratt, E.M.: What is This Thing Called Theory of Constraints and How Should it be Implemented?. North River Press, New York (1990)"},{"issue":"2","key":"41_CR4","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1111\/j.1540-5915.1995.tb01425.x","volume":"26","author":"S Lingayat","year":"1995","unstructured":"Lingayat, S., Mittenthal, J., O\u2019Keefe, R.M.: Order release in automated manufacturing systems. Decis. Sci. 26(2), 175\u2013208 (1995)","journal-title":"Decis. Sci."},{"key":"41_CR5","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1109\/66.4371","volume":"1","author":"CR Glassey","year":"1988","unstructured":"Glassey, C.R., Resende, M.G.: Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. Semi. Manuf. 1, 36\u201346 (1988)","journal-title":"IEEE Trans. Semi. Manuf."},{"key":"41_CR6","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/66.4384","volume":"1","author":"LM Wein","year":"1988","unstructured":"Wein, L.M.: Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf. 1, 115\u2013130 (1988)","journal-title":"IEEE Trans. Semicond. Manuf."},{"key":"41_CR7","doi-asserted-by":"crossref","unstructured":"Rose, O.: CONLOAD - a new lot release rule for semiconductor wafer fabs. In: Winter Simulation Conference, pp. 850\u2013855 (1999)","DOI":"10.1145\/324138.324535"},{"key":"41_CR8","first-page":"147","volume":"2","author":"ML Spearman","year":"1989","unstructured":"Spearman, M.L., Hopp, W.J., Woodruff, D.L.: A hierarchical control architecture for CONWIP production systems. J. Manuf. Oper. Manage. 2, 147\u2013171 (1989)","journal-title":"J. Manuf. Oper. Manage."},{"key":"41_CR9","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/0925-5273(94)90173-2","volume":"37","author":"JL Wahlers","year":"1994","unstructured":"Wahlers, J.L., Cox, J.F.: Competitive factors and performance measurement: applying the theory of constraints to meet customer needs. Int. J. Prod. Econ. 37, 229\u2013240 (1994)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"41_CR10","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/S0925-5273(99)00020-1","volume":"63","author":"SN Kaditasasoglu","year":"2000","unstructured":"Kaditasasoglu, S.N., Xiang, W., Hurly, S.F., Khumawala, B.M.: A study on the effect of the extent and location of protective capacity in flow systems. Int. J. Prod. Econ. 63(3), 217\u2013228 (2000)","journal-title":"Int. J. Prod. Econ."},{"issue":"4","key":"41_CR11","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1080\/09537280110121091","volume":"13","author":"JH Blackstone Jr","year":"2002","unstructured":"Blackstone Jr., J.H., Cox III, J.F.: Designing unbalanced lines - understanding protective capacity and protective inventory. Prod. Plan. Control 13(4), 416\u2013423 (2002)","journal-title":"Prod. Plan. Control"},{"issue":"1","key":"41_CR12","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1111\/j.1937-5956.1994.tb00107.x","volume":"3","author":"SR Lawrence","year":"1994","unstructured":"Lawrence, S.R., Buss, A.H.: Shifting production bottlenecks: causes, cures, and conundrums. Prod. Oper. Manage. 3(1), 21\u201337 (1994)","journal-title":"Prod. Oper. Manage."},{"key":"41_CR13","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1111\/j.1937-5956.1997.tb00409.x","volume":"6","author":"JV Simons","year":"1997","unstructured":"Simons, J.V., Simpson III, W.P.: An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster). Prod. Oper. Manage. 6, 3\u201322 (1997)","journal-title":"Prod. Oper. Manage."},{"issue":"5","key":"41_CR14","doi-asserted-by":"crossref","first-page":"869","DOI":"10.1080\/0020754042000298520","volume":"43","author":"M Stevenson","year":"2005","unstructured":"Stevenson, M., Hendry, L.C., Kingsman, B.G.: A review of production planning and control: the applicability of key concepts to the make-to-order industry. Int. J. Prod. Res. 43(5), 869\u2013898 (2005)","journal-title":"Int. J. Prod. Res."},{"key":"41_CR15","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(00)00266-6","volume":"134","author":"CW Craighead","year":"2001","unstructured":"Craighead, C.W., Patterson, J.W., Fredendall, L.D.: Protective capacity positioning: impact on manufacturing cell performance. Eur. J. Oper. Res. 134, 425\u2013438 (2001)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"41_CR16","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1080\/09537280110063726","volume":"13","author":"JW Patterson","year":"2002","unstructured":"Patterson, J.W., Fredendall, L.D., Craighead, C.W.: The impact of non-bottleneck variation in a manufacturing cell. Prod. Plan. Control 13(1), 76\u201385 (2002)","journal-title":"Prod. Plan. Control"},{"issue":"1","key":"41_CR17","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.ejor.2009.02.003","volume":"201","author":"LD Fredendall","year":"2010","unstructured":"Fredendall, L.D., Ojha, D., Patterson, J.W.: Concerning the theory of workload control. Eur. J. Oper. Res. 201(1), 99\u2013111 (2010)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"41_CR18","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1080\/00207543.2013.827808","volume":"52","author":"NO Fernandes","year":"2014","unstructured":"Fernandes, N.O., Land, M.J., Carmo-Silva, S.: Workload control in unbalanced job shops. Int. J. Prod. Res. 52(3), 679\u2013690 (2014)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"41_CR19","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1016\/j.ijpe.2011.02.018","volume":"131","author":"M Stevenson","year":"2011","unstructured":"Stevenson, M., Huang, Y., Hendry, L., Soepenberg, E.: The theory and practice of workload control: a research agenda and implementation strategy. Int. J. Prod. Econ. 131(2), 689\u2013700 (2011)","journal-title":"Int. J. Prod. Econ."},{"key":"41_CR20","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1016\/S0925-5273(96)00088-6","volume":"46\u201347","author":"ML Land","year":"1996","unstructured":"Land, M.L., Gaalman, G.J.C.: Workload control concepts in job shops - a critical assessment. Int. J. Prod. Econ. 46\u201347, 535\u20132548 (1996)","journal-title":"Int. J. Prod. Econ."},{"key":"41_CR21","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/j.ijpe.2010.09.026","volume":"131","author":"NO Fernandes","year":"2011","unstructured":"Fernandes, N.O., Carmo-Silva, S.: Workload Control under continuous order release. Int. J. Prod. Econ. 131, 257\u2013262 (2011)","journal-title":"Int. J. Prod. Econ."},{"issue":"12","key":"41_CR22","doi-asserted-by":"crossref","first-page":"3257","DOI":"10.1080\/00207543.2011.564664","volume":"50","author":"A Portioli-Staudacher","year":"2011","unstructured":"Portioli-Staudacher, A., Tantardini, M.: A lean-based ORR system for non-repetitive manufacturing. Int. J. Prod. Res. 50(12), 3257\u20133273 (2011)","journal-title":"Int. J. Prod. Res."},{"key":"41_CR23","unstructured":"APICS Dictionary, 7th edn. American Production and Inventory Control Society, Inc., Falls Church (1992)"},{"key":"41_CR24","doi-asserted-by":"crossref","unstructured":"Enns, S.T.: An integrated system for controlling shop loading and work flows. Intl. J. Prod. Res. 33(10), 2801\u20132820 (1995)","DOI":"10.1080\/00207549508904846"},{"key":"41_CR25","doi-asserted-by":"crossref","unstructured":"Carmo-Silva, S., Alves, A.C.: A framework for understanding Cellular Manufacturing. In: Ferreira, J.J.P. (ed.) E-Manufacturing: Business Paradigms and Supporting Technologies, 163\u2013172. Springer Science\u00a0+\u00a0Business Media, New York (2004)","DOI":"10.1007\/978-1-4419-8945-1_17"},{"key":"41_CR26","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1287\/opre.9.3.383","volume":"8","author":"JA Little","year":"1961","unstructured":"Little, J.A.: Proof of the theorem L\u00a0=\u00a0\u03bbW. Oper. Res. 8, 383\u2013387 (1961)","journal-title":"Oper. Res."}],"container-title":["Advances in Intelligent Systems and Computing","Recent Advances in Information Systems and Technologies"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-56538-5_41","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,20]],"date-time":"2019-09-20T03:18:22Z","timestamp":1568949502000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-56538-5_41"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"ISBN":["9783319565378","9783319565385"],"references-count":26,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-56538-5_41","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2017]]}}}