{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,9]],"date-time":"2025-12-09T15:41:29Z","timestamp":1765294889414,"version":"3.37.3"},"publisher-location":"Cham","reference-count":17,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319630908"},{"type":"electronic","value":"9783319630915"}],"license":[{"start":{"date-parts":[[2017,8,9]],"date-time":"2017-08-09T00:00:00Z","timestamp":1502236800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-63091-5_25","type":"book-chapter","created":{"date-parts":[[2017,8,8]],"date-time":"2017-08-08T05:35:54Z","timestamp":1502170554000},"page":"220-228","source":"Crossref","is-referenced-by-count":1,"title":["Improving Productivity and Standard Time Updating in an Industrial Company \u2013 A Case Study"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-9502-2346","authenticated-orcid":false,"given":"Mariana","family":"Ara\u00fajo","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4367-7412","authenticated-orcid":false,"given":"Gabriela","family":"Amaral","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2299-1859","authenticated-orcid":false,"given":"Leonilde","family":"Varela","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4917-2474","authenticated-orcid":false,"given":"Jos\u00e9","family":"Machado","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5598-3807","authenticated-orcid":false,"given":"Justyna","family":"Trojanowska","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,8,9]]},"reference":[{"issue":"1","key":"25_CR1","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1016\/j.ijpe.2006.09.009","volume":"107","author":"FA Abdulmalek","year":"2007","unstructured":"Abdulmalek, F.A., Rajgopal, J.: Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study. Int. J. Prod. Econ. 107(1), 223\u2013236 (2007). doi:\n            10.1016\/j.ijpe.2006.09.009","journal-title":"Int. J. Prod. Econ."},{"issue":"12","key":"25_CR2","doi-asserted-by":"publisher","first-page":"1103","DOI":"10.1080\/0951192x.2013.834483","volume":"26","author":"A Al-Ashaab","year":"2013","unstructured":"Al-Ashaab, A., Sobek, D.K.: Lean manufacturing and process development: a value creation paradigm that goes beyond Lean manufacturing. Int. J. Comput. Integr. Manuf. 26(12), 1103\u20131104 (2013). doi:\n10.1080\/0951192x.2013.834483","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"25_CR3","unstructured":"Ara\u00fajo, M.: Industrial Engineering. Masters Dissertation, University of Minho (2016)"},{"key":"25_CR4","unstructured":"Costa, L.F.T., Gomes, A., Pedro, M.F.M.: Introduction to Work Study. Guimar\u00e3es (2003)"},{"key":"25_CR5","unstructured":"Coutinho, C.P., Sousa, A., Dias, A., Bessa, F., Ferreira, M., Rodrigues, J.C.: Action research\u2014preferred methodology in educational practices. Revista Psicologia, Educa\u00e7\u00e3o e Cultura 13(2), 355\u2013379 (2009)"},{"issue":"2","key":"25_CR6","doi-asserted-by":"publisher","first-page":"741","DOI":"10.1016\/j.ijpe.2009.07.002","volume":"122","author":"J Gosling","year":"2009","unstructured":"Gosling, J., Naim, M.M.: Engineer-to-order supply chain management\u2014a literature review and research agenda. Int. J. Prod. Econ. 122(2), 741\u2013754 (2009). doi:\n10.1016\/j.ijpe.2009.07.002","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"25_CR7","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1016\/S0263-7863(97)00005-7","volume":"16","author":"Y Jang","year":"1998","unstructured":"Jang, Y., Lee, J.: Factors influencing the success of management consulting projects. Int. J. Proj. Manag. 16(2), 67\u201372 (1998). doi:\n10.1016\/S0263-7863(97)00005-7","journal-title":"Int. J. Proj. Manag."},{"issue":"1","key":"25_CR8","first-page":"41","volume":"30","author":"JF Krafcik","year":"1988","unstructured":"Krafcik, J.F.: Triumph of the lean production system. Sloan Manag. Rev. 30(1), 41\u201351 (1988)","journal-title":"Sloan Manag. Rev."},{"issue":"5","key":"25_CR9","doi-asserted-by":"publisher","first-page":"1309","DOI":"10.1080\/00207540701484921","volume":"47","author":"RF Lu","year":"2009","unstructured":"Lu, R.F., Petersen, T.D., Storch, R.L.: Asynchronous stochastic learning curve effects in engineering-to-order customization processes. Int. J. Prod. Res. 47(5), 1309\u20131329 (2009). doi:\n10.1080\/00207540701484921","journal-title":"Int. J. Prod. Res."},{"key":"25_CR10","unstructured":"Levine, G.: The fate of time study, The Industrial Advisor, Gene Levine and Associates, September (1997)"},{"key":"25_CR11","unstructured":"Moreira, D.A.: Production Management and Operations, 1st edn. Pioneer Thomson Learning (1993). ISBN 85-221-0135-3"},{"key":"25_CR12","volume-title":"Toyota Production System: Beyond Large-Scale Production","author":"T Ohno","year":"1988","unstructured":"Ohno, T.: Toyota Production System: Beyond Large-Scale Production. Productivity Press, New York (1988)"},{"key":"25_CR13","doi-asserted-by":"crossref","DOI":"10.1201\/9781420006605","volume-title":"Kaizen Assembly: Designing, Constructing, and Managing a Lean Assembly Line","author":"CA Ortiz","year":"2006","unstructured":"Ortiz, C.A.: Kaizen Assembly: Designing, Constructing, and Managing a Lean Assembly Line. CRC Press, New York (2006)"},{"issue":"1","key":"25_CR14","doi-asserted-by":"publisher","first-page":"387","DOI":"10.1016\/j.cirp.2012.03.064","volume":"61","author":"AM Radke","year":"2012","unstructured":"Radke, A.M., Tseng, M.M.: A risk management-based approach to inventory planning of engineering-to-order production. CIRP Ann. Manuf. Technol. 61(1), 387\u2013390 (2012). doi:\n10.1016\/j.cirp.2012.03.064","journal-title":"CIRP Ann. Manuf. Technol."},{"issue":"2","key":"25_CR15","first-page":"140","volume":"24","author":"P Taggart","year":"2013","unstructured":"Taggart, P., Kienhoefer, F.: The effectiveness of lean manufacturing audits in measuring operational performance improvements. S. Afr. J. Ind. Eng. 24(2), 140\u2013154 (2013)","journal-title":"S. Afr. J. Ind. Eng."},{"key":"25_CR16","volume-title":"The Machine That Changed the World: The Story of Lean Production","author":"J Womack","year":"1990","unstructured":"Womack, J., Jones, D., Roos, D.: The Machine That Changed the World: The Story of Lean Production. Rawson Associates, New York (1990)"},{"key":"25_CR17","unstructured":"Xavier, D., Botelho, S., Silva, M.: Time study to increase productivity in construction (2001)"}],"container-title":["Lecture Notes in Networks and Systems","Proceedings of the International Conference of Mechatronics and Cyber-MixMechatronics - 2017"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-63091-5_25","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,8,8]],"date-time":"2017-08-08T05:42:17Z","timestamp":1502170937000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-63091-5_25"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,8,9]]},"ISBN":["9783319630908","9783319630915"],"references-count":17,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-63091-5_25","relation":{},"ISSN":["2367-3370","2367-3389"],"issn-type":[{"type":"print","value":"2367-3370"},{"type":"electronic","value":"2367-3389"}],"subject":[],"published":{"date-parts":[[2017,8,9]]}}}