{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,26]],"date-time":"2025-12-26T07:06:10Z","timestamp":1766732770671,"version":"3.40.3"},"publisher-location":"Cham","reference-count":38,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319686189"},{"type":"electronic","value":"9783319686196"}],"license":[{"start":{"date-parts":[[2017,10,20]],"date-time":"2017-10-20T00:00:00Z","timestamp":1508457600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-68619-6_11","type":"book-chapter","created":{"date-parts":[[2017,10,19]],"date-time":"2017-10-19T05:10:01Z","timestamp":1508389801000},"page":"111-120","source":"Crossref","is-referenced-by-count":19,"title":["A Study of Priority Rules for a Levelled Production Plan"],"prefix":"10.1007","author":[{"given":"Paulina","family":"Rewers","sequence":"first","affiliation":[]},{"given":"Justyna","family":"Trojanowska","sequence":"additional","affiliation":[]},{"given":"Jacek","family":"Diakun","sequence":"additional","affiliation":[]},{"given":"Alvaro","family":"Rocha","sequence":"additional","affiliation":[]},{"given":"Luis P.","family":"Reis","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,10,20]]},"reference":[{"key":"11_CR1","unstructured":"Hamrol, A.: Strategies and Practices of Efficient Operation. LEAN SIX SIGMA and other (in Polish). PWN, Warszawa (2015)"},{"key":"11_CR2","doi-asserted-by":"crossref","unstructured":"Diering, M., Dyczkowski, K.: Assessing the raters agreement in the diagnostic catheter tube connector production process using novel fuzzy similarity coefficient. In: IEEE International Conference on Industrial Engineering and Engineering Management, pp. 228\u2013232 (2016)","DOI":"10.1109\/IEEM.2016.7797870"},{"issue":"2","key":"11_CR3","first-page":"211","volume":"19","author":"S Jasarevic","year":"2012","unstructured":"Jasarevic, S., Diering, M., Brdarevic, S.: Opinions of the consultants and certification houses regarding the quality factors and achieved effects of the introduced quality system. Tehnicki Vjesnik-Technical Gazette 19(2), 211\u2013220 (2012)","journal-title":"Tehnicki Vjesnik-Technical Gazette"},{"issue":"3","key":"11_CR4","first-page":"11","volume":"7","author":"S Borkowski","year":"2016","unstructured":"Borkowski, S., Knop, K.: Challenges faced in modern quality inspection. Manag. Prod. Eng. Rev. 7(3), 11\u201322 (2016)","journal-title":"Manag. Prod. Eng. Rev."},{"key":"11_CR5","doi-asserted-by":"crossref","unstructured":"K\u0142os, S., Patalas-Maliszewska, J.: Throughput analysis of automatic production lines based on simulation methods. intelligent data engineering and automated learning\u2014IDEAL. In: Jackowski, K., Burduk, R., Walkowiak, K., Wozniak, M., Yin, H. (eds.) Lecture Notes in Computer Science, vol. 9375, pp. 181\u2013190 (2015)","DOI":"10.1007\/978-3-319-24834-9_22"},{"key":"11_CR6","doi-asserted-by":"crossref","unstructured":"Kunz, G., Machado, J., Perondi, E.: Using timed automata for modeling, simulating and verifying networked systems controller\u2019s specifications. In: Neural Computing and Applications, pp. 1\u201311 (2015)","DOI":"10.1007\/s00521-015-2115-5"},{"key":"11_CR7","doi-asserted-by":"crossref","unstructured":"Sika, R., Hajkowski, J.: Synergy of modeling processes in the area of soft and hard modeling. In: 8th International Conference on Manufacturing Science and Education (MSE), Trends in New Industrial Revolution (2017)","DOI":"10.1051\/matecconf\/201712104009"},{"key":"11_CR8","doi-asserted-by":"crossref","unstructured":"Sika, R., Rogalewicz, M.: Demerit control chart as a decision support tool in quality control of ductile cast-iron casting process. In: MATEC Web of Conferences, vol. 121, p. 05007 (2017). 8th International Conference on Manufacturing Science and Education (MSE 2017)\u2014Trends in new industrial revolution (2017)","DOI":"10.1051\/matecconf\/201712105007"},{"issue":"6","key":"11_CR9","first-page":"1447","volume":"22","author":"JB Krolczyk","year":"2015","unstructured":"Krolczyk, J.B., Krolczyk, G.M., Legutko, S., Napiorkowski, J., Hloch, S., Foltys, J., Tama, E.: Material flow optimization\u2014a case study in automotive industry. Tehni\u010dki Vjesnik 22(6), 1447\u20131456 (2015)","journal-title":"Tehni\u010dki Vjesnik"},{"key":"11_CR10","volume-title":"The Toyota Way Fieldbook. A Practical Guide For Implementing Toyota\u2019s 4Ps","author":"JK Liker","year":"2006","unstructured":"Liker, J.K., Meier, D.P.: The Toyota Way Fieldbook. A Practical Guide For Implementing Toyota\u2019s 4Ps. The McGraw-Hill Companies, USA (2006)"},{"issue":"8","key":"11_CR11","first-page":"77","volume":"54","author":"T Andel","year":"1999","unstructured":"Andel, T.: Accentuate heijunka, eliminate junk, supply chain flow. Mater. Handl. Eng. 54(8), 77 (1999)","journal-title":"Mater. Handl. Eng."},{"key":"11_CR12","first-page":"22","volume":"3","author":"P Rewers","year":"2016","unstructured":"Rewers, P., \u017bywicki, K., Hamrol, A., Chabowski, P.: Methodology of conduct in providing creation of repeatable production plan (in Polish). Bus. Manage. 3, 22\u201330 (2016)","journal-title":"Bus. Manage."},{"key":"11_CR13","volume-title":"Toyota Management System","author":"Y Monden","year":"1993","unstructured":"Monden, Y.: Toyota Management System. Productivity Press, Portland, OR (1993)"},{"issue":"4","key":"11_CR14","first-page":"31","volume":"34","author":"JB Coleman","year":"1994","unstructured":"Coleman, J.B., Vaghefi, M.: Heijunka: a key to the Toyota production system. Prod. Invent. Manage. J. 34(4), 31\u201335 (1994)","journal-title":"Prod. Invent. Manage. J."},{"issue":"4","key":"11_CR15","doi-asserted-by":"crossref","first-page":"1212","DOI":"10.1086\/210148","volume":"104","author":"J Rinehart","year":"1997","unstructured":"Rinehart, J.: After lean production: evolving employment practices in the world auto industry. Am. J. Sociol. 104(4), 1212\u20131214 (1997)","journal-title":"Am. J. Sociol."},{"issue":"5","key":"11_CR16","doi-asserted-by":"crossref","first-page":"572","DOI":"10.1287\/mnsc.37.5.572","volume":"37","author":"C Yano","year":"1991","unstructured":"Yano, C., Rachamadugu, R.: Sequencing to minimize overload in assembly lines with product options. Manage. Sci. 37(5), 572 (1991)","journal-title":"Manage. Sci."},{"key":"11_CR17","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/S0360-8352(98)00113-2","volume":"36","author":"Z Xiaobo","year":"1996","unstructured":"Xiaobo, Z., Zhou, Z., Asres, A.: A note on Toyota\u2019s goal of sequencing mixed models on an assembly line. Comput. Ind. Eng. 36, 57\u201365 (1996)","journal-title":"Comput. Ind. Eng."},{"key":"11_CR18","doi-asserted-by":"crossref","unstructured":"Teece, D.J., Pisano G., Shuen, A.: Dynamic capabilities and strategic management. Strateg. Manage. J. 18(7) (1997)","DOI":"10.1002\/(SICI)1097-0266(199708)18:7<509::AID-SMJ882>3.0.CO;2-Z"},{"issue":"10","key":"11_CR19","doi-asserted-by":"crossref","first-page":"2997","DOI":"10.1080\/00207543.2012.751516","volume":"51","author":"M Faccio","year":"2013","unstructured":"Faccio, M., Gamberi, M., Persona, A.: Kanban number optimisation in a supermarket warehouse feeding a mixed-model assembly system. Int. J. Prod. Res. 51(10), 2997\u20133017 (2013)","journal-title":"Int. J. Prod. Res."},{"issue":"735","key":"11_CR20","first-page":"203","volume":"63","author":"K Wr\u00f3blewski","year":"1982","unstructured":"Wr\u00f3blewski, K., Jurecka, A., Krawczy\u0144ski, R.: Results of a study on the application of priority rules in manufacturing control (in Polish). Sci. J. Sil. Univ. Technol. Ser. Autom. 63(735), 203\u2013214 (1982)","journal-title":"Sci. J. Sil. Univ. Technol. Ser. Autom."},{"key":"11_CR21","volume-title":"Basics of manufacturing flow control (in Polish)","author":"KJ Wr\u00f3blewski","year":"1993","unstructured":"Wr\u00f3blewski, K.J.: Basics of manufacturing flow control (in Polish). WNT, Warszawa (1993)"},{"key":"11_CR22","volume-title":"Priority rules in manufacturing flow control (in Polish)","author":"KJ Wr\u00f3blewski","year":"1984","unstructured":"Wr\u00f3blewski, K.J., Krawczy\u0144ski, R., Kosieradzka, A., Kasprzyk, S.: Priority rules in manufacturing flow control (in Polish). Wydawnictwo Naukowo-Techniczne, Warszawa (1984)"},{"issue":"1","key":"11_CR23","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/j.ijpe.2012.08.019","volume":"141","author":"C Binchao","year":"2013","unstructured":"Binchao, C., Matis, T.I.: A flexible dispatching rule for minimizing tardiness in job shop scheduling. Int. J. Prod. Econ. 141(1), 360\u2013365 (2013)","journal-title":"Int. J. Prod. Econ."},{"key":"11_CR24","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03217-6","volume-title":"Scheduling in computer and manufacturing processes","author":"J B\u0142a\u017cewicz","year":"1996","unstructured":"B\u0142a\u017cewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., W\u0119glarz, J.: Scheduling in computer and manufacturing processes. Springer, Berlin (1996)"},{"key":"11_CR25","volume-title":"Theory of task scheduling (in Polish)","author":"EG Coffman","year":"1980","unstructured":"Coffman, E.G.: Theory of task scheduling (in Polish). WNT, Warszawa (1980)"},{"issue":"4","key":"11_CR26","first-page":"49","volume":"37","author":"A Jardzioch","year":"2013","unstructured":"Jardzioch, A., Bulwan, K.: The prioritisation of production orders under the bee colony algorithm. Adv. Manuf. Sci. Technol. 37(4), 49\u201359 (2013)","journal-title":"Adv. Manuf. Sci. Technol."},{"key":"11_CR27","unstructured":"Jardzioch, A., Skobiej, B.: Application of batch algorithm in sequencing manufacturing tasks. In: Knosala, R. (ed.) Innovations in Management And Production Engineering. Polskie Towarzystwo Zarz\u0105dzania Produkcj\u0105, pp. 552\u2013559 (2014)"},{"key":"11_CR28","unstructured":"Knosala, R.: Applications of artificial intelligence methods (in Polish). Wydawnictwo Naukowo-Techniczne (2002)"},{"key":"11_CR29","volume-title":"Discrete optimization in flexible manufacturing systems (in Polish)","author":"T Sawik","year":"1992","unstructured":"Sawik, T.: Discrete optimization in flexible manufacturing systems (in Polish). Wydawnictwo Naukowo-Techniczne, Warszawa (1992)"},{"key":"11_CR30","doi-asserted-by":"crossref","first-page":"961","DOI":"10.4028\/www.scientific.net\/AMM.657.961","volume":"657","author":"D Krenczyk","year":"2014","unstructured":"Krenczyk, D., Sko\u0142ud, B.: Transient states of cyclic production planning and control. Appl. Mech. Mater. 657, 961\u2013965 (2014)","journal-title":"Appl. Mech. Mater."},{"key":"11_CR31","doi-asserted-by":"crossref","unstructured":"Manupati, V.K., Gokula, K.M., Varela, M.L.R., Machado, J.: Telefacturing based distributed manufacturing environment for optimal manufacturing service by enhancing the interoperability in the hubs. J. Eng., 15 p. (2017)","DOI":"10.1155\/2017\/9305989"},{"key":"11_CR32","unstructured":"Sko\u0142ud, B.: Multi-range rhythmical manufacturing planning (in Polish). Zeszyty Naukowe Politechniki \u015al\u0105skiej, Mechanika, p. 136 (2000)"},{"key":"11_CR33","unstructured":"Conway, R.W.: An Experimental Investigation of Priority Assignment in a Job Shop. Rand Corporation Memorandum, RM-3789-PR, Santa Monica (1964)"},{"issue":"1","key":"11_CR34","first-page":"1","volume":"3","author":"E LeGrande","year":"1963","unstructured":"LeGrande, E.: The development of a factory simulation using actual operating data. Manage. Technol. 3(1), 1\u201319 (1963)","journal-title":"Manage. Technol."},{"key":"11_CR35","doi-asserted-by":"crossref","unstructured":"Nelson, R.T.: Simulation of labor efficiency and centralized assigment in a production model. Manage. Sci. 17(2) (1970)","DOI":"10.1287\/mnsc.17.2.B97"},{"key":"11_CR36","doi-asserted-by":"crossref","DOI":"10.1002\/9780470451793","volume-title":"Principles of Sequencing and Scheduling","author":"KR Baker","year":"2009","unstructured":"Baker, K.R., Dan, Trietsch D.: Principles of Sequencing and Scheduling. Wiley, New Jersey (2009)"},{"key":"11_CR37","unstructured":"Vieira, G.G., Varela, M.L.R., Putnik, G.D., Machado, J.M., Trojanowska, J.: Integrated platform for real-time control and production and productivity monitoring and analysis. Romanian Rev. Precis. Mech. Opt. Mechatron. 50, 119\u2013127 (2016) (Mecahitech\u201916)"},{"issue":"3","key":"11_CR38","first-page":"83","volume":"6","author":"M Szuszynski","year":"2015","unstructured":"Szuszynski, M., \u017burek, J.: Computer aided assembly sequence generation. Manage. Prod. Eng. Rev. 6(3), 83\u201387 (2015)","journal-title":"Manage. Prod. Eng. Rev."}],"container-title":["Lecture Notes in Mechanical Engineering","Advances in Manufacturing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-68619-6_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,4]],"date-time":"2019-10-04T17:46:32Z","timestamp":1570211192000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-68619-6_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10,20]]},"ISBN":["9783319686189","9783319686196"],"references-count":38,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-68619-6_11","relation":{},"ISSN":["2195-4356","2195-4364"],"issn-type":[{"type":"print","value":"2195-4356"},{"type":"electronic","value":"2195-4364"}],"subject":[],"published":{"date-parts":[[2017,10,20]]}}}