{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,18]],"date-time":"2026-02-18T00:59:06Z","timestamp":1771376346519,"version":"3.50.1"},"publisher-location":"Cham","reference-count":27,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319686189","type":"print"},{"value":"9783319686196","type":"electronic"}],"license":[{"start":{"date-parts":[[2017,10,20]],"date-time":"2017-10-20T00:00:00Z","timestamp":1508457600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-68619-6_13","type":"book-chapter","created":{"date-parts":[[2017,10,19]],"date-time":"2017-10-19T05:10:01Z","timestamp":1508389801000},"page":"131-140","source":"Crossref","is-referenced-by-count":18,"title":["Development of an Intelligent and Automated System for Lean Industrial Production, Adding\u00a0Maximum Productivity and Efficiency in\u00a0the\u00a0Production Process"],"prefix":"10.1007","author":[{"given":"Adriana F.","family":"Ara\u00fajo","sequence":"first","affiliation":[]},{"given":"Maria L. R.","family":"Varela","sequence":"additional","affiliation":[]},{"given":"Marivan S.","family":"Gomes","sequence":"additional","affiliation":[]},{"given":"Raissa C. C.","family":"Barreto","sequence":"additional","affiliation":[]},{"given":"Justyna","family":"Trojanowska","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,10,20]]},"reference":[{"key":"13_CR1","doi-asserted-by":"crossref","unstructured":"Aydilek, A., Aydilek, H., Allahvardi, A.: Increasing the profitability and competiveness in a production environment with random and bounded setup times. Int. J. Prod. Res., 106\u2013117 (2013)","DOI":"10.1080\/00207543.2011.652263"},{"issue":"2","key":"13_CR2","doi-asserted-by":"crossref","first-page":"129","DOI":"10.17270\/J.LOG.2016.2.3","volume":"12","author":"A Kolinski","year":"2016","unstructured":"Kolinski, A., Sliwczynski, B., Golinska-Dawson, P.: Evaluation model for production process economic efficiency. LogForum 12(2), 129\u2013145 (2016)","journal-title":"LogForum"},{"key":"13_CR3","doi-asserted-by":"crossref","unstructured":"K\u0142os, S.: Implementation of the AHP method in ERP-based decision support systems for a new product development. In: Dregvaite, G., Damasevicius, R. (eds.) Information and Software Technologies:\u00a021st International Conference on ICIST, pp. 199\u2013207. Springer, Berlin (2015)","DOI":"10.1007\/978-3-319-24770-0_18"},{"key":"13_CR4","doi-asserted-by":"crossref","unstructured":"K\u0142os, S., Patalas-Maliszewska, J.: Throughput analysis of automatic production lines based on simulation methods. In: Jackowski, K., Burduk, R., Walkowiak, K., Wo\u017aniak, M., Yin, H.: (eds.) Intelligent Data Engineering and Automated Learning\u2014IDEAL 2015. Springer, Berlin (2015)","DOI":"10.1007\/978-3-319-24834-9_22"},{"issue":"2","key":"13_CR5","first-page":"29","volume":"7","author":"A Kujawi\u0144ska","year":"2016","unstructured":"Kujawi\u0144ska, A., Rogalewicz, M., Diering, M.: Application of expectation maximization method for purchase decision-making support in welding branch. Manage. Prod. Eng. Rev. 7(2), 29\u201333 (2016)","journal-title":"Manage. Prod. Eng. Rev."},{"issue":"4","key":"13_CR6","first-page":"97","volume":"7","author":"M Rogalewicz","year":"2016","unstructured":"Rogalewicz, M., Sika, R.: Methodologies of knowledge discovery from data and Data mining methods in mechanical engineering. Manage. Prod. Eng. Rev. 7(4), 97\u2013108 (2016)","journal-title":"Manage. Prod. Eng. Rev."},{"key":"13_CR7","unstructured":"Vieira, G.G., Varela, M.L.R., Putnik, G.D., Machado, J.M., Trojanowska, J.: Integrated platform for real-time control and production and productivity monitoring and analysis. Romanian Rev. Precis. Mech. Opt. Mechatron. 50, 119\u2013127 (2016) (Mecahitech\u201916; Bucharest)"},{"key":"13_CR8","doi-asserted-by":"crossref","unstructured":"Wi\u0119cek-Janka, E., Lewandowska, A.: European version of a balanced scorecard in family enterprises (own research). In: 3rd International Conference on Management Science and Management Innovation (MSMI 2016). Atlantis Press (2016)","DOI":"10.2991\/msmi-16.2016.52"},{"issue":"9","key":"13_CR9","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1108\/01443579710171244","volume":"17","author":"SM James-Moore","year":"1997","unstructured":"James-Moore, S.M., Gibbons, A.: Is lean manufacture universally relevant? An investigate methodology. Int. J. Oper. Prod. Manage. 17(9), 899\u2013911 (1997)","journal-title":"Int. J. Oper. Prod. Manage."},{"key":"13_CR10","doi-asserted-by":"crossref","unstructured":"Kawa, A., Golinska, P.: Supply chain arrangements in recovery network. In: KES International Symposium on Agent and Multi-Agent Systems: Technologies and Applications, pp. 292\u2013301. Springer, Berlin Heidelberg (2010)","DOI":"10.1007\/978-3-642-13541-5_30"},{"key":"13_CR11","doi-asserted-by":"crossref","unstructured":"Kawa, A.: SMART logistics chain. In: Asian Conference on Intelligent Information and Database Systems, pp. 432\u2013438. Springer, Berlin, Heidelberg, (2012)","DOI":"10.1007\/978-3-642-28487-8_45"},{"key":"13_CR12","unstructured":"Womack, J.P., Jones, D.T., Roos, D.: A M\u00e1quina Que Mudou O Mundo, 14th ed. Campus, Rio de Janeiro (1992)"},{"key":"13_CR13","doi-asserted-by":"crossref","first-page":"1174","DOI":"10.1057\/jors.1995.166","volume":"46","author":"RB Johnston","year":"1999","unstructured":"Johnston, R.B.: Making manufacturing practices tacit: a case study of computer-aided production management and lean production. J. Oper. Res. Soc. 46, 1174\u20131183 (1999)","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"13_CR14","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1515\/afe-2015-0094","volume":"16","author":"Z Ignaszak","year":"2016","unstructured":"Ignaszak, Z., Sika, R., Perzyk, M., Kocha\u0144ski, A., Koz\u0142owski, J.: Effectiveness of SCADA systems in control of green sands properties. Arch. Foundry Eng. 16(1), 5\u201312 (2016)","journal-title":"Arch. Foundry Eng."},{"key":"13_CR15","doi-asserted-by":"crossref","first-page":"612","DOI":"10.4028\/www.scientific.net\/DDF.326-328.612","volume":"326\u2013328","author":"Z Ignaszak","year":"2012","unstructured":"Ignaszak, Z., Popielarski, P., Hajkowski, J., Prunier, J.-B.: Problem of acceptability of internal porosity in semi-finished cast product as new trend\u2014\u201ctolerance of damage\u201d. Mod. Des. Off. Defect Diffus. Forum 326\u2013328, 612\u2013619 (2012)","journal-title":"Mod. Des. Off. Defect Diffus. Forum"},{"key":"13_CR16","doi-asserted-by":"crossref","unstructured":"Braiden, B.W., Morrisson, K.R.: Lean manufacturing optimization of automotive motor compartment system. In: 19th International Conference on Computers and Industrial Engineering, vol. 31(1\/2), pp. 99\u2013102 (1996)","DOI":"10.1016\/0360-8352(96)00088-5"},{"key":"13_CR17","doi-asserted-by":"crossref","unstructured":"Mabry, B.G., Morrison, N.K.R.: Transformation to lean manufacturing by an automotive component supplier. In: 19th International Conference on Computers and Industrial Engineering, vol. 31(1\/2), pp. 95\u201398 (1996)","DOI":"10.1016\/0360-8352(96)00087-3"},{"issue":"2","key":"13_CR18","doi-asserted-by":"crossref","first-page":"132","DOI":"10.1108\/01445159810211855","volume":"18","author":"TA Kochan","year":"1998","unstructured":"Kochan, T.A.: Automotive industry looks for lean production. Assembl. Autom. 18(2), 132\u2013137 (1998)","journal-title":"Assembl. Autom."},{"key":"13_CR19","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0925-5273(98)00129-7","volume":"60\u201361","author":"H Katayama","year":"1999","unstructured":"Katayama, H., Bennett, D.: Agility, adaptability and leanness: a comparison of concepts and a study of practice. Int. J. Prod. Econ. 60\u201361, 43\u201351 (1999)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"13_CR20","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1177\/0143831X99203003","volume":"20","author":"I Hampson","year":"1999","unstructured":"Hampson, I.: Lean production and the Toyota Production System\u2014or, the case of the forgotten production concepts. Econ. Ind. Democr. 20(3), 369\u2013391 (1999)","journal-title":"Econ. Ind. Democr."},{"issue":"2","key":"13_CR21","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1080\/002075400189509","volume":"38","author":"RB Detty","year":"2000","unstructured":"Detty, R.B., Yingling, J.C.: Quantifyng benefits of conversion to lean manufacturing with discrete event simulation: a case study. Int. J. Prod. Res. 38(2), 429\u2013445 (2000)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"13_CR22","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1108\/09576060210415437","volume":"13","author":"H Soriano-Meier","year":"2012","unstructured":"Soriano-Meier, H., Forrester, P.L.: A model for evaluating the degree of leanness of manufacturing firms. Integr. Manuf. Syst. 13(2), 104\u2013109 (2012)","journal-title":"Integr. Manuf. Syst."},{"key":"13_CR23","unstructured":"Brown, S.: New evidence on quality in manufacturing plants: a challenge to lean production. Prod. Inventory Manage. J., 24\u201329 (1998)"},{"issue":"2","key":"13_CR24","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1108\/01443579610197120","volume":"16","author":"RW Schuring","year":"1996","unstructured":"Schuring, R.W.: Operational autonomy explains the value of group work in both lean and reflective production. Int. J. Oper. Prod. Manage. 16(2), 171\u2013182 (1996)","journal-title":"Int. J. Oper. Prod. Manage."},{"key":"13_CR25","unstructured":"Medeiros, E.N.: Uma Proposta de Metodologia para o Desenvolvimento de Projeto de Produto. Tese de Mestrado, Rio de Janeiro: Kay, J.M. Combining lean and agile characteristics: creation of virtual groups by enhanced production flow analysis. Int. J. Prod. Econ. 85, 305\u2013318 (2003)"},{"key":"13_CR26","doi-asserted-by":"crossref","first-page":"2237","DOI":"10.1007\/s00170-013-4836-x","volume":"68","author":"A Allahverdi","year":"2013","unstructured":"Allahverdi, A., Aydilek, H.: Algorithms for no-wait flowshops with total completion time subject to makespan. Int. J. Adv. Manuf. Technol. 68, 2237 (2013)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"13_CR27","unstructured":"Zandin, K.B.: MOST work measurement systems, Dekker (1990)"}],"container-title":["Lecture Notes in Mechanical Engineering","Advances in Manufacturing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-68619-6_13","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,4]],"date-time":"2019-10-04T17:46:08Z","timestamp":1570211168000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-68619-6_13"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10,20]]},"ISBN":["9783319686189","9783319686196"],"references-count":27,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-68619-6_13","relation":{},"ISSN":["2195-4356","2195-4364"],"issn-type":[{"value":"2195-4356","type":"print"},{"value":"2195-4364","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,10,20]]}}}