{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,26]],"date-time":"2026-03-26T19:26:53Z","timestamp":1774553213007,"version":"3.50.1"},"publisher-location":"Cham","reference-count":31,"publisher":"Springer International Publishing","isbn-type":[{"value":"9783319928616","type":"print"},{"value":"9783319928623","type":"electronic"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-319-92862-3_26","type":"book-chapter","created":{"date-parts":[[2018,9,19]],"date-time":"2018-09-19T12:26:08Z","timestamp":1537359968000},"page":"421-446","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":20,"title":["BIM for 3D Printing in Construction"],"prefix":"10.1007","author":[{"given":"Jochen","family":"Teizer","sequence":"first","affiliation":[]},{"given":"Alexander","family":"Blickle","sequence":"additional","affiliation":[]},{"given":"Tobias","family":"King","sequence":"additional","affiliation":[]},{"given":"Olaf","family":"Leitzbach","sequence":"additional","affiliation":[]},{"given":"Daniel","family":"Guenther","sequence":"additional","affiliation":[]},{"given":"Hannah","family":"Mattern","sequence":"additional","affiliation":[]},{"given":"Markus","family":"K\u00f6nig","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,9,20]]},"reference":[{"issue":"5","key":"26_CR1","doi-asserted-by":"publisher","first-page":"539","DOI":"10.1016\/j.autcon.2009.11.005","volume":"19","author":"N \u010c Babi\u010d","year":"2010","unstructured":"Babi\u010d, N. \u010c., Podbreznik, P., & Rebolj, D. (2010). Integrating resource production and construction using BIM. Automation in Construction, 19(5), 539\u2013543.","journal-title":"Automation in Construction"},{"key":"26_CR2","doi-asserted-by":"crossref","unstructured":"Bruckmann, T., Lalom, W., Nguyen, K., & Salah, B. (2012). Development of a storage retrieval machine for high racks using a wire robot. In Proceedings of the ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference (pp. 771\u2013780).","DOI":"10.1115\/DETC2012-70389"},{"key":"26_CR3","doi-asserted-by":"crossref","unstructured":"Bruckmann, T., Mattern, H., Spengler, A., Reichert, C., Malkwitzc, A., & Knig, M. (2016). Automated construction of masonry buildings using cable-driven parallel robots. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn (pp. 332\u2013340).","DOI":"10.22260\/ISARC2016\/0041"},{"issue":"8","key":"26_CR4","doi-asserted-by":"publisher","first-page":"923","DOI":"10.1016\/j.autcon.2008.03.001","volume":"17","author":"R A Buswell","year":"2008","unstructured":"Buswell, R. A., Thorpe, A., Soar, R. C., & Gibb, A. (2008). Design, data and process issues for mega-scale rapid manufacturing machines used for construction. Automation in Construction, 17(8), 923\u2013929.","journal-title":"Automation in Construction"},{"key":"26_CR5","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1061\/(ASCE)CP.1943-5487.0000115","volume":"26","author":"T Cheng","year":"2012","unstructured":"Cheng, T., Mantripragada, U., Teizer, J., & Vela, P. A. (2012). Automated trajectory and path planning analysis based on ultra wideband data. ASCE Journal of Computing in Civil Engineering, Reston, Virginia, 26, 151\u2013160.","journal-title":"ASCE Journal of Computing in Civil Engineering, Reston, Virginia"},{"key":"26_CR6","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/j.autcon.2015.05.007","volume":"57","author":"G Costa","year":"2015","unstructured":"Costa, G., & Madrazo, L. (2015). Connecting building component catalogues with BIM models using semantic technologies. Automation in Construction, 57, 239\u2013248.","journal-title":"Automation in Construction"},{"key":"26_CR7","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1016\/j.proeng.2014.10.536","volume":"85","author":"L Ding","year":"2014","unstructured":"Ding, L., Wei, R., & Che, H. (2014). Development of a BIM-based automated construction system. Procedia Engineering, 85, 123\u2013131.","journal-title":"Procedia Engineering"},{"key":"26_CR8","unstructured":"Guenther D. (2015). 3D printing \u2013 The state of the technology and the future of this process. Detail \u2013 Technology (pp. 596\u2013600)."},{"key":"26_CR9","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.autcon.2016.03.008","volume":"71","author":"O Golovina","year":"2016","unstructured":"Golovina, O., Teizer, J., & Pradhananga, N. (2016). Heat map generation for predictive safety planning: preventing struck-by and near miss interactions between workers-on-foot and construction equipment. Automation in Construction, Elsevier, 71, 99\u2013115.","journal-title":"Automation in Construction, Elsevier"},{"key":"26_CR10","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/j.autcon.2003.08.012","volume":"12","author":"B Khoshnevis","year":"2004","unstructured":"Khoshnevis, B. (2004). Automated construction by contour crafting-related robotics and information technologies. Automation in Construction, 12, 5\u201319.","journal-title":"Automation in Construction"},{"key":"26_CR11","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1504\/IJISE.2006.009791","volume":"1","author":"B Khoshnevis","year":"2006","unstructured":"Khoshnevis, B., Hwang, D., Yao, K., & Yeh, Z. (2006). Mega-scale fabrication by contour crafting. Industrial and Systems Engineering, 1, 301\u2013320.","journal-title":"Industrial and Systems Engineering"},{"key":"26_CR12","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.autcon.2015.07.008","volume":"59","author":"S S Kumar","year":"2015","unstructured":"Kumar, S. S., & Cheng, J. C. (2015). A BIM-based automated site layout planning framework for congested construction sites. Automation in Construction, 59, 24\u201337.","journal-title":"Automation in Construction"},{"key":"26_CR13","unstructured":"KS-PLUS Wandsystem GmbH. (2016). Ma\u00dfgeschneiderte L\u00f6sungen aus Kalksandstein. Retrieved from http:\/\/www.ks-plus.de\/5_1771_KS_PLUS_gesamt.pdf . Accessed Jan 2017."},{"issue":"7","key":"26_CR14","doi-asserted-by":"publisher","first-page":"865","DOI":"10.1016\/j.autcon.2009.03.011","volume":"18","author":"G Lee","year":"2009","unstructured":"Lee, G., Kim, H.-H., Lee, C.-J., Ham, S.-I., Yun, S.-H., Cho, H., Kim, B. K., Kim, G. T., & Kim, K. (2009). A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction, 18(7), 865\u2013874.","journal-title":"Automation in Construction"},{"key":"26_CR15","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.autcon.2012.05.002","volume":"26","author":"G Lee","year":"2012","unstructured":"Lee, G., Cho, J., Ham, S., Lee, T., Lee, G., Yun, S.-H., & Yang, H.-J. (2012). A BIM- and sensor-based tower crane navigation system for blind lifts. Automation in Construction, 26, 1\u201310.","journal-title":"Automation in Construction"},{"key":"26_CR16","unstructured":"Landsberger, S. E., & Sheridan, T. B. (1985). A new design for parallel link manipulator. In Proceedings Systems Man and Cybernetics Conference (pp. 812\u2013814)."},{"key":"26_CR17","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1016\/j.autcon.2011.06.010","volume":"21","author":"S Lim","year":"2011","unstructured":"Lim, S., Buswell, R., Le, T., Austin, S., Gibb, A., & Thorpe, T. (2011). Developments in construction-scale additive manufacturing processes. Automation in Construction, 21, 262\u2013268.","journal-title":"Automation in Construction"},{"key":"26_CR18","doi-asserted-by":"crossref","unstructured":"Mattern, H., Bruckmann, T., Spengler, A., & Knig, M. (2016). Simulation of automated construction using wire robots. In Proceedings of the 2016 Winter Simulation Conference, Washington, DC.","DOI":"10.1109\/WSC.2016.7822361"},{"key":"26_CR19","unstructured":"McGraw-Hill Construction. (2011). Prefabrication and Modularization: Increasing Productivity in the Construction Industry. SmartMarket report."},{"key":"26_CR20","doi-asserted-by":"crossref","unstructured":"Moghadam, M., Al-Hussein, M., & Umut, K. (2012). Automation of modular design and construction through an integrated BIM\/lean model. Gerontechnology, 11(2).","DOI":"10.4017\/gt.2012.11.02.611.00"},{"key":"26_CR21","unstructured":"Oesterle, S., Vansteenkiste, A., & Mirjan, A. (2012). Zero waste free-form formwork. In ICFF 2012 (pp. 258\u2013267)."},{"key":"26_CR22","unstructured":"Sachs, E. M., Haggerty, J. S., Cima, M. J., & Williams P. A. (1993). Three-dimensional printing techniques, United States Patent, No. 5,204,055, Date of Patent, 20 Apr 1993."},{"key":"26_CR23","volume-title":"In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction,","author":"K Schwabe","year":"2016","unstructured":"Schwabe, K., Knig, M., & Teizer, J. (2016). BIM applications of rule-based checking in construction site layout planning tasks. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn University."},{"key":"26_CR24","unstructured":"Strabag. (2016). Research, development and innovation 2015\/2016. Strabag AG."},{"key":"26_CR25","unstructured":"Teizer, J., & Kahlmann, T. (2008). Range imaging as an emerging optical 3D measurement technology. Transportation Research Record: Journal of the Transportation Research Board, Washington, DC, 2040 (pp. 19\u201329)."},{"issue":"5","key":"26_CR26","doi-asserted-by":"publisher","first-page":"630","DOI":"10.1016\/j.autcon.2010.02.009","volume":"19","author":"J Teizer","year":"2010","unstructured":"Teizer, J., Allread, B. S., Fullerton, C. E., & Hinze, J. (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19(5), 630\u2013640.","journal-title":"Automation in Construction"},{"issue":"5","key":"26_CR27","doi-asserted-by":"publisher","first-page":"594","DOI":"10.1061\/(ASCE)CO.1943-7862.0000467","volume":"138","author":"J Teizer","year":"2012","unstructured":"Teizer, J., Venugopal, M., Teizer, W., & Felkl, J. (2012). Nanotechnology and its impact on construction: Bridging the gap between researchers and industry professionals. Construction Engineering and Management, 138(5), 594\u2013604.","journal-title":"Construction Engineering and Management"},{"key":"26_CR28","doi-asserted-by":"crossref","unstructured":"Teizer, J., Blickle, A., King, T., Leitzbach, O., & Guenther, D. (2016). Large scale 3D printing of complex geometric shapes in construction. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn (pp. 948\u2013956).","DOI":"10.22260\/ISARC2016\/0114"},{"key":"26_CR29","doi-asserted-by":"publisher","first-page":"168","DOI":"10.1016\/j.autcon.2015.05.006","volume":"59","author":"J Wang","year":"2015","unstructured":"Wang, J., Zhang, X., Shou, W., Wang, X., Xu, B., Kim, M. J., & Wu, P. (2015). A BIM-based approach for automated tower crane layout planning. Automation in Construction, 59, 168\u2013178.","journal-title":"Automation in Construction"},{"key":"26_CR30","doi-asserted-by":"publisher","first-page":"67","DOI":"10.21809\/rilemtechlett.2016.16","volume":"1","author":"T Wangler","year":"2016","unstructured":"Wangler, T., Lloret, E., Reiter, L., Hack, N., Gramazio, F., Kohler, M., Bernhard, M., Dillenburger, B., Buchli, J., Roussel, N., & Flatt, R. (2016). Digital concrete: Opportunities and challenges. RILEM Technical Letters, 1, 67\u201375.","journal-title":"RILEM Technical Letters"},{"key":"26_CR31","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1016\/j.autcon.2015.09.009","volume":"60","author":"S Zhang","year":"2015","unstructured":"Zhang, S., Teizer, J., Pradhananga, N., & Eastman, C. (2015). Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Automation in Construction, 60, 74\u201386.","journal-title":"Automation in Construction"}],"container-title":["Building Information Modeling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-92862-3_26","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,24]],"date-time":"2019-10-24T07:51:50Z","timestamp":1571903510000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-92862-3_26"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783319928616","9783319928623"],"references-count":31,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-92862-3_26","relation":{},"subject":[],"published":{"date-parts":[[2018]]}}}