{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T02:52:31Z","timestamp":1743043951129,"version":"3.40.3"},"publisher-location":"M\u00fcnchen, Germany","reference-count":19,"publisher":"Carl Hanser Verlag GmbH & Co. KG","isbn-type":[{"type":"electronic","value":"9783446457676"}],"license":[{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2018,1,1]],"date-time":"2018-01-01T00:00:00Z","timestamp":1514764800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018]]},"DOI":"10.1007\/978-3-446-45767-6_11","type":"book-chapter","created":{"date-parts":[[2023,10,11]],"date-time":"2023-10-11T18:04:23Z","timestamp":1697047463000},"page":"154-171","source":"Crossref","is-referenced-by-count":0,"title":["Fertigungssteuerung mit BOA und CONWIP"],"prefix":"10.1007","author":[{"given":"Hans-Peter","family":"Wiendahl","sequence":"first","affiliation":[]},{"given":"Jens","family":"Lopitzsch","sequence":"additional","affiliation":[]},{"given":"Rouven","family":"Nickel","sequence":"additional","affiliation":[]},{"given":"Michael","family":"Schneider","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"11_CR1","series-title":"Fortschritt-Berichte VDI, Reihe 2","volume-title":"Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung","author":"W Bechte","year":"1984","unstructured":"Bechte, W.: Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung. Dissertation Universit\u00e4t Hannover. In: Fortschritt-Berichte VDI, Reihe 2, Nr. 70. D\u00fcsseldorf: VDI-Verlag, 1984"},{"issue":"3","key":"11_CR2","doi-asserted-by":"publisher","first-page":"789","DOI":"10.1080\/002075497195713","volume":"35","author":"AM Bonvik","year":"1997","unstructured":"Bonvik, A. M.; Couch, C. E.; Gershwin, S. B.: A comparison of production-line control mechanisms. In: International Journal of Production Research, vol. 35 (1997), no. 3, pp. 789\u2013804","journal-title":"International Journal of Production Research"},{"issue":"H. 6","key":"11_CR3","first-page":"239","volume":"90","author":"J-W Breithaupt","year":"2000","unstructured":"Breithaupt, J.-W.; L\u00f6dding, H.; Schneider, M.; Wiendahl, H.-P.: Fit f\u00fcr den Wettbewerb \u2013 Gestaltung eines innovativen Logistikkonzepts f\u00fcr Flugzeugbauteile. Fit for competition \u2013 Design and determination of an innovative logistics-concept for aircraft components. wt Werktstattstechnik 90 (2000), H. 6, S. 239\u2013242","journal-title":"Fit for competition \u2013 Design and determination of an innovative logistics-concept for aircraft components. wt Werktstattstechnik"},{"issue":"18","key":"11_CR4","doi-asserted-by":"publisher","first-page":"4589","DOI":"10.1080\/00207540050205523","volume":"38","author":"JM Framinan","year":"2000","unstructured":"Framinan, J. M.; Ruiz-Usano, R.; Leisten, R.: Input control and dispatching rules in a dynamic CONWIP flow-shop. In: International Journal of Production Research, vol. 38 (2000), no. 18, pp. 4589\u20134598","journal-title":"International Journal of Production Research"},{"issue":"4","key":"11_CR5","doi-asserted-by":"publisher","first-page":"332","DOI":"10.1080\/095372897235145","volume":"8","author":"RJ Graves","year":"1997","unstructured":"Graves, R. J.; Milne, R. J.: A new method for order release. In: Production, Planning & Control, vol. 8 (1997), no. 4, pp. 332\u2013342","journal-title":"Production, Planning & Control"},{"issue":"11","key":"11_CR6","doi-asserted-by":"publisher","first-page":"3253","DOI":"10.1080\/00207549608905087","volume":"34","author":"S Gstettner","year":"1996","unstructured":"Gstettner, S.; Kuhn, H.: Analysis of production control system kanban and CONWIP. In: International Journal of Production Research, vol. 34 (1996), no. 11, pp. 3253\u20133273","journal-title":"International Journal of Production Research"},{"issue":"3","key":"11_CR7","doi-asserted-by":"publisher","first-page":"635","DOI":"10.1080\/00207549108930093","volume":"29","author":"WJ Hopp","year":"1991","unstructured":"Hopp, W. J.; Spearman, M. L.: Throughput of a constant work in process manufacturing line subject to failures. In: International Journal of Production Research, vol. 29 (1991), no. 3, pp. 635\u2013655","journal-title":"International Journal of Production Research"},{"key":"11_CR8","volume-title":"Factory Physics","author":"WJ Hopp","year":"2011","unstructured":"Hopp, W. J.; Spearman, M. L.: Factory Physics. Waveland Press, 2011"},{"issue":"8","key":"11_CR9","doi-asserted-by":"publisher","first-page":"803","DOI":"10.1080\/095372898233579","volume":"9","author":"M Huang","year":"1998","unstructured":"Huang, M.; Wang, D.; Ip, W. H.: A simulation and comparative study of the CONWIP, Kanban and MRP production control systems in a cold rolling plant. In: Production, Planning & Control, vol. 9 (1998), no. 8, pp. 803\u2013812","journal-title":"Production, Planning & Control"},{"key":"11_CR10","volume-title":"Kapazit\u00e4tsterminierung zur Bestandsregelung in der Werkstattfertigung","author":"J Jendralski","year":"1978","unstructured":"Jendralski, J.: Kapazit\u00e4tsterminierung zur Bestandsregelung in der Werkstattfertigung. Dissertation TU Hannover, 1978"},{"key":"11_CR11","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-48459-3","volume-title":"Verfahren der Fertigungssteuerung: Grundlagen, Beschreibung, Konfiguration (VDI-Buch)","author":"H L\u00f6dding","year":"2016","unstructured":"L\u00f6dding, H.: Verfahren der Fertigungssteuerung: Grundlagen, Beschreibung, Konfiguration (VDI-Buch). 3. Aufl. Berlin, Heidelberg: Springer 2016.","edition":"3"},{"key":"11_CR12","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-92839-3","volume-title":"Logistische Kennlinien","author":"P Nyhuis","year":"2012","unstructured":"Nyhuis, P; Wiendahl, H.-P.: Logistische Kennlinien. 3. Aufl. Berlin, Heidelberg: Springer 2012","edition":"3"},{"key":"11_CR13","series-title":"Fortschritt-Berichte VDI, Reihe 2","volume-title":"Logistische Fertigungsbereichskennlinien","author":"M Schneider","year":"2004","unstructured":"Schneider, M.: Logistische Fertigungsbereichskennlinien. In: Fortschritt-Berichte VDI, Reihe 2, Nr. 647, D\u00fcsseldorf, VDI-Verlag 2004."},{"key":"11_CR14","volume-title":"Inventory Management and Production Planning and Scheduling","author":"EA Silver","year":"1998","unstructured":"Silver, E. A.; Pyke, D. F.; Peterson, R.: Inventory Management and Production Planning and Scheduling, 3rd ed. New York: Wiley 1998","edition":"3"},{"issue":"5","key":"11_CR15","doi-asserted-by":"publisher","first-page":"879","DOI":"10.1080\/00207549008942761","volume":"28","author":"ML Spearman","year":"1990","unstructured":"Spearman, M. L.; Woodruff, D. L.; Hopp, W. J.: CONWIP: a pull alternative to kanban. In: International Journal of Production Research, vol. 28 (1990), no. 5, pp. 879\u2013894","journal-title":"International Journal of Production Research"},{"key":"11_CR16","volume-title":"Belastungsorientierte Fertigungssteuerung","author":"H-P Wiendahl","year":"1987","unstructured":"Wiendahl, H.-P.: Belastungsorientierte Fertigungssteuerung. M\u00fcnchen, Wien: Hanser 1987"},{"key":"11_CR17","volume-title":"Betriebsorganisation f\u00fcr Ingenieure","author":"H-P Wiendahl","year":"2014","unstructured":"Wiendahl, H.-P.: Betriebsorganisation f\u00fcr Ingenieure. 8. Aufl. M\u00fcnchen: Hanser 2014","edition":"8"},{"key":"11_CR18","volume-title":"Fertigungsregelung. Logistische Beherrschung von Fertigungsabl\u00e4ufen auf Basis des Trichtermodells","author":"H-P Wiendahl","year":"1997","unstructured":"Wiendahl, H.-P.: Fertigungsregelung. Logistische Beherrschung von Fertigungsabl\u00e4ufen auf Basis des Trichtermodells. M\u00fcnchen, Wien: Hanser 1997"},{"issue":"4","key":"11_CR19","first-page":"437","volume":"62","author":"G Z\u00e4pfel","year":"1992","unstructured":"Z\u00e4pfel, G.; H\u00f6dlmoser, P.: L\u00e4\u00dft sich das KANBAN-Konzept bei einer Variantenfertigung wirtschaftlich einsetzen? In: Zeitschrift f\u00fcr Betriebswirtschaft, 62. Jg. (1992), H. 4, S. 437\u2013 458","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"}],"container-title":["Taschenbuch der Logistik"],"original-title":[],"language":"de","deposited":{"date-parts":[[2023,10,11]],"date-time":"2023-10-11T18:43:49Z","timestamp":1697049829000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.springerprofessional.de\/doi\/10.1007\/978-3-446-45767-6_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018]]},"ISBN":["9783446457676"],"references-count":19,"URL":"https:\/\/doi.org\/10.1007\/978-3-446-45767-6_11","relation":{"is-identical-to":[{"id-type":"doi","id":"10.3139\/9783446457676.011","asserted-by":"subject"}]},"subject":[],"published":{"date-parts":[[2018]]}}}