{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,14]],"date-time":"2025-02-14T05:13:21Z","timestamp":1739510001724,"version":"3.37.0"},"publisher-location":"Berlin, Heidelberg","reference-count":46,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783642040382"},{"type":"electronic","value":"9783642040399"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009]]},"DOI":"10.1007\/978-3-642-04039-9_12","type":"book-chapter","created":{"date-parts":[[2009,11,16]],"date-time":"2009-11-16T08:24:03Z","timestamp":1258359843000},"page":"295-324","source":"Crossref","is-referenced-by-count":7,"title":["A Hybrid Intelligent System for Distributed Dynamic Scheduling"],"prefix":"10.1007","author":[{"given":"Ana","family":"Madureira","sequence":"first","affiliation":[]},{"given":"Joaquim","family":"Santos","sequence":"additional","affiliation":[]},{"given":"Ivo","family":"Pereira","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"12_CR1","doi-asserted-by":"publisher","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job shop scheduling. Management Science\u00a034(3), 391\u2013401 (1988)","journal-title":"Management Science"},{"issue":"1","key":"12_CR2","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.ejor.2003.08.027","volume":"161","author":"H. Aytug","year":"2005","unstructured":"Aytug, H., Lawley, M.A., Mckay, K., Mohan, S., Uzsoy, R.: Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research\u00a0161(1), 86\u2013110 (2005)","journal-title":"European Journal of Operational Research"},{"key":"12_CR3","volume-title":"Introduction to Sequencing and Scheduling","author":"K.R. Baker","year":"1974","unstructured":"Baker, K.R.: Introduction to Sequencing and Scheduling. Wiley, New York (1974)"},{"key":"12_CR4","doi-asserted-by":"publisher","first-page":"573","DOI":"10.1016\/j.ejor.2004.03.003","volume":"164","author":"J. Blazewicz","year":"2005","unstructured":"Blazewicz, J., Ecker, K., Trystram, D.: Recent advances in scheduling in computer and manufacturing systems. European Journal of Operational Research\u00a0164, 573\u2013574 (2005)","journal-title":"European Journal of Operational Research"},{"key":"12_CR5","first-page":"299","volume-title":"Proceedings of the Fourth International Conference on Adaptive Computing in Design and Manufacture","author":"J. Branke","year":"2000","unstructured":"Branke, J.: Efficient evolutionary algorithms for searching robust solutions. In: Proceedings of the Fourth International Conference on Adaptive Computing in Design and Manufacture, pp. 299\u2013308. Springer, Heidelberg (2000)"},{"key":"12_CR6","volume-title":"Production Management Systems","author":"J. Brownie","year":"1988","unstructured":"Brownie, J., Harhen, J., Shivnan, J.: Production Management Systems. Addison-Wesley Publishing Co., Reading (1988)"},{"key":"12_CR7","first-page":"3","volume-title":"PRO-VE 1999: Proceedings of the IFIP TC5 WG5.3 \/ PRODNET Working Conference on Infrastructures for Virtual Enterprises","author":"L.M. Camarinha-Matos","year":"1999","unstructured":"Camarinha-Matos, L.M., Afsarmanesh, H.: The virtual enterprise concept. In: PRO-VE 1999: Proceedings of the IFIP TC5 WG5.3 \/ PRODNET Working Conference on Infrastructures for Virtual Enterprises, pp. 3\u201314. Kluwer Academic Publishers, Deventer (1999)"},{"issue":"2","key":"12_CR8","doi-asserted-by":"publisher","first-page":"106","DOI":"10.1080\/09537280410001662556","volume":"15","author":"M. Caridi","year":"2004","unstructured":"Caridi, M., Cavalieri, S.: Multiagent systems in production planning and control: An overview. Production Planning and Control\u00a015(2), 106\u2013118 (2004)","journal-title":"Production Planning and Control"},{"key":"12_CR9","unstructured":"Davis, L.D., Mitchell, M.: Handbook of genetic algorithms. Van Nostrand Reinhold (1991), http:\/\/citeseerx.ist.psu.edu\/viewdoc\/summary?doi=0.1.1.87.3586"},{"issue":"1-4","key":"12_CR10","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1007\/BF02023076","volume":"41","author":"M. Dell\u2019Amico","year":"1993","unstructured":"Dell\u2019Amico, M., Trubian, M.: Applying tabu search to the job-shop scheduling problem. Annals of Operations Research\u00a041(1-4), 231\u2013252 (1993)","journal-title":"Annals of Operations Research"},{"key":"12_CR11","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1006\/ijhc.1995.1031","volume":"42","author":"J. Dorn","year":"1995","unstructured":"Dorn, J., Kerr, R., Thalhammer, G.: Reactive scheduling: improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning. International Journal on Human-Computer Studies\u00a042, 687\u2013704 (1995)","journal-title":"International Journal on Human-Computer Studies"},{"key":"12_CR12","first-page":"375","volume-title":"Proceedings of the Fifth International Conference on Genetic Algorithms","author":"H.-l. Fang","year":"1993","unstructured":"Fang, H.-l., Ross, P., Corne, D.: A promising genetic algorithm approach to job-shop scheduling, rescheduling, and open-shop scheduling problems. In: Proceedings of the Fifth International Conference on Genetic Algorithms, pp. 375\u2013382. Morgan Kaufmann, San Francisco (1993)"},{"key":"12_CR13","unstructured":"Goldtratt, E., Fox, R.: The Race. North River Press (1986)"},{"key":"12_CR14","series-title":"Chapman & Hall\/Crc Computer and Information Science Series","doi-asserted-by":"crossref","DOI":"10.1201\/9781420010749","volume-title":"Handbook of Approximation Algorithms and Metaheuristics","author":"T.F. Gonzalez","year":"2007","unstructured":"Gonzalez, T.F.: Handbook of Approximation Algorithms and Metaheuristics. Chapman & Hall\/Crc Computer and Information Science Series. Chapman & Hall\/CRC, Boca Raton (2007), http:\/\/www.amazon.ca\/exec\/obidos\/redirect?tag=citeulike09-20%&amp;path=ASIN\/1584885505"},{"issue":"4","key":"12_CR15","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1017\/S0269888905000317","volume":"19","author":"B. Horling","year":"2005","unstructured":"Horling, B., Lesser, V.: A survey of multi-agent organizational paradigms. The Knowledge Engineering Review\u00a019(4), 281\u2013316 (2005), http:\/\/mas.cs.umass.edu\/paper\/366","journal-title":"The Knowledge Engineering Review"},{"key":"12_CR16","doi-asserted-by":"publisher","first-page":"390","DOI":"10.1016\/S0377-2217(98)00113-1","volume":"113","author":"A.S. Jain","year":"1999","unstructured":"Jain, A.S., Meeran, S.: Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research\u00a0113, 390\u2013434 (1999)","journal-title":"European Journal of Operational Research"},{"key":"12_CR17","unstructured":"K\u00e1d\u00e1r, B., Monostori, L., Cs\u00e1ji, B.: Adaptive approaches to increase the performance of production control systems. In: Proceedings of 36th CIRP International Seminar on Manufacturing Systems, Saarbr\u00fccken, Germany, pp. 305\u2013312 (2003)"},{"key":"12_CR18","doi-asserted-by":"publisher","first-page":"519","DOI":"10.1109\/ICIS.2007.107","volume-title":"6th IEEE International Conference on Computer and Information Science (ICIS 2007)","author":"S. Kamrul Hasan","year":"2007","unstructured":"Kamrul Hasan, S., Sarker, R., Cornforth, D.: Hybrid genetic algorithm for solving job-shop scheduling problem. In: 6th IEEE International Conference on Computer and Information Science (ICIS 2007), pp. 519\u2013524. IEEE Computer Society, Melbourne (2007)"},{"issue":"6","key":"12_CR19","doi-asserted-by":"publisher","first-page":"991","DOI":"10.1109\/TRA.2003.819735","volume":"19","author":"B.I. Kim","year":"2003","unstructured":"Kim, B.I., Heragu, S.S., Graves, R.J., Onge, A.S.: A hybrid scheduling and control system architecture for warehouse management. IEEE Transactions on Robotics and Automation\u00a019(6), 991\u20131000 (2003)","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"12_CR20","doi-asserted-by":"publisher","first-page":"1171","DOI":"10.1080\/002075497195605","volume":"35","author":"C.-Y. Lee","year":"1997","unstructured":"Lee, C.-Y., Piramuthu, S., Tsai, Y.-K.: Job shop scheduling with a genetic algorithm and machine learning. International Journal of Production Research\u00a035, 1171\u20131191 (1997)","journal-title":"International Journal of Production Research"},{"key":"12_CR21","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1023\/A:1025753309346","volume":"14","author":"Y.-H. Lee","year":"2003","unstructured":"Lee, Y.-H., Kumara, S.R.T., Chatterjee, K.: Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism. Journal of Intelligent Manufacturing\u00a014, 471\u2013484 (2003)","journal-title":"Journal of Intelligent Manufacturing"},{"key":"12_CR22","doi-asserted-by":"publisher","first-page":"2155","DOI":"10.1080\/00207540110038478","volume":"39","author":"T.-P. Lu","year":"2001","unstructured":"Lu, T.-P., Yih, Y.: An agent-based production control framework for multiple-line collaborative manufacturing. International Journal of Production Research\u00a039, 2155\u20132176 (2001)","journal-title":"International Journal of Production Research"},{"key":"12_CR23","unstructured":"Luck, M., McBurney, P., Shehory, O., Willmott, S.: Agent Technology: Computing as Interaction (A Roadmap for Agent Based Computing) (2005), http:\/\/www.agentlink.org\/roadmap\/al3rm.pdf"},{"key":"12_CR24","unstructured":"Madureira, A.: Meta-heuristics application to scheduling in dynamic environments of discrete manufacturing. PhD thesis, University of Minho, Braga, Portugal (2003) (in Portuguese)"},{"key":"12_CR25","first-page":"315","volume-title":"Proceedings of the IFIP TC5\/WG5.3 Forth IFIP\/IEEE International Conference on Information Technology for Balanced Automation Systems in Manufacture and Transportation","author":"A. Madureira","year":"2000","unstructured":"Madureira, A., Ramos, C., Silva, S.C.: A genetic algorithm for the dynamic single machine scheduling problem. In: Proceedings of the IFIP TC5\/WG5.3 Forth IFIP\/IEEE International Conference on Information Technology for Balanced Automation Systems in Manufacture and Transportation, pp. 315\u2013324. Kluwer, B.V, Deventer (2000)"},{"issue":"2","key":"12_CR26","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1515\/IJMSP.2001.4.2.121","volume":"4","author":"A.. Madureira","year":"2001","unstructured":"Madureira, A., Ramos, C., Silva, S.: An inter-machine activity coordination based approach for dynamic job-shop scheduling. International Journal for Manufacturing Science and Production\u00a04(2), 121\u2013131 (2001)","journal-title":"International Journal for Manufacturing Science and Production"},{"key":"12_CR27","first-page":"1596","volume":"3","author":"A. Madureira","year":"2004","unstructured":"Madureira, A., Ramos, C., Silva, S.: Toward dynamic scheduling through evolutionary computing. WSEAS Transactions on Systems\u00a03, 1596\u20131604 (2004)","journal-title":"WSEAS Transactions on Systems"},{"key":"12_CR28","doi-asserted-by":"crossref","unstructured":"Madureira, A., Santos, J., Gomes, N., Ramos, C.: Proposal of a cooperation mechanism for team-work based multi-agent system in dynamic scheduling through meta-heuristics. In: Proceedings 2007 IEEE International Symposium on Assembly and Manufacturing (ISAM 2007), Ann Arbor, Michigan, USA, pp. 233\u2013238 (2007)","DOI":"10.1109\/ISAM.2007.4288478"},{"key":"12_CR29","unstructured":"Manufuture, A vision for 2020, report of high level group. European Commission (2004)"},{"issue":"2","key":"12_CR30","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1016\/j.cirp.2006.10.004","volume":"55","author":"L. Monostori","year":"2006","unstructured":"Monostori, L., V\u00e1ncza, J., Kumara, S.R.T.: Agent based systems for manufacturing. CIRP Annals - Manufacturing Technology\u00a055(2), 697\u2013720 (2006)","journal-title":"CIRP Annals - Manufacturing Technology"},{"issue":"4","key":"12_CR31","first-page":"79","volume":"14","author":"H.S. Nwana","year":"1996","unstructured":"Nwana, H.S., Lee, L.C., Jennings, N.R.: Coordination in software agent systems. British Telecom Technical Journal\u00a014(4), 79\u201388 (1996), http:\/\/eprints.ecs.soton.ac.uk\/2109\/","journal-title":"British Telecom Technical Journal"},{"key":"12_CR32","unstructured":"OR-library (1990), http:\/\/people.brunel.ac.uk\/~mastjjb\/jeb\/info.html"},{"key":"12_CR33","doi-asserted-by":"crossref","unstructured":"Ouelhadj, D., Cowling, P.I., Petrovic, S.: Utility and stability measures for agent-based dynamic scheduling of steel continuous casting. In: Proceedings of the IEEE International Conference on Robotics and Automation, Taiwan, pp. 175\u2013180 (2003)","DOI":"10.1109\/ROBOT.2003.1241592"},{"key":"12_CR34","doi-asserted-by":"crossref","unstructured":"Papakostas, N., Mourtzis, D., Bechrakis, K., Chryssolouris, G., Doukas, D., Doyle, R.: A flexible agent based framework for manufacturing decision-making. In: Proceedings of the 9th Flexible Automation and Intelligent Manufacturing Conference, pp. 789\u2013800 (1999)","DOI":"10.1615\/FAIM1999.670"},{"key":"12_CR35","series-title":"Springer Series in Operations Research and Financial Engineering","volume-title":"Planning and Scheduling in Manufacturing and Services","author":"M.L. Pinedo","year":"2007","unstructured":"Pinedo, M.L.: Planning and Scheduling in Manufacturing and Services. Springer Series in Operations Research and Financial Engineering. Springer, Heidelberg (2007)"},{"key":"12_CR36","first-page":"7","volume":"32","author":"M. Pirlot","year":"1992","unstructured":"Pirlot, M.: General local search heuristics in combinatorial optimization: a tutorial. JORBEL Belgian Journal of Operations Research\u00a032, 7\u201368 (1992)","journal-title":"JORBEL Belgian Journal of Operations Research"},{"issue":"10","key":"12_CR37","doi-asserted-by":"publisher","first-page":"765","DOI":"10.1007\/s001700070030","volume":"6","author":"S.G. Ponnambalam","year":"2000","unstructured":"Ponnambalam, S.G., Aravindan, P., Rajesh, S.V.: A tabu search algorithm for job shop scheduling. The International Journal of Advanced Manufacturing Technology\u00a06(10), 765\u2013771 (2000)","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"12_CR38","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/978-1-4613-1195-9_9","volume-title":"The Planning and Scheduling of Production Systems","author":"M.C. Portmann","year":"1997","unstructured":"Portmann, M.C.: Scheduling methodology: optimization and compu-search approaches. In: The Planning and Scheduling of Production Systems, ch.\u00a09, pp. 271\u2013300. Chapman and Hall, Boca Raton (1997)"},{"issue":"2","key":"12_CR39","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1016\/0377-2217(93)90163-H","volume":"69","author":"N. Raman","year":"1993","unstructured":"Raman, N., Brian Talbot, F.: The job shop tardiness problem: A decomposition approach. European Journal of Operational Research\u00a069(2), 187\u2013199 (1993)","journal-title":"European Journal of Operational Research"},{"key":"12_CR40","volume-title":"Artificial Intelligence: A Modern Approach","author":"S.J. Russell","year":"2003","unstructured":"Russell, S.J., Norvig, P.: Artificial Intelligence: A Modern Approach. Pearson Education, London (2003)"},{"issue":"3","key":"12_CR41","doi-asserted-by":"publisher","first-page":"567","DOI":"10.1016\/S0377-2217(99)00311-2","volume":"126","author":"I. Sabuncuoglu","year":"2000","unstructured":"Sabuncuoglu, I., Bayiz, M.: Analysis of reactive scheduling problem in a job shop environment. European Journal of Operational Research\u00a0126(3), 567\u2013586 (2000)","journal-title":"European Journal of Operational Research"},{"key":"12_CR42","first-page":"177","volume-title":"Proceedings of AI & Manufacturing Research Planning Workshop","author":"W. Shen","year":"1998","unstructured":"Shen, W., Maturana, F., Norrie, D.H.: Learning in agent-based manufacturing systems. In: Proceedings of AI & Manufacturing Research Planning Workshop, pp. 177\u2013183. AAAI Press, Menlo Park (1998)"},{"key":"12_CR43","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1016\/S0166-3615(00)00066-X","volume":"43\/2","author":"J. V\u00e1ncza","year":"2000","unstructured":"V\u00e1ncza, J., M\u00e1rkus, A.: An agent model for incentive-based production scheduling. Computers in Industry\u00a043\/2, 173\u2013187 (2000)","journal-title":"Computers in Industry"},{"key":"12_CR44","volume-title":"Multi Agent Systems - A Modern Approach to Distributed Artificial Intelligence","author":"G. Weiss","year":"1999","unstructured":"Weiss, G.: Multi Agent Systems - A Modern Approach to Distributed Artificial Intelligence. MIT Press, Cambridge (1999)"},{"key":"12_CR45","unstructured":"Wellner, J., Dilger, W.: Job shop scheduling with multiagents. In: Workshop \u201dPlanen und Konfigurieren\u201d, University of W\u00fcrzburg (1999)"},{"key":"12_CR46","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-78985-7","volume-title":"Metaheuristics for Scheduling in Industrial and Manufacturing Applications","author":"F. Xhafa","year":"2008","unstructured":"Xhafa, F., Abraham, A.: Metaheuristics for Scheduling in Industrial and Manufacturing Applications. Springer, Heidelberg (2008)"}],"container-title":["Studies in Computational Intelligence","Natural Intelligence for Scheduling, Planning and Packing Problems"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-642-04039-9_12.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,13]],"date-time":"2025-02-13T07:09:57Z","timestamp":1739430597000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-642-04039-9_12"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009]]},"ISBN":["9783642040382","9783642040399"],"references-count":46,"URL":"https:\/\/doi.org\/10.1007\/978-3-642-04039-9_12","relation":{},"ISSN":["1860-949X","1860-9503"],"issn-type":[{"type":"print","value":"1860-949X"},{"type":"electronic","value":"1860-9503"}],"subject":[],"published":{"date-parts":[[2009]]}}}