{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,10]],"date-time":"2025-12-10T06:24:28Z","timestamp":1765347868446,"version":"3.46.0"},"publisher-location":"Singapore","reference-count":25,"publisher":"Springer Nature Singapore","isbn-type":[{"value":"9789819518210","type":"print"},{"value":"9789819518227","type":"electronic"}],"license":[{"start":{"date-parts":[[2026,1,1]],"date-time":"2026-01-01T00:00:00Z","timestamp":1767225600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2026,1,1]],"date-time":"2026-01-01T00:00:00Z","timestamp":1767225600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2026]]},"DOI":"10.1007\/978-981-95-1822-7_46","type":"book-chapter","created":{"date-parts":[[2025,12,10]],"date-time":"2025-12-10T06:21:45Z","timestamp":1765347705000},"page":"443-451","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Evaluating Modular Construction Through DfMA Methodology: Insights from Case Study Analysis"],"prefix":"10.1007","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4137-6528","authenticated-orcid":false,"given":"Zannat Ara Dilshad","family":"Shangi","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5911-9423","authenticated-orcid":false,"given":"B\u00e1rbara","family":"Rangel","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0009-0004-1625-7318","authenticated-orcid":false,"given":"Leonor","family":"Reis","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0009-0006-3584-2111","authenticated-orcid":false,"given":"Caroline","family":"Minetto","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2026,1,2]]},"reference":[{"issue":"6","key":"46_CR1","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1080\/01446190601071821","volume":"25","author":"C Goodier","year":"2007","unstructured":"Goodier C, Gibb A (2007) Future opportunities for offsite in the UK. Constr Manag Econ 25(6):585\u2013595","journal-title":"Constr Manag Econ"},{"issue":"1\u20132","key":"46_CR2","first-page":"77","volume":"17","author":"W Lu","year":"2021","unstructured":"Lu W et al (2021) Design for manufacture and assembly (DfMA) in construction: the old and the new. Archit Eng Des Manag 17(1\u20132):77\u201391","journal-title":"Archit Eng Des Manag"},{"key":"46_CR3","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2020.103388","volume":"120","author":"A-Q Gbadamosi","year":"2020","unstructured":"Gbadamosi A-Q et al (2020) Big data for design options repository: towards a DfMA approach for offsite construction. Autom Constr 120:103388","journal-title":"Autom Constr"},{"issue":"8","key":"46_CR4","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1061\/(ASCE)CO.1943-7862.0001877","volume":"146","author":"T Tan","year":"2020","unstructured":"Tan T et al (2020) Construction-oriented design for manufacture and assembly guidelines. J Constr Eng Manag 146(8):1","journal-title":"J Constr Eng Manag"},{"issue":"3","key":"46_CR5","first-page":"74","volume":"117","author":"S Ashley","year":"1995","unstructured":"Ashley S (1995) Cutting costs and time with DFMA. Mech Eng 117(3):74\u201377","journal-title":"Mech Eng"},{"issue":"5","key":"46_CR6","doi-asserted-by":"publisher","first-page":"538","DOI":"10.1080\/09613218.2019.1660608","volume":"48","author":"S Gao","year":"2020","unstructured":"Gao S, Jin R, Lu W (2020) Design for manufacture and assembly in construction: a review. Build Res Inform 48(5):538\u2013550","journal-title":"Build Res Inform"},{"key":"46_CR7","doi-asserted-by":"publisher","first-page":"7473","DOI":"10.1016\/j.matpr.2021.01.134","volume":"46","author":"CD Naiju","year":"2021","unstructured":"Naiju CD (2021) DFMA for product designers: a review. Mater Today Proc 46:7473\u20137478","journal-title":"Mater Today Proc"},{"issue":"7","key":"46_CR8","doi-asserted-by":"publisher","first-page":"505","DOI":"10.1016\/0010-4485(94)90082-5","volume":"26","author":"G Boothroyd","year":"1994","unstructured":"Boothroyd G (1994) Product design for manufacture and assembly. Comput Aided Des 26(7):505\u2013520","journal-title":"Comput Aided Des"},{"issue":"2","key":"46_CR9","doi-asserted-by":"publisher","first-page":"112","DOI":"10.1108\/01445151211212262","volume":"32","author":"R Bogue","year":"2012","unstructured":"Bogue R (2012) Design for manufacture and assembly: background, capabilities and applications. Assem Autom 32(2):112\u2013118","journal-title":"Assem Autom"},{"key":"46_CR10","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.autcon.2017.12.021","volume":"88","author":"Z Yuan","year":"2018","unstructured":"Yuan Z, Sun C, Wang Y (2018) Design for manufacture and assembly-oriented parametric design of prefabricated buildings. Autom Constr 88:13\u201322","journal-title":"Autom Constr"},{"key":"46_CR11","unstructured":"Jensen P, Olofsson T, Sandberg M, Malmgren L (2008) Reducing complexity of customized prefabricated buildings through modularization and IT support. In: International conference on information technology in construction. Santiago, Chile, pp 429\u2013437"},{"issue":"9","key":"46_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1061\/JCEMD4.COENG-13472","volume":"150","author":"A Sadoughi","year":"2024","unstructured":"Sadoughi A, Kouhirostami M, Kouhirostamkolaei M, Qi B, Costin A (2024) Autonomous building design for manufacturing and assembly: a systematic review of design application, challenges, and opportunities. J Constr Eng Manag 150(9):1","journal-title":"J Constr Eng Manag"},{"key":"46_CR13","unstructured":"Zhao Y, Tan T (2023) Sustainable design for manufacture and assembly: exploring modularity and material innovation in earth block construction. In: 28th International symposium on advancement of construction management and real estate, Nanjing, China"},{"issue":"2","key":"46_CR14","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1007\/s00004-013-0149-5","volume":"15","author":"H Pottmann","year":"2013","unstructured":"Pottmann H (2013) Architectural geometry and fabrication-aware design. Nexus Netw J 15(2):195\u2013208","journal-title":"Nexus Netw J"},{"issue":"3","key":"46_CR15","first-page":"267","volume":"19","author":"T Tan","year":"2023","unstructured":"Tan T, Mills G, Papadonikolaki E, Li B, Huang J (2023) Digital-enabled design for manufacture and assembly (DfMA) in offsite construction: a modularity perspective for the product and process integration. Archit Eng Des Manag 19(3):267\u2013282","journal-title":"Archit Eng Des Manag"},{"issue":"7","key":"46_CR16","doi-asserted-by":"publisher","first-page":"4084","DOI":"10.3390\/su14074084","volume":"14","author":"H Hyun","year":"2022","unstructured":"Hyun H, Kim H-G, Kim J-S (2022) Integrated off-site construction design process including DfMA considerations. Sustainability 14(7):4084","journal-title":"Sustainability"},{"key":"46_CR17","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2021.104015","volume":"133","author":"S Bakhshi","year":"2022","unstructured":"Bakhshi S, Chenaghlou MR, Rahimian FP, Edwards DJ, Dawood N (2022) Integrated BIM and DfMA parametric and algorithmic design based collaboration for supporting client engagement within offsite construction. Autom Constr 133:104015","journal-title":"Autom Constr"},{"issue":"4","key":"46_CR18","first-page":"164","volume":"171","author":"C Banks","year":"2018","unstructured":"Banks C, Kotecha R, Curtis J, Dee C, Pitt N, Papworth R (2018) Enhancing high-rise residential construction through design for manufacture and assembly\u2014a UK case study. Proc Inst Civil Eng Manag Procurement Law 171(4):164\u2013175","journal-title":"Proc Inst Civil Eng Manag Procurement Law"},{"issue":"7","key":"46_CR19","doi-asserted-by":"publisher","first-page":"763","DOI":"10.1080\/09613218.2019.1669009","volume":"48","author":"IY Wuni","year":"2020","unstructured":"Wuni IY, Shen GQ (2020) Critical success factors for modular integrated construction projects: a review. Build Res Inform 48(7):763\u2013784","journal-title":"Build Res Inform"},{"key":"46_CR20","doi-asserted-by":"publisher","first-page":"106788","DOI":"10.1016\/j.jobe.2023.106788","volume":"73","author":"AE Ikudayisi","year":"2023","unstructured":"Ikudayisi AE, Chan APC, Darko A, Adedeji YMD (2023) Integrated practices in the architecture, engineering, and construction industry: current scope and pathway towards industry 5.0. J Build Eng 73:106788","journal-title":"J Build Eng"},{"issue":"7","key":"46_CR21","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1080\/09544828.2016.1166482","volume":"27","author":"J Bonvoisin","year":"2016","unstructured":"Bonvoisin J, Halstenberg F, Buchert T, Stark R (2016) A systematic literature review on modular product design. J Eng Des 27(7):488\u2013514","journal-title":"J Eng Des"},{"issue":"12","key":"46_CR22","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1061\/(ASCE)CO.1943-7862.0001712","volume":"145","author":"F Innella","year":"2019","unstructured":"Innella F, Arashpour M, Bai Y (2019) Lean methodologies and techniques for modular construction: chronological and critical review. J Constr Eng Manag 145(12):1","journal-title":"J Constr Eng Manag"},{"issue":"9","key":"46_CR23","doi-asserted-by":"publisher","first-page":"696","DOI":"10.1080\/09544828.2011.653330","volume":"23","author":"FJ Emmatty","year":"2012","unstructured":"Emmatty FJ, Sarmah SP (2012) Modular product development through platform-based design and DFMA. J Eng Des 23(9):696\u2013714","journal-title":"J Eng Des"},{"key":"46_CR24","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2024.110619","volume":"96","author":"M-N David","year":"2024","unstructured":"David M-N, Miguel R-S, Ignacio P-Z (2024) Timber structures designed for disassembly: a cornerstone for sustainability in 21st century construction. J Build Eng 96:110619","journal-title":"J Build Eng"},{"issue":"13","key":"46_CR25","doi-asserted-by":"publisher","first-page":"4065","DOI":"10.3390\/en14134065","volume":"14","author":"TM O\u2019Grady","year":"2021","unstructured":"O\u2019Grady TM, Brajkovich N, Minunno R, Chong H-Y, Morrison GM (2021) Circular economy and virtual reality in advanced BIM-based prefabricated construction. Energies 14(13):4065","journal-title":"Energies"}],"container-title":["Lecture Notes in Civil Engineering","Construction, Energy, Environment and Sustainability"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-981-95-1822-7_46","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,12,10]],"date-time":"2025-12-10T06:21:47Z","timestamp":1765347707000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-981-95-1822-7_46"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026]]},"ISBN":["9789819518210","9789819518227"],"references-count":25,"URL":"https:\/\/doi.org\/10.1007\/978-981-95-1822-7_46","relation":{},"ISSN":["2366-2557","2366-2565"],"issn-type":[{"value":"2366-2557","type":"print"},{"value":"2366-2565","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026]]},"assertion":[{"value":"2 January 2026","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}},{"value":"ICCEES","order":1,"name":"conference_acronym","label":"Conference Acronym","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"International Conference on Construction, Energy, Environment and Sustainability","order":2,"name":"conference_name","label":"Conference Name","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Bari","order":3,"name":"conference_city","label":"Conference City","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"Italy","order":4,"name":"conference_country","label":"Conference Country","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"2025","order":5,"name":"conference_year","label":"Conference Year","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"11 June 2025","order":7,"name":"conference_start_date","label":"Conference Start Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"13 June 2025","order":8,"name":"conference_end_date","label":"Conference End Date","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"3","order":9,"name":"conference_number","label":"Conference Number","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"iccees2025","order":10,"name":"conference_id","label":"Conference ID","group":{"name":"ConferenceInfo","label":"Conference Information"}},{"value":"https:\/\/cees2025.uc.pt\/","order":11,"name":"conference_url","label":"Conference URL","group":{"name":"ConferenceInfo","label":"Conference Information"}}]}}