{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,21]],"date-time":"2024-06-21T07:14:20Z","timestamp":1718954060258},"reference-count":19,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2006,5,10]],"date-time":"2006-05-10T00:00:00Z","timestamp":1147219200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2006,5,10]],"date-time":"2006-05-10T00:00:00Z","timestamp":1147219200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Electr Eng"],"published-print":{"date-parts":[[2007,5]]},"DOI":"10.1007\/s00202-006-0022-6","type":"journal-article","created":{"date-parts":[[2006,5,9]],"date-time":"2006-05-09T13:06:29Z","timestamp":1147179989000},"page":"433-441","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Strategies for Power Systems Expansion Planning in a Competitive Electrical Market"],"prefix":"10.1007","volume":"89","author":[{"given":"A. M.","family":"Andreoni","sequence":"first","affiliation":[]},{"given":"A.","family":"Garcia-Agreda","sequence":"additional","affiliation":[]},{"given":"T. J.","family":"Strada","sequence":"additional","affiliation":[]},{"given":"J. T.","family":"Saraiva","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2006,5,10]]},"reference":[{"key":"22_CR1","first-page":"74","volume":"135","author":"CIGRE Working group 01 of study committee 37","year":"1991","unstructured":"CIGRE Working group 01 of study committee 37 (1991) Flexibility of power systems: principles, means of achievement and approaches for facing uncertainty by planning flexible development of power systems. Electra 135: 74\u201392","journal-title":"Electra"},{"key":"22_CR2","unstructured":"Arakawa F (1987) From toughness to flexibility. Historical Review on AESOP. Paper 37\u201387-(JP)-06.Montreal"},{"key":"22_CR3","unstructured":"CAMMESA (1997) Procedimientos para la Programaci\u00f3n de la Operaci\u00f3n, el Despacho de Cargas y el C\u00e1lculo de Precios. VERSI\u00d3N XI"},{"key":"22_CR4","unstructured":"EPRI (1979) Generation system reliability analysis for future cost\/benefit studies. Report EA-958"},{"key":"22_CR5","unstructured":"Strada TJ (1996) Optimizaci\u00f3n de la operaci\u00f3n de sistemas hidrot\u00e9rmicos de generaci\u00f3n, bajo consideraci\u00f3n de variables con comportamiento aleatorio. IEE-UNSJ Tesis Doctoral"},{"key":"22_CR6","volume-title":"Aplicaci\u00f3n de la matem\u00e1tica difusa para la evaluaci\u00f3n econ\u00f3mica de inversiones-Su aplicaci\u00f3n al Sector El\u00e9ctrico.","author":"A Garcia-Agreda","year":"1998","unstructured":"Garcia-Agreda A, Strada T, Andreoni A (1998) Aplicaci\u00f3n de la matem\u00e1tica difusa para la evaluaci\u00f3n econ\u00f3mica de inversiones-Su aplicaci\u00f3n al Sector El\u00e9ctrico. VI SEPOPE, Brasil"},{"key":"22_CR7","volume-title":"Fuzzy sets and systems, theory and applications","author":"D Dubois","year":"1980","unstructured":"Dubois D, Prade H (1980) Fuzzy sets and systems, theory and applications. Academic, London"},{"key":"22_CR8","volume-title":"Electric power applications of fuzzy systems","author":"ME El-Hawary","year":"1988","unstructured":"El-Hawary ME, (1988) Electric power applications of fuzzy systems. IEEE Press, London"},{"key":"22_CR9","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1287\/mnsc.17.4.B141","volume":"17","author":"RE Bellman","year":"1970","unstructured":"Bellman RE, Zadeh LA (1970) Decision making in fuzzy environment. Man Sci 17: 141\u2013164","journal-title":"Man Sci"},{"key":"22_CR10","first-page":"651","volume":"9","author":"E Economakos","year":"1979","unstructured":"Economakos E (1979) Application of fuzzy concepts to power demand forecasting. IEEE Trans. SMC 9: 651\u2013657","journal-title":"IEEE Trans. SMC"},{"key":"22_CR11","unstructured":"Saraiva JT, Miranda V (1993) Impacts in Power System Modeling from including fuzzy concepts in models.In: Proceedings of Athens Power Tech, Joint IEEE PES Conference, Athens."},{"key":"22_CR12","unstructured":"Torres GL, Da Silva LEB, Mukhedkar D (1989) A fuzzy knowledge base For load forecasting.In: 1991 expert system applications to European conference on circuit theory and design, ECCTD-89, IEE Symposium, Brighton, UK"},{"key":"22_CR13","doi-asserted-by":"crossref","unstructured":"Saraiva JT, Miranda V, Pinto L (1993) Impact on some planning decisions from a fuzzy modeling of power systems. In: Proceedings of the 1993 PICA, Scottsdale, Arizona","DOI":"10.1109\/PICA.1993.290999"},{"key":"22_CR14","unstructured":"Miranda V, Matos M, and Saraiva JT (1990) Fuzzy load flow \u2013 new algorithms incorporating uncertain generation and load representation. In: Proceedings of the 10th PSCC, Graz"},{"key":"22_CR15","unstructured":"Miranda V (1996) Fuzzy reliability analysis of power systems. In: The 12th power systems computation conference, Dresden."},{"issue":"(3","key":"22_CR16","first-page":"1231","volume":"6","author":"C-C Su","year":"1991","unstructured":"Su C-C, Hsu Y-Y (1991) Fuzzy dynamic programming \u2013 an application to unit commitment. IEEE Trans PAS, 6(3):1231\u20131237","journal-title":"IEEE Trans PAS,"},{"key":"22_CR17","unstructured":"Nonaka Y (1988) An approach to evaluation of flexibility of generation Mix. CIGRE SC-37 WG.01, Paris"},{"key":"22_CR18","doi-asserted-by":"publisher","first-page":"234","DOI":"10.1016\/0022-2496(77)90033-5","volume":"15","author":"TL Saaty","year":"1977","unstructured":"Saaty TL (1977) A scaling method for priorities in hierarchical structures. J Math Psychology 15: 234\u2013281","journal-title":"J Math Psychology"},{"key":"22_CR19","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-009-3249-4","volume-title":"Fuzzy sets, decision making and expert system","author":"HJ Zimmermann","year":"1987","unstructured":"Zimmermann HJ (1987) Fuzzy sets, decision making and expert system. Kluwer, Dordrecht"}],"container-title":["Electrical Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00202-006-0022-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s00202-006-0022-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00202-006-0022-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s00202-006-0022-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,17]],"date-time":"2022-05-17T15:12:33Z","timestamp":1652800353000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s00202-006-0022-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,5,10]]},"references-count":19,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2007,5]]}},"alternative-id":["22"],"URL":"https:\/\/doi.org\/10.1007\/s00202-006-0022-6","relation":{},"ISSN":["0948-7921","1432-0487"],"issn-type":[{"value":"0948-7921","type":"print"},{"value":"1432-0487","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,5,10]]},"assertion":[{"value":"17 January 2006","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 March 2006","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 May 2006","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}